Search Results

Search found 27355 results on 1095 pages for 'starter project'.

Page 142/1095 | < Previous Page | 138 139 140 141 142 143 144 145 146 147 148 149  | Next Page >

  • TextMate - completion using an external file or file contained in project?

    - by Neil Baldwin
    Does anyone know how to get TextMate to search an external file (or even the files contained in a TextMate "project") with which to perform word completion? I'm coding some stuff on the C64 (using TextMate to write the code) and I have an external file containing labels for all of the hardware registers/kernal routines e.g VIC2InteruptStatus = $D019 It would be really handy to be able to type, say, 'VIC2I' then press the key for word completion and have TextMate find matches in the external library file. Rather than how I'm having to do it at the moment by opening the library file and copy-paste the register names into my code.

    Read the article

  • The project estimates the installation of external and internal surveillance. [closed]

    - by Zhasulan Berdybekov
    The project estimates the installation of external and internal surveillance. Here are our objects: 1 - Number of cameras 2 - These are objects 3 - setting this distance to the Situation Centre 11 - New Alphabet - 1,5 km 11 - New Alphabet - 1 km 19 - New Alphabet - 800 m 19 - New Alphabet - 1 km 35 - The building - 200 m 35 - The building - 100 m 18 - The building - 100 m 22 - Outside videonalyudenie - 50 m to 1 km Please tell how many need to DVRs, and where they put on the object or situation center How to bring information to the Situation Centre. What cables needed. Your advice and comment. Thank you for your efforts!

    Read the article

  • Time to stop using &ldquo;Execute Package Task&rdquo;&ndash; a way to execute package in SSIS catalog taking advantage of the new project deployment model ,and the logging and reporting feature

    - by Kevin Shyr
    I set out to find a way to dynamically call package in SSIS 2012.  The following are 2 excellent blogs I found; I used them heavily.  The code below has some addition to parameter types and message types, but was made essentially derived entirely from the blogs. http://sqlblog.com/blogs/jamie_thomson/archive/2011/07/16/ssis-logging-in-denali.aspx http://www.ssistalk.com/2012/07/24/quick-tip-run-ssis-2012-packages-synchronously-and-other-execution-options/   The code: Every package will be called by a PackageController package.  The packageController is initialized with some information on which package to run and what information to pass in.   The following is the stored procedure called from the “Execute SQL Task”.  Here is the highlight of the stored procedure It takes in packageName, project name, and folder name (folder in SSIS project deployment to SSIS catalog) The stored procedure sets the package variables of the upcoming package execution Execute package in SSIS Catalog Get the status of the execution.  Also, if exists, get the error message’s message_id and store them in the management database. Return value to “Execute SQL Task” to manage failure properly CREATE PROCEDURE [AUDIT].[LaunchPackageExecutionInSSISCatalog]        @PackageName NVARCHAR(255)        , @ProjectFolder NVARCHAR(255)        , @ProjectName NVARCHAR(255)        , @AuditKey INT        , @DisableNotification BIT        , @PackageExecutionLogID INT AS BEGIN TRY        DECLARE @execution_id BIGINT = 0;        -- Create a package execution        EXEC [SSISDB].[catalog].[create_execution]                     @package_name=@PackageName,                     @execution_id=@execution_id OUTPUT,                     @folder_name=@ProjectFolder,                     @project_name=@ProjectName,                     @use32bitruntime=False;          UPDATE [AUDIT].[PackageInstanceExecutionLog] WITH(ROWLOCK)        SET [SSISCatalogExecutionID] = @execution_id        WHERE [PackageInstanceExecutionLogID] = @PackageExecutionLogID          -- this is to set the execution synchronized so that I can check the result in the end        EXEC [SSISDB].[catalog].[set_execution_parameter_value]                     @execution_id,                      @object_type=50,                     @parameter_name=N'SYNCHRONIZED',                     @parameter_value=1; -- true          /********************************************************         ********************************************************              Section: setting parameters                     Source table:  SSISDB.internal.object_parameters              object_type list:                     20: project level variables                     30: package level variables                     50: execution parameter         ********************************************************         ********************************************************/        EXEC [SSISDB].[catalog].[set_execution_parameter_value]                     @execution_id,                      @object_type=30,                     @parameter_name=N'FromParent_AuditKey',                     @parameter_value=@AuditKey; -- true          EXEC [SSISDB].[catalog].[set_execution_parameter_value]                     @execution_id,                      @object_type=30,                     @parameter_name=N'FromParent_DisableNotification',                     @parameter_value=@DisableNotification; -- true          EXEC [SSISDB].[catalog].[set_execution_parameter_value]                     @execution_id,                      @object_type=30,                     @parameter_name=N'FromParent_PackageInstanceExecutionID',                     @parameter_value=@PackageExecutionLogID; -- true        /********************************************************         ********************************************************              Section: setting variables END         ********************************************************         ********************************************************/            /* This section is carried over from example code           I don't see a reason to change them yet        */        -- Set our package parameters        EXEC [SSISDB].[catalog].[set_execution_parameter_value]                     @execution_id,                      @object_type=50,                     @parameter_name=N'DUMP_ON_EVENT',                     @parameter_value=1; -- true          EXEC [SSISDB].[catalog].[set_execution_parameter_value]                     @execution_id,                      @object_type=50,                     @parameter_name=N'DUMP_EVENT_CODE',                     @parameter_value=N'0x80040E4D;0x80004005';          EXEC [SSISDB].[catalog].[set_execution_parameter_value]                     @execution_id,                      @object_type=50,                     @parameter_name=N'LOGGING_LEVEL',                     @parameter_value= 1; -- Basic          EXEC [SSISDB].[catalog].[set_execution_parameter_value]                     @execution_id,                      @object_type=50,                     @parameter_name=N'DUMP_ON_ERROR',                     @parameter_value=1; -- true                              /********************************************************         ********************************************************              Section: EXECUTING         ********************************************************         ********************************************************/        EXEC [SSISDB].[catalog].[start_execution]                     @execution_id;        /********************************************************         ********************************************************              Section: EXECUTING END         ********************************************************         ********************************************************/            /********************************************************         ********************************************************              Section: checking execution result                     Source table:  [SSISDB].[catalog].[executions]              status:                     1: created                     2: running                     3: cancelled                     4: failed                     5: pending                     6: ended unexpectedly                     7: succeeded                     8: stopping                     9: completed         ********************************************************         ********************************************************/        if EXISTS(SELECT TOP 1 1                            FROM [SSISDB].[catalog].[executions] WITH(NOLOCK)                            WHERE [execution_id] = @execution_id                                  AND [status] NOT IN (2, 7, 9)) BEGIN                /********************************************************               ********************************************************                     Section: logging error messages                            Source table:  [SSISDB].[internal].[operation_messages]                     message type:                            10:  OnPreValidate                             20:  OnPostValidate                             30:  OnPreExecute                             40:  OnPostExecute                             60:  OnProgress                             70:  OnInformation                             90:  Diagnostic                             110:  OnWarning                            120:  OnError                            130:  Failure                            140:  DiagnosticEx                             200:  Custom events                             400:  OnPipeline                     message source type:                            10:  Messages logged by the entry APIs (e.g. T-SQL, CLR Stored procedures)                             20:  Messages logged by the external process used to run package (ISServerExec)                             30:  Messages logged by the package-level objects                             40:  Messages logged by tasks in the control flow                             50:  Messages logged by containers (For, ForEach, Sequence) in the control flow                             60:  Messages logged by the Data Flow Task                                    ********************************************************               ********************************************************/                INSERT INTO AUDIT.PackageInstanceExecutionOperationErrorLink                     SELECT @PackageExecutionLogID                                  ,[operation_message_id]                            FROM [SSISDB].[internal].[operation_messages] WITH(NOLOCK)                            WHERE operation_id = @execution_id                                  AND message_type IN (120, 130)                           EXEC [AUDIT].[FailPackageInstanceExecution] @PackageExecutionLogID, 'SSISDB Internal operation_messages found'                GOTO ReturnTrueAsErrorFlag                /********************************************************               ********************************************************                     Section: checking messages END               ********************************************************               ********************************************************/                /* This part is not really working, so now using rowcount to pass status              --DECLARE @PackageErrorMessage NVARCHAR(4000)              --SET @PackageErrorMessage = @PackageName + 'failed with executionID: ' + CONVERT(VARCHAR(20), @execution_id)                --RAISERROR (@PackageErrorMessage -- Message text.              --     , 18 -- Severity,              --     , 1 -- State,              --     , N'check table AUDIT.PackageInstanceExecutionErrorMessages' -- First argument.              --     );              */        END        ELSE BEGIN              GOTO ReturnFalseAsErrorFlagToSignalSuccess        END        /********************************************************         ********************************************************              Section: checking execution result END         ********************************************************         ********************************************************/ END TRY BEGIN CATCH        DECLARE @SSISCatalogCallError NVARCHAR(MAX)        SELECT @SSISCatalogCallError = ERROR_MESSAGE()          EXEC [AUDIT].[FailPackageInstanceExecution] @PackageExecutionLogID, @SSISCatalogCallError          GOTO ReturnTrueAsErrorFlag END CATCH;     /********************************************************  ********************************************************    Section: end result  ********************************************************  ********************************************************/ ReturnTrueAsErrorFlag:        SELECT CONVERT(BIT, 1) AS PackageExecutionErrorExists ReturnFalseAsErrorFlagToSignalSuccess:        SELECT CONVERT(BIT, 0) AS PackageExecutionErrorExists   GO

    Read the article

  • How can I get TFS 2010 to build each project to a separate directory?

    - by Jonathan Schuster
    In our project, we'd like to have our TFS build put each project into its own folder under the drop folder, instead of dropping all of the files into one flat structure. To illustrate, we'd like to see something like this: DropFolder/ Foo/ foo.exe Bar/ bar.dll Baz baz.dll This is basically the same question as was asked here, but now that we're using workflow-based builds, those solutions don't seem to work. The solution using the CustomizableOutDir property looked like it would work best for us, but I can't get that property to be recognized. I customized our workflow to pass it in to MSBuild as a command line argument (/p:CustomizableOutDir=true), but it seems MSBuild just ignores it and puts the output into the OutDir given by the workflow. I looked at the build logs, and I can see that the CustomizableOutDir and OutDir properties are both getting set in the command line args to MSBuild. I still need OutDir to be passed in so that I can copy my files to TeamBuildOutDir at the end. Any idea why my CustomizableOutDir parameter isn't getting recognized, or if there's a better way to achieve this?

    Read the article

  • First TDD, Simple 2-tier C# Project - what do I unit test?

    - by Joel
    This is probably a stupid question but my googling isn't finding a satisfactory answer. I'm starting a small project in C#, with just a business layer and a data access layer - strangely, the UI will come later, and I have very little (read:no) concept / control over what it will look like. I would like to try TDD for this project. I'm using Visual Studio 2008 (soon to be 2010), I have ReSharper 5, and nUnit. Again, I want to do Test-Driven Development, but not necessarily the entire XP system. My question is - when and where do I write the first unit test? Do I only test logic before I write it, or do I test everything? It seems counter-productive to test things that have no reason to fail (auto-properties, empty constructors)...but it seems like the "No new code without a failing test" maxim requires this. Links or references are fine (but preferably to online resources, not books - I would like to get started ASAP). Thanks in advance for any guidance!

    Read the article

  • should/could i use ruby-on-rails 3 for my next project?

    - by fayer
    im new to ruby and ruby on rails. im on a new project and would really like to code in ruby. of course u have to use a framework like RoR for web development. so my question is if i should/could use ruby-on-rails 3 for this new project that i will start with in 2-3 weeks from now. are there tutorials for it? is it stable enough? well tested? cause one thing when entering something totally new, you need tutorials and books that teach you how to use it. i guess there arent a lot of sources for this information so maybe its better for me to use the latest stable version? what do you think? thanks

    Read the article

  • When is a PHP project too small for a framework?

    - by Jonathan Nicol
    I'm about to start on a small, static website project: no database or CMS required. Basically, a brochure website. I used the CodeIgniter framework recently to develop a full-blown web application, and I'm wondering if it appropriate to also use CI for smaller, simpler sites. Typically for a static brochure site I would write regular PHP pages with a few includes thrown in to save on repetition (i.e. HTML with a sprinking of PHP), but this time around I'm wondering if my new friend CodeIgniter might be able to streamline the development process. Is it sensible to consider a framework for such a simple project, or is it overkill? I'm worried that I might be the proverbial carpenter whose only tool is a hammer, and sees every problem as a nail!

    Read the article

  • How do I force Eclipse to rebuild if files in another project change (any change)?

    - by James Moore
    I've got an Eclipse (Galileo) project (called ProguardBuilder) that runs Proguard over a set of class files in other projects and produces a jar file. I'd like to have the ProguardBuilder project get rebuilt any time any class file in the other projects changes. AutoBuild doesn't do that; presumably it's smart enough to recognize and ignore any changes that don't affect anything externally visible. My problem is that I don't care whether or not the change is visible, since I need to completely rebuild ProguardBuilder any time the class files it depends on change at all. How do I tell Eclipse to do this sort of rebuild?

    Read the article

  • Grafting Scala 2.8 into a Netbeans NBAndroid Project...What steps am I missing?

    - by Michael Kohout
    Hi All; Due to Apple's recent T+C hijinks, I've become interested in developing for Android. Anyways, I'm trying to get a mixed-language Android 2.1 project going in Netbeans 6.8 (with the NBAndroid 0.10 plugin). The two languages being Java and Scala(2.8 head build). To give you a basic idea of what the app does right now, it's just a simple "Hello World" app. To get this to build, I've modified the projects's build.xml file: -- -injars ${scala-library}(!META-INF/MANIFEST.MF,!library.properties) -outjars "${build.classes.dir}/classes.min.jar" -libraryjars "${file.reference.android.jar}" -dontwarn -dontoptimize -dontobfuscate -keep public class * extends android.app.Activity -keep public class scala.xml.include.sax.Main** I've gotten the project so that it'll build, but it errors on startup in my Android Emulator(inside the emulator Android tells me my application has stopped unexpectedly). So my questions are: Does anyone see what I may be doing wrong? And is there any way to get access to the logs that the emulator must create? thanks Mike Kohout

    Read the article

  • Is it possible to add a New Project Wizard with a VSPackage?

    - by Gerald
    I have a VSPackage for Visual Studio 2008 that I created for adding some editor and custom language functionality. I also have a need to add a new project/solution wizard to create a new Solution and a complex series of C++ projects to the solution. I know I can do this using a "Custom Wizard", but I would be much happier if I can implement this within my VSPackage using C# instead. So I guess the main question is, is it possible to add an entry to the Project Types dialogs in Visual Studio from a VSPackage? Or is the "Custom Wizard" and JScript my only option here? And if it's possible, where can I find information and/or samples on how to accomplish this?

    Read the article

  • How to be sure that my MVC project is runting on the correct version after upgrade to vs2010?

    - by Stephane
    I just installed visual studio 2010 and upgraded my MVC project (which was running on MVC RC2 in visual studio 2008). visual studio 2010 updated every project file to target the framework 4.0. But the system.web.dll is pointing to C:\Program Files (x86)\Microsoft ASP.NET\ASP.NET MVC 2\Assemblies\System.Web.Mvc.dll in VS2010 object browser, I have every dll showing up in multiple versions as expected (3.5.0.0 and 4.0.0.0) except for the System.Web.Mvc dll which doesn't show any version and points to the path I mentioned above. Isn't this namespace point to the Framework folder like the System.Web namespace? C:\Program Files (x86)\Reference Assemblies\Microsoft\Framework.NETFramework\v4.0\System.Web.dll

    Read the article

  • How to turn off project mirroring from SourcForge to launchpad?

    - by C.W.Holeman II
    I have project Emle in Launchpad. I set it to import from emle.svn.sourceforge.net. My intention was to do a single import of the files from SourceForge. EmleBranches2.0 shows that what I actually did was set it to mirror the SourceForge project. Import details Import Status: Reviewed This branch is an import of the Subversion branch from https://emle.svn.sourceforge.net/svnroot/emle/trunk. The next import is scheduled to run in 35 minutes. Last successful import was 5 hours ago. Import started 5 hours ago on russkaya and finished 5 hours ago taking 30 seconds — see the log Import started 12 hours ago on neumayer and finished 12 hours ago taking 30 seconds — see the log Import started 20 hours ago on russkaya and finished 20 hours ago taking 30 seconds — see the log How can I turn off the mirroring?

    Read the article

  • How to package .Net framework in Visual Studio project?

    - by raj.tiwari
    I have created a C#/.Net application using visual studio. I have also created an installer project that puts out two files: An MSI file Setup.exe file In my installer project properties I have setup .Net 3.5 as a prerequisite. What I would like my installer to do as as follows: Put out a single file (MSI/exe/whatever) that also includes .Net framework prerequisite The installer should check whether .Net framework is installed on the target machine. If not, it should install it from its own bundled copy. Right now my installer sends people to the web for getting .Net. This is not the user experience I want. Thanks for your help. -Raj

    Read the article

  • How to I convert a Silverlight 3.0 project to Silverlight 4.0?

    - by Justin
    I have a solution with several Silverlight Class Libraries and a Silverlight Application in it. I was originally built in VS 2008 with Silverlight 3.0. What changes do I need to make so that it builds using Silverlight 4.0? I already have VS 2010 and the Silverlight 4.0 toolkit installed. When I opened the project it seems to have upgraded to .NET 4.0 in my ASP.NET Web Project but not the Silverlight projects. Pretty sure they are still building against .NET 3.5 and Silverlight 3.0. Thanks.

    Read the article

  • Aptana Studio 2.0: How to checkout SVN Project to SFTP remote dir?

    - by Brian Lacy
    If you're familiar with the excellent Aptana Studio IDE, you know it's based on Eclipse. You also know it comes pre-packaged with SFTP capability. I need to work on a remote server, where I have Apache installed; SFTP is ideal for this. I've installed the Subclipse plugin, and I can access and checkout projects from the Repo. I can create a new project from SVN source, which will download all the source to my chosen workspace or a specified location. But I can't figure out a way to combine these features! I need to create a Project on a remote server via SFTP but I need to link the source to a repository. Is there any way to do this?

    Read the article

  • How to be sure that my MVC project is running on the correct version after upgrade to vs2010?

    - by Stephane
    I just installed visual studio 2010 and upgraded my MVC project (which was running on MVC RC2 in visual studio 2008). visual studio 2010 updated every project file to target the framework 4.0. But the system.web.dll is pointing to C:\Program Files (x86)\Microsoft ASP.NET\ASP.NET MVC 2\Assemblies\System.Web.Mvc.dll in VS2010 object browser, I have every dll showing up in multiple versions as expected (3.5.0.0 and 4.0.0.0) except for the System.Web.Mvc dll which doesn't show any version and points to the path I mentioned above. Isn't this namespace point to the Framework folder like the System.Web namespace? C:\Program Files (x86)\Reference Assemblies\Microsoft\Framework.NETFramework\v4.0\System.Web.dll

    Read the article

  • C++ Project compiles as static lib, fails (linker error) as dynamic lib. why??

    - by Roey
    Hi All. I've a VS2008 native C++ project, that I wish to compile as a DLL. It only references one external library (log4cplus.lib), and uses its functions. (also uses log4cplus's .h files , naturally). When I try to compile my project as a static library, it succeeeds. When I try as DLL, it fails : 1>MessageWriter.obj : error LNK2019: unresolved external symbol "public: static class log4cplus::Logger __cdecl log4cplus::Logger::getInstance(class std::basic_string<wchar_t,struct std::char_traits<wchar_t>,class std::allocator<wchar_t> > const &)" (?getInstance@Logger@log4cplus@@SA?AV12@ABV?$basic_string@_WU?$char_traits@_W@std@@V?$allocator@_W@2@@std@@@Z) referenced in function "class log4cplus::Logger __cdecl Log(void)" (?Log@@YA?AVLogger@log4cplus@@XZ) There are 4 more errors just like this related to functions within log4cplus.lib. It seems like something really stupid.. please help me :) Thanks!

    Read the article

  • how to call any method of Project from classlibrary?

    - by Pankaj Mishra
    Hello I have Class Library Where a class of multithreading Of Producer and consumer based. private void WorkDeQueue() { while (true) { string Url = null; lock (locker) { if (queueList.Count > 0) { Url = queueList.Dequeue(); /* return if a null is found in the queue */ if (Url == null) return; } } if (Url != null) { /* if a job was found then process it */ GetData(Url); //This Is a Method } else { /* if a job was not found (meaning list is empty) then * wait till something is added to it*/ wh.WaitOne(); } } } this GetData method has no body on that class. How can i call any method of my project in palace of getdata. I tried with factory Pattern and also with reflection. but both didn't worked for me. So plz tell me how can i call any method of my project from here.

    Read the article

  • Keeping a database structure up to date in a project where code is on subversion?

    - by Bruno De Barros
    I have been working with Subversion for a while now, and it's been incredible for the management of my projects, and even to help managing the deployment to several different servers, but there is just the one thing that still annoys me. Whenever I make any changes to the database structure, I need to update every server manually, I have to keep track of any changes I made, and because some of my servers run branches of the project (modifications that are still being worked on, or were made for different purposes), it's a bit awkward. Until now, I've been using a "database.sql" file, which is a dump of the database structure for a specific revision. But it just seems like such a bad way to manage this. And I was wondering, how does everyone else manage their MySQL databases when they're working on a project and using Subversion?

    Read the article

  • Trying to debug a plugin in tuxguitar, need help building the project in Eclipse.

    - by Shawn Simon
    I am not too familiar with java / eclipse but I am trying to debug a plugin in TuxGuitar. The plugin is the gtp plugin which allows reading of guitar pro files. I have imported the main project, TuxGuitar, and the TuxGuitar-gtp plugin. I have all build dependencies configured and the project builds. However, when I debug the app, the plugin is not available. The documentation says plugins are loaded from the share/plugins folder and they are jar files. I tried exporting the gtp plugin as a jar into the share/plugins folder, but it still does not load when I debug. Is there some sort of configuration I need to do in Eclipse? Thanks!

    Read the article

  • Right way to have a thread in parallel to django project on wsgi.

    - by Enrico Carlesso
    Hi guys. I'm writing a django project, and I need to have a parallel thread which performs certain tasks. The project will be deployed in Apache2.2 with mod_wsgi. Actually my implementation consists on a thread with a while True - Sleep which is called from my django.wsgi file. Is this implementation correct? Two problems raises: does django.wsgi get called only once? Will I have just that instance of the thread running? And second, I need to "manually" visit at least a page to have the Thread run. Is there a workaround? Does anyone has some hints on better solutions? Thanks in advance.

    Read the article

< Previous Page | 138 139 140 141 142 143 144 145 146 147 148 149  | Next Page >