Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 279/1407 | < Previous Page | 275 276 277 278 279 280 281 282 283 284 285 286  | Next Page >

  • error: unexplained error (code 130) at rsync.c(541) [sender=3.0.7]

    - by brazorf
    This error: unexplained error (code 130) at rsync.c(541) [sender=3.0.7] error is happening after i changed router. Actually, i found out that this error just happens on a ctrl+c signal, so it could be not representative about the error itself. The command i run is very basic: rsync -avz --delete /local/path/ username@host:/path/to/remote/directory Basically, the rsync just stuck there and nothing's happening, until i ctrl+c. After interrupting the process i got the error in subject. I past the whole thing here: rsync -avvvvz --delete /source/path/ username@host:/path/to/direectory cmd=<NULL> machine=HOSTNAME user=username path=/path/to/direectory cmd[0]=ssh cmd[1]=-l cmd[2]=username cmd[3]=HOSTNAME cmd[4]=rsync cmd[5]=--server cmd[6]=-vvvvlogDtprze.iLsf cmd[7]=--delete cmd[8]=. cmd[9]=/path/to/direectory opening connection using: ssh -l username HOSTNAME rsync --server -vvvvlogDtprze.iLsf --delete . /path/to/direectory note: iconv_open("UTF-8", "UTF-8") succeeded. ^C[sender] _exit_cleanup(code=20, file=rsync.c, line=541): entered rsync error: unexplained error (code 130) at rsync.c(541) [sender=3.0.7] [sender] _exit_cleanup(code=20, file=rsync.c, line=541): about to call exit(130) The authentication runs on ssh via rsa key. I tried basic troubleshoot such as: ping the remote host ssh -l username remote.host check software firewall logs i asked the remote host sysadmin to check for logs, and when i run that command a ssh connection is actually being established and i can state there is no comunication/authentication/name resolution issue here. Rolling back to old router make this work again. Both client and server are running ubuntu 10.04. Try to take a look at my router configuration, where i'm no experienced at all, but i didnt see any "suspect" (what i was looking for is firewall blocking something) setting. The router itself is DLINK DVA-G3670B. Any suggestion? Thank You F.

    Read the article

  • Employee Tracking: Is there a similar software to Elance WorkView or oDesk "Team Room"?

    - by Kunal
    We are looking for a great commercial or free tool which can monitor all our remote employees and keep the reports centrally. We need it similar to Elance WorkView or oDesk "Team Room", what these tools do is: Take screenshots at random interval. Track the activity on computer based on key strokes. (not a necessity) It doesn't necessarily need to track time but will be good to have, our aim is to monitor employees and make sure they're working - that's all. I'll give oDesk Team Room 10/10 and I haven't been able to find such tool. Is there anyone who can suggest such tool? Thanks

    Read the article

  • Is there software that will help me convert my PST files into a searachable web archive?

    - by chronoz
    I have used POP3 for many and many years and always used PST files for back-up purposes. I'd like to be able to create a searchable mail archive of this 12GB worth of e-mail. I had used Horde + Qmail for a while for searching e-mail, but it was truly horrible and even extremely slow when searching into a few ten thousands of e-mails, let alone more than a million. I would prefer a free solution that would provide fast searching through historical e-mails. Also, preferably hosted on a server, so I don't have to worry about backing up any more crucial data on my desktop.

    Read the article

  • Is it illegal to download (from torrents) software that you have already legally bought?

    - by joshhunt
    With Snow Leopard now out, I decided to order myself a copy. But as I bought it online, it takes six to eight weeks three to five days for to to arrive via snail mail, but I want it now. Seeing that I have already legally bought a license for Snow Leopard, can I download a retail version of Snow Leopard from a torrent, without breaking the law? I understand that the law varies from country to country, so I acknowledge that this may be a tough question to answer sufficiently. I am in Australia, so I suppose I am mostly interested in answeres regarding Australian law, but other counties (or a general response) are also fine NOTE: SuperUser is NOT a legal resource and any advice/answers here should NOT be used as legal advice in any way.

    Read the article

  • Is there any open source DVD duplication software like Nero?

    - by johnny
    Nero Essentials isn't working right and I wondered if there was anything open source that I could use. I need to duplicate a DVD that I have authored - not a data disc a "real" dvd (with vob files, etc.) CDBurnerXP did not have this. Or, if I create an .iso is that the same thing when I burn it back to my duplicate? Thanks.

    Read the article

  • Which Revision Control Software to use for Personal Dropbox?

    - by wag2639
    I want to set up a sync repositiory that would be similar to Dropbox. Goals/Requirements: Free (Open Source very preferable) Linux host (probably Ubuntu) Windows/Mac/Linux clients Potential for multiple users with limited access (optional) Preferable easy, doesn't necessarily need to be automatic Revision control very preferable Basically, I want to be able to use multiple computers, possible with different OS's, and be able to access, use, and sync files across all of them. I also want to have a local copy of the repository for when I'm not connected to the network (as if I'm working on a laptop, I want to keep a local repository to keep revision and merge later with "master" repository). For example, I'm editing a few pictures on my laptop during the day outside of my network, but when I get home, I would like to sync the changes, including incremental changes, with my desktop at home. I would also like my roommates to be able to access and use this repository too but limit access to certain files. For example, I may want to use this to backup financial records but wouldn't want them to have access to those files. I'm a programmer and familiar with SVN but I know that wouldn't be the most appropriate since it doesn't handle binaries well and doesn't keep a local repository. I know better choices exist but I don't really know them well enough to choose the best one.

    Read the article

  • is AV software needed for Windows XP Mode on Windows 7?

    - by Wesley
    Hi all, I just got Windows XP Mode on my Windows 7 Professional 64-bit machine. I notice that the Windows XP Security Center notes that I don't have any virus protection. However, I'm running AVG Free on Windows 7. Do I need to have some sort of anti-virus program installed on Windows XP Mode? Thanks in advance.

    Read the article

  • Deploying a Django application in a virtual Ubuntu Server

    - by mfsaint
    I have a virtualbox machine running Ubuntu Server 10.04LTS. My intention is to this machine to work like a VPS, this way I can learn and prepare for when I get a VPS service. Apache+mod_wsgi for deploying the Django app seems the right choice to me. I have the domain (marianofalcon.com.ar) but nothing else, no DNS. The problem is that I'm pretty lost with all the deployment stuff. I know how to configure mod_wsgi(with the django.wsgi file) and apache(creating a VirtualHost). Something is missing and I don't know what it is. I think that I lack networking skills ant that's the big problem. Trying to host the app on a virtualbox adds some difficulty because I don't know well what IP to use. This is what I've got: file placed at: /etc/apache2/sites-available: NameVirtualHost *:80 <VirtualHost *:80> ServerAdmin [email protected] ServerName www.my-domain.com ServerAlias my-domain.com Alias /media /path/to/my/project/media DocumentRoot /path/to/my/project WSGIScriptAlias / /path/to/your/project/apache/django.wsgi ErrorLog /var/log/apache2/error.log LogLevel warn CustomLog /var/log/apache2/access.log combined </VirtualHost> django.wsgi file: import os, sys wsgi_dir = os.path.abspath(os.path.dirname(__file__)) project_dir = os.path.dirname(wsgi_dir) sys.path.append(project_dir) project_settings = os.path.join(project_dir,'settings') os.environ['DJANGO_SETTINGS_MODULE'] = 'myproject.settings' import django.core.handlers.wsgi application = django.core.handlers.wsgi.WSGIHandler()

    Read the article

  • Is there a software that can index the contents of the registry for quick lookups?

    - by Benoit
    Searching in the Windows registry can be ve------ry------ lo----ng. Is there some tool available that can index the contents of the whole registry, or contents of a single hive, such that fast lookups are available? (for example generating some SQLite database with FTS3 or FTS4 enabled for full text search) Thank you. PS. I don't want RegScanner or tools that perform a new, linear search every time. I want an indexer, with which then a search can be instantaneous. See question comments.

    Read the article

  • Software Engineer's explanation of Facebook photo privacy, with UML diagram?

    - by Alex R
    Facebook photo privacy is more complex than most people think - including the bloggers who fill the Internet trying to explain it in simple terms. Not only there is the basic album-level privacy setting to consider, but also what happens with Tagging (and related privacy settings) as well as the Share button when clicked by a Friend. Has anybody seen a good, engineering-type (e.g. UML) diagram? I envision it should include the various privacy "states" a photo can be in, what causes state transitions, and the characteristics of each state? Thanks

    Read the article

  • does any sync software find files that have moved paths within a folder?

    - by kpierce8
    Say I have a pictures folder which I reorganized on one computer. I'd like to use that directory as the base and compare it with another version on a backup drive. Will any sync/compare program find that a file in one folder has moved locations within a compare folder. For instance say I reorganized my pictures from trips into folders by year with the trips folders inside each year folder. If I use a regular compare utility I wind up with two copies of everything that's moved in different locations.

    Read the article

  • PDF to HTML - batch converter - most reliable and accurate free AND paid for software?

    - by Rob
    I'm look for either a free or paid-for (about 50$/40pounds) BATCH PDF to HTML converter to convert several PDF files at once. Needs to be able to handle vectored and bitmap images within the file, outputting both as jpegs referenced by the html pages. I've tried iorigsoft paid-for PDF to HTML - problems it seems to hang or just go idle, and the stuff it actually converts have broken links - the wrong name is used for constituent chapters as html. Also tried application from intrapdf.com but this crashes near the beginning of the conversion, consitently. Looked at opensource tools but they look equally flakey or use old PDF versions. Need it on Windows 7 32bit home. Thoughts?

    Read the article

  • Install Office software on a standard user account automatically.

    - by Earls
    If I know the Administrator account name and password on a Windows 7 computer, would it be possible to create an Office 2010 install CD that would "silently" install Office 2010 on a standard user account which does not have installation privileges. As in, the group policy "always install with elevated privileges" is in effect for the user. Some way to built the admin account privileges into the office installer? VBS Script? CMD? Understand, the laptops are in the field, the end user doesn't have the admin password and can't have the admin password. Thanks.

    Read the article

  • clean reinstall of windows on dell xps 1530 using bundled software from dell?

    - by kacalapy
    i wanted to delete my laptop hard drive and reinstall the os that came on the media with the laptop originally. i booted from the windows disk and reinstalled windows but this did not delete my hard drive and even worse it made a windows.old folder with all my old junk on my c drive how do i get a clean/ deleted c drive with new install of my os? i have a small 120 Gig solid state hard drive with just one partition. i would like to create two partitions on the new install. my main issue is not being able to get a clean install such that the result is a pure windows laptop with no junk files that have accumulated over time. please advise.

    Read the article

  • Good free software to track and graph memory and CPU usage on Windows?

    - by TheLQ
    There are many questions on Linux memory tracking, but I haven't seen any for Windows. In my case however its a Windows XP Pro box I need to track the memory and CPU usage of. The reason I need it is due to a server program I'm trying that is eating all my processor and some of my memory which is freezing my RDP session and System Explorer and even makes it difficult to login physically. As this is a very constrained server I'm working off of (768 MB RAM with Pentium 4 which disappears with this program), I need a program that doesn't run/require a webserver. I can give it a MySQL database if necessary however. Is there any suggestions for such a program?

    Read the article

  • Why do some software not get load balanced even when there are multiple cores?

    - by Nav
    While VTune Analyzer was running on a blade server with 8 cores, I observed the cpu useage percentage using mpstat -P ALL 1. mpstat showed me that VTune was taking up 100% of a single core, while all other cores were idle. Why does that happen? Shouldn't the OS (RHEL Server 5.2) automatically distribute load across cores? The same happened when I tried running MATLAB (even after enabling multithreading support in the MATLAB settings). p.s: I'm a developer. Not a sys admin. So felt it better to ask here rather than at serverfault.

    Read the article

  • clean reinstall of windows on dell xps 1530 using bundled software from dell?

    - by kacalapy
    i wanted to delete my laptop hard drive and reinstall the os that came on the media with the laptop originally. i booted from the windows disk and reinstalled windows but this did not delete my hard drive and even worse it made a windows.old folder with all my old junk on my c drive how do i get a clean/ deleted c drive with new install of my os? i have a small 120 Gig solid state hard drive with just one partition. i would like to create two partitions on the new install. my main issue is not being able to get a clean install such that the result is a pure windows laptop with no junk files that have accumulated over time. please advise.

    Read the article

  • Win 7: Are motherboard / chipset drivers part of the Software Update?

    - by Horst Walter
    Is the Windows 7 update automatically updating Chipset and motherboard drivers? I am basically talking about mainstream boards / processors (ASUS; Intel, AMD, ...), so the question reads "in general". Certainly there are exotic system not updated automatically. This is a duplicate of dangling Will Windows 7 Update Find Chipset Drivers? (one answer, no acceptance, comment directly questions the answer). I am interested in this topic as well, so I dare to ask the question again.

    Read the article

< Previous Page | 275 276 277 278 279 280 281 282 283 284 285 286  | Next Page >