Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 310/1407 | < Previous Page | 306 307 308 309 310 311 312 313 314 315 316 317  | Next Page >

  • Access to bound data in IMultiValueConverter.ConvertBack() in C#/WPF

    - by absence
    I have a problem with a multibinding: <Canvas> <local:SPoint x:Name="sp" Width="10" Height="10"> <Canvas.Left><!-- irrelevant binding here --></Canvas.Left> <Canvas.Top> <MultiBinding Converter="{StaticResource myConverter}" Mode="TwoWay"> <Binding ElementName="cp1" Path="(Canvas.Top)"/> <Binding ElementName="cp1" Path="Height"/> <Binding ElementName="cp2" Path="(Canvas.Top)"/> <Binding ElementName="cp2" Path="Height"/> <Binding ElementName="sp" Path="Height"/> <Binding ElementName="sp" Path="Slope" Mode="TwoWay"/> </MultiBinding> </Canvas.Top> </local:SPoint> <local:CPoint x:Name="cp1" Width="10" Height="10" Canvas.Left="20" Canvas.Top="150"/> <local:CPoint x:Name="cp2" Width="10" Height="10" Canvas.Left="100" Canvas.Top="20"/> </Canvas> In order to calculate the Canvas.Top value, myConverter needs all the bound values. This works great in Convert(). Going the other way, myConverter should ideally calculate the Slope value (Binding.DoNothing for the rest), but it needs the other values in addition to the Canvas.Top one passed to ConvertBack(). What is the right way to solve this? I have tried making the binding OneWay and create an additional multibinding for local:SPoint.Slope, but that causes infinite recursion and stack overflow. I was thinking the ConverterParameter could be used, but it seems like it's not possible to bind to it.

    Read the article

  • WPF: Update Listbox automatically C#

    - by Ashley
    Hi, I have two WPF windows developed using the surface SDK, one that is a data entry form, and the second dispays the data in a listbox. The listbox displays the data perfectly but when I add a new record using the data entry form, the listbox is not updated until I reopen the window. Is there a way to automatically update the listbox through binding or something? This is the listbox code: <s:SurfaceListBox Height="673" Margin="0,26,0,31" Name="surfaceListBox1" ItemsSource="{Binding Path={}}" Width="490"> <s:SurfaceListBox.ItemTemplate> <DataTemplate> <StackPanel Orientation="Horizontal"> <Label Width="80" FontSize="8" Content="{Binding Path=item1}"></Label> <Label Width="80" FontSize="8" Content="{Binding Path=item2}"></Label> <Label Width="210" FontSize="8" Content="{Binding Path=item3}"></Label> <Label Width="80" FontSize="8" Content="{Binding Path=item4}"></Label> <Label Width="60" FontSize="8" Content="{Binding Path=item5, Converter={StaticResource booleanconverter}}"></Label> </StackPanel> </DataTemplate> </s:SurfaceListBox.ItemTemplate> </s:SurfaceListBox> I am using Visual C# 2008 and the code to fill the listbox is: private SHIPS_LOGDataSet ShipData = new SHIPS_LOGDataSet(); private SHIPS_LOGDataSetTableAdapters.MAINTableAdapter taMain = new SHIPS_LOGDataSetTableAdapters.MAINTableAdapter(); private SHIPS_LOGDataSetTableAdapters.TableAdapterManager taManager = new ShipsLogSurface.SHIPS_LOGDataSetTableAdapters.TableAdapterManager(); private void SurfaceWindow_Loaded(object sender, RoutedEventArgs e) { this.taMain.Fill(this.ShipData.MAIN); this.DataContext = from MAIN in this.ShipData.MAIN orderby MAIN.MESSAGE_ID descending select MAIN; } The only table in my database is called MAIN. I'm guessing I might have to use a collection view or similar but don't know how to implement that. Any ideas would be much appreciated. Thanks

    Read the article

  • DynamicResource and Dynamic Items in ContextMenu on XamDataGrid

    - by miguel
    I would like to dynamically create a set of context menu options based upon some properties. Currently, I am creating a context menu as a DynamicResource with the visibility of the menu options bound to the properties, however, it seems that the DynamicResource is created only once, at runtime. Is this true? What I would like to do is have the menu generated each time, which will take into account the property changes on the data object. Please see the following XAML snippet: <Border DockPanel.Dock="Right" Margin="4,4,4,4" BorderBrush="Gray" BorderThickness="1" CornerRadius="3" > <igDP:XamDataGrid Height="Auto" Width="Auto" Style="{DynamicResource DefaultInfragisticsGridStyle}" Name="axeDataGrid" ActiveRecord="{Binding Path=SelectedItem, Mode=TwoWay}" DataSource="{Binding Path=Axes}" ContextMenuOpening="ContextMenuOpeningHandler"> <igDP:XamDataGrid.Resources> <Style TargetType="{x:Type igDP:DataRecordPresenter}" BasedOn="{x:Static Themes:DataPresenterAero.DataRecordPresenter}"/> <ContextMenu x:Key="RecordContextMenu"> <ContextMenu.Resources> <BooleanToVisibilityConverter x:Key="booleanToVisibilityConverter"/> </ContextMenu.Resources> <MenuItem Header="Cancel Axe" Command="{Binding RelativeSource={RelativeSource FindAncestor, AncestorType={x:Type igDP:XamDataGrid}}, Path=DataContext.CancelAxe}" Visibility="{Binding RelativeSource={RelativeSource FindAncestor, AncestorType={x:Type igDP:XamDataGrid}}, Path=DataContext.IsCancelAxeAllowed, Converter={StaticResource booleanToVisibilityConverter}, Mode=OneWay}"/> <MenuItem Header="Create RFQ" Command="{Binding RelativeSource={RelativeSource FindAncestor, AncestorType={x:Type igDP:XamDataGrid}}, Path=DataContext.CreateRFQ}" Visibility="{Binding RelativeSource={RelativeSource FindAncestor, AncestorType={x:Type igDP:XamDataGrid}}, Path=DataContext.IsCreateRfqAllowed, Converter={StaticResource booleanToVisibilityConverter}, Mode=OneWay}"/> </ContextMenu> <Style TargetType="{x:Type igDP:DataRecordCellArea}"> <Setter Property="ContextMenu" Value="{DynamicResource RecordContextMenu}" /> </Style>

    Read the article

  • jQuery, jQuery UI, and Dual Licensed Plugins (Dual Licensing)

    - by John Hartsock
    OK I have read many posts regarding Dual Licensing using MIT and GPL licenses. But Im curious still, as the wording seems to be inclusive. Many of the Dual Licenses state that the software is licensed using "MIT AND GPL". The "AND" is what confuses me. It seems to me that the word "AND" in the terms, means you will be licensing the product using both licenses. Most of the posts, here on stackoverflow, state that you can license the software using one "OR" the other. JQuery specifically states "OR", whereas JQuery UI specifically States "AND". Another Instance of the "AND" would be JQGrid. Im not a lawyer but, it seems to me that a legal interpretation of this would state that use of the software would mean that your using the software under both licenses. Has anyone who has contacted a lawyer gotten clarification or a definitive answer as to what is true? Can you use Dual licensed software products that state "AND" in the terms of agreement under either license? EDITED: Guys here is specifically what Im talking about on jquery.org/license you see the following stated: You may use any jQuery project under the terms of either the MIT License or the GNU General Public License (GPL) Version 2 but in the header of Jquery's and Jquery UI library you see this: * Dual licensed under the MIT and GPL licenses. * http://docs.jquery.com/License The site says MIT or GPL but the license statement in the software says MIT and GPL.

    Read the article

  • OS X, Mercurial and MediaTemple problem

    - by bschaeffer
    I've installed Mercurial per MT's knowledge base file here. Working with it server side using ssh from my Mac works fine. I can initialize repositories and the like, but pulling from the server or pushing from my Mac produces an error I don't understand. Here's what I get when call hg push from my local installation (hash marks represent my server number): remote: Traceback (most recent call last): remote: File "/home/#####/users/.home/data/mercurial-1.5/hg", line 27, in ? remote: mercurial.dispatch.run() remote: File "/nfs/c05/h01/mnt/#####/data/mercurial-1.5/mercurial/dispatch.py", line 16, in run remote: sys.exit(dispatch(sys.argv[1:])) remote: File "/nfs/c05/h01/mnt/#####/data/mercurial-1.5/mercurial/dispatch.py", line 21, in dispatch remote: u = _ui.ui() remote: File "/nfs/c05/h01/mnt/#####/data/mercurial-1.5/mercurial/ui.py", line 38, in __init__ remote: for f in util.rcpath(): remote: File "/nfs/c05/h01/mnt/#####/data/mercurial-1.5/mercurial/util.py", line 1200, in rcpath remote: _rcpath = os_rcpath() remote: File "/nfs/c05/h01/mnt/#####/data/mercurial-1.5/mercurial/util.py", line 1174, in os_rcpath remote: path = system_rcpath() remote: File "/nfs/c05/h01/mnt/#####/data/mercurial-1.5/mercurial/posix.py", line 41, in system_rcpath remote: path.extend(rcfiles(os.path.dirname(sys.argv[0]) + remote: File "/nfs/c05/h01/mnt/#####/data/mercurial-1.5/mercurial/posix.py", line 30, in rcfiles remote: rcs.extend([os.path.join(rcdir, f) remote: File "/nfs/c05/h01/mnt/#####/data/mercurial-1.5/mercurial/demandimport.py", line 75, in __getattribute__ remote: self._load() remote: File "/nfs/c05/h01/mnt/#####/data/mercurial-1.5/mercurial/demandimport.py", line 47, in _load remote: mod = _origimport(head, globals, locals) remote: ImportError: No module named osutil abort: no suitable response from remote hg! Mercurial on my Mac is configured as follows [ui] username = John Smith editor = te -w remotecmd = ~/data/mercurial-1.5/hg My local single repo is configured as follows (hash marks represent my server number): [paths] default = ssh://mysite.com@s#####.gridserver.com/domains/mysite.com/html Mercurial on the server is configured with a just a username: [ui] username = John Smith The server .bash_profile is configured as follows (per the installation guide): # Aliases alias ls-a='ls -a -l' # Added this as suggested by the MediaTemple guide export PYTHONPATH=${HOME}/lib/python:$PYTHONPATH export PATH=${HOME}/bin:$PATH I understand this probably isn't a MediaTemple problem, but more likely an installation problem. I would really appreciate any assitance on this problem. Thanks in advance!

    Read the article

  • Handlers returns 404 error on IIS7.5 integrated pipeline

    - by er-v
    <httpHandlers> <add path="ajaxpro/*.ashx" verb="POST,GET" type="AjaxPro.AjaxHandlerFactory, AjaxPro.2" /> <add path="Reserved.ReportViewerWebControl.axd" verb="*" type="Microsoft.Reporting.WebForms.HttpHandler, Microsoft.ReportViewer.WebForms, Version=9.0.0.0, Culture=neutral, PublicKeyToken=b03f5f7f11d50a3a" validate="false" /> <remove verb="*" path="*.asmx" /> <add verb="*" path="*.asmx" validate="false" type="System.Web.Script.Services.ScriptHandlerFactory, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35" /> <add verb="*" path="*_AppService.axd" validate="false" type="System.Web.Script.Services.ScriptHandlerFactory, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35" /> <add verb="GET,HEAD" path="ScriptResource.axd" validate="false" type="System.Web.Handlers.ScriptResourceHandler, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35" /> </httpHandlers> Hello to everybody. I have the problen whith iis7.5 in integrated mode. When I use it in classic mode handlers that presented above work fine, but if I switch to the integrated pipeline - all requests that should be handled return 404 error. Why?

    Read the article

  • Detect the language & django locale-url

    - by mamcx
    I want to deploy a website in english & spanish and detect the user browser languaje & redirect to the correct locale site. My site is www.elmalabarista.com I install django-localeurl, but I discover that the languaje is not correctly detected. This are my middlewares: MIDDLEWARE_CLASSES = ( 'django.contrib.sessions.middleware.SessionMiddleware', 'django.middleware.locale.LocaleMiddleware', 'multilingual.middleware.DefaultLanguageMiddleware', 'middleware.feedburner.FeedburnerMiddleware', 'lib.threadlocals.ThreadLocalsMiddleware', 'middleware.url.UrlMiddleware', 'django.contrib.auth.middleware.AuthenticationMiddleware', 'maintenancemode.middleware.MaintenanceModeMiddleware', 'middleware.redirect.RedirectMiddleware', 'openidconsumer.middleware.OpenIDMiddleware', 'django.middleware.doc.XViewMiddleware', 'middleware.ajax_errors.AjaxMiddleware', 'pingback.middleware.PingbackMiddleware', 'localeurl.middleware.LocaleURLMiddleware', 'multilingual.flatpages.middleware.FlatpageFallbackMiddleware', 'django.middleware.common.CommonMiddleware', ) But ALWAYS the site get to US despite the fact my OS & Browser setup is spanish. LANGUAGES = ( ('en', ugettext('English')), ('es', ugettext('Spanish')), ) DEFAULT_LANGUAGE = 1 Then, I hack the middleware of locale-url and do this: def process_request(self, request): locale, path = self.split_locale_from_request(request) if request.META.has_key('HTTP_ACCEPT_LANGUAGE'): locale = utils.supported_language(request.META['HTTP_ACCEPT_LANGUAGE'].split(',')[0]) locale_path = utils.locale_path(path, locale) if locale_path != request.path_info: if request.META.get("QUERY_STRING", ""): locale_path = "%s?%s" % (locale_path, request.META['QUERY_STRING']) return HttpResponseRedirect(locale_path) request.path_info = path if not locale: locale = settings.LANGUAGE_CODE translation.activate(locale) request.LANGUAGE_CODE = translation.get_language() However, this detect fine the language but redirect the "en" urls to "es". So is impossible navigate in english. UPDATE: This is the final code (after the input from Carl Meyer) with a fix for the case of "/": def process_request(self, request): locale, path = self.split_locale_from_request(request) if (not locale) or (locale==''): if request.META.has_key('HTTP_ACCEPT_LANGUAGE'): locale = utils.supported_language(request.META['HTTP_ACCEPT_LANGUAGE'].split(',')[0]) else: locale = settings.LANGUAGE_CODE locale_path = utils.locale_path(path, locale) if locale_path != request.path_info: if request.META.get("QUERY_STRING", ""): locale_path = "%s?%s" % (locale_path, request.META['QUERY_STRING']) return HttpResponseRedirect(locale_path) request.path_info = path translation.activate(locale) request.LANGUAGE_CODE = translation.get_language()

    Read the article

  • Navigating through a sea of hype

    - by wouldLikeACrystalBall
    This is a vague, open question, so if you have no interest in these, please leave now. A few years ago it seemed everyone thought the death of desktop software was imminent. Web applications were the future. Everyone would move to cloud-based software-as-a-service systems, and developing applications for specific end-user platforms like Windows would soon become something of a ghetto. Joel's "How Microsoft Lost the API War" was but one of many such pieces sounding the death knell for this way of software development. Flash-forward to 2010, and the hype is all around mobile devices, particularly the iPhone. Software-as-a-Service vendors--even small ones such as YCombinator startups--go out of their way to build custom applications for the iPhone and other smart phone devices; applications that can be quite sophisticated, that run only on specific hardware and software architectures and are thus inherently incompatible. Now some of you are probably thinking, "Well, only the decline of desktop software was predicted; mobile devices aren't desktops." But the term was used by those predicting its demise to mean laptops also, and really any platform capable of running a browser. What was promised was a world where HTML and related standards would supplant native applications and their inherent difficulties. We would all code to the browser, not the OS. But here we are in 2010 with the AppStore bulging and development for the iPad just revving up. A few days ago, I saw someone on Hacker News claim that the future of computing was entirely in small, portable devices. Apparently the future is underpowered, requires dexterous thumbs and induces near-sightedness. How do those who so vehemently asserted one thing now assert the opposite with equal vehemence, without making even the slightest admission of error? And further, how are we as developers supposed to sift through all of this? I bought into the whole web-standards utopianism that was in vogue back in '06-'07 and now feel like it was a mistake. Is there some formula one can apply rather than a mere appeal to experience?

    Read the article

  • Change the Default Application Pool in IIS7 using .net?

    - by EdenMachine
    I'm using the following function to create a IIS7 Application and/or Virtual Directory. How would I also set the Application to use a different Application Pool? Private Sub CreateVirtualDir(ByVal WebSite As String, ByVal AppName As String, ByVal Path As String, Optional ByVal IsApplication As Boolean = True, Optional ByVal RunScripts As Boolean = True, Optional ByVal IsWrite As Boolean = True) Dim IISSchema As New System.DirectoryServices.DirectoryEntry("IIS://" & WebSite & "/Schema/AppIsolated") Dim CanCreate As Boolean = Not IISSchema.Properties("Syntax").Value.ToString.ToUpper() = "BOOLEAN" IISSchema.Dispose() If CanCreate Then Dim PathCreated As Boolean Try Dim IISAdmin As New System.DirectoryServices.DirectoryEntry("IIS://" & WebSite & "/W3SVC/1/Root") 'make sure folder exists If Not System.IO.Directory.Exists(Path) Then System.IO.Directory.CreateDirectory(Path) PathCreated = True End If 'If the virtual directory already exists then delete it For Each VD As System.DirectoryServices.DirectoryEntry In IISAdmin.Children If VD.Name = AppName Then IISAdmin.Invoke("Delete", New String() {VD.SchemaClassName, AppName}) IISAdmin.CommitChanges() Exit For End If Next VD 'Create and setup new virtual directory Dim VDir As System.DirectoryServices.DirectoryEntry = IISAdmin.Children.Add(AppName, "IIsWebVirtualDir") VDir.Properties("Path").Item(0) = Path If IsApplication Then VDir.Properties("AppFriendlyName").Item(0) = AppName End If VDir.Properties("EnableDirBrowsing").Item(0) = False VDir.Properties("AccessRead").Item(0) = True VDir.Properties("AccessExecute").Item(0) = False VDir.Properties("AccessWrite").Item(0) = IsWrite VDir.Properties("AccessScript").Item(0) = RunScripts VDir.Properties("AuthNTLM").Item(0) = True VDir.Properties("EnableDefaultDoc").Item(0) = True VDir.Properties("DefaultDoc").Item(0) = "default.htm,default.aspx,default.asp" VDir.Properties("AspEnableParentPaths").Item(0) = True 'VDir.Properties("AppCreate").Item(0) = False VDir.CommitChanges() 'the following are acceptable params 'INPROC = 0 'OUTPROC = 1 'POOLED = 2 If IsApplication Then VDir.Invoke("AppCreate", 1) Else VDir.Invoke("AppCreate", False) End If Catch Ex As Exception If PathCreated Then System.IO.Directory.Delete(Path) End If 'MsgBox(Ex.Message) End Try End If End Sub

    Read the article

  • OCUnit & NSBundle

    - by kpower
    I created OCUnit test in concordance with "iPhone Development Guide". Here is the class I want to test: // myClass.h #import <Foundation/Foundation.h> #import <UIKit/UIKit.h> @interface myClass : NSObject { UIImage *image; } @property (readonly) UIImage *image; - (id)initWithIndex:(NSUInteger)aIndex; @end // myClass.m #import "myClass.m" @implementation myClass @synthesize image; - (id)init { return [self initWithIndex:0]; } - (id)initWithIndex:(NSUInteger)aIndex { if ((self = [super init])) { NSString *name = [[NSString alloc] initWithFormat:@"image_%i", aIndex]; NSString *path = [[NSBundle mainBundle] pathForResource:name ofType:@"png"]; image = [[UIImage alloc] initWithContentsOfFile:path]; if (nil == image) { @throw [NSException exceptionWithName:@"imageNotFound" reason:[NSString stringWithFormat:@"Image (%@) with path \"%@\" for current index (%i) wasn't found.", [name autorelease], path, aIndex] userInfo:nil]; } [path release]; } return self; } - (void)dealloc { [image release]; [super dealloc]; } @end And my unit-test (LogicTests target): // myLogic.m #import <SenTestingKit/SenTestingKit.h> #import <UIKit/UIKit.h> #import "myClass.h" @interface myLogic : SenTestCase { } - (void)testTemp; @end @implementation myLogic - (void)testTemp { STAssertNoThrow([[myClass alloc] initWithIndex:0], "myClass initialization error"); } @end All necessary frameworks, "myClass.m" and images added to target. But on build I have an error: [[myClass alloc] initWithIndex:0] raised Image (image_0) with path \"(null)\" for current index (0) wasn't found.. myClass initialization error This code (initialization) works fine in application itself (main target) and later displays correct image. I've also checked my project folder (build/Debug-iphonesimulator/LogicTests.octest/) - there are LogicTests, Info.plist and necessary image files (image_0.png is one of them). What's wrong?

    Read the article

  • Storing data on SD Card in Android

    - by BBoom
    Using the guide at Android Developers (http://developer.android.com/guide/topics/data/data-storage.html) I've tried to store some data to the SD-Card. This is my code: // Path to write files to String path = Environment.getExternalStorageDirectory().getAbsolutePath() + "/Android/data/"+ctxt.getString(R.string.package_name)+"/files/"; String fname = "mytest.txt"; // Current state of the external media String extState = Environment.getExternalStorageState(); // External media can be written onto if (extState.equals(Environment.MEDIA_MOUNTED)) { try { // Make sure the path exists boolean exists = (new File(path)).exists(); if (!exists){ new File(path).mkdirs(); } // Open output stream FileOutputStream fOut = new FileOutputStream(path + fname); fOut.write("Test".getBytes()); // Close output stream fOut.flush(); fOut.close(); } catch (IOException ioe) { ioe.printStackTrace(); } When I create the new FileOutputStream I get a FileNotFound exception. I have also noticed that "mkdirs()" does not seem to create the directory. Can anyone tell me what I'm doing wrong? I'm testing on an AVD with a 2GB sd card and "hw.sdCard: yes", the File Explorer of DDMS in Eclipse tells me that the only directory on the sdcard is "LOST.DIR".

    Read the article

  • FileInputStream throws NullPointerException.

    - by Mohamed
    I am getting nullpointerexception, don't know what actually is causing it. I read from java docs that fileinputstream only throws securityexception so don't understand why this exception pops up. here is my code snippet. private Properties prop = new Properties(); private String settings_file_name = "settings.properties"; private String settings_dir = "\\.autograder\\"; public Properties get_settings() { String path = this.get_settings_directory(); System.out.println(path + this.settings_dir + this.settings_file_name); if (this.settings_exist(path)) { try { FileInputStream in = new FileInputStream(path + this.settings_dir + this.settings_file_name); this.prop.load(in); in.close(); } catch (IOException e) { e.printStackTrace(); } } else { this.create_settings_file(path); try{ this.prop.load(new FileInputStream(path + this.settings_dir + this.settings_file_name)); }catch (IOException ex){ //ex.printStackTrace(); } } return this.prop; } private String get_settings_directory() { String user_home = System.getProperty("user.home"); if (user_home == null) { throw new IllegalStateException("user.home==null"); } return user_home; } and here is my stacktrace: C:\Users\mohamed\.autograder\settings.properties Exception in thread "main" java.lang.NullPointerException at autograder.Settings.get_settings(Settings.java:41) at autograder.Application.start(Application.java:20) at autograder.Main.main(Main.java:19) Java Result: 1 BUILD SUCCESSFUL (total time: 0 seconds) Line 41 is: this.prop.load(in);

    Read the article

  • Use the Django ORM in a standalone script (again)

    - by Rishabh Manocha
    I'm trying to use the Django ORM in some standalone screen scraping scripts. I know this question has been asked before, but I'm unable to figure out a good solution for my particular problem. I have a Django project with defined models. What I would like to do is use these models and the ORM in my scraping script. My directory structure is something like this: project scrape #scraping scripts ... test.py web django_project settings.py ... #Django files I tried doing the following in project/scrape/test.py: print os.path.join(os.path.abspath('..'), 'web', 'django_project') sys.path.append(os.path.join(os.path.abspath('..'), 'web', 'django_project')) print sys.path print "-------" os.environ['DJANGO_SETTINGS_MODULE'] = 'django_project.settings' #print os.environ from django_project.myapp.models import MyModel print MyModel.objects.count() However, I get an ImportError when I try to run test.py: Traceback (most recent call last): File "test.py", line 12, in <module> from django_project.myapp.models import MyModel ImportError: No module named django_project.myapp.models One solution I found around this problem is to create a symbolic link to ../web/govcheck in the scrape folder: :scrape rmanocha$ ln -s ../web/govcheck ./govcheck With this, I can then run test.py just fine. However, this seems like a hack, and more importantly, is not very portable (I will have to create this symbolic link everywhere I run this code). So, I was wondering if anyone has any better solutions for my problem?

    Read the article

  • I'd like to rebuild my web server without web management software; what knowledge, skills, and tools will I require? [closed]

    - by Joe Zeng
    I've been using Webmin for my web server that runs my personal website and a host of other websites for a while now, and I feel like I should be able to manage my web server more directly, because I haven't even touched the Webmin for the past year or so and I feel like maybe it has too much functionality that I have to click through the next time I want to access it or create a new subdomain or database on my site. I want to try something lighter and more wholly manageable, now that I'm more comfortable with using ssh and command-line tools. I've decided that I'm going to try using Django as a framework, but obviously that's only part of the picture. What sort of knowledge will I require?

    Read the article

  • RegistryKey ValueCount/SubKeyCount wrong

    - by Mark J Miller
    I am trying to query the following registry key values: HKLM\SOFTWARE\Microsoft\MSSQLServer\Client\SharedMemoryOn HKLM\SOFTWARE\Microsoft\MSSQLServer\Client\SuperSocketNetLib\ProtocolOrder But depending on which machine I'm running the program the query returns null. When I debug on my local machine and I inspect the value for ValueCount for: HKLM\SOFTWARE\Microsoft\MSSQLServer\Client HKLM\SOFTWARE\Microsoft\MSSQLServer\Client\SuperSocketNetLib The count is 0 and OpenSubKey returns null. I am a domain admin, in the local administrators group and have added the following to my app.manifest: <requestedExecutionLevel level="requireAdministrator" uiAccess="false" /> Any idea why? private static void ValidateSqlClientSettings() { Console.WriteLine("\r\n/////////////// LOCAL SQL CLIENT PROTOCOLS ////////////////"); RegistryKey keyHKLM = Registry.LocalMachine; ///TODO: nullreferenceexception - connect to remote machine and find out why RegistryKey sqlClientKey = keyHKLM.OpenSubKey(@"SOFTWARE\Microsoft\MSSQLServer\Client"); if (sqlClientKey == null) { WriteLine2Console(@"WARNING: unable to read registry key '{0}\SOFTWARE\Microsoft\MSSQLServer\Client'", ConsoleColor.Yellow); } var cliKeyNames = from k in sqlClientKey.GetSubKeyNames() where k == "SuperSocketNetLib" select k; ///TODO: find out why these values are always missing (even if I can see them in regedit) Console.Write("Shared Memory Disabled (cliconfg): "); if (Convert.ToBoolean(sqlClientKey.GetValue("SharedMemoryOn"))) WriteLine2Console("FAILED", ConsoleColor.Red); else if(sqlClientKey.GetValue("SharedMemoryOn") == null) WriteLine2Console(String.Format("WARNING - unable to read '{0}\\SharedMemoryOn'", sqlClientKey.Name), ConsoleColor.Yellow); else WriteLine2Console("PASS", ConsoleColor.Green); Console.Write("Client Protocol Order (cliconfg - tcp first): "); foreach (string cliKey in cliKeyNames) { RegistryKey subKey = sqlClientKey.OpenSubKey(cliKey); object order = subKey.GetValue("ProtocolOrder"); if (order != null && order.ToString().StartsWith("tcp") == false) { WriteLine2Console("FAILED", ConsoleColor.Red); } else if (order == null) { WriteLine2Console(String.Format("WARNING - unable to read '{0}\\ProtocolOrder'", subKey.Name), ConsoleColor.Yellow); } else { WriteLine2Console("PASS", ConsoleColor.Green); } subKey.Close(); } sqlClientKey.Close(); keyHKLM.Close(); }

    Read the article

  • classpath error when executing a jar by ant

    - by changed
    Hi I am trying to execute a jar file created using ant. But i am not able to find out why libraries are not available while executing jar. I am trying to load derby embedded database driver but some how i am not getting derby.jar in classpath. Error that i am getting is [java] Unable to load the JDBC driver org.apache.derby.jdbc.EmbeddedDriver [java] Please check your CLASSPATH. [java] java.lang.ClassNotFoundExcepApplication Started [java] tion: org.apache.derby.jdbc.EmbeddedDriver [java] at java.net.URLClassLoader$1.run(URLClassLoader.java:200) a <path id="jar.classpath"> <fileset dir="${lib.dir}" includes="*.jar" /> </path> <path id="compiled-src.jar.classpath"> <path refid="jar.classpath" /> <pathelement location="${build.classes.dir}" /> </path> <target name="jar" depends="compile-src" description="Create Jar"> <mkdir dir="${dist.dir}" /> <manifestclasspath property="lib.list" jarfile="${dist.dir}/"> <classpath refid="jar.classpath" /> </manifestclasspath> <jar destfile="${dist.dir}/${ant.project.name}.jar" basedir="${build.classes.dir}" > <manifest> <attribute name="Main-Class" value="${main-class}" /> <attribute name="Class-Path" value="${lib.list}" /> </manifest> </jar> </target> <target name="run" depends="jar" description="Run application from jar"> <java jar="${dist.dir}/${ant.project.name}.jar" fork="true" /> </target>

    Read the article

  • Can a GeneralPath be modified?

    - by Dov
    java2d is fairly expressive, but requires constructing lots of objects. In contrast, the older API would let you call methods to draw various shapes, but lacks all the new features like transparency, stroke, etc. Java has fairly high costs associated with object creation. For speed, I would like to create a GeneralPath whose structure does not change, but go in and change the x,y points inside. path = new GeneralPath(GeneralPath.WIND_EVEN_ODD, 10); path.moveTo(x,y); path.lineTo(x2, y2); double len = Math.sqrt((x2-x)*(x2-x) + (y2-y)*(y2-y)); double dx = (x-x2) * headLen / len; double dy = (y-y2) * headLen / len; double dx2 = -dy * (headWidth/headLen); double dy2 = dx * (headWidth/headLen); path.lineTo(x2 + dx + dx2, y2 + dy + dy2); path.moveTo(x2 + dx - dx2, y2 + dy - dy2); path.lineTo(x2,y2); This one isn't even that long. Imagine a much longer sequence of commands, and only the ones on the end are changing. I just want to be able to overwrite commands, to have an iterator effectively. Does that exist?

    Read the article

  • Draw an Inset NSShadow and Inset Stroke

    - by Alexsander Akers
    I have an NSBezierPath and I want to draw in inset shadow (similar to Photoshop) inside the path. Is there anyway to do this? Also, I know you can -stroke paths, but can you stroke inside a path (similar to Stroke Inside in Photoshop)? Update This is the code I'm using. The first part makes a white shadow downwards. The second part draws the gray gradient. The third part draws the black inset shadow. Assume path is an NSBezierPath instance and that clr(...) returns an NSColor from a hex string. NSShadow * shadow = [NSShadow new]; [shadow setShadowColor: [NSColor colorWithDeviceWhite: 1.0f alpha: 0.5f]]; [shadow setShadowBlurRadius: 0.0f]; [shadow setShadowOffset: NSMakeSize(0, 1)]; [shadow set]; [shadow release]; NSGradient * gradient = [[NSGradient alloc] initWithColorsAndLocations: clr(@"#262729"), 0.0f, clr(@"#37383a"), 0.43f, clr(@"#37383a"), 1.0f, nil]; [gradient drawInBezierPath: path angle: 90.0f]; [gradient release]; [NSGraphicsContext saveGraphicsState]; [path setClip]; shadow = [NSShadow new]; [shadow setShadowColor: [NSColor redColor]]; [shadow setShadowBlurRadius: 0.0f]; [shadow setShadowOffset: NSMakeSize(0, -1)]; [shadow set]; [shadow release]; [path stroke]; [NSGraphicsContext restoreGraphicsState]; Here you can see a gradient fill, a white drop shadow downwards, and a black inner shadow downwards.

    Read the article

  • Adding a guideline to the editor in Visual Studio

    - by xsl
    Introduction I've always been searching for a way to make Visual Studio draw a line after a certain amount of characters: Below is a guide to enable these so called guidelines for various versions of Visual Studio. Visual Studio 2010 Install Paul Harrington's Editor Guidelines extension. Open the registry at HKEY_CURRENT_USER\Software\Microsoft\VisualStudio\10.0\Text Editor and add a new string called Guides with the value RGB(100,100,100), 80. The first part specifies the color, while the other one (80) is the column the line will be displayed. Or install the Guidelines UI extension, which will add entries to the editor's context menu for adding/removing the entries without needing to edit the registry directly. The current disadvantage of this method is that you can't specify the column directly. Visual Studio 2008 and Other Versions If you are using Visual Studio 2008 open the registry at HKEY_CURRENT_USER\Software\Microsoft\VisualStudio\9.0\Text Editor and add a new string called Guides with the value RGB(100,100,100), 80. The first part specifies the color, while the other one (80) is the column the line will be displayed. The vertical line will appear, when you restart Visual Studio. This trick also works for various other version of Visual Studio, as long as you use the correct path: 2003: HKEY_CURRENT_USER\Software\Microsoft\VisualStudio\7.1\Text Editor 2005: HKEY_CURRENT_USER\Software\Microsoft\VisualStudio\8.0\Text Editor 2008: HKEY_CURRENT_USER\Software\Microsoft\VisualStudio\9.0\Text Editor 2008 Express: HKEY_CURRENT_USER\Software\Microsoft\VCExpress\9.0\Text Editor This also works in SQL Server 2005 and probably other versions.

    Read the article

  • Storing arrays in NSUserDefaultsController

    - by neoneye
    Currently I use NSUserDefaults and I'm interested in using NSUserDefaultsController, so that I get notifications when things change. Below is my current code. items = /* NSArray of MYItem's */; NSData* data = [NSKeyedArchiver archivedDataWithRootObject:items]; [[NSUserDefaults standardUserDefaults] setObject:data forKey:kMYItems]; How should I rework my code to store items in NSUserDefaultsController ? Is NSKeyedArchiver the smartest way to store arrays? @interface MYItem : NSObject <NSCoding> { NSString* name; NSString* path; } @property (copy) NSString* name; @property (copy) NSString* path; @end @implementation MYItem @synthesize name, path; -(void)encodeWithCoder:(NSCoder*)coder { [coder encodeObject:name forKey:@"name"]; [coder encodeObject:path forKey:@"path"]; } -(id)initWithCoder:(NSCoder*)coder { [super init]; [self setName:[coder decodeObjectForKey:@"name"]]; [self setPath:[coder decodeObjectForKey:@"path"]]; return self; } @end

    Read the article

  • Java: dangerous self-returning-recursive function by IOException?

    - by HH
    I had very errorsome Exception handling with if-clauses. An exception occurs if not found path. An exception returns the function again. The function is recursive. Safe? $ javac SubDirs.java $ java SubDirs Give me an path. . HELLO com TOASHEOU google common annotations base collect internal Give me an path. IT WON'T FIND ME, SO IT RETURNS ITSELF due to Exception caught Give me an path. $ cat SubDirs.java import java.io.*; import java.util.*; public class SubDirs { private List<File> getSubdirs(File file) throws IOException { List<File> subdirs = Arrays.asList(file.listFiles(new FileFilter() { public boolean accept(File f) { return f.isDirectory(); } })); subdirs = new ArrayList<File>(subdirs); List<File> deepSubdirs = new ArrayList<File>(); for(File subdir : subdirs) { deepSubdirs.addAll(getSubdirs(subdir)); } subdirs.addAll(deepSubdirs); return subdirs; } public static void search() { try{ BufferedReader in = new BufferedReader(new InputStreamReader(System.in)); String s; System.out.println("Give me an path."); while ((s = in.readLine()) != null && s.length() != 0){ SubDirs dirs = new SubDirs(); List<File> subDirs = dirs.getSubdirs(new File(s)); for ( File f : subDirs ) { System.out.println(f.getName()); } System.out.println("Give me an path."); } }catch(Exception e){ // Simple but is it safe? search(); } } public static void main(String[] args) throws IOException { search(); } }

    Read the article

  • Locking behaviour is different via network shares

    - by MattH
    I have been trying to lock a file so that other cloned services cannot access the file. I then read the file, and then move the file when finished. The Move is allowed by using FileShare.Delete. However in later testing, we found that this approach does not work if we are looking at a network share. I appreciate my approach may not have been the best, but my specific question is: Why does the below demo work against the local file, but not against the network file? The more specific you can be the better, as I've found very little information in my searches that indicates network shares behave differently to local disks. string sourceFile = @"C:\TestFile.txt"; string localPath = @"C:\MyLocalFolder\TestFile.txt"; string networkPath = @"\\MyMachine\MyNetworkFolder\TestFile.txt"; File.WriteAllText(sourceFile, "Test data"); if (!File.Exists(localPath)) File.Copy(sourceFile, localPath); foreach (string path in new string[] { localPath, networkPath }) { using (FileStream fsLock = File.Open(path, FileMode.Open, FileAccess.ReadWrite, (FileShare.Read | FileShare.Delete))) { string target = path + ".out"; File.Move(path, target); //This is the point of failure, when working with networkPath if (File.Exists(target)) File.Delete(target); } if (!File.Exists(path)) File.Copy(sourceFile, path); }

    Read the article

  • Read alphanumeric characters from csv file in C#

    - by Prasad
    I am using the following code to read my csv file: public DataTable ParseCSV(string path) { if (!File.Exists(path)) return null; string full = Path.GetFullPath(path); string file = Path.GetFileName(full); string dir = Path.GetDirectoryName(full); //create the "database" connection string string connString = "Provider=Microsoft.ACE.OLEDB.12.0;" + "Data Source=\"" + dir + "\\\";" + "Extended Properties=\"text;HDR=Yes;FMT=Delimited;IMEX=1\""; //create the database query string query = "SELECT * FROM " + file; //create a DataTable to hold the query results DataTable dTable = new DataTable(); //create an OleDbDataAdapter to execute the query OleDbDataAdapter dAdapter = new OleDbDataAdapter(query, connString); //fill the DataTable dAdapter.Fill(dTable); dAdapter.Dispose(); return dTable; } But the above doesn't reads the alphanumeric value from the csv file. it reads only i either numeric or alpha. Whats the fix i need to make to read the alphanumeric values? Please suggest.

    Read the article

  • Issues with securing ELMAH file

    - by Kumar
    I am trying to allow the access to the elmah.axd file for only a perticular login and all others should be denied. I have followed Phil Haack's tutorial for securing the file. <httpHandlers> <remove verb="*" path="*.asmx"/> <add verb="*" path="*.asmx" validate="false" type="System.Web.Script.Services.ScriptHandlerFactory, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> <add verb="*" path="*_AppService.axd" validate="false" type="System.Web.Script.Services.ScriptHandlerFactory, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35"/> <add verb="GET,HEAD" path="ScriptResource.axd" type="System.Web.Handlers.ScriptResourceHandler, System.Web.Extensions, Version=3.5.0.0, Culture=neutral, PublicKeyToken=31BF3856AD364E35" validate="false"/> <add verb="POST,GET,HEAD" path="admin/elmah.axd" type="Elmah.ErrorLogPageFactory, Elmah" /> </httpHandlers> <location path="admin"> <system.web> <authorization> <allow users="[email protected]"/> <deny users="*"/> </authorization> </system.web> </location> First I logged in as [email protected] and tried to access the http://localhost:58961/admin/elmah.axd file and I am rightly being redirected to the Login.aspx page. Next I logged in as [email protected] and was able to access the elmah file at http://localhost:58961/admin/elmah.axd. Now I logged in again as [email protected] and I was able to access the emlah file now. What is the reason for this behavior?

    Read the article

  • Proving that the distance values extracted in Dijkstra's algorithm is non-decreasing?

    - by Gail
    I'm reviewing my old algorithms notes and have come across this proof. It was from an assignment I had and I got it correct, but I feel that the proof certainly lacks. The question is to prove that the distance values taken from the priority queue in Dijkstra's algorithm is a non-decreasing sequence. My proof goes as follows: Proof by contradiction. Fist, assume that we pull a vertex from Q with d-value 'i'. Next time, we pull a vertex with d-value 'j'. When we pulled i, we have finalised our d-value and computed the shortest-path from the start vertex, s, to i. Since we have positive edge weights, it is impossible for our d-values to shrink as we add vertices to our path. If after pulling i from Q, we pull j with a smaller d-value, we may not have a shortest path to i, since we may be able to reach i through j. However, we have already computed the shortest path to i. We did not check a possible path. We no longer have a guaranteed path. Contradiction.

    Read the article

< Previous Page | 306 307 308 309 310 311 312 313 314 315 316 317  | Next Page >