Search Results

Search found 107 results on 5 pages for 'developement'.

Page 5/5 | < Previous Page | 1 2 3 4 5 

  • ask help: I need to create a demo application in Java to test my new designed Java Api

    - by Christophe
    A new programmer needs yourhelp. I'm working on a porject of re-developement of Java driver for the company's PIN pad terminals. the Java Api (CPXApplicationUpdate) will allow the applications in pinpads to be updated and to be downloaded at different speed (Baud rate). the Java Api was created. i followed the protocolto build the message. the message is to send to a RS-232 port. i'm trying to use setter and getter to let the code work as an API. import java.io.InputStream; import java.io.OutputStream; import java.util.Properties; public class CPXApplicationUpdate extends CPXCommand { private int speed; // TODO: temporary variable for baud rate test stub. // speed: baud rate of the maintenance application performing DL /** Creates a new instance of CPXApplicationUpdate */ public CPXApplicationUpdate() { speed = 9600; // no baud rate change CPXProcessor.logger.fine("-------CPXApplicationUpdate constructor"); // setParam("timeout", _cmdInfo.getDefaultParValue("timeout")); } public CPXApplicationUpdate(int speedinit) { speed = speedinit; // TODO: where to get the speed? wait for user input. CPXProcessor.logger.fine("-------CPXApplicationUpdate constructor"); // setParam("timeout", _cmdInfo.getDefaultParValue("timeout")); } public void setSpeed(int speed){ this.speed = speed; } protected void buildRequest() throws ElitePortException { String trans = ""; // build the full-qualified message trans = addToRequest(trans, (char) 0); trans = addToRequest(trans, (char) 5); trans = addToRequest(trans, (char) 6); trans = addToRequest(trans, (char) 0); trans = addToRequest(trans, (char) 0); trans = addToRequest(trans, (char) 2); switch (speed) { case 9600: trans = addToRequest(trans, (char) 0x09); break; case 19200: trans = addToRequest(trans, (char) 0x0A); break; case 115200: trans = addToRequest(trans, (char) 0x0E); break; default: // TODO: unexpected baud rate. throw(); break; } trans = EncryptBinary(trans); trans = "F0." + trans; wrapRequest(trans); } protected String addToRequest(String req, char c) { CPXProcessor.logger.fine("adding char to request: I-" + (int) c + " C-" + c + " H-" + Integer.toHexString((int) c)); return req + c; } protected String addToRequest(String req, String s) { CPXProcessor.logger.fine("adding String to request: S-" + s); return req + s; } protected String addToRequest(String req) { return req; } public void analyzeResponse() { String response_transaction, response; int absLen = _response.length(); if (absLen < 4) return; response = _response.substring(3); CPXProcessor.logger.fine("stripped response=[" + response + "]"); for (int i = 0; i < response.length(); i++) { char c = response.charAt(i); CPXProcessor.logger.fine("[" + i + "] = " + c + " <> " + Integer.toHexString((int) c)); } int status = (short) response.charAt(3); CPXProcessor.logger.fine("status = " + status); _outputValues.put("status", "" + status); } please help me to correct the code. Now, i need to create a demo application to test if this java driver (Java Api) works. the value of the speed can be input by users (command line), or creat property files. how can i do that?

    Read the article

  • CodePlex Daily Summary for Wednesday, December 19, 2012

    CodePlex Daily Summary for Wednesday, December 19, 2012Popular ReleasesToolbox for Dynamics CRM 2011: XrmToolBox (1.0.0.0): Initial Release Contains following tools: Attribute Bulk Updater Iconator Role Updater Scripts Finder SiteMap Editor Solution Import View Layout Replicator WebResources Manager Also include the sample tool described in the documentation "How to develop your own tool" More tools to come later...NB_Store - Free DotNetNuke Ecommerce Catalog Module: NB_Store v2.3.3 Rel0: DNN 5.3.2 and above, and DNN 6 Compatible - Some release notes are discussed here. Important : v2.3.3 requires the Back Office module to be placed onto a seperate page to the productlist. During the upgrade process, this module retains your existing configuration by not overwriting any existing settings and templates. If you wish to reset your configuration to gain all new settings and templates, please review this KB article. Please view the following documentation if you are installing ...F# PowerPack with F# Compiler Source Drops: PowerPack for FSharp 3.0 + .NET 4.x + VS2010: This is a release of the old FSharp Power Pack binaries recompiled for F# 3.0, .NET 4.0/4.5 and Silveright 5. NOTE: This is for F# 3.0 & .NET 4.0 or F# 3.0 & Silverlight 5 NOTE: The assemblies are no longer strong named NOTE: The assemblies are not added to the GAC NOTE: In some cases functionality overlaps with F# 3.0, e.g. SI Units of measurecodeSHOW: codeSHOW AppPackage Release 16: This release is a package file built out of Visual Studio that you can side load onto your machine if for some reason you don't have access to the Windows Store. To install it, just unzip and run the .ps1 file using PowerShell (right click | run with PowerShell). Attention: if you want to download the source code for codeSHOW, you're in the wrong place. You need to go to the SOURCE CODE tab.Move Mouse: Move Mouse 2.5.3: FIXED - Issue where it errors on load if the screen saver interval is over 333 minutes.LINUX????????: LINUX????????: LINUX????????cnbeta: cnbeta: cnbetaCSDN ??: CSDN??????: CSDN??????PowerShell Community Extensions: 2.1.1 Production: PowerShell Community Extensions 2.1.1 Release NotesDec 16, 2012 This version of PSCX supports both Windows PowerShell 2.0 and 3.0. Bug fix for HelpUri error with the Get-Help proxy command. See the ReleaseNotes.txt download above for more information.VidCoder: 1.4.11 Beta: Added Hungarian translation, thanks to Brechler Zsolt. Update HandBrake core to SVN 5098. This update should fix crashes on some files. Updated the enqueue split button to fit in better with the active Windows theme. Updated presets to use x264 preset/profile/level.???: Cnblogs: CNBLOGSSandcastle Help File Builder: SHFB v1.9.6.0 with Visual Studio Package: General InformationIMPORTANT: On some systems, the content of the ZIP file is blocked and the installer may fail to run. Before extracting it, right click on the ZIP file, select Properties, and click on the Unblock button if it is present in the lower right corner of the General tab in the properties dialog. This new release contains bug fixes and feature enhancements. There are some potential breaking changes in this release as some features of the Help File Builder have been moved into...Electricity, Gas and Temperature Monitoring with Netduino Plus: V1.0.1 Netduino Plus Monitoring: This is the first stable release from the Netduino Plus Monitoring program. Bugfixing The code is enhanced at some places in respect to the V0.6.1 version There is a possibility to add multiple S0 meters Website for realtime display of data Website for configuring the Netduino Comments are welcome! Additions will not be made to this version. This is the first and last major Netduino Plus V1 release. The new development will take place with the Netduino Plus V2 development board in mi...Windows Store Application Library: Windows Store Application Library - 1.1.1.0: Windows Store Application Library StoreAppLib can be installed from Visual Studio "Manage NuGet Packages" tool. This release of Windows Store Application Library contains following controls and utilities. DatePicker control TimePicker control PageHeaderTextBlock control with Global Navigation Menu Popup manager AppBarButton control TapEffect animation DateTimeConverter ConcatenationConverter CountConverterCRM 2011 Visual Ribbon Editor: Visual Ribbon Editor (1.3.1116.8): [FIX] Fixed issue not displaying CRM system button images correctly (incorrect path in file VisualRibbonEditor.exe.config)My Expenses Windows Store LOB App Demo: My Expenses Version 1: This is version 1 of the MyExpenses Windows 8 line of business demo app. The app is written in XAML and C#. It calls a WCF service that works with a SQL Server database. The app uses the Callisto toolkit. You can get it at https://github.com/timheuer/callisto. The Expenses.sql file contains the SQL to create the Expenses database. The ExpensesWCFService.zip file contains the WCF service, also written in C#. You should create a WCF service. Create an Entity Framework model and point it to...Manage upload files for SP 2010: Manage upload files (SP 2010) 1.0.0: Version 1.0.0: Manage upload file size on specific application page Simple in use Simple installation Work on: SharePoint Foundation 2010 Sharepoint Server 2010 (Standard, Enterprise) Localized: English RussianMCEBuddy Viewer: MCEBuddy Viewer 1.0.0 Beta: MCEBuddy Viewer for MCEBuddy 2.x Windows Media Center Add-On to view the current job status of MCEbuddy. Requirements: 1. Installed MCEBuddy 2.x (tested on release 2.3.7-2.3.10) http://mcebuddy2x.codeplex.com 2. Windows Media Center (tested on Windows 7 Pro 32-bit&64-bit, Windows 8 Pro with WMC 64-bit) Before installing the new version of Plug-in uninstall old version through windows control panelBlackJumboDog: Ver5.7.4: 2012.12.13 Ver5.7.4 (1)Web???????、???????????????????????????????????????????VFPX: ssClasses A1.0: My initial release. See https://vfpx.codeplex.com/wikipage?title=ssClasses&referringTitle=Home for a brief description of what is inside this releaseNew ProjectsAutonomic Middleware: Reflective middleware using workflow that makes the middleware autonomic.Battleforge: Assault: A card battle game. This project is being built using Silverlight 4 in C#.ChurajPatterns: Design patterns testing and overview console application.FimExplorer: Tool for executing XPath queries against FIM without going through it's web portal.Financial Management Studio: This is a WPF application for the financial management. Will use bunch of technologies such as: MVVM, Microsoft Extension Framework and Entities Framework.iJob: Do u no what is this?Developed with C#.net3.5 MSSQL2008Interaction Production Server: A software based networked lighting controller. It brokers many protocols together to allow easy setup and development of new stage lighting controllers.Interface weaver Custom Tool: A CustomTool for vs auto implementing interface based on aspects (auto INotifyPropertychanged data context implementation, auto command mapping...).IntroductionWeb: This is the second time for us to build something extraordinaryiSteam: iSteam is a product being developed focusing on the Steamworks platform, to advertise and centralize everything about steam in one application.iSun_PLS: iSun PLS is a Photo libary System, to help you manager your pictures on your server!LSharp: A Scripting Language Interpreter for .NETMassive Dangerzone: Don't try this at home.MinGuid: An alternative / replacement for those long Guid strings, simply call the function in the library which generates the Unique 16 character string.Nx Portable Framework: Framework aiming to speed up cross platform movile developement.Orchard Training Demo module: Demo Orchard module for training purposes. This module completes the training materials at http://english.orchardproject.hu/Training/Oriol ASAP: ASAPPanopticonize API: This project provides code samples for the panopticonize.com video thumbnailing API.Registry Editor Navigator: The small utility that takes a path and makes Regedit open to that path. Similar to RegJump but it has UI, uses clipboard and has a global keyboard hook. SafetyExam: ??????????????Simple Queuing System: This project is created to show you how queuing system can be implemented in MSMQ in C#. The sample is implemented from real life queuing system. TypeScript plugin enhancements for VS 2010 add-in: This add-in allows to - Compile .ts files by saveVisual Studio Help Downloader 2012: Tool for downloading the Visual Studio 2012 help packages for offline useWebGoat.NET test repository: THis is a clone of the WebGoat.NET project hosted at GitHub, provided here for those who need to be able to have a TFS-accessible copy of WebGoat.WebPythonHost: A .NET application hosting web python environment.Wpf Sqlite Management: about 1 month i publish this project and use avalon edit and avalon doc in my project WPFSchematics: The WPFSchematics is a vector graphic interactive system,and based on WPF graphics technology.XEasyFileSearch: easy and quick file searcherZweiBooks: Plugin for a Bukkit-Server.

    Read the article

  • WCF- Large Data

    - by Pinu
    I have a WCF Web Service with basicHTTPBinding , the server side the transfer mode is streamedRequest as the client will be sending us large file in the form of memory stream. But on client side when i use transfer mode as streamedRequest its giving me a this errro "The remote server returned an error: (400) Bad Request" And when i look in to trace information , i see this as the error message Exception: There is a problem with the XML that was received from the network. See inner exception for more details. InnerException: The body of the message cannot be read because it is empty. I am able to send up to 5MB of data using trasfermode as buffered , but it will effect the performance of my web service in the long run , if there are many clients who are trying to access the service in buffered transfer mode. SmartConnect.Service1Client Serv = new SmartConnectClient.SmartConnect.Service1Client(); SmartConnect.OrderCertMailResponse OrderCert = new SmartConnectClient.SmartConnect.OrderCertMailResponse(); OrderCert.UserID = "abcd"; OrderCert.Password = "7a80f6623"; OrderCert.SoftwareKey = "90af1"; string applicationDirectory = @"\\inid\utty\Bran"; byte[] CertMail = File.ReadAllBytes(applicationDirectory + @"\5mb_test.zip"); MemoryStream str = new MemoryStream(CertMail); //OrderCert.Color = true; //OrderCert.Duplex = false; //OrderCert.FirstClass = true; //OrderCert.File = str; //OrderCert.ReturnAddress1 = "Test123"; //OrderCert.ReturnAddress2 = "Test123"; //OrderCert.ReturnAddress3 = "Test123"; //OrderCert.ReturnAddress4 = "Test123"; OrderCert.File = str; //string OrderNumber = ""; //string Password = OrderCert.Password; //int ReturnCode = 0; //string ReturnMessage = ""; //string SoftwareKey = OrderCert.SoftwareKey; //string UserID = OrderCert.UserID; //OrderCert.File = str; MemoryStream FileStr = str; Serv.OrderCertMail(OrderCert); // Serv.OrderCertMail(ref OrderNumber, ref Password, ref ReturnCode, ref ReturnMessage, ref SoftwareKey, ref UserID, ref FileStr ); lblON.Text = OrderCert.OrderNumber; Serv.Close(); // My Web Service - Service Contract [OperationContract] OrderCertMailResponse OrderCertMail(OrderCertMailResponse OrderCertMail); [MessageContract] public class OrderCertMailResponse { string userID = ""; string password = ""; string softwareID = ""; MemoryStream file = null; //MemoryStream str = null; [MessageHeader] //[DataMember] public string UserID { get { return userID; } set { userID = value; } } [MessageHeader] //[DataMember] public string Password { get { return password; } set { password = value; } } [MessageHeader] //[DataMember] public string SoftwareKey { get { return softwareID; } set { softwareID = value; } } [MessageBodyMember] // [DataMember] public MemoryStream File { get { return file; } set { file = value; } } [MessageHeader] //[DataMember] public string ReturnMessage; [MessageHeader] //[DataMember] public int ReturnCode; [MessageHeader] public string OrderNumber; //// Control file fields //[MessageHeader] ////[DataMember] //public string ReturnAddress1; //[MessageHeader] ////[DataMember] //public string ReturnAddress2; //[MessageHeader] ////[DataMember] //public string ReturnAddress3; //[MessageHeader] ////[DataMember] //public string ReturnAddress4; //[MessageHeader] ////[DataMember] //public bool FirstClass; //[MessageHeader] ////[DataMember] //public bool Color; //[MessageHeader] ////[DataMember] //public bool Duplex; } [ServiceBehavior(IncludeExceptionDetailInFaults = true)] public class Service1 : IService1 { public OrderCertMailResponse OrderCertMail(OrderCertMailResponse OrderCertMail) { OrderService CertOrder = new OrderService(); ClientUserInfo Info = new ClientUserInfo(); ControlFileInfo Control = new ControlFileInfo(); //Info.Password = "f2496623"; // hard coded password for development testing purposes //Info.SoftwareKey = "6dbb71"; // hard coded software key this is a developement software key //Info.UserName = "sdfs"; // hard coded UserID - for testing Info.UserName = OrderCertMail.UserID.ToString(); Info.Password = OrderCertMail.Password.ToString(); Info.SoftwareKey = OrderCertMail.SoftwareKey.ToString(); //Control.ReturnAddress1 = OrderCertMail.ReturnAddress1; //Control.ReturnAddress2 = OrderCertMail.ReturnAddress2; //Control.ReturnAddress3 = OrderCertMail.ReturnAddress3; //Control.ReturnAddress4 = OrderCertMail.ReturnAddress4; //Control.CertMailFirstClass = OrderCertMail.FirstClass; //Control.CertMailColor = OrderCertMail.Color; //Control.CertMailDuplex = OrderCertMail.Duplex; //byte[] CertFile = new byte[0]; //byte[] CertFile = null; //string applicationDirectory = @"\\intrepid\utility\Bryan"; // byte[] CertMailFile = File.ReadAllBytes(applicationDirectory + @"\3mb_test.zip"); //MemoryStream str = new MemoryStream(CertMailFile); OrderCertMailResponseClass OrderCertResponse = CertOrder.OrderCertmail(Info,Control,OrderCertMail.File); OrderCertMail.ReturnMessage = OrderCertResponse.ReturnMessage.ToString(); OrderCertMail.ReturnCode = Convert.ToInt32(OrderCertResponse.ReturnCode.ToString()); OrderCertMail.OrderNumber = OrderCertResponse.OrderNumber; return OrderCertMail; }

    Read the article

  • CodePlex Daily Summary for Tuesday, October 25, 2011

    CodePlex Daily Summary for Tuesday, October 25, 2011Popular ReleasesScrum Task Board Card Creator: TaskCardCreator 2.5.0.0: What's New: UX improvement: Loading of work items is done in a worker thread Use memory, not the file system, when creating reports for better performance UI improvement: Better parent/child relation between the TeamProjectPicker and MainWindow Microsoft Visual Studio Scrum 1.0: Dedicated Impediment card added Supported Templates: Microsoft Visual Studio Scrum 1.0 Product Backlog Item, Task, Impediment, and Bug MSF for Agile Software Development v5.0 User Story, Task, and BugSubtitleTools: SubtitleTools 1.9: - Improved: Some DVD players need a mandatory UTF8-BOM (http://en.wikipedia.org/wiki/Byteordermark) at the beginning of the file to show RTL subtitles correctly.THE NVL Maker: The NVL Maker Ver 3.06: 3.06 ??? ??3.04,???CG MODE?? ??3.05—— ??????????????????????????????? ?????????config.tjs????????(??????????????????????????) ????config.tjs???,????????????,????????????Config.tjs。(???????,?????????,???KAGConfig??) ???????“????”??,??????????????????(Data) ??????????????????? ???????????,????????,??????????? ?fadeoutbgm?????????,???????????????,?????????? ????????,???“??????”??。(??????????macro_edu.ks??) ????????,????????A??????,???“??????”。 ?????????????,???????B??????,???“...Xomega Framework: Xomega.Framework 1.2: Release 1.2 of Xomega Framework refactors projects to allow generating assemblies for different target frameworks and profiles and allows deploying it as a NuGet package. It also includes some small fixes to the service and presentation layer classes.People's Note: People's Note 0.31: Added note tag editing. Changed note edit conflict resolution to keep the latest version. To install: copy the appropriate CAB file onto your WM device and run it.Windows Azure Toolkit for Windows Phone: Windows Azure Toolkit for Windows Phone v1.3.1: Upgraded Windows Azure projects to Windows Azure Tools for Microsoft Visual Studio 2010 1.5 – September 2011 Upgraded the tools tools to support the Windows Phone Developer Tools RTW Update SQL Azure only scenarios to use ASP.NET Universal Providers (through the System.Web.Providers v1.0.1 NuGet package) Changed Shared Access Signature service interface to support more operations Refactored Blobs API to have a similar interface and usage to that provided by the Windows Azure SDK Stor...xUnit.net Contrib: xunitcontrib-resharper 0.4.4 (dotCover): xunitcontrib release 0.4.4 (ReSharper runner) This release provides a test runner plugin for Resharper 6.0 RTM, targetting all versions of xUnit.net. (See the xUnit.net project to download xUnit.net itself.) This release addresses the following issues:Support for dotCover code coverage 4132 Note that this build work against ALL VERSIONS of xunit. The files are compiled against xunit.dll 1.8 - DO NOT REPLACE THIS FILE. Thanks to xunit's version independent runner system, this package can r...BookShop: BookShop: BookShop WP7 clientRibbon Editor for Microsoft Dynamics CRM 2011: Ribbon Editor (0.1.2122.266): Added CodePlex and PayPal links New icon Bug fix: can't connect to an IFD deployment when the discovery service url has been customizedDotNet.Framework.Common: DotNet.Framework.Common 4.0: ??????????,????????????XML Explorer: XML Explorer 4.0.5: Changes in 4.0.5: Added 'Copy Attribute XPath to Address Bar' feature. Added methods for decoding node text and value from Base64 encoded strings, and copying them to the clipboard. Added 'ChildNodeDefinitions' to the options, which allows for easier navigation of parent-child and ID-IDREF relationships. Discovery happens on-demand, as nodes are expanded and child nodes are added. Nodes can now have 'virtual' child nodes, defined by an xpath to select an identifier (usually relative to ...Media Companion: MC 3.419b Weekly: A couple of minor bug fixes, but the important fix in this release is to tackle the extremely long load times for users with large TV collections (issue #130). A note has been provided by developer Playos: "One final note, you will have to suffer one final long load and then it should be fixed... alternatively you can delete the TvCache.xml and rebuild your library... The fix was to include the file extension so it doesn't have to look for the video file (checking to see if a file exists is a...CODE Framework: 4.0.11021.0: This build adds a lot of our WPF components, including our MVVC and MVC components as well as a "Metro" and "Battleship" style.GridLibre para Visual FoxPro: GridLibre para Visual FoxPro v3.5: GridLibre Para Visual FoxPro: esta herramienta ayudara a los usuarios y programadores en los manejos de los datos, como Filtrar, multiseleccion y el autoformato a las columnas como la asignacion del controlsource.WiX Toolset: WiX v3.6 Beta: First beta release of WiX v3.6. The primary focus is on Burn but there are also many small bug fixes to the core toolset. For more information see: http://robmensching.com/blog/posts/2011/10/24/WiX-v3.6-Beta-releasedUmbraco CMS: Umbraco 5.0 CMS Alpha 3: Umbraco 5 Alpha 3Umbraco 5 (aka Jupiter) will be the next version of everyone's favourite, friendly ASP.NET CMS that already powers over 100,000 websites worldwide. Try out the Alpha of v5 today! If you're new to Umbraco and would like to get a low-down on our popular and easy-to-learn approach to content management, check out our intro video. What's Alpha 3?This is our third Alpha release. It's intended for developers looking to become familiar with the codebase & architecture, or for thos...Vkontakte WP: Vkontakte: source codeWay2Sms Applications for Android, Desktop/Laptop & Java enabled phones: Way2SMS Desktop App v2.0: 1. Fixed issue with sending messages due to changes to Way2Sms site 2. Updated the character limit to 160 from 140GART - Geo Augmented Reality Toolkit: 1.0.1: About Release 1.0.1 Release 1.0.1 is a service release that addresses several issues and improves performance. As always, check the Documentation tab for instructions on how to get started. If you don't have the Windows Phone SDK yet, grab it here. Breaking Change Please note: There is a breaking change in this release. As noted below, the WorldCalculationMode property of ARItem has been replaced by a user-definable function. ARItem is now automatically wired up with a function that perform...Microsoft Ajax Minifier: Microsoft Ajax Minifier 4.32: Fix for issue #16710 - string literals in "constant literal operations" which contain ASP.NET substitutions should not be considered "constant." Move the JS1284 error (Misplaced Function Declaration) so it only fires when in strict mode. I got a couple complaints that people didn't like that error popping up in their existing code when they could verify that the location of that function, although not strict JS, still functions as expected cross-browser.New ProjectsApiDiff.Net: API Difference/Reporting project written in C# using the wonderful Cecil engine (http://www.mono-project.com/Cecil) to show differences between versions of a public API. Something like the unsupported MS tool "libcheck"Aspect Oriented Programming with .Net: Demo project using PostSharp for AOP in .Net.CCBBAA: CCBBAACdf.Iris.MiniProjetCalculateur: Application Client / Serveur calculateur en langage CCmjSiverlight: a silverlight libraryCSharpKaartSpel: Super Kaart Spel.Developer Team Article System Management: Developer Team Article System Management Makes it easier for Authors to publish their articles . It developed in VB.NET .DirectoryMonitor: DirectoryMonitorDNN Administrador de Tareas: Un Proyecto de codigo abierto Domek: Taki sobie domekEDXGraphics: This is Edward(Shiqiu) Liu's personal code repository. Projects here are primarily about Graphics, AI and Algorithms. For more introduction, please visit [url:www.edxgraphics.com] Enterprise SSIS Framework: The Enterprise SSIS Framework is a project intended to simplify the management of an organization’s administration and ETL assets by abstracting the coordination and control flow into metadata. This project consists of the four parts: - Core SSIS Packages: A set of packages that are responsible for workflow within the framework - SQL Server 2008 DB: Holds all the metadata necessary to drive the application - Administration App: A web-based front end to facilitate managing assets running ...FIM Task Sequencer "RunJob": Runjob is a simple batch controller for FIM (MIIS and ILM) for starting and monitoring the execution of FIM Run Profiles that allows for complex (looping and branching) sequences to be put together with a simple XML 'task' file. Key features include: * Works with MIIS / ILM / FIM * Optionally Connects to the SQL database to verify that run profiles exist * Can execute arbitrary tasks via a command line. * Based on the results of command line or previous run history can loop and jump ...Ham Bone Soup amateur radio software and electronic log: Ham Bone Soup is a open source software written for satisfying the needs of Amateur Radio operators. The central feature is an especially flexible logging system for acommodating contests and general purpose logs, but will grow to include many other vital Amateur radio features. It doesn't do anything yet, we are just geting started.H? th?ng qu?n lý chi tiêu - windows phone: H? th?ng qu?n lý chi tiêu - windows phoneJavascript Editor for SharePoint: Javascript Editor for SharePoint is a lightweight, in-browser editor that lets you quickly prototype and test custom javascript code in SharePointLegoWeb: Open source Web CMS base on ASP.NET Webparts + MARCXML metadata: LegoWeb is an open source web content management solution developed base on combination of ASP.NET 2.0 Webparts and MARCXML Metadata. It is very simple and very flexible. LuaXna: An simple engine that allow to devolop in LUA for XNA. It have logging feature and cycles.Manager Game: Student project for game developement course. Using XNA 4.0 for Windows platform.Metroed: A Metro version of the PhoneyTools (a WP7 toolkit) for use with C#/VB WinRT applications.My Masters Sample Project for Sharepoint 2010: The feature stabling example project which is provide to deploy custom master page to personel sites on Sharepoint 2010 The solution is anwering fallowing questions : * How to deploy a custom master page ? * How to customize a masterpage ? * How to attach custom master page to personal sites using stabling feature ? NDepend TFS 2010 integration: NDepend TFS 2010 integration provides build activities, a build report customization addin, and extends the TFS Warehouse in order to leverage NDepend quality statistics for your projects. Open Source Renderer: Open Source RendererPearTunes: Peartunes is a university project.Plugin Framework Web: Lighweight plugin framework for web applicationsQTP TFS Generic Test Integration: In Microsoft Visual Studio 2010 there is a Generic Test type that allows you to integrate with automation tools like QTP. I have created a pretty simple solution that allows you to use your existing QTP automation scripts within the Microsoft Visual Studio testing framework and here's a sample below. The key part of this solution is transforming HP's QTP format to Microsoft’s Generic Test format so that you can publish the results to TFS. The added benefit of this integration is that you c...RequiemDream: the project for manage workflow records reexecute to helping developers for debugging.Rift Addon Studio 2010: Rift AddOn Studio (AOS) is an open source development environment designed to bring a Visual Studio-like experience to building Rift AddOns. For more information on exactly what AOS does, check out the list of features below. Small Database Tools: This is a project for me to create small tools I created for database related functions.SQL Azure Membership, Profile, Role provider starter kit for MVC3 project: When you use out of box MVC 3 site template the Membership, Profile and Role provider DB is created as attached MDF file by the name AspNetDB.mdf. This project has needed steps to easily migrate this DB into SQL Azure. This is a complete MVC3 Starter site project and could be used for your next 'Big Thing' as soon as properly setup. Enjoy :)SQL Server BareMetal Hands-on-Labs: The SQL Server BareMetal Hands-on-Labs project allows you to build a SQL Server Hands-on-Lab Enviroment from scratch, using Windows Server 2008 R2 SP1 Hyper-V. State Theater Website: Building a website designed to provide information about live theater throughout a state. Basically, it a port of NJTheater.com from classic ASP to Asp.Net making it customizable to any state along the way.Static web generator: Zoltar let you generate your website (blog, personl website,etc) from a set of md files. Ukulele Chord Finder: Ukulele Chord FinderUser Profile Cleaner: This application allows you to manage via GUI or command line user profiles, removed the profiles no longer used by a number of days. The application allows you to set a list of profiles that can be excluded from deletion. Virtual Visit: This project have made the virtual visite for your siteWP7 Open source project collection by eLite: ??Windows Phone????????zebrawebservice: ??AWB,??OPS??

    Read the article

  • CodePlex Daily Summary for Sunday, November 20, 2011

    CodePlex Daily Summary for Sunday, November 20, 2011Popular ReleasesFree SharePoint 2010 Sites Templates: SharePoint Server 2010 Sites Templates: here is the list of sites templates to be downloadednopCommerce. Open source shopping cart (ASP.NET MVC): nopcommerce 2.30: Highlight features & improvements: • Performance optimization. • Back in stock notifications. • Product special price support. • Catalog mode (based on customer role) To see the full list of fixes and changes please visit the release notes page (http://www.nopCommerce.com/releasenotes.aspx).Cetacean Monitoring: Cetacean Monitoring Project Release V 0.1: This is a zip with a working executable for evaluation purposes.WPF Converters: WPF Converters V1.2.0.0: support for enumerations, value types, and reference types in the expression converter's equality operators the expression converter now handles DependencyProperty.UnsetValue as argument values correctly (#4062) StyleCop conformance (more or less)Json.NET: Json.NET 4.0 Release 4: Change - JsonTextReader.Culture is now CultureInfo.InvariantCulture by default Change - KeyValurPairConverter no longer cares about the order of the key and value properties Change - Time zone conversions now use new TimeZoneInfo instead of TimeZone Fix - Fixed boolean values sometimes being capitalized when converting to XML Fix - Fixed error when deserializing ConcurrentDictionary Fix - Fixed serializing some Uris returning the incorrect value Fix - Fixed occasional error when...Media Companion: MC 3.423b Weekly: Ensure .NET 4.0 Full Framework is installed. (Available from http://www.microsoft.com/download/en/details.aspx?id=17718) Ensure the NFO ID fix is applied when transitioning from versions prior to 3.416b. (Details here) Replaced 'Rebuild' with 'Refresh' throughout entire code. Rebuild will now be known as Refresh. mc_com.exe has been fully updated TV Show Resolutions... Resolved issue #206 - having to hit save twice when updating runtime manually Shrunk cache size and lowered loading times f...Delta Engine: Delta Engine Beta Preview v0.9.1: v0.9.1 beta release with lots of refactoring, fixes, new samples and support for iOS, Android and WP7 (you need a Marketplace account however). If you want a binary release for the games (like v0.9.0), just say so in the Forum or here and we will quickly prepare one. It is just not much different from v0.9.0, so I left it out this time. See http://DeltaEngine.net/Wiki.Roadmap for details.ASP.net Awesome Samples (Web-Forms): 1.0 samples: Full Demo VS2008 Very Simple Demo VS2010 (demos for the ASP.net Awesome jQuery Ajax Controls)SharpMap - Geospatial Application Framework for the CLR: SharpMap-0.9-AnyCPU-Trunk-2011.11.17: This is a build of SharpMap from the 0.9 development trunk as per 2011-11-17 For most applications the AnyCPU release is the recommended, but in case you need an x86 build that is included to. For some dataproviders (GDAL/OGR, SqLite, PostGis) you need to also referense the SharpMap.Extensions assembly For SqlServer Spatial you need to reference the SharpMap.SqlServerSpatial assemblySQL Monitor - tracking sql server activities: SQLMon 4.1 alpha 5: 1. added basic schema support 2. added server instance name and process id 3. fixed problem with object search index out of range 4. improved version comparison with previous/next difference navigation 5. remeber main window spliter and object explorer spliter positionAJAX Control Toolkit: November 2011 Release: AJAX Control Toolkit Release Notes - November 2011 Release Version 51116November 2011 release of the AJAX Control Toolkit. AJAX Control Toolkit .NET 4 - Binary – AJAX Control Toolkit for .NET 4 and sample site (Recommended). AJAX Control Toolkit .NET 3.5 - Binary – AJAX Control Toolkit for .NET 3.5 and sample site (Recommended). Notes: - The current version of the AJAX Control Toolkit is not compatible with ASP.NET 2.0. The latest version that is compatible with ASP.NET 2.0 can be found h...MVC Controls Toolkit: Mvc Controls Toolkit 1.5.5: Added: Now the DateRanteAttribute accepts complex expressions containing "Now" and "Today" as static minimum and maximum. Menu, MenuFor helpers capable of handling a "currently selected element". The developer can choose between using a standard nested menu based on a standard SimpleMenuItem class or specifying an item template based on a custom class. Added also helpers to build the tree structure containing all data items the menu takes infos from. Improved the pager. Now the developer ...SharpCompress - a fully native C# library for RAR, 7Zip, Zip, Tar, GZip, BZip2: SharpCompress 0.7: Reworked API to be more consistent. See Supported formats table. Added some more helper methods - e.g. OpenEntryStream (RarArchive/RarReader does not support this) Fixed up testsSilverlight Toolkit: Windows Phone Toolkit - Nov 2011 (7.1 SDK): This release is coming soon! What's new ListPicker once again works in a ScrollViewer LongListSelector bug fixes around OutOfRange exceptions, wrong ordering of items, grouping issues, and scrolling events. ItemTuple is now refactored to be the public type LongListSelectorItem to provide users better access to the values in selection changed handlers. PerformanceProgressBar binding fix for IsIndeterminate (item 9767 and others) There is no longer a GestureListener dependency with the C...DotNetNuke® Community Edition: 06.01.01: Major Highlights Fixed problem with the core skin object rendering CSS above the other framework inserted files, which caused problems when using core style skin objects Fixed issue with iFrames getting removed when content is saved Fixed issue with the HTML module removing styling and scripts from the content Fixed issue with inserting the link to jquery after the header of the page Security Fixesnone Updated Modules/Providers ModulesHTML version 6.1.0 ProvidersnoneDotNetNuke Performance Settings: 01.00.00: First release of DotNetNuke SQL update queries to set the DNN installation for optimimal performance. Please review and rate this release... (stars are welcome)SCCM Client Actions Tool: SCCM Client Actions Tool v0.8: SCCM Client Actions Tool v0.8 is currently the latest version. It comes with following changes since last version: Added "Wake On LAN" action. WOL.EXE is now included. Added new action "Get all active advertisements" to list all machine based advertisements on remote computers. Added new action "Get all active user advertisements" to list all user based advertisements for logged on users on remote computers. Added config.ini setting "enablePingTest" to control whether ping test is ru...C.B.R. : Comic Book Reader: CBR 0.3: New featuresAdd magnifier size and scale New file info view in the backstage Add dynamic properties on book and settings Sorting and grouping in the explorer with new design Rework on conversion : Images, PDF, Cbr/rar, Cbz/zip, Xps to the destination formats Images, Cbz and XPS ImprovmentsSuppress MainViewModel and ExplorerViewModel dependencies Add view notifications and Messages from MVVM Light for ViewModel=>View notifications Make thread better on open catalog, no more ihm freeze, less t...Desktop Google Reader: 1.4.2: This release remove the like and the broadcast buttons as Google Reader stopped supporting them (no, we don't like this decission...) Additionally and to have at least a small plus: the login window now automaitcally logs you in if you stored username and passwort (no more extra click needed) Finally added WebKit .NET to the about window and removed Awesomium MD5-Hash: 5fccf25a2fb4fecc1dc77ebabc8d3897 SHA-Hash: d44ff788b123bd33596ad1a75f3b9fa74a862fdbRDRemote: Remote Desktop remote configurator V 1.0.0: Remote Desktop remote configurator V 1.0.0New ProjectsAutonomous Robot Combat: The project is about a Robotic game arena where 6-8 robots will engage in a team combat using infrared guns. The infrared guns will also have red light LEDs to simulate muzzle flash. Once the project finishes, it will be displayed in University of Plymouth.B2BPro: B2BPro best solution for businessBattlestar Galactica Fighters: Battlestar Galactica Fighters is a 3D vertical scrolling shoot 'em up. It's developed in C# and F# for the XNA Programming exam at Master in Computer Game Developement 2011/2012 in Verona, Italy.Content Compiler 3 - Compile your XNA media outside Visual Studio!: The Content Compiler helps you to compile your media files for use with XNA without using Visual Studio. After almost three years of Development, the third version of the CCompiler is nearly finished and we decided to put it up on Codeplex to "keep it alive".CreaMotion NHibernate Class Builder: NHibernate Class Builder C# , WPF Supports all type relations Supports MsSql, MySql -- Specially developed for NHibernate Learnersecs_tqdt_kd: Electric Custom System Thông quan di?n t? Kinh DoanhIMDb Helper: IMDb Helper is a C# library that provides access to information in the IMDb website. IMDb Helper uses web requests to access the IMDb website, and regular expressions to parse the responses (it doesn't use any external library, only pure .NET). Lion Solution: This is an open source Accounting project for small business usage. Developed by: Sleiman Jneidi Hussein Zawawi Management of Master Lists in SharePoint with Choice Filter Lookup column: Management of Master Lists in SharePoint with Choice Filter Lookup column you can view the detail of the project on http://sharepointarrow.blogspot.com/2011/11/management-of-master-lists-in.htmlMRDS FezMini Robot Brick: This is an attemp to write services for MRDS to control a FezMini Robot with a wireless connection attached to COM2 on the FezMini Board.MVC Route Unit Tester: Provides convenient, easy to use methods that let you unit test the route table in your ASP.NET MVC application. Unlike many libraries, this lets you test routes both ways -- both incoming and going. You can specify an incoming request and assert that it matches a given route (or that there are no matches). You can also specify route data and assert that a given URL will be generated by your application.MyWalk: MyWalk (codename: MyLife) is a novel health application that makes tracking walking a part of daily life. NGeo: NGeo makes it easier for users of geographic data to invoke GeoNames and Yahoo! GeoPlanet / PlaceFinder services. You'll no longer have to write your own GeoNames, GeoPlanet, or PlaceFinder clients. It's developed in ASP.NET 4.0, and uses WCF ServiceModel libraries to deserialize JSON data into Plain Old C# Objects.Octopus Tools: Octopus is an automated deployment server for .NET applications, powered by NuGet. OctopusTools is a set of useful command line and MSBuild tasks designed for automating Octopus.PDV Moveis: Loja MoveisReddit#: Reddit# is a Reddit library for C# or other .Net languages.Rubik: Rubik is, simply, a stab at creating a decent implementation of a Rubik's cube in WPF, and in the process aplying MVVM to the 3D game milieu.Sample Service-Oriented Architecture: Sample of service-oriented architecture using WCF.SFinger: SFinger adds two finger scrolling to synaptics touchpad on Windows. SigemFinal: Versión final del proyecto de diseñoSlResource: silverlight resource managementSonce - Simple ON-line Circuit Editor: Circuit Editor in Silverlight, unfinished student project written in C#Tricofil: Site da Tricofil com Administrador de ConteudoTwincat Ads .Net Client: This is the client implementation of the Ads/Ams protocol created by Beckhoff. (I'm not affiliated with Beckhoff) This implementation will be in C# and will not depend on other libraries. This means it can be used in silverlight and windows phone projects. This project is not finished yet!!WomanMagazine: This is a woman Online Magazine with lot of info and entertainment resources for women

    Read the article

  • CodePlex Daily Summary for Monday, April 09, 2012

    CodePlex Daily Summary for Monday, April 09, 2012Popular ReleasesStyleCop+: StyleCop+ 1.8: Built over StyleCop 4.7.17.0 According to http://stylecop.codeplex.com/workitem/7156, it should be the last version which is released without new features and only for compatibility reasons. Do not forget to Unblock the file after downloading (more details) Stay tuned!Path Copy Copy: 10.1: This release addresses the following work items: 11357 11358 11359 This release is a recommended upgrade, especially for users who didn't install the 10.0.1 version.ExtAspNet: ExtAspNet v3.1.3: ExtAspNet - ?? ExtJS ??? ASP.NET 2.0 ???,????? AJAX ?????????? ExtAspNet ????? ExtJS ??? ASP.NET 2.0 ???,????? AJAX ??????????。 ExtAspNet ??????? JavaScript,?? CSS,?? UpdatePanel,?? ViewState,?? WebServices ???????。 ??????: IE 7.0, Firefox 3.6, Chrome 3.0, Opera 10.5, Safari 3.0+ ????:Apache License 2.0 (Apache) ??:http://extasp.net/ ??:http://bbs.extasp.net/ ??:http://extaspnet.codeplex.com/ ??:http://sanshi.cnblogs.com/ ????: +2012-04-08 v3.1.3 -??Language="zh_TW"?JS???BUG(??)。 +?D...Coding4Fun Tools: Coding4Fun.Phone.Toolkit v1.5.5: New Controls ChatBubble ChatBubbleTextBox OpacityToggleButton New Stuff TimeSpan languages added: RU, SK, CS Expose the physics math from TimeSpanPicker Image Stretch now on buttons Bug Fixes Layout fix so RoundToggleButton and RoundButton are exactly the same Fix for ColorPicker when set via code behind ToastPrompt bug fix with OnNavigatedTo Toast now adjusts its layout if the SIP is up Fixed some issues with Expression Blend supportHarness - Internet Explorer Automation: Harness 2.0.3: support the operation fo frameset, frame and iframe Add commands SwitchFrame GetUrl GoBack GoForward Refresh SetTimeout GetTimeout Rename commands GetActiveWindow to GetActiveBrowser SetActiveWindow to SetActiveBrowser FindWindowAll to FindBrowser NewWindow to NewBrowser GetMajorVersion to GetVersionBetter Explorer: Better Explorer 2.0.0.861 Alpha: - fixed new folder button operation not work well in some situations - removed some unnecessary code like subclassing that is not needed anymore - Added option to make Better Exlorer default (at least for WIN+E operations) - Added option to enable file operation replacements (like Terracopy) to work with Better Explorer - Added some basic usability to "Share" button - Other fixesText Designer Outline Text: Version 2 Preview 2: Added Fake 3D demos for C++ MFC, C# Winform and C# WPFLightFarsiDictionary - ??????? ??? ?????/???????: LightFarsiDictionary - v1: LightFarsiDictionary - v1WPF Application Framework (WAF): WPF Application Framework (WAF) 2.5.0.3: Version: 2.5.0.3 (Milestone 3): This release contains the source code of the WPF Application Framework (WAF) and the sample applications. Requirements .NET Framework 4.0 (The package contains a solution file for Visual Studio 2010) The unit test projects require Visual Studio 2010 Professional Changelog Legend: [B] Breaking change; [O] Marked member as obsolete [O] WAF: Mark the StringBuilderExtensions class as obsolete because the AppendInNewLine method can be replaced with string.Jo...GeoMedia PostGIS data server: PostGIS GDO 1.0.1.2: This is a new version of GeoMeda PostGIS data server which supports user rights. It means that only those feature classes, which the current user has rights to select, are visible in GeoMedia. Issues fixed in this release Fixed problem with renaming and deleting feature classes - IMPORTANT! - the gfeatures view must be recreated so that this issue is completely fixed. The attached script "GFeaturesView2.sql" can be used to accomplish this task. Another way is to drop and recreate the metadat...SkyDrive Connector for SharePoint: SkyDrive Connector for SharePoint: Fixed a few bugs pertaining to live authentication Removed dependency on Shared Documents Removed CallBack web part propertyClosedXML - The easy way to OpenXML: ClosedXML 0.65.2: Aside from many bug fixes we now have Conditional Formatting The conditional formatting was sponsored by http://www.bewing.nl (big thanks) New on v0.65.1 Fixed issue when loading conditional formatting with default values for icon sets New on v0.65.2 Fixed issue loading conditional formatting Improved inserts performanceLiberty: v3.2.0.0 Release 4th April 2012: Change Log-Added -Halo 3 support (invincibility, ammo editing) -Halo 3: ODST support (invincibility, ammo editing) -The file transfer page now shows its progress in the Windows 7 taskbar -"About this build" settings page -Reach Change what an object is carrying -Reach Change which node a carried object is attached to -Reach Object node viewer and exporter -Reach Change which weapons you are carrying from the object editor -Reach Edit the weapon controller of vehicles and turrets -An error dia...MSBuild Extension Pack: April 2012: Release Blog Post The MSBuild Extension Pack April 2012 release provides a collection of over 435 MSBuild tasks. A high level summary of what the tasks currently cover includes the following: System Items: Active Directory, Certificates, COM+, Console, Date and Time, Drives, Environment Variables, Event Logs, Files and Folders, FTP, GAC, Network, Performance Counters, Registry, Services, Sound Code: Assemblies, AsyncExec, CAB Files, Code Signing, DynamicExecute, File Detokenisation, GUID’...DotNetNuke® Community Edition CMS: 06.01.05: Major Highlights Fixed issue that stopped users from creating vocabularies when the portal ID was not zero Fixed issue that caused modules configured to be displayed on all pages to be added to the wrong container in new pages Fixed page quota restriction issue in the Ribbon Bar Removed restriction that would not allow users to use a dash in page names. Now users can create pages with names like "site-map" Fixed issue that was causing the wrong container to be loaded in modules wh...51Degrees.mobi - Mobile Device Detection and Redirection: 2.1.3.1: One Click Install from NuGet Changes to Version 2.1.3.11. [assembly: AllowPartiallyTrustedCallers] has been added back into the AssemblyInfo.cs file to prevent failures with other assemblies in Medium trust environments. 2. The Lite data embedded into the assembly has been updated to include devices from December 2011. The 42 new RingMark properties will return Unknown if RingMark data is not available. Changes to Version 2.1.2.11Code Changes 1. The project is now licenced under the Mozilla...MVC Controls Toolkit: Mvc Controls Toolkit 2.0.0: Added Support for Mvc4 beta and WebApi The SafeqQuery and HttpSafeQuery IQueryable implementations that works as wrappers aroung any IQueryable to protect it from unwished queries. "Client Side" pager specialized in paging javascript data coming either from a remote data source, or from local data. LinQ like fluent javascript api to build queries either against remote data sources, or against local javascript data, with exactly the same interface. There are 3 different query objects exp...nopCommerce. Open source shopping cart (ASP.NET MVC): nopcommerce 2.50: Highlight features & improvements: • Significant performance optimization. • Allow store owners to create several shipments per order. Added a new shipping status: “Partially shipped”. • Pre-order support added. Enables your customers to place a Pre-Order and pay for the item in advance. Displays “Pre-order” button instead of “Buy Now” on the appropriate pages. Makes it possible for customer to buy available goods and Pre-Order items during one session. It can be managed on a product variant ...WiX Toolset: WiX v3.6 RC0: WiX v3.6 RC0 (3.6.2803.0) provides support for VS11 and a more stable Burn engine. For more information see Rob's blog post about the release: http://robmensching.com/blog/posts/2012/4/3/WiX-v3.6-Release-Candidate-Zero-availableSageFrame: SageFrame 2.0: Sageframe is an open source ASP.NET web development framework developed using ASP.NET 3.5 with service pack 1 (sp1) technology. It is designed specifically to help developers build dynamic website by providing core functionality common to most web applications.New ProjectsAprilSpring: Common Framework by pansq and huangghASP.Net MVC Dynamic JS/CSS Script Compression Framework: ASP.Net MVC JS and CSS dynamic script compression and composite script library. Also resolves virtual content urls in CSS files.BANews: ???????????????????,??SQL+Server2008,C#,asp.net????,??????Jquery?CSS+DIV??。??????,?????????????,????????,??????,??。Blazonisation: If have emblem of some state, but don't know anything about it, you can use this tool to resolve your problem. Controle de Campenato: Outro Projeto com alunos da Infnet onde desenvolveremos um controle de campeonato...Controle Financeiro Pessoal Web: Projeto desenvolvido com os alunos do curso Oficial da Microsoft na INFNET. Consiste em controlar as despesas e receitas durante o mes e realizar uma projeção sobre os próximos meses. Bons Estudos, Prof. Carlos PedroCoPro - The .NET Content Provisioning Framework: CoPro makes content management, localization and globalization for ASP.NET Developers easier. It provides a framework which takes care of all management and provisioning activities and the developer only has to create the content and place it on the site. It is developed in C#.cppERF: Class ERF function. Test on VC++ 2008 express, and cygwin.Dev Studio 17 Web-Based FTP Client: Dev Studio 17 Web-Based FTP Client is a web based ftp application built using asp.net, c#.EasyCRMNet: EasyCRMNetEnterpriseLibrary Azure Backing Store: Most developers face difficulties in migrating the application, which is using caching block of Enterprise library, to azure due to unavailability of app fabric cache backing store for Enterprise Library. This library provides an app fabric backing store for enterprise library.Event Aggregator: One of the key aspects in application design is managing dependencies between modules. Good architecture might begin to suffer from strong coupling as long as the project grows. All this affects further development by making it harder to change modules (a change in one module usually forces a ripple effect of changes in other modules), also strongly coupled modules are harder to reuse and test. Message coupling is a good choice in developing loosely coupled architecture. This is the looses...FarhadYazdan-Panah Personal Repsitory: A place for backupFluent Assertions MVC: MVC Extensions for Fluent Assertions library. Source Code is on GitHub: https://github.com/CaseyBurns/FluentAssertions.MVCGboot: GtalkBotGetPicture: GetPicture is a project that get some pictures at a website.It is not good,just use to study.gmfbridge: clone for gmfbridge http://www.gdcl.co.uk/gmfbridge/GoodStore: ??????????,??B/S??,asp.net?sqlserver???,???????,?????????。。。JSLint for Resharper: Adds highlighting of JSLint validation errors to Resharper. kiemtien: Alpha state website, very unstable.nuIDE Kinect Prototype (Experimental): Prototype for Kinect-integrated Visual Studio extension concept. (Not yet alpha - throw away code)PB-LOG-Quick and easy XML logger for .NET: PB-LOG is a quick and easy XML logger for all kink of .NET application. You can insert log associated to a user. There're 4 kind of log: Error, Info, Warning, Event. It's developed in C# 4. There's also a PB-LOG for WP7.PB-LOG-WP7-Quick and easy XML logger for Windows Phone 7: PB-LOG is a quick and easy XML logger for all Windows Phone 7. You can insert log associated to a user. There're 4 kind of log: Error, Info, Warning, Event. It's developed in C# 4.Persian_Calendar_for_Microsoft_Office: "Persian_Calendar_for_Microsoft_Office" makes it easier for Office user group to do their tasks according to time-sheets in IRAN. You'll no longer have to depend on other forms of calendar. It would be developed in any programming language esp C#.Projeto Agenda FPU: Projeto AgendaPS Framework: PS.Framework is an Application Framework to simplify the developement of .NET Applications. It's containing many helpfull classes and functions e.g. an RemotingInterface to simplify the use of .NET Remoting.Quizzer123: Awesome application for quizzes and tests!SharePoint 2010 Automatic Content Database Selection: This solution for SharePoint 2010 automatically selects the smallest content database when you create a new site collection in a web application.SIToFb2: samizdat to bf2 converterSmart Logger: SmartLogger is a web service that can consume exceptions thrown from client applications. The exceptions can be categorized based on severity, applications and exception time stamp. It also includes a search feature to drill down the exceptions log based on search criteria. The release 1.0 will include logging exceptions with search feature. Adding new applications and user right management will follow.Sync Sync: [image:365572] A SharePoint ETL and migration toolTestCuttingStockUsingSolverFoundation: using solver foundation from msft to solve civ e 606 group assignment 2, the cutting stock problem.Vote: ?,???????????????!??,????,?????!WebFurniture: Web-?????????? ??? ?????????????? ????????? ???????yammyy2: yammyy2 zhongjh: ?????????,???????。

    Read the article

  • Agile Development

    - by James Oloo Onyango
    Alot of literature has and is being written about agile developement and its surrounding philosophies. In my quest to find the best way to express the importance of agile methodologies, i have found Robert C. Martin's "A Satire Of Two Companies" to be both the most concise and thorough! Enjoy the read! Rufus Inc Project Kick Off Your name is Bob. The date is January 3, 2001, and your head still aches from the recent millennial revelry. You are sitting in a conference room with several managers and a group of your peers. You are a project team leader. Your boss is there, and he has brought along all of his team leaders. His boss called the meeting. "We have a new project to develop," says your boss's boss. Call him BB. The points in his hair are so long that they scrape the ceiling. Your boss's points are just starting to grow, but he eagerly awaits the day when he can leave Brylcream stains on the acoustic tiles. BB describes the essence of the new market they have identified and the product they want to develop to exploit this market. "We must have this new project up and working by fourth quarter October 1," BB demands. "Nothing is of higher priority, so we are cancelling your current project." The reaction in the room is stunned silence. Months of work are simply going to be thrown away. Slowly, a murmur of objection begins to circulate around the conference table.   His points give off an evil green glow as BB meets the eyes of everyone in the room. One by one, that insidious stare reduces each attendee to quivering lumps of protoplasm. It is clear that he will brook no discussion on this matter. Once silence has been restored, BB says, "We need to begin immediately. How long will it take you to do the analysis?" You raise your hand. Your boss tries to stop you, but his spitwad misses you and you are unaware of his efforts.   "Sir, we can't tell you how long the analysis will take until we have some requirements." "The requirements document won't be ready for 3 or 4 weeks," BB says, his points vibrating with frustration. "So, pretend that you have the requirements in front of you now. How long will you require for analysis?" No one breathes. Everyone looks around to see whether anyone has some idea. "If analysis goes beyond April 1, we have a problem. Can you finish the analysis by then?" Your boss visibly gathers his courage: "We'll find a way, sir!" His points grow 3 mm, and your headache increases by two Tylenol. "Good." BB smiles. "Now, how long will it take to do the design?" "Sir," you say. Your boss visibly pales. He is clearly worried that his 3 mms are at risk. "Without an analysis, it will not be possible to tell you how long design will take." BB's expression shifts beyond austere.   "PRETEND you have the analysis already!" he says, while fixing you with his vacant, beady little eyes. "How long will it take you to do the design?" Two Tylenol are not going to cut it. Your boss, in a desperate attempt to save his new growth, babbles: "Well, sir, with only six months left to complete the project, design had better take no longer than 3 months."   "I'm glad you agree, Smithers!" BB says, beaming. Your boss relaxes. He knows his points are secure. After a while, he starts lightly humming the Brylcream jingle. BB continues, "So, analysis will be complete by April 1, design will be complete by July 1, and that gives you 3 months to implement the project. This meeting is an example of how well our new consensus and empowerment policies are working. Now, get out there and start working. I'll expect to see TQM plans and QIT assignments on my desk by next week. Oh, and don't forget that your crossfunctional team meetings and reports will be needed for next month's quality audit." "Forget the Tylenol," you think to yourself as you return to your cubicle. "I need bourbon."   Visibly excited, your boss comes over to you and says, "Gosh, what a great meeting. I think we're really going to do some world shaking with this project." You nod in agreement, too disgusted to do anything else. "Oh," your boss continues, "I almost forgot." He hands you a 30-page document. "Remember that the SEI is coming to do an evaluation next week. This is the evaluation guide. You need to read through it, memorize it, and then shred it. It tells you how to answer any questions that the SEI auditors ask you. It also tells you what parts of the building you are allowed to take them to and what parts to avoid. We are determined to be a CMM level 3 organization by June!"   You and your peers start working on the analysis of the new project. This is difficult because you have no requirements. But from the 10-minute introduction given by BB on that fateful morning, you have some idea of what the product is supposed to do.   Corporate process demands that you begin by creating a use case document. You and your team begin enumerating use cases and drawing oval and stick diagrams. Philosophical debates break out among the team members. There is disagreement as to whether certain use cases should be connected with <<extends>> or <<includes>> relationships. Competing models are created, but nobody knows how to evaluate them. The debate continues, effectively paralyzing progress.   After a week, somebody finds the iceberg.com Web site, which recommends disposing entirely of <<extends>> and <<includes>> and replacing them with <<precedes>> and <<uses>>. The documents on this Web site, authored by Don Sengroiux, describes a method known as stalwart-analysis, which claims to be a step-by-step method for translating use cases into design diagrams. More competing use case models are created using this new scheme, but again, people can't agree on how to evaluate them. The thrashing continues. More and more, the use case meetings are driven by emotion rather than by reason. If it weren't for the fact that you don't have requirements, you'd be pretty upset by the lack of progress you are making. The requirements document arrives on February 15. And then again on February 20, 25, and every week thereafter. Each new version contradicts the previous one. Clearly, the marketing folks who are writing the requirements, empowered though they might be, are not finding consensus.   At the same time, several new competing use case templates have been proposed by the various team members. Each template presents its own particularly creative way of delaying progress. The debates rage on. On March 1, Prudence Putrigence, the process proctor, succeeds in integrating all the competing use case forms and templates into a single, all-encompassing form. Just the blank form is 15 pages long. She has managed to include every field that appeared on all the competing templates. She also presents a 159- page document describing how to fill out the use case form. All current use cases must be rewritten according to the new standard.   You marvel to yourself that it now requires 15 pages of fill-in-the-blank and essay questions to answer the question: What should the system do when the user presses Return? The corporate process (authored by L. E. Ott, famed author of "Holistic Analysis: A Progressive Dialectic for Software Engineers") insists that you discover all primary use cases, 87 percent of all secondary use cases, and 36.274 percent of all tertiary use cases before you can complete analysis and enter the design phase. You have no idea what a tertiary use case is. So in an attempt to meet this requirement, you try to get your use case document reviewed by the marketing department, which you hope will know what a tertiary use case is.   Unfortunately, the marketing folks are too busy with sales support to talk to you. Indeed, since the project started, you have not been able to get a single meeting with marketing, which has provided a never-ending stream of changing and contradictory requirements documents.   While one team has been spinning endlessly on the use case document, another team has been working out the domain model. Endless variations of UML documents are pouring out of this team. Every week, the model is reworked.   The team members can't decide whether to use <<interfaces>> or <<types>> in the model. A huge disagreement has been raging on the proper syntax and application of OCL. Others on the team just got back from a 5-day class on catabolism, and have been producing incredibly detailed and arcane diagrams that nobody else can fathom.   On March 27, with one week to go before analysis is to be complete, you have produced a sea of documents and diagrams but are no closer to a cogent analysis of the problem than you were on January 3. **** And then, a miracle happens.   **** On Saturday, April 1, you check your e-mail from home. You see a memo from your boss to BB. It states unequivocally that you are done with the analysis! You phone your boss and complain. "How could you have told BB that we were done with the analysis?" "Have you looked at a calendar lately?" he responds. "It's April 1!" The irony of that date does not escape you. "But we have so much more to think about. So much more to analyze! We haven't even decided whether to use <<extends>> or <<precedes>>!" "Where is your evidence that you are not done?" inquires your boss, impatiently. "Whaaa . . . ." But he cuts you off. "Analysis can go on forever; it has to be stopped at some point. And since this is the date it was scheduled to stop, it has been stopped. Now, on Monday, I want you to gather up all existing analysis materials and put them into a public folder. Release that folder to Prudence so that she can log it in the CM system by Monday afternoon. Then get busy and start designing."   As you hang up the phone, you begin to consider the benefits of keeping a bottle of bourbon in your bottom desk drawer. They threw a party to celebrate the on-time completion of the analysis phase. BB gave a colon-stirring speech on empowerment. And your boss, another 3 mm taller, congratulated his team on the incredible show of unity and teamwork. Finally, the CIO takes the stage to tell everyone that the SEI audit went very well and to thank everyone for studying and shredding the evaluation guides that were passed out. Level 3 now seems assured and will be awarded by June. (Scuttlebutt has it that managers at the level of BB and above are to receive significant bonuses once the SEI awards level 3.)   As the weeks flow by, you and your team work on the design of the system. Of course, you find that the analysis that the design is supposedly based on is flawedno, useless; no, worse than useless. But when you tell your boss that you need to go back and work some more on the analysis to shore up its weaker sections, he simply states, "The analysis phase is over. The only allowable activity is design. Now get back to it."   So, you and your team hack the design as best you can, unsure of whether the requirements have been properly analyzed. Of course, it really doesn't matter much, since the requirements document is still thrashing with weekly revisions, and the marketing department still refuses to meet with you.     The design is a nightmare. Your boss recently misread a book named The Finish Line in which the author, Mark DeThomaso, blithely suggested that design documents should be taken down to code-level detail. "If we are going to be working at that level of detail," you ask, "why don't we simply write the code instead?" "Because then you wouldn't be designing, of course. And the only allowable activity in the design phase is design!" "Besides," he continues, "we have just purchased a companywide license for Dandelion! This tool enables 'Round the Horn Engineering!' You are to transfer all design diagrams into this tool. It will automatically generate our code for us! It will also keep the design diagrams in sync with the code!" Your boss hands you a brightly colored shrinkwrapped box containing the Dandelion distribution. You accept it numbly and shuffle off to your cubicle. Twelve hours, eight crashes, one disk reformatting, and eight shots of 151 later, you finally have the tool installed on your server. You consider the week your team will lose while attending Dandelion training. Then you smile and think, "Any week I'm not here is a good week." Design diagram after design diagram is created by your team. Dandelion makes it very difficult to draw these diagrams. There are dozens and dozens of deeply nested dialog boxes with funny text fields and check boxes that must all be filled in correctly. And then there's the problem of moving classes between packages. At first, these diagram are driven from the use cases. But the requirements are changing so often that the use cases rapidly become meaningless. Debates rage about whether VISITOR or DECORATOR design patterns should be used. One developer refuses to use VISITOR in any form, claiming that it's not a properly object-oriented construct. Someone refuses to use multiple inheritance, since it is the spawn of the devil. Review meetings rapidly degenerate into debates about the meaning of object orientation, the definition of analysis versus design, or when to use aggregation versus association. Midway through the design cycle, the marketing folks announce that they have rethought the focus of the system. Their new requirements document is completely restructured. They have eliminated several major feature areas and replaced them with feature areas that they anticipate customer surveys will show to be more appropriate. You tell your boss that these changes mean that you need to reanalyze and redesign much of the system. But he says, "The analysis phase is system. But he says, "The analysis phase is over. The only allowable activity is design. Now get back to it."   You suggest that it might be better to create a simple prototype to show to the marketing folks and even some potential customers. But your boss says, "The analysis phase is over. The only allowable activity is design. Now get back to it." Hack, hack, hack, hack. You try to create some kind of a design document that might reflect the new requirements documents. However, the revolution of the requirements has not caused them to stop thrashing. Indeed, if anything, the wild oscillations of the requirements document have only increased in frequency and amplitude.   You slog your way through them.   On June 15, the Dandelion database gets corrupted. Apparently, the corruption has been progressive. Small errors in the DB accumulated over the months into bigger and bigger errors. Eventually, the CASE tool just stopped working. Of course, the slowly encroaching corruption is present on all the backups. Calls to the Dandelion technical support line go unanswered for several days. Finally, you receive a brief e-mail from Dandelion, informing you that this is a known problem and that the solution is to purchase the new version, which they promise will be ready some time next quarter, and then reenter all the diagrams by hand.   ****   Then, on July 1 another miracle happens! You are done with the design!   Rather than go to your boss and complain, you stock your middle desk drawer with some vodka.   **** They threw a party to celebrate the on-time completion of the design phase and their graduation to CMM level 3. This time, you find BB's speech so stirring that you have to use the restroom before it begins. New banners and plaques are all over your workplace. They show pictures of eagles and mountain climbers, and they talk about teamwork and empowerment. They read better after a few scotches. That reminds you that you need to clear out your file cabinet to make room for the brandy. You and your team begin to code. But you rapidly discover that the design is lacking in some significant areas. Actually, it's lacking any significance at all. You convene a design session in one of the conference rooms to try to work through some of the nastier problems. But your boss catches you at it and disbands the meeting, saying, "The design phase is over. The only allowable activity is coding. Now get back to it."   ****   The code generated by Dandelion is really hideous. It turns out that you and your team were using association and aggregation the wrong way, after all. All the generated code has to be edited to correct these flaws. Editing this code is extremely difficult because it has been instrumented with ugly comment blocks that have special syntax that Dandelion needs in order to keep the diagrams in sync with the code. If you accidentally alter one of these comments, the diagrams will be regenerated incorrectly. It turns out that "Round the Horn Engineering" requires an awful lot of effort. The more you try to keep the code compatible with Dandelion, the more errors Dandelion generates. In the end, you give up and decide to keep the diagrams up to date manually. A second later, you decide that there's no point in keeping the diagrams up to date at all. Besides, who has time?   Your boss hires a consultant to build tools to count the number of lines of code that are being produced. He puts a big thermometer graph on the wall with the number 1,000,000 on the top. Every day, he extends the red line to show how many lines have been added. Three days after the thermometer appears on the wall, your boss stops you in the hall. "That graph isn't growing quickly enough. We need to have a million lines done by October 1." "We aren't even sh-sh-sure that the proshect will require a m-million linezh," you blather. "We have to have a million lines done by October 1," your boss reiterates. His points have grown again, and the Grecian formula he uses on them creates an aura of authority and competence. "Are you sure your comment blocks are big enough?" Then, in a flash of managerial insight, he says, "I have it! I want you to institute a new policy among the engineers. No line of code is to be longer than 20 characters. Any such line must be split into two or more preferably more. All existing code needs to be reworked to this standard. That'll get our line count up!"   You decide not to tell him that this will require two unscheduled work months. You decide not to tell him anything at all. You decide that intravenous injections of pure ethanol are the only solution. You make the appropriate arrangements. Hack, hack, hack, and hack. You and your team madly code away. By August 1, your boss, frowning at the thermometer on the wall, institutes a mandatory 50-hour workweek.   Hack, hack, hack, and hack. By September 1st, the thermometer is at 1.2 million lines and your boss asks you to write a report describing why you exceeded the coding budget by 20 percent. He institutes mandatory Saturdays and demands that the project be brought back down to a million lines. You start a campaign of remerging lines. Hack, hack, hack, and hack. Tempers are flaring; people are quitting; QA is raining trouble reports down on you. Customers are demanding installation and user manuals; salespeople are demanding advance demonstrations for special customers; the requirements document is still thrashing, the marketing folks are complaining that the product isn't anything like they specified, and the liquor store won't accept your credit card anymore. Something has to give.    On September 15, BB calls a meeting. As he enters the room, his points are emitting clouds of steam. When he speaks, the bass overtones of his carefully manicured voice cause the pit of your stomach to roll over. "The QA manager has told me that this project has less than 50 percent of the required features implemented. He has also informed me that the system crashes all the time, yields wrong results, and is hideously slow. He has also complained that he cannot keep up with the continuous train of daily releases, each more buggy than the last!" He stops for a few seconds, visibly trying to compose himself. "The QA manager estimates that, at this rate of development, we won't be able to ship the product until December!" Actually, you think it's more like March, but you don't say anything. "December!" BB roars with such derision that people duck their heads as though he were pointing an assault rifle at them. "December is absolutely out of the question. Team leaders, I want new estimates on my desk in the morning. I am hereby mandating 65-hour work weeks until this project is complete. And it better be complete by November 1."   As he leaves the conference room, he is heard to mutter: "Empowermentbah!" * * * Your boss is bald; his points are mounted on BB's wall. The fluorescent lights reflecting off his pate momentarily dazzle you. "Do you have anything to drink?" he asks. Having just finished your last bottle of Boone's Farm, you pull a bottle of Thunderbird from your bookshelf and pour it into his coffee mug. "What's it going to take to get this project done? " he asks. "We need to freeze the requirements, analyze them, design them, and then implement them," you say callously. "By November 1?" your boss exclaims incredulously. "No way! Just get back to coding the damned thing." He storms out, scratching his vacant head.   A few days later, you find that your boss has been transferred to the corporate research division. Turnover has skyrocketed. Customers, informed at the last minute that their orders cannot be fulfilled on time, have begun to cancel their orders. Marketing is re-evaluating whether this product aligns with the overall goals of the company. Memos fly, heads roll, policies change, and things are, overall, pretty grim. Finally, by March, after far too many sixty-five hour weeks, a very shaky version of the software is ready. In the field, bug-discovery rates are high, and the technical support staff are at their wits' end, trying to cope with the complaints and demands of the irate customers. Nobody is happy.   In April, BB decides to buy his way out of the problem by licensing a product produced by Rupert Industries and redistributing it. The customers are mollified, the marketing folks are smug, and you are laid off.     Rupert Industries: Project Alpha   Your name is Robert. The date is January 3, 2001. The quiet hours spent with your family this holiday have left you refreshed and ready for work. You are sitting in a conference room with your team of professionals. The manager of the division called the meeting. "We have some ideas for a new project," says the division manager. Call him Russ. He is a high-strung British chap with more energy than a fusion reactor. He is ambitious and driven but understands the value of a team. Russ describes the essence of the new market opportunity the company has identified and introduces you to Jane, the marketing manager, who is responsible for defining the products that will address it. Addressing you, Jane says, "We'd like to start defining our first product offering as soon as possible. When can you and your team meet with me?" You reply, "We'll be done with the current iteration of our project this Friday. We can spare a few hours for you between now and then. After that, we'll take a few people from the team and dedicate them to you. We'll begin hiring their replacements and the new people for your team immediately." "Great," says Russ, "but I want you to understand that it is critical that we have something to exhibit at the trade show coming up this July. If we can't be there with something significant, we'll lose the opportunity."   "I understand," you reply. "I don't yet know what it is that you have in mind, but I'm sure we can have something by July. I just can't tell you what that something will be right now. In any case, you and Jane are going to have complete control over what we developers do, so you can rest assured that by July, you'll have the most important things that can be accomplished in that time ready to exhibit."   Russ nods in satisfaction. He knows how this works. Your team has always kept him advised and allowed him to steer their development. He has the utmost confidence that your team will work on the most important things first and will produce a high-quality product.   * * *   "So, Robert," says Jane at their first meeting, "How does your team feel about being split up?" "We'll miss working with each other," you answer, "but some of us were getting pretty tired of that last project and are looking forward to a change. So, what are you people cooking up?" Jane beams. "You know how much trouble our customers currently have . . ." And she spends a half hour or so describing the problem and possible solution. "OK, wait a second" you respond. "I need to be clear about this." And so you and Jane talk about how this system might work. Some of her ideas aren't fully formed. You suggest possible solutions. She likes some of them. You continue discussing.   During the discussion, as each new topic is addressed, Jane writes user story cards. Each card represents something that the new system has to do. The cards accumulate on the table and are spread out in front of you. Both you and Jane point at them, pick them up, and make notes on them as you discuss the stories. The cards are powerful mnemonic devices that you can use to represent complex ideas that are barely formed.   At the end of the meeting, you say, "OK, I've got a general idea of what you want. I'm going to talk to the team about it. I imagine they'll want to run some experiments with various database structures and presentation formats. Next time we meet, it'll be as a group, and we'll start identifying the most important features of the system."   A week later, your nascent team meets with Jane. They spread the existing user story cards out on the table and begin to get into some of the details of the system. The meeting is very dynamic. Jane presents the stories in the order of their importance. There is much discussion about each one. The developers are concerned about keeping the stories small enough to estimate and test. So they continually ask Jane to split one story into several smaller stories. Jane is concerned that each story have a clear business value and priority, so as she splits them, she makes sure that this stays true.   The stories accumulate on the table. Jane writes them, but the developers make notes on them as needed. Nobody tries to capture everything that is said; the cards are not meant to capture everything but are simply reminders of the conversation.   As the developers become more comfortable with the stories, they begin writing estimates on them. These estimates are crude and budgetary, but they give Jane an idea of what the story will cost.   At the end of the meeting, it is clear that many more stories could be discussed. It is also clear that the most important stories have been addressed and that they represent several months worth of work. Jane closes the meeting by taking the cards with her and promising to have a proposal for the first release in the morning.   * * *   The next morning, you reconvene the meeting. Jane chooses five cards and places them on the table. "According to your estimates, these cards represent about one perfect team-week's worth of work. The last iteration of the previous project managed to get one perfect team-week done in 3 real weeks. If we can get these five stories done in 3 weeks, we'll be able to demonstrate them to Russ. That will make him feel very comfortable about our progress." Jane is pushing it. The sheepish look on her face lets you know that she knows it too. You reply, "Jane, this is a new team, working on a new project. It's a bit presumptuous to expect that our velocity will be the same as the previous team's. However, I met with the team yesterday afternoon, and we all agreed that our initial velocity should, in fact, be set to one perfectweek for every 3 real-weeks. So you've lucked out on this one." "Just remember," you continue, "that the story estimates and the story velocity are very tentative at this point. We'll learn more when we plan the iteration and even more when we implement it."   Jane looks over her glasses at you as if to say "Who's the boss around here, anyway?" and then smiles and says, "Yeah, don't worry. I know the drill by now."Jane then puts 15 more cards on the table. She says, "If we can get all these cards done by the end of March, we can turn the system over to our beta test customers. And we'll get good feedback from them."   You reply, "OK, so we've got our first iteration defined, and we have the stories for the next three iterations after that. These four iterations will make our first release."   "So," says Jane, can you really do these five stories in the next 3 weeks?" "I don't know for sure, Jane," you reply. "Let's break them down into tasks and see what we get."   So Jane, you, and your team spend the next several hours taking each of the five stories that Jane chose for the first iteration and breaking them down into small tasks. The developers quickly realize that some of the tasks can be shared between stories and that other tasks have commonalities that can probably be taken advantage of. It is clear that potential designs are popping into the developers' heads. From time to time, they form little discussion knots and scribble UML diagrams on some cards.   Soon, the whiteboard is filled with the tasks that, once completed, will implement the five stories for this iteration. You start the sign-up process by saying, "OK, let's sign up for these tasks." "I'll take the initial database generation." Says Pete. "That's what I did on the last project, and this doesn't look very different. I estimate it at two of my perfect workdays." "OK, well, then, I'll take the login screen," says Joe. "Aw, darn," says Elaine, the junior member of the team, "I've never done a GUI, and kinda wanted to try that one."   "Ah, the impatience of youth," Joe says sagely, with a wink in your direction. "You can assist me with it, young Jedi." To Jane: "I think it'll take me about three of my perfect workdays."   One by one, the developers sign up for tasks and estimate them in terms of their own perfect workdays. Both you and Jane know that it is best to let the developers volunteer for tasks than to assign the tasks to them. You also know full well that you daren't challenge any of the developers' estimates. You know these people, and you trust them. You know that they are going to do the very best they can.   The developers know that they can't sign up for more perfect workdays than they finished in the last iteration they worked on. Once each developer has filled his or her schedule for the iteration, they stop signing up for tasks.   Eventually, all the developers have stopped signing up for tasks. But, of course, tasks are still left on the board.   "I was worried that that might happen," you say, "OK, there's only one thing to do, Jane. We've got too much to do in this iteration. What stories or tasks can we remove?" Jane sighs. She knows that this is the only option. Working overtime at the beginning of a project is insane, and projects where she's tried it have not fared well.   So Jane starts to remove the least-important functionality. "Well, we really don't need the login screen just yet. We can simply start the system in the logged-in state." "Rats!" cries Elaine. "I really wanted to do that." "Patience, grasshopper." says Joe. "Those who wait for the bees to leave the hive will not have lips too swollen to relish the honey." Elaine looks confused. Everyone looks confused. "So . . .," Jane continues, "I think we can also do away with . . ." And so, bit by bit, the list of tasks shrinks. Developers who lose a task sign up for one of the remaining ones.   The negotiation is not painless. Several times, Jane exhibits obvious frustration and impatience. Once, when tensions are especially high, Elaine volunteers, "I'll work extra hard to make up some of the missing time." You are about to correct her when, fortunately, Joe looks her in the eye and says, "When once you proceed down the dark path, forever will it dominate your destiny."   In the end, an iteration acceptable to Jane is reached. It's not what Jane wanted. Indeed, it is significantly less. But it's something the team feels that can be achieved in the next 3 weeks.   And, after all, it still addresses the most important things that Jane wanted in the iteration. "So, Jane," you say when things had quieted down a bit, "when can we expect acceptance tests from you?" Jane sighs. This is the other side of the coin. For every story the development team implements,   Jane must supply a suite of acceptance tests that prove that it works. And the team needs these long before the end of the iteration, since they will certainly point out differences in the way Jane and the developers imagine the system's behaviour.   "I'll get you some example test scripts today," Jane promises. "I'll add to them every day after that. You'll have the entire suite by the middle of the iteration."   * * *   The iteration begins on Monday morning with a flurry of Class, Responsibilities, Collaborators sessions. By midmorning, all the developers have assembled into pairs and are rapidly coding away. "And now, my young apprentice," Joe says to Elaine, "you shall learn the mysteries of test-first design!"   "Wow, that sounds pretty rad," Elaine replies. "How do you do it?" Joe beams. It's clear that he has been anticipating this moment. "OK, what does the code do right now?" "Huh?" replied Elaine, "It doesn't do anything at all; there is no code."   "So, consider our task; can you think of something the code should do?" "Sure," Elaine said with youthful assurance, "First, it should connect to the database." "And thereupon, what must needs be required to connecteth the database?" "You sure talk weird," laughed Elaine. "I think we'd have to get the database object from some registry and call the Connect() method. "Ah, astute young wizard. Thou perceives correctly that we requireth an object within which we can cacheth the database object." "Is 'cacheth' really a word?" "It is when I say it! So, what test can we write that we know the database registry should pass?" Elaine sighs. She knows she'll just have to play along. "We should be able to create a database object and pass it to the registry in a Store() method. And then we should be able to pull it out of the registry with a Get() method and make sure it's the same object." "Oh, well said, my prepubescent sprite!" "Hay!" "So, now, let's write a test function that proves your case." "But shouldn't we write the database object and registry object first?" "Ah, you've much to learn, my young impatient one. Just write the test first." "But it won't even compile!" "Are you sure? What if it did?" "Uh . . ." "Just write the test, Elaine. Trust me." And so Joe, Elaine, and all the other developers began to code their tasks, one test case at a time. The room in which they worked was abuzz with the conversations between the pairs. The murmur was punctuated by an occasional high five when a pair managed to finish a task or a difficult test case.   As development proceeded, the developers changed partners once or twice a day. Each developer got to see what all the others were doing, and so knowledge of the code spread generally throughout the team.   Whenever a pair finished something significant whether a whole task or simply an important part of a task they integrated what they had with the rest of the system. Thus, the code base grew daily, and integration difficulties were minimized.   The developers communicated with Jane on a daily basis. They'd go to her whenever they had a question about the functionality of the system or the interpretation of an acceptance test case.   Jane, good as her word, supplied the team with a steady stream of acceptance test scripts. The team read these carefully and thereby gained a much better understanding of what Jane expected the system to do. By the beginning of the second week, there was enough functionality to demonstrate to Jane. She watched eagerly as the demonstration passed test case after test case. "This is really cool," Jane said as the demonstration finally ended. "But this doesn't seem like one-third of the tasks. Is your velocity slower than anticipated?"   You grimace. You'd been waiting for a good time to mention this to Jane but now she was forcing the issue. "Yes, unfortunately, we are going more slowly than we had expected. The new application server we are using is turning out to be a pain to configure. Also, it takes forever to reboot, and we have to reboot it whenever we make even the slightest change to its configuration."   Jane eyes you with suspicion. The stress of last Monday's negotiations had still not entirely dissipated. She says, "And what does this mean to our schedule? We can't slip it again, we just can't. Russ will have a fit! He'll haul us all into the woodshed and ream us some new ones."   You look Jane right in the eyes. There's no pleasant way to give someone news like this. So you just blurt out, "Look, if things keep going like they're going, we're not going to be done with everything by next Friday. Now it's possible that we'll figure out a way to go faster. But, frankly, I wouldn't depend on that. You should start thinking about one or two tasks that could be removed from the iteration without ruining the demonstration for Russ. Come hell or high water, we are going to give that demonstration on Friday, and I don't think you want us to choose which tasks to omit."   "Aw forchrisakes!" Jane barely manages to stifle yelling that last word as she stalks away, shaking her head. Not for the first time, you say to yourself, "Nobody ever promised me project management would be easy." You are pretty sure it won't be the last time, either.   Actually, things went a bit better than you had hoped. The team did, in fact, have to drop one task from the iteration, but Jane had chosen wisely, and the demonstration for Russ went without a hitch. Russ was not impressed with the progress, but neither was he dismayed. He simply said, "This is pretty good. But remember, we have to be able to demonstrate this system at the trade show in July, and at this rate, it doesn't look like you'll have all that much to show." Jane, whose attitude had improved dramatically with the completion of the iteration, responded to Russ by saying, "Russ, this team is working hard, and well. When July comes around, I am confident that we'll have something significant to demonstrate. It won't be everything, and some of it may be smoke and mirrors, but we'll have something."   Painful though the last iteration was, it had calibrated your velocity numbers. The next iteration went much better. Not because your team got more done than in the last iteration but simply because the team didn't have to remove any tasks or stories in the middle of the iteration.   By the start of the fourth iteration, a natural rhythm has been established. Jane, you, and the team know exactly what to expect from one another. The team is running hard, but the pace is sustainable. You are confident that the team can keep up this pace for a year or more.   The number of surprises in the schedule diminishes to near zero; however, the number of surprises in the requirements does not. Jane and Russ frequently look over the growing system and make recommendations or changes to the existing functionality. But all parties realize that these changes take time and must be scheduled. So the changes do not cause anyone's expectations to be violated. In March, there is a major demonstration of the system to the board of directors. The system is very limited and is not yet in a form good enough to take to the trade show, but progress is steady, and the board is reasonably impressed.   The second release goes even more smoothly than the first. By now, the team has figured out a way to automate Jane's acceptance test scripts. The team has also refactored the design of the system to the point that it is really easy to add new features and change old ones. The second release was done by the end of June and was taken to the trade show. It had less in it than Jane and Russ would have liked, but it did demonstrate the most important features of the system. Although customers at the trade show noticed that certain features were missing, they were very impressed overall. You, Russ, and Jane all returned from the trade show with smiles on your faces. You all felt as though this project was a winner.   Indeed, many months later, you are contacted by Rufus Inc. That company had been working on a system like this for its internal operations. Rufus has canceled the development of that system after a death-march project and is negotiating to license your technology for its environment.   Indeed, things are looking up!

    Read the article

< Previous Page | 1 2 3 4 5