Search Results

Search found 16889 results on 676 pages for 'date range picker'.

Page 8/676 | < Previous Page | 4 5 6 7 8 9 10 11 12 13 14 15  | Next Page >

  • Using Range Function

    - by Michael Alexander Riechmann
    My goal is to make a program that takes an input (Battery_Capacity) and ultimately spits out a list of the (New_Battery_Capacity) and the Number of (Cycle) it takes for it ultimately to reach maximum capacity of 80. Cycle = range (160) Charger_Rate = 0.5 * Cycle Battery_Capacity = float(raw_input("Enter Current Capacity:")) New_Battery_Capacity = Battery_Capacity + Charger_Rate if Battery_Capacity < 0: print 'Battery Reading Malfunction (Negative Reading)' elif Battery_Capacity > 80: print 'Battery Reading Malfunction (Overcharged)' elif float(Battery_Capacity) % 0.5 !=0: print 'Battery Malfunction (Charges Only 0.5 Interval)' while Battery_Capacity >= 0 and Battery_Capacity < 80: print New_Battery_Capacity I was wondering why my Cycle = range(160) isn't working in my program?

    Read the article

  • PHP: detecting IP's entry to a specific IP range

    - by ilnur777
    I have the PHP function that determines whether one IP goes to a specific IP range, but I don't know how to find out the IP's network and mask. Can anyone help with this? <? // Example of calling and checking IP-address 192.168.0.4 // belonging to a network 192.168.0.0 with mask 255.255.255.248 if(ip_vs_net("192.168.0.4","192.168.0.0","255.255.255.248")){ print "Address belongs to a netwok<BR>"; } else { print "Address is out of subnetwork's range<BR>"; } function ip_vs_net($ip,$network,$mask){ if(((ip2long($ip))&(ip2long($mask)))==ip2long($network)){ return 1; } else { return 0; } } ?>

    Read the article

  • Wordpress Events List Date Problem

    - by Roger
    Hi, I'm having a problem displaying events in the correct order in wordpress. I think the problem is because wordpress is treating the date as a string and ordering it by the day because it's in british date format. The goal is to display a list of future events with the most current event at the top of the list. But I must use the british date format of dd/mm/yyyy. Do I need to go back to the drawing board or is there a way of converting the date to achieve the result I need? Thanks in advance :) <ul> <?php // Get today's date in the right format $todaysDate = date('d/m/Y');?> <?php query_posts('showposts=50&category_name=Training&meta_key=date&meta_compare=>=&meta_value=' . $todaysDate . '&orderby=meta_value&order=ASC'); ?> <?php if (have_posts()) : while (have_posts()) : the_post(); ?> <li> <h3><a href="<?php the_permalink(); ?>"> <?php the_title(); ?> </a></h3> <?php $getDate = get_post_meta($post->ID, 'date', TRUE); $dateArray = explode('/', $getDate); ?> <?php if($getDate != '') { ?> <div class="coursedate rounded"><?php echo date('d F Y', mktime(0, 0, 0, $dateArray[1], $dateArray[0], $dateArray[2])); ?></div> <?php } ?> <p><?php get_clean_excerpt(140, get_the_content()); ?>...</p> <p><strong><a class="link" href="<?php the_permalink(); ?>">For further details and booking click here</a></strong></p> </li> <?php endwhile; ?> <?php else : ?> <li>Sorry, no upcoming events!</li> <?php endif; ?>

    Read the article

  • Create lags with a for-loop in R

    - by cptn
    I've got a data.frame with stock data of several companies (here it's only two). I want 10 additional columns in my stock data.frame df with lagged dates (from -5 days to +5 days) for both companies in my event data.frame. I'm using a for loop which is probably not the best solution, but it works partially. DATE <- c("01.01.2000","02.01.2000","03.01.2000","06.01.2000","07.01.2000","09.01.2000","10.01.2000","01.01.2000","02.01.2000","04.01.2000","06.01.2000","07.01.2000","09.01.2000","10.01.2000") RET <- c(-2.0,1.1,3,1.4,-0.2, 0.6, 0.1, -0.21, -1.2, 0.9, 0.3, -0.1,0.3,-0.12) COMP <- c("A","A","A","A","A","A","A","B","B","B","B","B","B","B") df <- data.frame(DATE, RET, COMP, stringsAsFactors=F) df # DATE RET COMP # 1 01.01.2000 -2.00 A # 2 02.01.2000 1.10 A # 3 03.01.2000 3.00 A # 4 06.01.2000 1.40 A # 5 07.01.2000 -0.20 A # 6 09.01.2000 0.60 A # 7 10.01.2000 0.10 A # 8 01.01.2000 -0.21 B # 9 02.01.2000 -1.20 B # 10 04.01.2000 0.90 B # 11 06.01.2000 0.30 B # 12 07.01.2000 -0.10 B # 13 09.01.2000 0.30 B # 14 10.01.2000 -0.12 B this loop works fine comp <- as.vector(unique(df$COMP)) mylist <- vector('list', length(comp)) # create lags in DATE for(i in 1:length(comp)) { print(i) comp_i <- comp[i] df_k <- df[df$COMP %in% comp_i, ] # all trading days of one firm df_k <- transform(df_k, DATEm1 = c(NA, head(DATE, -1)), DATEm2 = c(NA, NA, head(DATE, -2)), DATEm3 = c(NA, NA, NA, head(DATE, -3)), DATEm4 = c(NA, NA, NA, NA,head(DATE, -4)), DATEm5 = c(NA, NA, NA, NA, NA, head(DATE, -5)), DATEp1 = c(DATE[-1], NA)) #DATEp2 = c(DATE[-2], NA, NA), #DATEp3 = c(DATE[-3], NA, NA, NA), #DATEp4 = c(DATE[-4], NA, NA, NA, NA), #DATEp5 = c(DATE[-5], NA, NA, NA, NA, NA)) mylist[[i]] = df_k } df1 <- do.call(rbind, mylist) But if I add the lines with DATEp2, DATEp3, DATEp4, DATEp5. the code doesn't work. Can anybody tell me what I'm doing wrong here? Here the code with all the lagged dates. # create lags in DATE for(i in 1:length(comp)) { print(i) comp_i <- comp[i] df_k <- df[df$COMP %in% comp_i, ] # all trading days of one firm df_k <- transform(df_k, DATEm1 = c(NA, head(DATE, -1)), DATEm2 = c(NA, NA, head(DATE, -2)), DATEm3 = c(NA, NA, NA, head(DATE, -3)), DATEm4 = c(NA, NA, NA, NA,head(DATE, -4)), DATEm5 = c(NA, NA, NA, NA, NA, head(DATE, -5)), DATEp1 = c(DATE[-1], NA), DATEp2 = c(DATE[-2], NA, NA), DATEp3 = c(DATE[-3], NA, NA, NA), DATEp4 = c(DATE[-4], NA, NA, NA, NA), DATEp5 = c(DATE[-5], NA, NA, NA, NA, NA)) mylist[[i]] = df_k } df1 <- do.call(rbind, mylist)

    Read the article

  • Store date object in sqlite database

    - by bnabilos
    Hello, I'm using a database in my Java project and I want to store date in it, the 5th and the 6th parameter are Date Object. I used the solution below but I have errors in these 2 lines : creerFilm.setDate(5, new Date (getDateDebut().getDate())); creerFilm.setDate(6, new Date (getDateFin().getDate())); PreparedStatement creerFilm = connecteur.getConnexion().prepareStatement("INSERT INTO FILM (ID, REF, NOM, DISTRIBUTEUR, DATEDEBUT, DATEFIN) VALUES (?, ?, ?, ?, ?, ?)"); creerFilm.setInt(1, getId()); creerFilm.setString(2, getReference()); creerFilm.setString(3, getNomFilm()); creerFilm.setString(4, getDistributeur()); creerFilm.setDate(5, new Date (getDateDebut().getDate())); creerFilm.setDate(6, new Date (getDateFin().getDate())); creerFilm.executeUpdate(); creerFilm.close(); Can you help me to fix that please ? Thank you

    Read the article

  • How to distinguish date at midnight from date w/o time in Oracle?

    - by Swiety
    I would like to distinguish date at midnight (i.e. '12/05/2010 00:00:00') from date without time specified (i.e. '12/05/2010'). This value is provided by user, sometimes it is only date which is important, sometimes it is date and time and later the application is expected to show the time only when it was explicitly provided. So for the following inputs I would expect the following outputs: for '12/05/2010' I would expect '12/05/2010' for '12/05/2010 09:23' I would expect '12/05/2010 09:23' for '12/05/2010 00:00' I would expect '12/05/2010 00:00' I know I can model it in two separate columns, date and time, but I was wondering was there any way of handling this in single date column?

    Read the article

  • Date range advanced count calculation in TSQL

    - by cihata87
    I am working on call center project and I have to calculate the call arrivals at the same time between specific time ranges. I have to write a procedure which has parameters StartTime, EndTime and Interval For Example: Start Time: 11:00 End Time: 12:00 Interval: 20 minutes so program should divide the 1-hour time range into 3 parts and each part should count the arrivals which started and finished in this range OR arrivals which started and haven't finished yet Should be like this: 11:00 - 11:20 15 calls at the same time(TimePeaks) 11:20 - 11:40 21 calls ... 11:40 - 12:00 8 calls ... Any suggestions how to calculate them?

    Read the article

  • How do I improve this design for dealing with intersecting date ranges and resolving date range conf

    - by derdo
    I am working on some code that deals with date ranges. I have pricing activities that have a starting-date and an end-date to set a certain price for that range. There are multiple pricing activities with intersecting date ranges. What I ultimately need is the ability to query valid prices for a date range. I pass in (jan1,jan31) and I get back a list that says jan1--jan10 $4 , jan11--jan19 $3 jan20--jan31 $4. There are priorities between pricing activities. Some type of pricing activities have high priority, so they override other pricing activities and for certain type of pricing activities lowest price wins etc. I currently have a class that holds these pricing activities and keeps a resolved pricing calendar. As I add new pricing activities I update the resolved calendar. As I write more tests/code, it started to get very complicated with all the different cases (pricing activities intersecting in different ways). I am ending up with very complicated code where I am resolving a newly added pricing activity. See AddPricingActivity() method below. Can anybody think of a simpler way to deal with this? Could there be similar code somewhere out there? Public class PricingActivity() { DateTime startDate; DateTime endDate; Double price; Public bool StartsBeforeEndsAfter (PricingActivity pAct) { // pAct covers this pricing activity } Public bool StartsMiddleEndsAfter (PricingActivity pAct){ // early part of pAct Itersects with later part of this pricing activity } //more similar methods to cover all the combinations of intersecting } Public Class PricingActivityList() { List<PricingActivity> activities; SortedDictionary<Date, PricingActivity> resolvedPricingCalendar; Public void AddPricingActivity(PricingActivity pAct) { //update the resolvedCalendar //go over each activity and find intersecting ones //update the resolved calendar correctly //depending on the type of the intersection //this part is getting out of hand….. } }

    Read the article

  • In PHP, how do I add 3 months to the purchase date retrieved from the iPhone InApp receipt?

    - by Cocoanut
    After I have validated the receipt against the App Store from my PHP server, the App Store sends me back a JSON response with "status" : 0 "receipt" : ( .... ) One of the receipt items is "purchase_date" which contains the following string (example) "2010-02-09 19:17:04 Etc/GMT" I'm trying to establish a subscription service and would like to add 3 months to this date and then write that expiry date into a MySQL table. Is there a string-to-date type function in PHP that can allow me to achieve the adding of 3 months? I have found this example which looks like it adds 1 month to a date: $date = date("Y-m-d");// current date $date = strtotime(date("Y-m-d", strtotime($date)) . " +1 month"); But I'm not sure how I can turn the string passed by the App Store into a PHP recognised date.

    Read the article

  • In registration form adding date dialogbox how can apply validation in system date in dialog ends

    - by narasimha
    hi i am implementing registration form adding date field then click icon to display date dialog window then limit date validation in system date below date only how can implement the validation protected Dialog onCreateDialog(int id) { Calendar c = Calendar.getInstance(); int cyear = c.get(Calendar.YEAR); int cmonth = c.get(Calendar.MONTH); int cday = c.get(Calendar.DAY_OF_MONTH); switch (id) { case DATE_DIALOG_ID: return new DatePickerDialog(this, mDateSetListener, cyear, cmonth, cday); } return null; } private DatePickerDialog.OnDateSetListener mDateSetListener = new DatePickerDialog.OnDateSetListener() { public void onDateSet(DatePicker view, int year, int monthOfYear, int dayOfMonth) { String date_selected = String.valueOf(monthOfYear+1)+" /"+String.valueOf(dayOfMonth)+" /"+String.valueOf(year); EditText birthday=(EditText) findViewById(R.id.EditTextBirthday); birthday.setText(date_selected); } }; public void onClick(View v) { if(v == b1) showDialog(DATE_DIALOG_ID); } } ** showing in system date in below dates only how can implemented some solution in running year to below years are display not incrementing above years this condition are appliying validations how can implemented ?

    Read the article

  • MySQL range date overlap check

    - by Glide
    This table is used to store sessions CREATE TABLE session ( id int(11) NOT NULL AUTO_INCREMENT , start_date date , end_date date ); INSERT INTO session (start_date, end_date) VALUES ("2010-01-01", "2010-01-10") , ("2010-01-20", "2010-01-30") , ("2010-02-01", "2010-02-15") ; We don't want to have conflict between ranges Let's say we need to insert a new session from 2010-01-05 to 2010-01-25 We would like to know the conflicting session(s). Here is my query: SELECT * FROM session WHERE TRUE AND ("2010-01-05" BETWEEN start_date AND end_date OR "2010-01-25" BETWEEN start_date AND end_date OR "2010-01-05" >= start_date AND "2010-01-25" <= end_date ) ; Here is the result: +----+------------+------------+ | id | start_date | end_date | +----+------------+------------+ | 1 | 2010-01-01 | 2010-01-10 | | 2 | 2010-01-20 | 2010-01-30 | +----+------------+------------+ Is there a better practice way to get that ?

    Read the article

  • Using an objects date (without time) for a table header instead of an objects date and time (iphone)

    - by billywilliamton
    I've been working on an iphone project and have run into an issue. Currently In the table view where it displays all the objects, I use headers based on the objects datePerformed field. The only problem is that my code apparently creates a header that contains both the date and time resulting in objects not being grouped solely by their date as I intended, but rather based on their date and time. I'm not sure if it matters, but when an object is created I use a date picker to pick the date, but not the time. I was wondering if anyone could give me any suggestions or advice. Here is the code where i set up the fetchedResultsController - (NSFetchedResultsController *)fetchedResultsController { if (fetchedResultsController != nil) { return fetchedResultsController; } // Create and configure a fetch request with the Exercise entity. NSFetchRequest *fetchRequest = [[NSFetchRequest alloc] init]; NSEntityDescription *entity = [NSEntityDescription entityForName:@"Exercise" inManagedObjectContext:managedObjectContext]; [fetchRequest setEntity:entity]; // Create the sort descriptors array using date and name NSSortDescriptor *dateDescriptor = [[NSSortDescriptor alloc] initWithKey:@"datePerformed" ascending:NO]; NSSortDescriptor *nameDescriptor = [[NSSortDescriptor alloc] initWithKey:@"name" ascending:YES]; NSArray *sortDescriptors = [[NSArray alloc] initWithObjects:dateDescriptor, nameDescriptor, nil]; [fetchRequest setSortDescriptors:sortDescriptors]; // Create and initialize the fetch results controller NSFetchedResultsController *aFetchedResultsController = [[NSFetchedResultsController alloc] initWithFetchRequest:fetchRequest managedObjectContext:managedObjectContext sectionNameKeyPath:@"datePerformed" cacheName:@"Root"]; self.fetchedResultsController = aFetchedResultsController; fetchedResultsController.delegate = self; // Memory management calls [aFetchedResultsController release]; [fetchRequest release]; [dateDescriptor release]; [nameDescriptor release]; [sortDescriptors release]; return fetchedResultsController; } Here's where I set up the table header properties - (NSString *)tableView:(UITableView *)tableView titleForHeaderInSection:(NSInteger)section { // Display the exercise' date as section headings. return [[[fetchedResultsController sections] objectAtIndex:section] name]; } Any suggestions welcome. Thanks for your time. -Billy Williamton

    Read the article

  • Composing adaptors in Boost::range

    - by bruno nery
    I started playing with Boost::Range in order to have a pipeline of lazy transforms in C++]1. My problem now is how to split a pipeline in smaller parts. Suppose I have: int main(){ auto map = boost::adaptors::transformed; // shorten the name auto sink = generate(1) | map([](int x){ return 2*x; }) | map([](int x){ return x+1; }) | map([](int x){ return 3*x; }); for(auto i : sink) std::cout << i << "\n"; } And I want to replace the first two maps with a magic_transform, i.e.: int main(){ auto map = boost::adaptors::transformed; // shorten the name auto sink = generate(1) | magic_transform() | map([](int x){ return 3*x; }); for(auto i : sink) std::cout << i << "\n"; } How would one write magic_transform? I looked up Boost::Range's documentation, but I can't get a good grasp of it.

    Read the article

  • How do I change the date format in Gnome 3 shell?

    - by James Haigh
    I want to change the date/time format on the top panel to a format close to RFC 3339 / ISO 8601, like one of these: %F %T ? 2013-06-24 16:13:00 %F %a %T ? 2013-06-24 Mon 16:13:00 %A %F %T ? Monday 2013-06-24 16:13:00 I know Unity has a preference somewhere hidden away in dconf, this is how I did it in Unity, but I can't find such a preference for Gnome 3 shell. Preferably, I'd also like to set one of these as my system-wide date/time locale preference.

    Read the article

  • Log "date -s" command

    - by LinuxPenseur
    Hi, I know that the date -s <STRING> command sets the time described by the string STRING. What i want is to log the above command whenever it is used to set the time into the file /tmp/log/user.log. In my Linux distribution the logging is done by syslog-ng. I already have some logs going into /tmp/log/user.log. This is the content of /etc/syslog-ng/syslog-ng.conf in my system for logging into /tmp/log/user.log destination d_notice { file("/tmp/log/user.log");}; filter f_filter10 { level(notice) and not facility(mail,authpriv,cron); }; log { source(s_sys); filter(f_filter10); destination(d_notice); }; What should i do so that date -s command is also logged into /tmp/log/user.log

    Read the article

  • Vista: "Change date and time" causes permissions error

    - by alexsome
    I double-click on the time in the bottom right to open the date and time panel. Then I click on the "Change date and time..." button (which has a shield) and I get the UAC dialog. I click "Continue", then am presented with an error that reads: Unable to continue You do not have permission to perform this task. Please contact your computer administrator for help. I will mention I have Comodo installed, but I have turned it off to test this out and I get the same results. All that I've found while googling were suggestions to turn UAC off, but I am interested in learning what the actual problem is. Thanks in advance.

    Read the article

  • javascript Date.parse

    - by user121196
    Case One: new Date(Date.parse("Jul 8, 2005")); Output: Fri Jul 08 2005 00:00:00 GMT-0700 (PST) Case Two: new Date(Date.parse("2005-07-08")); Output: Thu Jul 07 2005 17:00:00 GMT-0700 (PST) Why is the second parse incorrect?

    Read the article

  • compare string to date on mysql

    - by Mercer
    hello, i have a table with a date, this date is a string i want to compare this string with a date in my request. SELECT FE_CLIENT.* FROM FE_CLIENT WHERE D_DATFINPUBLI < '2010/06/03' How can i cast my column date_deb to a date for compare ..?

    Read the article

  • php date() function displaying wrong time

    - by ladaghini
    I'm building a site with wordpress, and when I use the date() function on an otherwise empty file, it shows the right date. However, if I use it in a file that includes other wordpress files, the time is displayed as GMT time, so the date is off. If anyone can figure out how I can use date function without interruption from the wordpress methods, I'd appreciated it.

    Read the article

  • How to insert date in sqlite through java.

    - by dimitar
    Hello guys, I want to make a database that will hold a date in it(SQLite). Now first to ask is what is the right syntax to declare a date column. The second i want to know is how to insert date in it after that. And the third thing i want to know is how to select dates between, for example to select all rows which contain date between 01/05/2010 and 05/06/2010. Thank you

    Read the article

  • Set the current date in PHP

    - by Rowan
    I'm currently working on my company's in-house CMS and wish to add the ability for an admin to view the site on a specific date. This will allow admins to preview the site with archived or scheduled posts. I'd like to avoid finding all mentions of date() or time() and offsetting them. Is there a way of making PHP think it's a specific date so that all calls to date() default to the new time? Thank you

    Read the article

  • Format date in String Template email

    - by Gearóid
    I'm creating an email using String Template but when I print out a date, it prints out the full date (eg. Wed Apr 28 10:51:37 BST 2010). I'd like to print it out in the format dd/mm/yyyy but don't know how to format this in the .st file. I can't modify the date individually (using java's simpleDateFormatter) because I iterate over a collection of objects with dates. Is there a way to format the date in the .st email template?

    Read the article

  • Change date format (in DB or output) to dd/mm/yyyy - PHP MySQL

    - by Jess
    MySQL stores the date in my database (by default) as 'YYYY-MM-DD' The field type for my date is 'DATE' (I do not need any time storage).. Is there a simple way to change it by default to DD/MM/YYYY ? I call up different dates in 2 different tables, and no where in any of my code do I have anything resembling a date variable or anything! Hopefully this is a straight forward change?

    Read the article

< Previous Page | 4 5 6 7 8 9 10 11 12 13 14 15  | Next Page >