Exchange 2003 calendar's "far" future is blank when scheduling

Posted by wfaulk on Server Fault See other posts from Server Fault or by wfaulk
Published on 2010-04-13T21:38:19Z Indexed on 2010/04/13 21:43 UTC
Read the original article Hit count: 334

Filed under:
|

If a user tries to schedule a meeting in the "far" future, where ""far" future" seems to mean "seven or more weeks into the future", no existing meetings show up, and resources (at least) frequently (if not always) show up with the white-with-black-hatching "No Information" indicator in the meeting creation window, but shows up fine if you look at the actual calendar from the main Outlook window.

Is this expected behavior? If so, is there any way to extend how far out Exchange/Outlook will look?

© Server Fault or respective owner

Related posts about exchange-2003

Related posts about calendar