How to specify prerequisite jobs in Hudson

Posted by sjohnston on Stack Overflow See other posts from Stack Overflow or by sjohnston
Published on 2010-05-14T18:03:11Z Indexed on 2010/05/14 21:34 UTC
Read the original article Hit count: 213

I have a Hudson job that just does a check-out/update to a third-party library. Call this Job A.

Several other jobs depend on this library. Call them Jobs B and C. They use the stuff checked out by Job A, and need it to be up-to-date.

My question is, how can I require Jobs B and C to always run Job A (to update the library) before they run through their build routine?

If this is not possible, can someone recommend another way to achieve the same effect?

© Stack Overflow or respective owner

Related posts about hudson

Related posts about build