TFS 2008 ignores team project check-in settings

Posted by JoshEarl on Stack Overflow See other posts from Stack Overflow or by JoshEarl
Published on 2010-12-08T13:57:34Z Indexed on 2010/12/27 7:54 UTC
Read the original article Hit count: 216

Filed under:

I'm trying to set up our TFS 2008 instance to require that projects build before they can be checked in.

I have created a check-in policy using the out of the box "Builds" policy, but I'm still able to check broken projects in after mangling the code and attempting to build the project.

We're a small shop, and TFS was originally set up with our team's Active Directory group listed as TFS admins. Is this the problem? Do check-in policies apply to TFS admins?

Any other suggestions?

© Stack Overflow or respective owner

Related posts about tfs