Migrating a virtual domain controller for DR exercise
Posted
by
Dips
on Server Fault
See other posts from Server Fault
or by Dips
Published on 2011-02-03T05:14:09Z
Indexed on
2011/02/03
7:27 UTC
Read the original article
Hit count: 656
windows-server-2003
Hello gurus,
I have a question. I have a requirement where I have a virtual domain controller and I have to migrate it to another virtual server in a different location. It is for test purposes to test out a DR scenario and the test will be deemed successful if the users that authenticate using the production DC can do so in the backup DC. I don't know much about this and thus don't know why it was assigned to me. So any assistance will be greatly appreciated. What I had in mind was: 1) Taking a snapshot of the production server and then restoring it in the other server. But I was told that this is not the suggested way of doing it. I was not told why. Is that right?If a snapshot is to be taken then what is the best way to do it. Any ideas on where I can get the documentation for this? 2) Another way would be to build the test DC from ground up, match it to the specs of production DC and then perform the DR test. Is this a better option? What will be needed to perform such an activity? Where can I find documentation on that?
I apologise for the length of this query. As I said I am quite a novice and hope to get a better resolution. Any assistance will be greatly appreciated.
Regards,
© Server Fault or respective owner