New Oracle E-Business Suite R12 OS and Tools Requirements on IBM AIX on Power Systems
Posted
by John Abraham
on Oracle Blogs
See other posts from Oracle Blogs
or by John Abraham
Published on Thu, 24 Feb 2011 11:08:22 -0800
Indexed on
2011/02/24
23:30 UTC
Read the original article
Hit count: 412
Filed under:
Error when finding categories...
IBM has announced May 1st, 2011 as the end of Support for Version 8 of the IBM XL C/C++ compiler currently used for Release 12 builds and patching. The
target date of the switchover -- May 1st 2011 -- corresponds to when this
older compiler will no longer be supported by IBM.
Beginning on May 1st 2011, Oracle E-Business Suite patches for Release 12 (12.0, 12.1) on the IBM AIX on Power Systems platform will be built with Version 9 of the IBM XL C/C++ compiler.
Customers who plan to patch or upgrade their E-Business Suite R12 environments after May 1st, 2011 must meet all the new requirements prior to applying new patches or upgrades.
Please review the documents below for all new requirements pertaining to the new runtime and utilities packages on IBM AIX on Power Systems.
Beginning on May 1st 2011, Oracle E-Business Suite patches for Release 12 (12.0, 12.1) on the IBM AIX on Power Systems platform will be built with Version 9 of the IBM XL C/C++ compiler.
Customers who plan to patch or upgrade their E-Business Suite R12 environments after May 1st, 2011 must meet all the new requirements prior to applying new patches or upgrades.
Please review the documents below for all new requirements pertaining to the new runtime and utilities packages on IBM AIX on Power Systems.
© Oracle Blogs or respective owner