Gauging Maturity of your BPM Strategy - part 2 / 2

Posted by Sanjeev Sharma on Oracle Blogs See other posts from Oracle Blogs or by Sanjeev Sharma
Published on Wed, 23 Nov 2011 12:12:30 -0600 Indexed on 2011/11/24 2:05 UTC
Read the original article Hit count: 350

Filed under:

In my earlier post I had discussed the essence of maturity assessment and the business imperative for doing the same in the context of BPM. In this post I will discuss Oracle’s BPM Maturity assessment methodology.

Oracle’s BPM Maturity model comprises of the following components:

  • Maturity – represents stages of evolution of your BPM capability with 0 being the lowest level and 5 being the highest level 
  • Domain – represents multiple perspectives both technical and business oriented against which your BPM capability can be assessed
  • Adoption – represents scale of BPM rollout starting at the project level to the enterprise level

Note: Your BPM capability can be at different levels of maturity for the different domains.

Oracle’s BPM assessment methodology measures the maturity of your BPM capability at the individual domain level as well as the aggregate level. The output of Oracle’s BPM assessment benefits you in two ways:

  • Gap Analysis by comparing the “As-Is” BPM capability with the desired “To-Be” BPM capability along the various domains  (see Figure 1)
  • Systematic Adoption by aligning evolution of BPM capability with its rollout in multiple phases (see Figure 2)

© Oracle Blogs or respective owner

Related posts about /Oracle/Thoughts