So I was thinking that there must be a better way to run NUnit tests for a .net project via teamcity. Currently the build of the project takes about 10 minutes , and the testing step takes 30ish minutes.
I was thinking about splitting up the Nunit tests into 3 groups, assigning them each to a different agent. And then make sure they have a build dependency on the initial build before they start.
This was the best way i thought of doing it, Is there a different way I should also consider?
On a side note Is it possible to combine all the Nunit tests at the end to get one report from the tests being build on 3 different machines? I dont think this is possible unless someone thought of a clever hack.