Best ways to move a server room and 80 desktops to a new building
Posted
by
Marko
on Server Fault
See other posts from Server Fault
or by Marko
Published on 2011-01-27T16:07:31Z
Indexed on
2012/10/11
3:40 UTC
Read the original article
Hit count: 181
physical-environment
Need to plan the best way to physically move a server room (12 IBM x3400 towers) and all associated networking equipment to a new building.
Everything is going, comms (80 strong call centre operation), desktops(80-90) the whole lot and has to be done efficiently over a weekend.
What I cant seem to find are the best ways to move equipment, i.e is it best to remove hard drives and pack them separetely, do I pack the chassis' with foam and/or surround them in bubble wrap?
Are there specific products designed to move computer equipment and where would I find these.
The internet has failed me so far, please help
© Server Fault or respective owner