Uralelektrostroy Improves Turnaround Times for Engineering and Construction Projects by Approximately 50% with Better Project Data Management

Posted by Melissa Centurio Lopes on Oracle Blogs See other posts from Oracle Blogs or by Melissa Centurio Lopes
Published on Mon, 24 Jun 2013 16:27:52 +0000 Indexed on 2013/06/24 22:26 UTC
Read the original article Hit count: 221

LLC Uralelektrostroy was established in 1998, to meet the growing demand for reliable energy supply, which included the deployment and operation of a modern power grid system for Russia’s booming economy and industrial sector. To rise to the challenge, the country required a company with a strong reputation and the ability to strategically operate energy production and distribution facilities. As a renowned energy expert, Uralelektrostroy successfully embarked on the mission—focusing on the design, construction, and operation of power grids, transmission lines, and generation facilities. Today, Uralelektrostroy leads the Russian utilities industry with operations across the country, particularly in the Ural, Western Siberia, and Moscow regions.

Challenges:

  • Track work progress through all engineering project development stages with ease—from planning and start-up operations, to onsite construction and quality assurance—to enhance visibility into complex projects, such as power grid and power-transmission-line construction

  • Implement and execute engineering projects faster—for example, designing and building power generation and distribution facilities—by better monitoring numerous local subcontractors

  • Improve alignment of project schedules with project owners’ requirements—awarding federal and regional authorities—to avoid incurring fines for missing deadlines

Solutions:

  • Used Oracle’s Primavera P6 Enterprise Project Portfolio Management 8.1 to streamline communication with customers and subcontractors through better data management and harmonized reporting, reducing construction project implementation and turnaround times by approximately 50%, on average

  • Enabled fast generation of work-in-progress reports that track project schedules, budgets, materials, and staffing—from approval and material procurement, to construction and delivery

  • Reduced the number of construction sites by nearly 30% (from 35 to 25) by identifying unprofitable sites—streamlining operations at the company’s construction site network and increasing profitability

  • Improved project visibility by enabling managers to efficiently track project status, ensuring on-time reporting and punctual project deliveries to federal customers to reduce delay penalties to zero

“Oracle’s Primavera P6 Enterprise Project Portfolio Management 8.1 drastically changed the way we run our business. We’ve reduced the number of redundant assets, streamlined project implementation and execution, and improved collaboration with our customers and contractors. Overall, the Oracle deployment helped to increase our profitability.” – Roman Aleksandrovich Naumenko, Head of Information Technology, LLC Uralelektrostroy

Read the complete customer snapshot here.

© Oracle Blogs or respective owner

Related posts about /Oracle/Customer Case Studies