Search Results

Search found 3 results on 1 pages for 'cookieoffortune'.

Page 1/1 | 1 

  • Excel 2007: Using a time to set XY chart axis scaling like in 2003

    - by CookieOfFortune
    In Excel 2003, when you created a XY chart using time as an axis, you could set the scaling of these axes by typing in the date. In Excel 2007, you have to use the decimal version of the time (eg. How many days since some arbitrary earlier date). I was wondering if there was a way to avoid having to make such a calculation? A developer posted on a blog that this issue would be fixed in a future release, but all versions of Excel 2007 I have tried have not resolved this issue. The relevant quote: Those of you familiar with this technique of converting time to a decimal may recall that Excel 2003 allowed you to enter a date and time like “1/1/07 11:00 AM” directly in the axis option min/max fields and Excel would calculate the appropriate decimal representation. This currently does not work in Excel 2007 but will be fixed in a subsequent release.

    Read the article

  • System will only boot into a Live CD with core disabled in BIOS and ACPI off.

    - by CookieOfFortune
    I have a system that was running a Q6600 and Windows 7 RC. It crashed last night into a BSOD with a MACHINE_CHECK_EXCEPTION. Now it does that every time it boots into Windows. I tried using my Ubuntu Live CD, but the kernel would error out, the stack trace showed something along the linse of "Can not synchronized to one of the CPUs". Working from this, I enabled the "Limit CPU to 3 cores" option in my BIOS and tried again. This time, it seemed to have died after an ACPI call, so I disabled that during the boot and now it is running from the Ubuntu Live CD, showing 2 cores. Does anyone here think I have any hope or is it simply a CPU waiting to die? EDIT: 1 core now.

    Read the article

  • Using a time to set XY chart axis scaling like in 2003

    - by CookieOfFortune
    In Excel 2003, when you created a XY chart using time as an axis, you could set the scaling of these axes by typing in the date. In Excel 2007, you have to use the decimal version of the time (eg. How many days since some arbitrary earlier date). I was wondering if there was a way to avoid having to make such a calculation? A developer posted on a blog that this issue would be fixed in a future release, but all versions of Excel 2007 I have tried have not resolved this issue. The relevant quote: Those of you familiar with this technique of converting time to a decimal may recall that Excel 2003 allowed you to enter a date and time like “1/1/07 11:00 AM” directly in the axis option min/max fields and Excel would calculate the appropriate decimal representation. This currently does not work in Excel 2007 but will be fixed in a subsequent release.

    Read the article

1