(guest Article by Nancy)
Please be aware with the upcoming release of EPM v11.1.2.2.000, it is highly recommended you first read the"ORACLE® ENTERPRISE PERFORMANCE MANAGEMENT SYSTEM 11.1.2.2.000 Readme"
prior to installing this release.
We want to highlight the "Installation Information" section which includes the following late-breaking information:
Business Rules Migration to Calculation Manager
Oracle Hyperion Calculation Manager has replaced Oracle Hyperion Business Rules as the mechanism for designing and managing business rules, therefore, Business Rules is no longer released with EPM System Release 11.1.2.2. If you are applying 11.1.2.2 as a maintenance release, or upgrading to Release 11.1.2.2, and have been using Business Rules in an earlier release, you must migrate to Calculation Manager rules in Release 11.1.2.2. (See Oracle Enterprise Performance Management System Installation and Configuration Guide.)
Planning User Interface Enhancements
This release of Planning includes a large number of user interface enhancements, as described in Oracle Hyperion Planning New Features. To optimize performance with these new features, you must implement the following recommended configuration.
Server: 64-bit, 16 GB physical RAM
Client: Optimized for Internet Explorer 9 and Firefox 10 or higher
Client-to-Server Connectivity: High-speed internet connection or VPN connection between client and server, client-to-server ping time < 150 milliseconds for best performance
The new, improved Planning user interface requires efficient browsers to handle interactivity provided through Web 2.0 like functionality. In our testing, Internet Explorer 7, Internet Explorer 8, and Firefox 3.x are not sufficient to handle such interactivity, and the responsiveness in these versions of browsers is not as fast as the user interface in the previous releases of Planning. For this reason, we strongly recommend that you upgrade your browser to Internet Explorer 9 or Firefox 10 to get responsiveness similar to what you experienced in previous releases. In some instances, the response times in Internet Explorer 7, Internet Explorer 8 and Firefox 3.x could be acceptable. Hence, we suggest that you uptake the new user interface only after you conduct an end user response test and you are satisfied with the results of these tests for these versions of browsers.
Please note that it is still possible to leverage the old user interface and features from Planning Release 11.1.2.1. (For more information, see “Using the Planning Release 11.1.2.1 User Interface and Features” in the Oracle Hyperion Planning Administrator's Guide.)
IBM HTTP Server and IIS Default Ports
Both IBM HTTP Server and IIS Web Server use 80 as their default port. If you are using WebSphere, you must change one of these defaults so that there is no port conflict.
If you have further questions, please utilize the Planning or Essbase MOS Community.