Hudson pipelines
- by johnoc
Hi
Can anyone help with this problem?
I have a test job, a downstream job and a join job.
I only want the join job to run if the downstream job succeeds.
If the test job fails and the downstream job succeeds I still want to run the join job.
Anyone know of a plugin that can help here?
The join plugin is not good enough because I can configure it to run join job when test AND downstream succeed, or run join regardless of either jobs success/failure. But not run join job ONLY if downstream succeeds.
Why do I want to do it this way? I want to pipeline jobs together but only if a common "downstream" job succeeds. If it fails then I want the pipeline to "break".
Many thanks
John