Search Results

Search found 24 results on 1 pages for 'ott'.

Page 1/1 | 1 

  • new ActiveXObject('Word.Application') creates new winword.exe process when IE security does not allo

    - by Mark Ott
    We are using MS Word as a spell checker for a few fields on a private company web site, and when IE security settings are correct it works well. (Zone for the site set to Trusted, and trusted zone modified to allow control to run without prompting.) The script we are using creates a word object and closes it afterward. While the object exists, a winword.exe process runs, but it is destroyed when the word object is closed. If our site is not set in the trusted zone (Internet zone with default security level) the call that creates the word object fails as expected, but the winword.exe process is still created. I do not have any way to interact with this process in the script, so the process stays around until the user logs off (users have no way to manually destroy the process, and it wouldn't be a good solution even if they did.) The call that attempts to create the object is... try { oWordApplication = new ActiveXObject('Word.Application'); } catch(error) { // irrelevant code removed, described in comments.. // notify user spell check cannot be used // disable spell check option } So every time the page is loaded this code may be run again, creating yet another orphan winword.exe process. oWordApplication is, of course, undefined in the catch block. I would like to be able to detect the browser security settings beforehand, but I have done some searching on this and do not think that it is possible. Management here is happy with it as it is. As long as IE security is set correctly it works, and it works well for our purposes. (We may eventually look at other options for spell check functionality, but this was quick, inexpensive, and does everything we need it to do.) This last problem bugs me and I'd like to do something about it, but I'm out of ideas and I have other things that are more in need of my attention. Before I put it aside, I thought I'd ask for suggestions here...

    Read the article

  • Parametrized Strategy Pattern

    - by ott
    I have several Java classes which implement the strategy pattern. Each class has variable number parameters of different types: interface Strategy { public data execute(data); } class StrategyA implements Strategy { public data execute(data); } class StrategyB implements Strategy { public StrategyB(int paramA, int paramB); public data execute(data); } class StrategyB implements Strategy { public StrategyB(int paramA, String paramB, double paramC); public data execute(data); } Now I want that the user can enter the parameters in some kind of UI. The UI should be chosen at runtime, i.e. the strategies should be independent of it. The parameter dialog should not be monolithic and there should be the possibility to make it behave and look different for each strategy and UI (e.g. console or Swing). How would you solve this problem?

    Read the article

  • Python Eggs on Google App Engine

    - by ott
    Usually I would use virtualenv and pip for deployment of web applications. With Google App Engine this doesn't work, because all import statement are relative to directory of the application. The most common approach I saw was to simply copy the packages from site-packages to the directory of the application. This involves manual work and is error-prone. Another approach was to changes install_lib and install_scripts in ~/.pydisutils.cfg, but this doesn't allow me to use pip in my home directory simultaneously. Do you have any suggestions for this?

    Read the article

  • Oracle Enterprise Cloud Summit Egerszalókon

    - by Lajos Sárecz
    2011 március 30-án a HOUG konferencia keretében tartjuk az Oracle Enterprise Cloud Summit konferenciát. A konferencia programja a HOUG programjába illeszkedik, megtalálható a HOUG konferencia weboldalán. Igyekszünk teljes áttekintést adni arról, az Oracle milyen technológiákkal támogatja akár a publikus, akár a privát felhok kialakítását. Érdemes már most regisztrálni, a mai nap még kedvezményesen lehet megtenni. Azt gondolom, mind a konferencia helyszínét biztosító Saliris Resort Spa & Konferencia Hotel, mind a konferencia programja indokolja a részvételt, remélem sok olvasómmal találkozhatok ott személyesen is.

    Read the article

  • Egy DBA napja - Utópia, vagy sem?

    - by lsarecz
    Ma délelott a HOUG BI/DW és DB szakmai napján tartottam egy eloadást arról, hogyan kellene egy DBA-nak dolgoznia manapság. A lényeg az volt, hogy az üzlet legjobb kiszolgálása érdekében célszeru a felhasználók és az alkalmazás oldaláról megközelíteni a kérdést. Azaz monitorozzuk a felhasználók elégedettségét, majd ha valami nem stimmel fúrjunk le alsóbb rétegekbe (MW, DB, OS, HW, Storage, Network), és ott folytassuk a diagnosztikát. Meglepetésemre az eloadást követoen a DB szakosztály vezetoje úgy kommentálta az eloadást, hogy ez még utópisztikus. Ma délután egy a hallgatók között ülo üzemeltetési igazgató e-mail-ben jelezte, hogy ezzel o sem ért egyet, mert ok már most is így üzemeltetnek, még ha nem is minden elemében a Grid Control-t használják. És mi sem bizonyítja jobban, hogy ez az üzemeltetési model nem utópia, mint hogy az Oracle Enterprise Manager 11g tökéletes támogatást ad minderre. Akit ezek után érdekel az eloadásom, az innen letöltheti: 1. fele, 2. fele.

    Read the article

  • How can I prevent Libre Office to start unexpected when I start other applications?

    - by brubaker
    I am on Ubuntu 11.10/64bit with Gnome 3. Regards [update] I trying to say that when I start an application like Nautilus LibreOffice starts as well. Sometimes this also happens when I open a document with a totally different extension i.e. a .html doc. I checked if and which plugins are installed to Firefox: OpenOffice.org Plug-in File: libnpsoplugin.so Version: OpenOffice.org Plug-in handles all its documents MIME Type Description Suffixes application/vnd.stardivision.calc StarCalc 3.0 - 5.0 sdc application/vnd.stardivision.chart StarChart 3.0 - 5.0 sds application/vnd.stardivision.draw StarDraw 3.0 - 5.0 sda application/vnd.stardivision.impress StarImpress 3.0 - 5.0 sdd application/vnd.stardivision.impress-packed StarImpress-packed 3.0 - 5.0 sdp application/vnd.stardivision.math StarMath 3.0 - 5.0 smf application/vnd.stardivision.writer StarWriter Template 3.0 - 5.0 vor application/vnd.stardivision.writer-global StarWriter Global 3.0 - 5.0 sgl application/vnd.staroffice.writer StarWriter 3.0 - 5.0 sdw application/vnd.sun.xml.calc StarOffice 6.0/7 Spreadsheet sxc application/vnd.sun.xml.calc.template StarOffice 6.0/7 Spreadsheet Template stc application/vnd.sun.xml.draw StarOffice 6.0/7 Drawing sxd application/vnd.sun.xml.draw.template StarOffice 6.0/7 Drawing Template std application/vnd.sun.xml.impress StarOffice 6.0/7 Presentation sxi application/vnd.sun.xml.impress.template StarOffice 6.0/7 Presentation Template sti application/vnd.sun.xml.math StarOffice 6.0/7 Formula sxm application/vnd.sun.xml.writer StarOffice 6.0/7 Text Document sxw application/vnd.sun.xml.writer.global StarOffice 6.0/7 Master Document sxg application/vnd.sun.xml.writer.template StarOffice 6.0/7 Text Document Template stw application/vnd.oasis.opendocument.text OpenDocument Text odt application/vnd.oasis.opendocument.text-template OpenDocument Text Template ott application/vnd.oasis.opendocument.text-master OpenDocument Master Document odm application/vnd.oasis.opendocument.text-web HTML Document Template oth application/vnd.oasis.opendocument.spreadsheet OpenDocument Spreadsheet ods application/vnd.oasis.opendocument.spreadsheet-template OpenDocument Spreadsheet Template ots application/vnd.oasis.opendocument.graphics OpenDocument Drawing odg application/vnd.oasis.opendocument.graphics-template OpenDocument Drawing Template otg application/vnd.oasis.opendocument.presentation OpenDocument Presentation odp application/vnd.oasis.opendocument.presentation-template OpenDocument Presentation Template otp application/vnd.oasis.opendocument.formula OpenDocument Formula odf

    Read the article

  • Kipróbálható az ingyenes új Oracle Data Miner 11gR2 grafikus workflow-val

    - by Fekete Zoltán
    Oracle Data Mining technológiai információs oldal. Oracle Data Miner 11g Release 2 - Early Adopter oldal. Megjelent, letöltheto és kipróbálható az Oracle Data Mining, az Oracle adatbányászat új grafikus felülete, az Oracle Data Miner 11gR2. Az Oracle Data Minerhez egyszeruen az SQL Developer-t kell letöltenünk, mivel az adatbányászati felület abból indítható. Az Oracle Data Mining az Oracle adatbáziskezelobe ágyazott adatbányászati motor, ami az Oracle Database Enterprise Edition opciója. Az adatbányászat az adattárházak elemzésének kifinomult eszköze és folyamata. Az Oracle Data Mining in-database-mining elonyeit felvonultatja: - nincs felesleges adatmozgatás, a teljes adatbányászati folyamatban az adatbázisban maradnak az adatok - az adatbányászati modellek is az Oracle adatbázisban vannak - az adatbányászati eredmények, cluster adatok, döntések, valószínuségek, stb. szintén az adatbázisban keletkeznek, és ott közvetlenül elemezhetoek Az új ingyenes Data Miner felület "hatalmas gazdagodáson" ment keresztül az elozo verzióhoz képest. - grafikus adatbányászati workflow szerkesztés és futtatás jelent meg! - továbbra is ingyenes - kibovült a felület - új elemzési lehetoségekkel bovült - az SQL Developer 3.0 felületrol indítható, ez megkönnyíti az adatbányászati funkciók meghívását az adatbázisból, ha épp nem a grafikus felületetet szeretnénk erre használni Az ingyenes Data Miner felület az Oracle SQL Developer kiterjesztéseként érheto el, így az elemzok közvetlenül dolgozhatnak az adatokkal az adatbázisban és a Data Miner grafikus felülettel is, építhetnek és kiértékelhetnek, futtathatnak modelleket, predikciókat tehetnek és elemezhetnek, támogatást kapva az adatbányászati módszertan megvalósítására. A korábbi Oracle Data Miner felület a Data Miner Classic néven fut és továbbra is letöltheto az OTN-rol. Az új Data Miner GUI-ból egy képernyokép: Milyen feladatokra ad megoldási lehetoséget az Oracle Data Mining: - ügyfél viselkedés megjövendölése, prediktálása - a "legjobb" ügyfelek eredményes megcélzása - ügyfél megtartás, elvándorlás kezelés (churn) - ügyfél szegmensek, klaszterek, profilok keresése és vizsgálata - anomáliák, visszaélések felderítése - stb.

    Read the article

  • Hosting provider that allows you to host your own VM image?

    - by Timo Geusch
    I've already looked at the 'Best Hosted VM Provider' question and checked the recommendations there, but I seem to have slightly odd requirements. Basically, I am looking for a host that allows me to host a VM image I supply (FreeBSD, which most of the suggested hosters don't support, they only seem to support various Linuxes) instead of one of their standard images. I'm a long time BSD user and have had colo BSD servers in the past so I'm pretty sure that i don't need much in the way of software support, but I'd basically like to run my server on managed hardware without having to rent the whole server. For the usage I have that would way OTT as we're talking a couple of small apps with very few users, a couple of blogs and (most importantly) email hosting for about 6-10 domains with moderate traffic levels. Oh, and reliability trumps cost to a certain extent.

    Read the article

  • Az érem másik oldala

    - by peter.nagy
    Az Exalogic kapcsán, ha már valaki hallott róla, akkor leginkább a teljesítmény ugrik be. Mint normálisan majdnem minden szerver megoldás új verziójánál. Nos ez nyilvánvalóan nincs másképp itt sem, amire büszkék is lehetünk. Ugyanakkor nagyon fontos tulajdonsága az Exalogicnak, hogy szinte azonnal hadrafogható. Ez persze már részben elérheto, mivel képesek vagyunk kész virtuális gépeket letölteni komplett telepítéssel. Persze ott még a vasra külön fel kell húzni a virtualizációs szoftvert. Na és itt jönnek a problémák. Bárki aki már látott, csinált, vagy végig nézte egy rendszerhez szükséges infrastruktúra felhúzását az tudja mirol beszélek. A telepítés, megfelelo verziók, szükséges patch-ek, hálózati eszközök bekötése. Aztán mindennek a konfigurálása. A legjobb esetben is napok, de inkább hetek kérdése mire üzemkész lenne. Az Exalogic esetében ez más, hiszen gyárilag összereszelték, a konfiguráció kialakítása gyakorlatilag néhány paraméter file és kész. De lássuk is, hogy mennyi ido onnan, hogy kibontottuk a dobozból. Mindössze egy nap. A hab a tortán pedig a full stack upgrade. Nem külön minden egyes komponenst. Firmware-tol a WebLogic szerverig.

    Read the article

  • Deal Registration Moves to Oracle Partner Store (OPS)- The Four Action Items for Partners

    - by Richard Lefebvre
    In November 2012, Oracle’s partner deal registration process will move to the Oracle Partner Store (OPS). During this time, OPS will become the single source for partners to register deals, obtain deal status, and place orders. What will partners need to do? 1. Request an OPS Account – If your company is new to OPS the first thing you need to do is request an account (if your company already has an OPS account, go to step 2). It’s important to have the person who will be managing your OPS account make this request as soon as possible. They will be set up as your company’s primary administrator. 2. Set-Up Users in OPS – Setup of users can start immediately, and will be handled by the primary OPS administrator at your company. The process is simple, but all existing users of Global PRM (Partner Relationship Management) deal registration will need to be set up in OPS before November 14, 2012.  3. Review/Action Any Registrations Pending Submission in PRM – Prior to November 14, 2012, all pending registrations should be submitted in the existing PRM system. It is important that this step is complete so registrations will not need to be re-entered when the system is moved to OPS on November 17, 2012. Registrations pending submission are easily identified on the registration listing screen with either “Incomplete” or “Returned to Partner” in the status column.  4. Attend Training – Oracle will offer multiple VAD and VAR training sessions beginning October 29, 2012. It is recommended that all users attend one of these important sessions.  Detailed instructions on each of these tasks can be found on the OPS Information Page. OPS will offer several enhancements to the deal registration process, including: Simplified Registration Form Easier Product Selection Expanded Browser Support Shared Registration Visibility Between VAD and VAR Pre-set Customer Selection From Partner Ordering Base Best Regards, Titina Ott Vice President, Worldwide A&C Systems And Business Processes 

    Read the article

  • Deal Registration is moving to OPS– Guest Post

    - by Kristin Rose
    Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:10.0pt; font-family:"Times New Roman","serif";} We have listened to, contemplated around, and agreed with your feedback when it comes to our current deal registration system, and now we are proud to announce that deal registration is moving to the Oracle Partner Store! If you missed the live announcement at Oracle OpenWorld, watch below as Titina Ott, VP of  Worldwide Alliances & Channels, presents on this upcoming and exciting functionality. Some benefits of this move include: Simplified Registration Form Easier and Faster Product Selection Expanded Browser Support Shared Registration Visibility Between VAD and VAR Downloadable tracking and reporting Shared Customer Selection From Partner Ordering Functions As you may already be aware, the Oracle Partner Store is a very popular, feature rich application for partners like you, that handles software and hardware ordering, including configurations, additional discount requests and product and price information. This big move is set to go live November 19th 2012, but don’t wait until then! If you don’t already have an Oracle Partner Store account, register today  and get ready for the big move! Best Regards, Simon Davis Senior Director Ww A&C Quote To Order

    Read the article

  • Which datagrid to use for ASP.NET MVC2 project?

    - by Nick
    Hi, I am developing a commercial MVC2 app that requires a grid that has callback update in some form to support 10,000+ rows. It should also support relatively rich content (icons, multiline descriptions etc). Although it requires the usual paging/scrolling/sorting features it does not need support for grouping. So nothing that special. The commercial grids I looked at were Component Art (http://www.componentart.com/products/aspnetmvc/datagrid/) and Telerik (http://www.telerik.com/products/aspnet-mvc/grid.aspx) which both look pretty good but may be a little OTT for what I need. They are also $800 and $999 respectively (1 developer). I've also looked at jqGrid (http://www.trirand.net/download.aspx) and the grid from MvcContrib. These appear ok but for a commercial app I am concerned that these may be risky options - though could be wrong there. I'd really appreciate any views/exprience on either the above grids or perhaps you can suggest a better option/approach. FYI I am using EF4 and C#. Cheers

    Read the article

  • emacs cedet set up doubt

    - by trybeingarun
    Hi, I installed cedet successfully today and got most of it working; thanks to Alex Ott's Gentle Introduction to Cedet. However i am having a problem When I give the exact path relative to the current file i am working on then auto-completion is working fine. #include "../../opensource/inc/lldp_port.h" void test_func() { lldp_port port; port.blah //here auto-completion worked fine } However i cannot specify the full path all the time( we have eclipse at office and it generates makefiles for us ) #include "lldp_port.h" void test_func() { lldp_port port; port. //here auto-completion does not work :( } What should i do to solve this?

    Read the article

  • How to free an Oracle Object-Type passed to an external procedure

    - by chila
    I'm using OTT to pass and load an Object Type from a C++ external procedure. The problem I have is that I don't know how to somehow mark the object for deallocation once extproc has done marshalling it. The object remains in extproc's memory forever making it grow in memory consumtion. Here's part of the code: void decodeFromBuffer(OCIExtProcContext *ctx, GPRS_GPRSCHARGINGRECORD *record, GPRS_GPRSCHARGINGRECORD_ind *recordInd, const unsigned char *buffer, int buffLen, OCIInd *bufferInd) { . . . assert(OCIExtProcGetEnv(ctx, &envh, &svch, &errh) == OCI_SUCCESS); recordInd->_atomic = OCI_IND_NOTNULL; // somehow I should mark the object for deallocation after extproc has done marshalling it // using OCINumberFromInt and OCIStringAssignText to load the object (this memory is never deallocated) . . . } How could I mark the object (and subobjects) for deallocation?

    Read the article

  • How can I dynamically load the correct sprite from a sprite sheet?

    - by Leonard Challis
    I am making a simple card game in unity. The game is based on a standard 52-card pack, with identical backs for unique faces. In my particular game different cards are worth different values and have various special abilities. The game will have 52 cards on the table (on the draw position or in the face-down deck or in someone's hand) at all times, so this number won't change. I thought that making a Card prefab and instantiating 52 of these manually would be a bad idea. Even doing it in code, I thought, would be a bit OTT, and that I should just instantiate visual cards when they are face-up to the player. I have a sprite sheet of the 52 cards and the back, which is imported as a Sprite in multiple mode, sliced in to a grid containing all the cards needed to play the game. The problem I now face is that, through my GameController script I want to generate a shuffled pack of cards, deal some to each player and then show those cards to a player. However, I am not sure of the best way, or even if it's possible, to do this dynamically with the sprite sheets as they are. For instance if I have the following: private CardRank rank; private CardSuite suite; private void Start() { this.rank = CardRank.Ace; this.suite = CardSuite.Spades; } This class would be instantiated by the game manager. I would have 52 of these in code. Whenever I have to visually show a card in the scene, I would use a card prefab, which is essentially a game object with a SpriteRenderer on it. I would need to dynamically load the correct sprite for this object from the spritesheet. The sliced sprites from the sprite sheet actually have names in the format AS (Ace of Spades), 7H (Seven of Hearts), etc - though this was a manual thing I did myself of course. I have also tried various alternative solutions, including creating animations, having separate sprites not in a spritesheet and having an array of available sprites in an array with a specific index for each card, but none seem as elegant as trying to load the correct sprite at runtime, as I'm trying to. So, how do I load a specific sprite from a spritesheet at runtime? I'm open to suggestions, even those that make me think differently about how to approach the problem.

    Read the article

  • PC powers off at random times

    - by Timo Huovinen
    Short Version After experiencing some problems with Mobo batteries my PC started to power off at random times, the power off is instant and sudden and does not restart afterwards, need help figuring out the cause. Facts: Powers off when PC is playing games Powers off when PC is idle Powers off when PC is in safe mode Powers off when PC is in BIOS Powers off when PC is booted through a Windows installation USB Replaced the motherboard battery several times Replaced the 650W PSU with a 750W PSU Replaced the RAM Swapped the RAM between slots Re-applied thermal paste to the CPU Checked if the motherboard touches the case Nothing is overclocked PC Specs PC specs: OS: Windows 7 Ultimate SP1 RAM: klingston 1333MHz 4GB stick CPU: AMD Phenom II x4 955 Mobo: Gigabyte 88GMA-UD2H rev 2.2 Motherboard battery: CR2032 3v HDD: 500GB Seagate ST3500418AS ATA Device Graphics: ATI/AMD Radeon HD 6870 Very Long version Around 10 months ago I built a brand new gaming PC. Around 6 months ago it's time setting in windows started resetting to the year 2010. I swapped the Motherboard battery for a new one of the exact same size and shape and voltage, and the problems disappeared...for around 2 weeks. Then the same problem happened again, time gets reset, I swapped the battery again, and the problem was gone for good and everything was great for about 3 months.. then another problem started happening, the PC started to power off suddenly and without warning at completely random times, sometimes the PC works for and hour, sometimes 5 minutes. So I read on the forums that it might be either the PSU or the motherboard Battery or RAM or HDD or the Graphics card or the CPU or the motherboard or the drivers or a Virus or Grounding issues, or something short circuiting, basically it can be anything... I spent some days researching, and decided to remove the possibility of a virus. I reset the CMOS, cleared all BIOS settings and reinstalled windows 7 after a full format of the HDD, but the random power off kept happening. I then disabled the restart on error option in windows and looked at the event log for error events, but they did not help me figure out the problem. Network list service depends on network location awareness the dependency group failed to start Source Kernel Power Event 41 Task Category 63 Source Disk Event ID 11 Task Category None The driver detected a controller error on device disk I took apart the PC, every little piece, re-applied some expensive thermal paste to the CPU, and double checked that none of the pieces are touching the PC case. The problem was gone, the PC no longer powered off randomly I re-attached the graphics card and all was good for 4 months... then the power off problem appeared again, but was happening at high intervals, the PC would shutdown once in 2 days on average, at random points in time, sometimes when it's idle all day long, sometimes when it's running CRYSIS 2. I checked the CPU temperature, because I know that AMD CPU's have a built in protection mechanism that switches off the PC if the CPU gets too hot, and the Temp was 50C system temp, and 45C CPU after running the PC all day long (I did not do tests to see if there are any temperature spikes, don't know how to do them) Originally the PSU that powered the PC was 650Watts and had one 4 pin cable to power the CPU, I replaced it with a new 750Watts PSU which has two 4 pin cables for the CPU, but the problem remained. I removed the graphics card and let the motherboard use the built in one, but the PC kept suddenly powering off at random times. I took apart the PC completely again, and re-applied thermal paste to the CPU, added lots of insulation, and checked for any type of short-circuit possibility again and again, but the problem remained. The problem was like that for some months. I replaced the Battery a couple of times over the time, changed lots of options in windows, and tried everything I could, but it kept powering off, so I stopped using the PC as much as I used to, just living with the random power offs from time to time, until a couple of days ago, when the power off happens almost immediately after powering on the PC. I replaced the RAM with a brand new one, but that did not help. Took apart the PC again, checked for anything anywhere that might cause it, found some small scratches on the very edge of the motherboard to the left of the PCI express x16 slot. This might cause the problem, I thought, but the scratch looks very superficial, not deep at all, and if the scratch did harm the motherboard, wouldn't it cause it to not start at all? And why did it start to power off a while ago, and then suddenly stop powering off? The scratches could not have vanished??? did chkdsk \d but it powered off when it was at 75% I removed the hard disks, the graphics card, while I fiddled with the BIOS settings, and suddenly the PC shut down while I was looking at the BIOS version. This makes me realize, it is not caused by: HDD, Windows, Drivers or the Graphics card I cleared the CMOS again, updated the BIOS from F5 to F6f beta, but that did not help, it might even seem that the PC powers off even sooner. The shutdown even happened to me while I booted through a windows 7 installation USB and was in the repair console. I removed one of the cables powering the CPU, now only one 4pin cable powers it, and it worked for 30mins after doing that, which makes me think that it's the CPU overheating, and because it gets less power, it overheats slower? The things that I am still considering: CPU overheating (does not seem to overheat, maybe false readings?) Motherboard short circuiting (faulty motherboard?) I desperately need some advice in what is faulty, is it a faulty Motherboard or an overheating CPU? or maybe something else? I have been breaking my head over this problem over a span of 6 months. I'm not sure if this is a good place to ask this question, if it is not, then tell me where I can get some experienced help. More info I have also discovered a mysterious piece that seems to have fallen out of the motherboard i119.photobucket.com/albums/o126/yurikolovsky/strangepiece.jpg What is it? Looks like each time that it powers off the datetime gets reset I also found another forum post tomshardware.co.uk/forum/… except I don't have Integrated PeripheralsUSB Keyboard Function option in BIOS :S Comments summary (asked by Random moderator) Q. tell me, if the computer restarts, is it immediately? Does it take a second and then restarts? Do you see (BSOD) or hear (PSU, short circuit) any suspicious when it happens? After reading trough it, it remains the mainboard that is faulty. – JohannesM A. Immediate power off, all the fans stop instantly, all the light turn off instantly, no sound or anything, and it remains off until I turn it back on. Thanks for the feedback, faulty motherboard is what I fear. Q. Try stress-testing the system with Prime95 and see if errors or shutdowns occur when the CPU is under full load. – speakr A. Prime95 heat stress test peaked CPU heat at 60C after 5mins, it powered off after 30mins of testing in the middle of the test with no errors, Prime95 Heat test or the stress-testing with low RAM usage (small or in-place FFTs) do not report errors while testing for 10-60 mins. The power off does not seem like it is affected by Prime95 at all Makes me wonder if it's a CPU or Motherboard issue at all. Q. I had similar random/intermittent problems with my old board. It gave one of a few different symptoms: keyboard and/or mouse would die and/or the RAM wouldn't work and/or it would shut down. It was in bad shape. One problems was that my old PSU had literally burned the connector on it (browned around the pins), another was that a broken lead inside the layers of the PCB would work sometimes if it happened to be hot or if I bent the board—by jamming a hunk of wood behind it. I managed to keep the board alive for several years, but eventually nothing I did would make it work correctly anymore. – Synetech A. I will try that as the last resort, ok? ;) Q. Have you tried a different power cord, surge protector, outlet (on a different circuit). It's worth a shot just to ensure it's not subpar wiring or a week circuit (dips in power may cause shutdown if the PSU can't pull enough juice from the wall). – Kyle A. yes, I attached the PC to an entirely different outlet on a different circuit and the problem persists. After connecting it to a different outlet after starting the PC it gave me 3 long beeps and 1 short one, then the PC immediately proceeded to boot up normally. Q. Re-check your mainboard manual and all PSU connections to your mainboard to be sure that nothing is missing (e.g. 12V ATX 4-pin/6-pin connector). If you can provoke shutdowns with Prime95, then consider buying new hardware -- a stable system should run Prime95 for 24h without any errors. Prime95 mentions errors in the log when they occur and gives a summary after the stress test was stopped manually (e.g. "0 errors, 0 warnings", if all is fine) – speakr A. Re-checked, there are no more PSU connectors that I can physically connect, except the one ATX 4-pin (there are 2 that power the CPU) that I disconnected on purpose, I have reconnected it but the problem persists. Q. With one PC I had a short curcuit. The power button on the front plate had its cables soldered, but not isolated, and the contacts were very close to the metal case. A heavier touch was enough to cause a shutdown. The PC's vibration could be enough – ott-- A. yes, it seems to switch off with even the lightest touch, I switched on the PC, then pulled out the front panel power cable that connects to the motherboard so the power button does not work anymore, after 5 mins of working like that, with the power button completely disconnected, just sitting idle, the PC powered off again, I don't think it's the power button. Q. I wonder if you dare to operate components without the case, that is remove motherboard, power, disk ( just put the motherboard on a wooden desk). Don't bend the adapters when running like that. – ott-- A. yes, I do dare to do that, but only tomorrow, too tired/late right now.

    Read the article

  • Is there an Installer Analyser tool that can list what Registry Keys will be created?

    - by EvoGamer
    I can think of 3 ways to achieve my goal: Create a clean VPC, install a given piece of software, and compare the before and after states. Somehow reverse-engineer the installer. Somehow redirect the output of the installer in question so that all registry calls and copy/move file commands are recorded, but not executed. The first option can be done manually, or potentially automated, but I feel it's rather OTT for my needs. The second could cause all sorts of licencing issues, not to mention it may not always return a correct result. Also, without delving into hex editing, I can't think of a way that it would be possible to do manually (some installers - eg Anti-Virus software - may react unfavourably on automated attempts to investigate the installer). The third option shows the most promise, although if the first could be stripped down into a lightweight throwaway environment, it would work pretty much the same way. However, I'm not sure how to do it. So my question is: What tools are available (if any) and/or how could I find out this information manually? I'm not looking to reverse-engineer anything (if I can help it), but I just want to know exactly what changes are being made to my PC by a given piece of software.

    Read the article

  • IPgallery banks on Solaris SPARC

    - by Frederic Pariente
    IPgallery is a global supplier of converged legacy and Next Generation Networks (NGN) products and solutions, including: core network components and cloud-based Value Added Services (VAS) for voice, video and data sessions. IPgallery enables network operators and service providers to offer advanced converged voice, chat, video/content services and rich unified social communications in a combined legacy (fixed/mobile), Over-the-Top (OTT) and Social Community (SC) environments for home and business customers. Technically speaking, this offer is a scalable and robust telco solution enabling operators to offer new services while controlling operating expenses (OPEX). In its solutions, IPgallery leverages the following Oracle components: Oracle Solaris, Netra T4 and SPARC T4 in order to provide a competitive and scalable solution without the price tag often associated with high-end systems. Oracle Solaris Binary Application Guarantee A unique feature of Oracle Solaris is the guaranteed binary compatibility between releases of the Solaris OS. That means, if a binary application runs on Solaris 2.6 or later, it will run on the latest release of Oracle Solaris.  IPgallery developed their application on Solaris 9 and Solaris 10 then runs it on Solaris 11, without any code modification or rebuild. The Solaris Binary Application Guarantee helps IPgallery protect their long-term investment in the development, training and maintenance of their applications. Oracle Solaris Image Packaging System (IPS) IPS is a new repository-based package management system that comes with Oracle Solaris 11. It provides a framework for complete software life-cycle management such as installation, upgrade and removal of software packages. IPgallery leverages this new packaging system in order to speed up and simplify software installation for the R&D and production environments. Notably, they use IPS to deliver Solaris Studio 12.3 packages as part of the rapid installation process of R&D environments, and during the production software deployment phase, they ensure software package integrity using the built-in verification feature. Solaris IPS thus improves IPgallery's time-to-market with a faster, more reliable software installation and deployment in production environments. Extreme Network Performance IPgallery saw a huge improvement in application performance both in CPU and I/O, when running on SPARC T4 architecture in compared to UltraSPARC T2 servers.  The same application (with the same activation environment) running on T2 consumes 40%-50% CPU, while it consumes only 10% of the CPU on T4. The testing environment comprised of: Softswitch (Call management), TappS (Telecom Application Server) and Billing Server running on same machine and initiating various services in capacity of 1000 CAPS (Call Attempts Per Second). In addition, tests showed a huge improvement in the performance of the TCP/IP stack, which reduces network layer processing and in the end Call Attempts latency. Finally, there is a huge improvement within the file system and disk I/O operations; they ran all tests with maximum logging capability and it didn't influence any benchmark values. "Due to the huge improvements in performance and capacity using the T4-1 architecture, IPgallery has engineered the solution with less hardware.  This means instead of deploying the solution on six T2-based machines, we will deploy on 2 redundant machines while utilizing Oracle Solaris Zones and Oracle VM for higher availability and virtualization" Shimon Lichter, VP R&D, IPgallery In conclusion, using the unique combination of Oracle Solaris and SPARC technologies, IPgallery is able to offer solutions with much lower TCO, while providing a higher level of service capacity, scalability and resiliency. This low-OPEX solution enables the operator, the end-customer, to deliver a high quality service while maintaining high profitability.

    Read the article

  • Is inconsistent formatting a sign of a sloppy programmer?

    - by dreza
    I understand that everyone has their own style of programming and that you should be able to read other people's styles and accept it for what it is. However, would one be considered a sloppy programmer if one's style of coding was inconsistent across whatever standard they were working against? Some example of inconsistencies might be: Sometimes naming private variables with _ and sometimes not Sometimes having varying indentations within code blocks Not aligning braces up i.e. same column if using start using new line style Spacing not always consistent around operators i.e. p=p+1, p+=1 vs other times p =p+1 or p = p + 1 etc Is this even something that as a programmer I should be concerned with addressing? Or is it such a minor nit picking thing that at the end of the day I should just not worry about it and worry about what the end user sees and whether the code works rather than how it looks while working? Is it sloppy programming or just over obsessive nit picking? EDIT: After some excellent comments I realized I may have left out some information in my question. This question came about after reviewing another colleagues code check-in and noticing some of these things and then realizing that I've seen these kind of in-consistencies in previous check-ins. It then got me thinking about my code and whether I do the same things and noticed that I typically don't etc I'm not suggesting his technique is either bad or good in this question or whether his way of doing things is right or wrong. EDIT: To answer some queries to some more good feed back. The specific instance this review occurred in was using Visual Studio 2010 and programming in c# so I don't think the editor would cause any issues. In fact it should only help I would hope. Sorry if I left that piece of info out and it effects any current answers. I was trying to be a bit more generic in understanding if this would be considered sloppy etc. And to add an even more specific example of a code piece I saw during reading of the check-in: foreach(var block in Blocks) { // .. some other code in here foreach(var movement in movements) { movement.Moved.Zero(); } // the un-formatted brace } Such a minor thing I know, but many small things add up(???), and I did have to double glance at the code at the time to see where everything lined up I guess. Please note this code was formatted appropriately before this check-in. EDIT: After reading some great answers and varying thoughts, the summary I've taken from this was. It's not necessarily a sign of a sloppy programmer however as programmers we have a duty (to ourselves and other programmers) to make the code as readable as possible to assist in further ongoing development. However it can hint at inadequacies which is something that is only possible to review on a case by case (person by person) basis. There are many reasons why this might occur. They should be taken in context and worked through with the person/people involved if reasonable. We have a duty to try and help all programmers become better programmers! In the good old days when development was done using good old notepad (or other simple text editing tool) this occurred much more frequently. However we have the assistance of modern IDE's now so although we shouldn't necessarily become OTT about this, it should still probably be addressed to some degree. We as programmers vary in our standards, styles and approaches to solutions. However it seems that in general we all take PRIDE in our work and as a trait it is something that can stand programmers apart. Making something to the best of our abilities both internal (code) and external (end user result) goes along way to giving us that big fat pat on the back that we may not go looking for but swells our heart with pride. And finally to quote CrazyEddie from his post below. Don't sweat the small stuff

    Read the article

  • Javascript: Controlling the order that event handlers / listeners are exeucted in

    - by LRE
    Once again the IE Monster has hit me with an odd problem. I'm writing some changes into an asp.net site I inherited a while back. One of the problems is that in some pages there are several controls that add javascript functions as handlers to the onload event (using YUI if that matters). Some of those event handlers assume certain other functions have been executed. This is well and good in Firefox and IE7 as the handlers seem to execute in order of registration. IE8 on the other hand does this backwards. I could go with some kind of double-checking approach but given the controls are present in several pages I feel that'd create even more dependencies. So I've started cooking up my own queue class that I push the functions to and can control their execution order. Then I'll register an onload handler that instructs the queue to execute in my preferred order. I'm part way through that and have started wondering 2 things: Am I going OTT? Am I reinventing the wheel? Anyone have any insights? Any clean solutions that allow me to easily enforce execution order?

    Read the article

  • Root directory permissions on Mac OS X 10.6?

    - by Agos
    Hi, I was wondering if it's normal that the root directory / should be owned by “root”. I get asked for my password every time I want to do something there (e.g. save a file, create a directory) and I don't remember this happening before (though this may just be my faulty memory). Here's the relevant terminal output: MacBook:~ ago$ ls -lah / total 37311 drwxr-xr-x@ 35 root staff 1,2K 22 Mar 12:34 . drwxr-xr-x@ 35 root staff 1,2K 22 Mar 12:34 .. -rw-rw-r--@ 1 root admin 21K 22 Mar 10:21 .DS_Store drwx------ 3 root admin 102B 28 Feb 2008 .Spotlight-V100 d-wx-wx-wt 2 root admin 68B 31 Ago 2009 .Trashes -rw-r--r--@ 1 ago 501 45K 23 Gen 2008 .VolumeIcon.icns srwxrwxrwx 1 root staff 0B 22 Mar 12:34 .dbfseventsd ---------- 1 root admin 0B 23 Giu 2009 .file drwx------ 27 root admin 918B 22 Mar 10:55 .fseventsd -rw-r--r--@ 1 ago admin 59B 30 Ott 2007 .hidden -rw------- 1 root wheel 320K 30 Nov 11:42 .hotfiles.btree drwxr-xr-x@ 2 root wheel 68B 18 Mag 2009 .vol drwxrwxr-x+ 276 root admin 9,2K 19 Mar 18:28 Applications drwxrwxr-x@ 21 root admin 714B 14 Nov 12:01 Developer drwxrwxr-t+ 74 root admin 2,5K 18 Dic 22:14 Library drwxr-xr-x@ 2 root wheel 68B 23 Giu 2009 Network drwxr-xr-x 4 root wheel 136B 13 Nov 17:49 System drwxr-xr-x 6 root admin 204B 31 Ago 2009 Users drwxrwxrwt@ 4 root admin 136B 22 Mar 12:35 Volumes drwxr-xr-x@ 39 root wheel 1,3K 13 Nov 17:44 bin drwxrwxr-t@ 2 root admin 68B 23 Giu 2009 cores dr-xr-xr-x 3 root wheel 5,1K 17 Mar 11:29 dev lrwxr-xr-x@ 1 root wheel 11B 31 Ago 2009 etc -> private/etc dr-xr-xr-x 2 root wheel 1B 17 Mar 11:30 home drwxrwxrwt@ 3 root wheel 102B 31 Ago 2009 lost+found -rw-r--r--@ 1 root wheel 18M 3 Nov 19:40 mach_kernel dr-xr-xr-x 2 root wheel 1B 17 Mar 11:30 net drwxr-xr-x@ 3 root admin 102B 24 Nov 2007 opt drwxr-xr-x@ 6 root wheel 204B 31 Ago 2009 private drwxr-xr-x@ 64 root wheel 2,1K 13 Nov 17:44 sbin lrwxr-xr-x@ 1 root wheel 11B 31 Ago 2009 tmp -> private/tmp drwxr-xr-x@ 17 root wheel 578B 12 Set 2009 usr lrwxr-xr-x@ 1 root wheel 11B 31 Ago 2009 var -> private/var Are these ownerships / permissions ok? Should I chmod/chown something? Thanks in advance

    Read the article

  • JavaOne Latin America Opening Keynotes

    - by Tori Wieldt
    Originally published on blogs.oracle.com/javaone It was a great first day at JavaOne Brazil, which included the Java Strategy and Java Technical keynotes. Henrik Stahl, Senior Director, Product Management for Java opened the keynotes by saying that this is the third year for JavaOne Latin America. He explained, "You know what they say, the first time doesn't count, the second time is a habit and the third time it's a tradition!" He mentioned that he was thrilled that this is largest JavaOne in Brazil to date, and he wants next year to be larger. He said that Oracle knows Latin America is an important hub for development.  "We continually come back to Latin America because of the dedication the community has with driving the continued innovation for Java," he said. Stahl explained that Oracle and the Java community must continue to innovate and Make the Future Java together. The success of Java depends on three important factors: technological innovation, Oracle as a strong steward of Java, and community participation. "The Latin American Java Community (especially in Brazil) is a shining example of how to be positive contributor to Java," Stahl said. Next, George Saab, VP software dev, Java Platform Group at Oracle, discussed some of the recent and upcoming changes to Java. "In addition to the incremental improvements to Java 7, we have also increased the set of platforms supported by Oracle from Linux, Windows, and Solaris to now also include Mac OS X and Linux/ARM for ARM-based PCs such as the Raspberry Pi and emerging ARM based microservers."  Saab announced that EA builds for Linux ARM Hard Float ABI will be available by the end of the year.  Staffan Friberg, Product Manager, Java Platform Group, provided an overview of some of the language coming in Java 8, including Lambda, remove of PermGen, improved data and time APIs and improved security, Java 8 development is moving along. He reminded the audience that they can go to OpenJDK to see this development being done in real-time, and that there are weekly early access builds of OracleJDK 8 that developers can download and try today. Judson Althoff, Senior Vice President, Worldwide Alliances and Channels and Embedded Sales, was invited to the stage, and the audience was told that "even though he is wearing a suit, he is still pretty technical." Althoff started off with a bang: "The Internet of Things is on a collision course with big data and this is a huge opportunity for developers."  For example, Althoff said, today cars are more a data device than a mechanical device. A car embedded with sensors for fuel efficiency, temperature, tire pressure, etc. can generate a petabyte of data A DAY. There are similar examples in healthcare (patient monitoring and privacy requirements creates a complex data problem) and transportation management (sending a package around the world with sensors for humidity, temperature and light). Althoff then brought on stage representatives from three companies that are successful with Java today, first Axel Hansmann, VP Strategy & Marketing Communications, Cinterion. Mr. Hansmann explained that Cinterion, a market leader in Latin America, enables M2M services with Java. At JavaOne San Francisco, Cinterion launched the EHS5, the smallest 3g solderable module, with Java installed on it. This provides Original Equipment Manufacturers (OEMs) with a cost effective, flexible platform for bringing advanced M2M technology to market.Next, Steve Nelson, Director of Marketing for the Americas, at Freescale explained that Freescale is #1 in Embedded Processors in Wired and Wireless Communications, and #1 in Automotive Semiconductors in the Americas. He said that Java provides a mature, proven platform that is uniquely suited to meet the requirements of almost any type of embedded device. He encouraged University students to get involved in the Freescale Cup, a global competition where student teams build, program, and race a model car around a track for speed.Roberto Franco, SBTVD Forum President, SBTVD, talked about Ginga, a Java-based standard for television in Brazil. He said there are 4 million Ginga TV sets in Brazil, and they expect over 20 million TV sets to be sold by the end of 2014. Ginga is also being adopted in other 11 countries in Latin America. Ginga brings interactive services not only at TV set, but also on other devices such as tablets,  PCs or smartphones, as the main or second screen. "Interactive services is already a reality," he said, ' but in a near future, we foresee interactivity enhanced TV content, convergence with OTT services and a big participation from the audience,  all integrated on TV, tablets, smartphones and second screen devices."Before he left the stage, Nandini Ramani thanked Judson for being part of the Java community and invited him to the next Geek Bike Ride in Brazil. She presented him an official geek bike ride jersey.For the Technical Keynote, a "blue screen of death" appeared. With mock concern, Stephin Chin asked the rest of the presenters if they could go on without slides. What followed was a interesting collection of demos, including JavaFX on a tablet, a look at Project Easel in NetBeans, and even Simon Ritter controlling legos with his brainwaves! Stay tuned for more dispatches.

    Read the article

  • JavaOne Latin America Opening Keynotes

    - by Tori Wieldt
    It was a great first day at JavaOne Brazil, which included the Java Strategy and Java Technical keynotes. Henrik Stahl, Senior Director, Product Management for Java opened the keynotes by saying that this is the third year for JavaOne Latin America. He explained, "You know what they say, the first time doesn't count, the second time is a habit and the third time it's a tradition!" He mentioned that he was thrilled that this is largest JavaOne in Brazil to date, and he wants next year to be larger. He said that Oracle knows Latin America is an important hub for development.  "We continually come back to Latin America because of the dedication the community has with driving the continued innovation for Java," he said. Stahl explained that Oracle and the Java community must continue to innovate and Make the Future Java together. The success of Java depends on three important factors: technological innovation, Oracle as a strong steward of Java, and community participation. "The Latin American Java Community (especially in Brazil) is a shining example of how to be positive contributor to Java," Stahl said. Next, George Saab, VP software dev, Java Platform Group at Oracle, discussed some of the recent and upcoming changes to Java. "In addition to the incremental improvements to Java 7, we have also increased the set of platforms supported by Oracle from Linux, Windows, and Solaris to now also include Mac OS X and Linux/ARM for ARM-based PCs such as the Raspberry Pi and emerging ARM based microservers."  Saab announced that EA builds for Linux ARM Hard Float ABI will be available by the end of the year.  Staffan Friberg, Product Manager, Java Platform Group, provided an overview of some of the language coming in Java 8, including Lambda, remove of PermGen, improved data and time APIs and improved security, Java 8 development is moving along. He reminded the audience that they can go to OpenJDK to see this development being done in real-time, and that there are weekly early access builds of OracleJDK 8 that developers can download and try today. Judson Althoff, Senior Vice President, Worldwide Alliances and Channels and Embedded Sales, was invited to the stage, and the audience was told that "even though he is wearing a suit, he is still pretty technical." Althoff started off with a bang: "The Internet of Things is on a collision course with big data and this is a huge opportunity for developers."  For example, Althoff said, today cars are more a data device than a mechanical device. A car embedded with sensors for fuel efficiency, temperature, tire pressure, etc. can generate a petabyte of data A DAY. There are similar examples in healthcare (patient monitoring and privacy requirements creates a complex data problem) and transportation management (sending a package around the world with sensors for humidity, temperature and light). Althoff then brought on stage representatives from three companies that are successful with Java today, first Axel Hansmann, VP Strategy & Marketing Communications, Cinterion. Mr. Hansmann explained that Cinterion, a market leader in Latin America, enables M2M services with Java. At JavaOne San Francisco, Cinterion launched the EHS5, the smallest 3g solderable module, with Java installed on it. This provides Original Equipment Manufacturers (OEMs) with a cost effective, flexible platform for bringing advanced M2M technology to market.Next, Steve Nelson, Director of Marketing for the Americas, at Freescale explained that Freescale is #1 in Embedded Processors in Wired and Wireless Communications, and #1 in Automotive Semiconductors in the Americas. He said that Java provides a mature, proven platform that is uniquely suited to meet the requirements of almost any type of embedded device. He encouraged University students to get involved in the Freescale Cup, a global competition where student teams build, program, and race a model car around a track for speed.Roberto Franco, SBTVD Forum President, SBTVD, talked about Ginga, a Java-based standard for television in Brazil. He said there are 4 million Ginga TV sets in Brazil, and they expect over 20 million TV sets to be sold by the end of 2014. Ginga is also being adopted in other 11 countries in Latin America. Ginga brings interactive services not only at TV set, but also on other devices such as tablets,  PCs or smartphones, as the main or second screen. "Interactive services is already a reality," he said, ' but in a near future, we foresee interactivity enhanced TV content, convergence with OTT services and a big participation from the audience,  all integrated on TV, tablets, smartphones and second screen devices."Before he left the stage, Nandini Ramani thanked Judson for being part of the Java community and invited him to the next Geek Bike Ride in Brazil. She presented him an official geek bike ride jersey.For the Technical Keynote, a "blue screen of death" appeared. With mock concern, Stephin Chin asked the rest of the presenters if they could go on without slides. What followed was a interesting collection of demos, including JavaFX on a tablet, a look at Project Easel in NetBeans, and even Simon Ritter controlling legos with his brainwaves! Stay tuned for more dispatches.

    Read the article

  • Agile Development

    - by James Oloo Onyango
    Alot of literature has and is being written about agile developement and its surrounding philosophies. In my quest to find the best way to express the importance of agile methodologies, i have found Robert C. Martin's "A Satire Of Two Companies" to be both the most concise and thorough! Enjoy the read! Rufus Inc Project Kick Off Your name is Bob. The date is January 3, 2001, and your head still aches from the recent millennial revelry. You are sitting in a conference room with several managers and a group of your peers. You are a project team leader. Your boss is there, and he has brought along all of his team leaders. His boss called the meeting. "We have a new project to develop," says your boss's boss. Call him BB. The points in his hair are so long that they scrape the ceiling. Your boss's points are just starting to grow, but he eagerly awaits the day when he can leave Brylcream stains on the acoustic tiles. BB describes the essence of the new market they have identified and the product they want to develop to exploit this market. "We must have this new project up and working by fourth quarter October 1," BB demands. "Nothing is of higher priority, so we are cancelling your current project." The reaction in the room is stunned silence. Months of work are simply going to be thrown away. Slowly, a murmur of objection begins to circulate around the conference table.   His points give off an evil green glow as BB meets the eyes of everyone in the room. One by one, that insidious stare reduces each attendee to quivering lumps of protoplasm. It is clear that he will brook no discussion on this matter. Once silence has been restored, BB says, "We need to begin immediately. How long will it take you to do the analysis?" You raise your hand. Your boss tries to stop you, but his spitwad misses you and you are unaware of his efforts.   "Sir, we can't tell you how long the analysis will take until we have some requirements." "The requirements document won't be ready for 3 or 4 weeks," BB says, his points vibrating with frustration. "So, pretend that you have the requirements in front of you now. How long will you require for analysis?" No one breathes. Everyone looks around to see whether anyone has some idea. "If analysis goes beyond April 1, we have a problem. Can you finish the analysis by then?" Your boss visibly gathers his courage: "We'll find a way, sir!" His points grow 3 mm, and your headache increases by two Tylenol. "Good." BB smiles. "Now, how long will it take to do the design?" "Sir," you say. Your boss visibly pales. He is clearly worried that his 3 mms are at risk. "Without an analysis, it will not be possible to tell you how long design will take." BB's expression shifts beyond austere.   "PRETEND you have the analysis already!" he says, while fixing you with his vacant, beady little eyes. "How long will it take you to do the design?" Two Tylenol are not going to cut it. Your boss, in a desperate attempt to save his new growth, babbles: "Well, sir, with only six months left to complete the project, design had better take no longer than 3 months."   "I'm glad you agree, Smithers!" BB says, beaming. Your boss relaxes. He knows his points are secure. After a while, he starts lightly humming the Brylcream jingle. BB continues, "So, analysis will be complete by April 1, design will be complete by July 1, and that gives you 3 months to implement the project. This meeting is an example of how well our new consensus and empowerment policies are working. Now, get out there and start working. I'll expect to see TQM plans and QIT assignments on my desk by next week. Oh, and don't forget that your crossfunctional team meetings and reports will be needed for next month's quality audit." "Forget the Tylenol," you think to yourself as you return to your cubicle. "I need bourbon."   Visibly excited, your boss comes over to you and says, "Gosh, what a great meeting. I think we're really going to do some world shaking with this project." You nod in agreement, too disgusted to do anything else. "Oh," your boss continues, "I almost forgot." He hands you a 30-page document. "Remember that the SEI is coming to do an evaluation next week. This is the evaluation guide. You need to read through it, memorize it, and then shred it. It tells you how to answer any questions that the SEI auditors ask you. It also tells you what parts of the building you are allowed to take them to and what parts to avoid. We are determined to be a CMM level 3 organization by June!"   You and your peers start working on the analysis of the new project. This is difficult because you have no requirements. But from the 10-minute introduction given by BB on that fateful morning, you have some idea of what the product is supposed to do.   Corporate process demands that you begin by creating a use case document. You and your team begin enumerating use cases and drawing oval and stick diagrams. Philosophical debates break out among the team members. There is disagreement as to whether certain use cases should be connected with <<extends>> or <<includes>> relationships. Competing models are created, but nobody knows how to evaluate them. The debate continues, effectively paralyzing progress.   After a week, somebody finds the iceberg.com Web site, which recommends disposing entirely of <<extends>> and <<includes>> and replacing them with <<precedes>> and <<uses>>. The documents on this Web site, authored by Don Sengroiux, describes a method known as stalwart-analysis, which claims to be a step-by-step method for translating use cases into design diagrams. More competing use case models are created using this new scheme, but again, people can't agree on how to evaluate them. The thrashing continues. More and more, the use case meetings are driven by emotion rather than by reason. If it weren't for the fact that you don't have requirements, you'd be pretty upset by the lack of progress you are making. The requirements document arrives on February 15. And then again on February 20, 25, and every week thereafter. Each new version contradicts the previous one. Clearly, the marketing folks who are writing the requirements, empowered though they might be, are not finding consensus.   At the same time, several new competing use case templates have been proposed by the various team members. Each template presents its own particularly creative way of delaying progress. The debates rage on. On March 1, Prudence Putrigence, the process proctor, succeeds in integrating all the competing use case forms and templates into a single, all-encompassing form. Just the blank form is 15 pages long. She has managed to include every field that appeared on all the competing templates. She also presents a 159- page document describing how to fill out the use case form. All current use cases must be rewritten according to the new standard.   You marvel to yourself that it now requires 15 pages of fill-in-the-blank and essay questions to answer the question: What should the system do when the user presses Return? The corporate process (authored by L. E. Ott, famed author of "Holistic Analysis: A Progressive Dialectic for Software Engineers") insists that you discover all primary use cases, 87 percent of all secondary use cases, and 36.274 percent of all tertiary use cases before you can complete analysis and enter the design phase. You have no idea what a tertiary use case is. So in an attempt to meet this requirement, you try to get your use case document reviewed by the marketing department, which you hope will know what a tertiary use case is.   Unfortunately, the marketing folks are too busy with sales support to talk to you. Indeed, since the project started, you have not been able to get a single meeting with marketing, which has provided a never-ending stream of changing and contradictory requirements documents.   While one team has been spinning endlessly on the use case document, another team has been working out the domain model. Endless variations of UML documents are pouring out of this team. Every week, the model is reworked.   The team members can't decide whether to use <<interfaces>> or <<types>> in the model. A huge disagreement has been raging on the proper syntax and application of OCL. Others on the team just got back from a 5-day class on catabolism, and have been producing incredibly detailed and arcane diagrams that nobody else can fathom.   On March 27, with one week to go before analysis is to be complete, you have produced a sea of documents and diagrams but are no closer to a cogent analysis of the problem than you were on January 3. **** And then, a miracle happens.   **** On Saturday, April 1, you check your e-mail from home. You see a memo from your boss to BB. It states unequivocally that you are done with the analysis! You phone your boss and complain. "How could you have told BB that we were done with the analysis?" "Have you looked at a calendar lately?" he responds. "It's April 1!" The irony of that date does not escape you. "But we have so much more to think about. So much more to analyze! We haven't even decided whether to use <<extends>> or <<precedes>>!" "Where is your evidence that you are not done?" inquires your boss, impatiently. "Whaaa . . . ." But he cuts you off. "Analysis can go on forever; it has to be stopped at some point. And since this is the date it was scheduled to stop, it has been stopped. Now, on Monday, I want you to gather up all existing analysis materials and put them into a public folder. Release that folder to Prudence so that she can log it in the CM system by Monday afternoon. Then get busy and start designing."   As you hang up the phone, you begin to consider the benefits of keeping a bottle of bourbon in your bottom desk drawer. They threw a party to celebrate the on-time completion of the analysis phase. BB gave a colon-stirring speech on empowerment. And your boss, another 3 mm taller, congratulated his team on the incredible show of unity and teamwork. Finally, the CIO takes the stage to tell everyone that the SEI audit went very well and to thank everyone for studying and shredding the evaluation guides that were passed out. Level 3 now seems assured and will be awarded by June. (Scuttlebutt has it that managers at the level of BB and above are to receive significant bonuses once the SEI awards level 3.)   As the weeks flow by, you and your team work on the design of the system. Of course, you find that the analysis that the design is supposedly based on is flawedno, useless; no, worse than useless. But when you tell your boss that you need to go back and work some more on the analysis to shore up its weaker sections, he simply states, "The analysis phase is over. The only allowable activity is design. Now get back to it."   So, you and your team hack the design as best you can, unsure of whether the requirements have been properly analyzed. Of course, it really doesn't matter much, since the requirements document is still thrashing with weekly revisions, and the marketing department still refuses to meet with you.     The design is a nightmare. Your boss recently misread a book named The Finish Line in which the author, Mark DeThomaso, blithely suggested that design documents should be taken down to code-level detail. "If we are going to be working at that level of detail," you ask, "why don't we simply write the code instead?" "Because then you wouldn't be designing, of course. And the only allowable activity in the design phase is design!" "Besides," he continues, "we have just purchased a companywide license for Dandelion! This tool enables 'Round the Horn Engineering!' You are to transfer all design diagrams into this tool. It will automatically generate our code for us! It will also keep the design diagrams in sync with the code!" Your boss hands you a brightly colored shrinkwrapped box containing the Dandelion distribution. You accept it numbly and shuffle off to your cubicle. Twelve hours, eight crashes, one disk reformatting, and eight shots of 151 later, you finally have the tool installed on your server. You consider the week your team will lose while attending Dandelion training. Then you smile and think, "Any week I'm not here is a good week." Design diagram after design diagram is created by your team. Dandelion makes it very difficult to draw these diagrams. There are dozens and dozens of deeply nested dialog boxes with funny text fields and check boxes that must all be filled in correctly. And then there's the problem of moving classes between packages. At first, these diagram are driven from the use cases. But the requirements are changing so often that the use cases rapidly become meaningless. Debates rage about whether VISITOR or DECORATOR design patterns should be used. One developer refuses to use VISITOR in any form, claiming that it's not a properly object-oriented construct. Someone refuses to use multiple inheritance, since it is the spawn of the devil. Review meetings rapidly degenerate into debates about the meaning of object orientation, the definition of analysis versus design, or when to use aggregation versus association. Midway through the design cycle, the marketing folks announce that they have rethought the focus of the system. Their new requirements document is completely restructured. They have eliminated several major feature areas and replaced them with feature areas that they anticipate customer surveys will show to be more appropriate. You tell your boss that these changes mean that you need to reanalyze and redesign much of the system. But he says, "The analysis phase is system. But he says, "The analysis phase is over. The only allowable activity is design. Now get back to it."   You suggest that it might be better to create a simple prototype to show to the marketing folks and even some potential customers. But your boss says, "The analysis phase is over. The only allowable activity is design. Now get back to it." Hack, hack, hack, hack. You try to create some kind of a design document that might reflect the new requirements documents. However, the revolution of the requirements has not caused them to stop thrashing. Indeed, if anything, the wild oscillations of the requirements document have only increased in frequency and amplitude.   You slog your way through them.   On June 15, the Dandelion database gets corrupted. Apparently, the corruption has been progressive. Small errors in the DB accumulated over the months into bigger and bigger errors. Eventually, the CASE tool just stopped working. Of course, the slowly encroaching corruption is present on all the backups. Calls to the Dandelion technical support line go unanswered for several days. Finally, you receive a brief e-mail from Dandelion, informing you that this is a known problem and that the solution is to purchase the new version, which they promise will be ready some time next quarter, and then reenter all the diagrams by hand.   ****   Then, on July 1 another miracle happens! You are done with the design!   Rather than go to your boss and complain, you stock your middle desk drawer with some vodka.   **** They threw a party to celebrate the on-time completion of the design phase and their graduation to CMM level 3. This time, you find BB's speech so stirring that you have to use the restroom before it begins. New banners and plaques are all over your workplace. They show pictures of eagles and mountain climbers, and they talk about teamwork and empowerment. They read better after a few scotches. That reminds you that you need to clear out your file cabinet to make room for the brandy. You and your team begin to code. But you rapidly discover that the design is lacking in some significant areas. Actually, it's lacking any significance at all. You convene a design session in one of the conference rooms to try to work through some of the nastier problems. But your boss catches you at it and disbands the meeting, saying, "The design phase is over. The only allowable activity is coding. Now get back to it."   ****   The code generated by Dandelion is really hideous. It turns out that you and your team were using association and aggregation the wrong way, after all. All the generated code has to be edited to correct these flaws. Editing this code is extremely difficult because it has been instrumented with ugly comment blocks that have special syntax that Dandelion needs in order to keep the diagrams in sync with the code. If you accidentally alter one of these comments, the diagrams will be regenerated incorrectly. It turns out that "Round the Horn Engineering" requires an awful lot of effort. The more you try to keep the code compatible with Dandelion, the more errors Dandelion generates. In the end, you give up and decide to keep the diagrams up to date manually. A second later, you decide that there's no point in keeping the diagrams up to date at all. Besides, who has time?   Your boss hires a consultant to build tools to count the number of lines of code that are being produced. He puts a big thermometer graph on the wall with the number 1,000,000 on the top. Every day, he extends the red line to show how many lines have been added. Three days after the thermometer appears on the wall, your boss stops you in the hall. "That graph isn't growing quickly enough. We need to have a million lines done by October 1." "We aren't even sh-sh-sure that the proshect will require a m-million linezh," you blather. "We have to have a million lines done by October 1," your boss reiterates. His points have grown again, and the Grecian formula he uses on them creates an aura of authority and competence. "Are you sure your comment blocks are big enough?" Then, in a flash of managerial insight, he says, "I have it! I want you to institute a new policy among the engineers. No line of code is to be longer than 20 characters. Any such line must be split into two or more preferably more. All existing code needs to be reworked to this standard. That'll get our line count up!"   You decide not to tell him that this will require two unscheduled work months. You decide not to tell him anything at all. You decide that intravenous injections of pure ethanol are the only solution. You make the appropriate arrangements. Hack, hack, hack, and hack. You and your team madly code away. By August 1, your boss, frowning at the thermometer on the wall, institutes a mandatory 50-hour workweek.   Hack, hack, hack, and hack. By September 1st, the thermometer is at 1.2 million lines and your boss asks you to write a report describing why you exceeded the coding budget by 20 percent. He institutes mandatory Saturdays and demands that the project be brought back down to a million lines. You start a campaign of remerging lines. Hack, hack, hack, and hack. Tempers are flaring; people are quitting; QA is raining trouble reports down on you. Customers are demanding installation and user manuals; salespeople are demanding advance demonstrations for special customers; the requirements document is still thrashing, the marketing folks are complaining that the product isn't anything like they specified, and the liquor store won't accept your credit card anymore. Something has to give.    On September 15, BB calls a meeting. As he enters the room, his points are emitting clouds of steam. When he speaks, the bass overtones of his carefully manicured voice cause the pit of your stomach to roll over. "The QA manager has told me that this project has less than 50 percent of the required features implemented. He has also informed me that the system crashes all the time, yields wrong results, and is hideously slow. He has also complained that he cannot keep up with the continuous train of daily releases, each more buggy than the last!" He stops for a few seconds, visibly trying to compose himself. "The QA manager estimates that, at this rate of development, we won't be able to ship the product until December!" Actually, you think it's more like March, but you don't say anything. "December!" BB roars with such derision that people duck their heads as though he were pointing an assault rifle at them. "December is absolutely out of the question. Team leaders, I want new estimates on my desk in the morning. I am hereby mandating 65-hour work weeks until this project is complete. And it better be complete by November 1."   As he leaves the conference room, he is heard to mutter: "Empowermentbah!" * * * Your boss is bald; his points are mounted on BB's wall. The fluorescent lights reflecting off his pate momentarily dazzle you. "Do you have anything to drink?" he asks. Having just finished your last bottle of Boone's Farm, you pull a bottle of Thunderbird from your bookshelf and pour it into his coffee mug. "What's it going to take to get this project done? " he asks. "We need to freeze the requirements, analyze them, design them, and then implement them," you say callously. "By November 1?" your boss exclaims incredulously. "No way! Just get back to coding the damned thing." He storms out, scratching his vacant head.   A few days later, you find that your boss has been transferred to the corporate research division. Turnover has skyrocketed. Customers, informed at the last minute that their orders cannot be fulfilled on time, have begun to cancel their orders. Marketing is re-evaluating whether this product aligns with the overall goals of the company. Memos fly, heads roll, policies change, and things are, overall, pretty grim. Finally, by March, after far too many sixty-five hour weeks, a very shaky version of the software is ready. In the field, bug-discovery rates are high, and the technical support staff are at their wits' end, trying to cope with the complaints and demands of the irate customers. Nobody is happy.   In April, BB decides to buy his way out of the problem by licensing a product produced by Rupert Industries and redistributing it. The customers are mollified, the marketing folks are smug, and you are laid off.     Rupert Industries: Project Alpha   Your name is Robert. The date is January 3, 2001. The quiet hours spent with your family this holiday have left you refreshed and ready for work. You are sitting in a conference room with your team of professionals. The manager of the division called the meeting. "We have some ideas for a new project," says the division manager. Call him Russ. He is a high-strung British chap with more energy than a fusion reactor. He is ambitious and driven but understands the value of a team. Russ describes the essence of the new market opportunity the company has identified and introduces you to Jane, the marketing manager, who is responsible for defining the products that will address it. Addressing you, Jane says, "We'd like to start defining our first product offering as soon as possible. When can you and your team meet with me?" You reply, "We'll be done with the current iteration of our project this Friday. We can spare a few hours for you between now and then. After that, we'll take a few people from the team and dedicate them to you. We'll begin hiring their replacements and the new people for your team immediately." "Great," says Russ, "but I want you to understand that it is critical that we have something to exhibit at the trade show coming up this July. If we can't be there with something significant, we'll lose the opportunity."   "I understand," you reply. "I don't yet know what it is that you have in mind, but I'm sure we can have something by July. I just can't tell you what that something will be right now. In any case, you and Jane are going to have complete control over what we developers do, so you can rest assured that by July, you'll have the most important things that can be accomplished in that time ready to exhibit."   Russ nods in satisfaction. He knows how this works. Your team has always kept him advised and allowed him to steer their development. He has the utmost confidence that your team will work on the most important things first and will produce a high-quality product.   * * *   "So, Robert," says Jane at their first meeting, "How does your team feel about being split up?" "We'll miss working with each other," you answer, "but some of us were getting pretty tired of that last project and are looking forward to a change. So, what are you people cooking up?" Jane beams. "You know how much trouble our customers currently have . . ." And she spends a half hour or so describing the problem and possible solution. "OK, wait a second" you respond. "I need to be clear about this." And so you and Jane talk about how this system might work. Some of her ideas aren't fully formed. You suggest possible solutions. She likes some of them. You continue discussing.   During the discussion, as each new topic is addressed, Jane writes user story cards. Each card represents something that the new system has to do. The cards accumulate on the table and are spread out in front of you. Both you and Jane point at them, pick them up, and make notes on them as you discuss the stories. The cards are powerful mnemonic devices that you can use to represent complex ideas that are barely formed.   At the end of the meeting, you say, "OK, I've got a general idea of what you want. I'm going to talk to the team about it. I imagine they'll want to run some experiments with various database structures and presentation formats. Next time we meet, it'll be as a group, and we'll start identifying the most important features of the system."   A week later, your nascent team meets with Jane. They spread the existing user story cards out on the table and begin to get into some of the details of the system. The meeting is very dynamic. Jane presents the stories in the order of their importance. There is much discussion about each one. The developers are concerned about keeping the stories small enough to estimate and test. So they continually ask Jane to split one story into several smaller stories. Jane is concerned that each story have a clear business value and priority, so as she splits them, she makes sure that this stays true.   The stories accumulate on the table. Jane writes them, but the developers make notes on them as needed. Nobody tries to capture everything that is said; the cards are not meant to capture everything but are simply reminders of the conversation.   As the developers become more comfortable with the stories, they begin writing estimates on them. These estimates are crude and budgetary, but they give Jane an idea of what the story will cost.   At the end of the meeting, it is clear that many more stories could be discussed. It is also clear that the most important stories have been addressed and that they represent several months worth of work. Jane closes the meeting by taking the cards with her and promising to have a proposal for the first release in the morning.   * * *   The next morning, you reconvene the meeting. Jane chooses five cards and places them on the table. "According to your estimates, these cards represent about one perfect team-week's worth of work. The last iteration of the previous project managed to get one perfect team-week done in 3 real weeks. If we can get these five stories done in 3 weeks, we'll be able to demonstrate them to Russ. That will make him feel very comfortable about our progress." Jane is pushing it. The sheepish look on her face lets you know that she knows it too. You reply, "Jane, this is a new team, working on a new project. It's a bit presumptuous to expect that our velocity will be the same as the previous team's. However, I met with the team yesterday afternoon, and we all agreed that our initial velocity should, in fact, be set to one perfectweek for every 3 real-weeks. So you've lucked out on this one." "Just remember," you continue, "that the story estimates and the story velocity are very tentative at this point. We'll learn more when we plan the iteration and even more when we implement it."   Jane looks over her glasses at you as if to say "Who's the boss around here, anyway?" and then smiles and says, "Yeah, don't worry. I know the drill by now."Jane then puts 15 more cards on the table. She says, "If we can get all these cards done by the end of March, we can turn the system over to our beta test customers. And we'll get good feedback from them."   You reply, "OK, so we've got our first iteration defined, and we have the stories for the next three iterations after that. These four iterations will make our first release."   "So," says Jane, can you really do these five stories in the next 3 weeks?" "I don't know for sure, Jane," you reply. "Let's break them down into tasks and see what we get."   So Jane, you, and your team spend the next several hours taking each of the five stories that Jane chose for the first iteration and breaking them down into small tasks. The developers quickly realize that some of the tasks can be shared between stories and that other tasks have commonalities that can probably be taken advantage of. It is clear that potential designs are popping into the developers' heads. From time to time, they form little discussion knots and scribble UML diagrams on some cards.   Soon, the whiteboard is filled with the tasks that, once completed, will implement the five stories for this iteration. You start the sign-up process by saying, "OK, let's sign up for these tasks." "I'll take the initial database generation." Says Pete. "That's what I did on the last project, and this doesn't look very different. I estimate it at two of my perfect workdays." "OK, well, then, I'll take the login screen," says Joe. "Aw, darn," says Elaine, the junior member of the team, "I've never done a GUI, and kinda wanted to try that one."   "Ah, the impatience of youth," Joe says sagely, with a wink in your direction. "You can assist me with it, young Jedi." To Jane: "I think it'll take me about three of my perfect workdays."   One by one, the developers sign up for tasks and estimate them in terms of their own perfect workdays. Both you and Jane know that it is best to let the developers volunteer for tasks than to assign the tasks to them. You also know full well that you daren't challenge any of the developers' estimates. You know these people, and you trust them. You know that they are going to do the very best they can.   The developers know that they can't sign up for more perfect workdays than they finished in the last iteration they worked on. Once each developer has filled his or her schedule for the iteration, they stop signing up for tasks.   Eventually, all the developers have stopped signing up for tasks. But, of course, tasks are still left on the board.   "I was worried that that might happen," you say, "OK, there's only one thing to do, Jane. We've got too much to do in this iteration. What stories or tasks can we remove?" Jane sighs. She knows that this is the only option. Working overtime at the beginning of a project is insane, and projects where she's tried it have not fared well.   So Jane starts to remove the least-important functionality. "Well, we really don't need the login screen just yet. We can simply start the system in the logged-in state." "Rats!" cries Elaine. "I really wanted to do that." "Patience, grasshopper." says Joe. "Those who wait for the bees to leave the hive will not have lips too swollen to relish the honey." Elaine looks confused. Everyone looks confused. "So . . .," Jane continues, "I think we can also do away with . . ." And so, bit by bit, the list of tasks shrinks. Developers who lose a task sign up for one of the remaining ones.   The negotiation is not painless. Several times, Jane exhibits obvious frustration and impatience. Once, when tensions are especially high, Elaine volunteers, "I'll work extra hard to make up some of the missing time." You are about to correct her when, fortunately, Joe looks her in the eye and says, "When once you proceed down the dark path, forever will it dominate your destiny."   In the end, an iteration acceptable to Jane is reached. It's not what Jane wanted. Indeed, it is significantly less. But it's something the team feels that can be achieved in the next 3 weeks.   And, after all, it still addresses the most important things that Jane wanted in the iteration. "So, Jane," you say when things had quieted down a bit, "when can we expect acceptance tests from you?" Jane sighs. This is the other side of the coin. For every story the development team implements,   Jane must supply a suite of acceptance tests that prove that it works. And the team needs these long before the end of the iteration, since they will certainly point out differences in the way Jane and the developers imagine the system's behaviour.   "I'll get you some example test scripts today," Jane promises. "I'll add to them every day after that. You'll have the entire suite by the middle of the iteration."   * * *   The iteration begins on Monday morning with a flurry of Class, Responsibilities, Collaborators sessions. By midmorning, all the developers have assembled into pairs and are rapidly coding away. "And now, my young apprentice," Joe says to Elaine, "you shall learn the mysteries of test-first design!"   "Wow, that sounds pretty rad," Elaine replies. "How do you do it?" Joe beams. It's clear that he has been anticipating this moment. "OK, what does the code do right now?" "Huh?" replied Elaine, "It doesn't do anything at all; there is no code."   "So, consider our task; can you think of something the code should do?" "Sure," Elaine said with youthful assurance, "First, it should connect to the database." "And thereupon, what must needs be required to connecteth the database?" "You sure talk weird," laughed Elaine. "I think we'd have to get the database object from some registry and call the Connect() method. "Ah, astute young wizard. Thou perceives correctly that we requireth an object within which we can cacheth the database object." "Is 'cacheth' really a word?" "It is when I say it! So, what test can we write that we know the database registry should pass?" Elaine sighs. She knows she'll just have to play along. "We should be able to create a database object and pass it to the registry in a Store() method. And then we should be able to pull it out of the registry with a Get() method and make sure it's the same object." "Oh, well said, my prepubescent sprite!" "Hay!" "So, now, let's write a test function that proves your case." "But shouldn't we write the database object and registry object first?" "Ah, you've much to learn, my young impatient one. Just write the test first." "But it won't even compile!" "Are you sure? What if it did?" "Uh . . ." "Just write the test, Elaine. Trust me." And so Joe, Elaine, and all the other developers began to code their tasks, one test case at a time. The room in which they worked was abuzz with the conversations between the pairs. The murmur was punctuated by an occasional high five when a pair managed to finish a task or a difficult test case.   As development proceeded, the developers changed partners once or twice a day. Each developer got to see what all the others were doing, and so knowledge of the code spread generally throughout the team.   Whenever a pair finished something significant whether a whole task or simply an important part of a task they integrated what they had with the rest of the system. Thus, the code base grew daily, and integration difficulties were minimized.   The developers communicated with Jane on a daily basis. They'd go to her whenever they had a question about the functionality of the system or the interpretation of an acceptance test case.   Jane, good as her word, supplied the team with a steady stream of acceptance test scripts. The team read these carefully and thereby gained a much better understanding of what Jane expected the system to do. By the beginning of the second week, there was enough functionality to demonstrate to Jane. She watched eagerly as the demonstration passed test case after test case. "This is really cool," Jane said as the demonstration finally ended. "But this doesn't seem like one-third of the tasks. Is your velocity slower than anticipated?"   You grimace. You'd been waiting for a good time to mention this to Jane but now she was forcing the issue. "Yes, unfortunately, we are going more slowly than we had expected. The new application server we are using is turning out to be a pain to configure. Also, it takes forever to reboot, and we have to reboot it whenever we make even the slightest change to its configuration."   Jane eyes you with suspicion. The stress of last Monday's negotiations had still not entirely dissipated. She says, "And what does this mean to our schedule? We can't slip it again, we just can't. Russ will have a fit! He'll haul us all into the woodshed and ream us some new ones."   You look Jane right in the eyes. There's no pleasant way to give someone news like this. So you just blurt out, "Look, if things keep going like they're going, we're not going to be done with everything by next Friday. Now it's possible that we'll figure out a way to go faster. But, frankly, I wouldn't depend on that. You should start thinking about one or two tasks that could be removed from the iteration without ruining the demonstration for Russ. Come hell or high water, we are going to give that demonstration on Friday, and I don't think you want us to choose which tasks to omit."   "Aw forchrisakes!" Jane barely manages to stifle yelling that last word as she stalks away, shaking her head. Not for the first time, you say to yourself, "Nobody ever promised me project management would be easy." You are pretty sure it won't be the last time, either.   Actually, things went a bit better than you had hoped. The team did, in fact, have to drop one task from the iteration, but Jane had chosen wisely, and the demonstration for Russ went without a hitch. Russ was not impressed with the progress, but neither was he dismayed. He simply said, "This is pretty good. But remember, we have to be able to demonstrate this system at the trade show in July, and at this rate, it doesn't look like you'll have all that much to show." Jane, whose attitude had improved dramatically with the completion of the iteration, responded to Russ by saying, "Russ, this team is working hard, and well. When July comes around, I am confident that we'll have something significant to demonstrate. It won't be everything, and some of it may be smoke and mirrors, but we'll have something."   Painful though the last iteration was, it had calibrated your velocity numbers. The next iteration went much better. Not because your team got more done than in the last iteration but simply because the team didn't have to remove any tasks or stories in the middle of the iteration.   By the start of the fourth iteration, a natural rhythm has been established. Jane, you, and the team know exactly what to expect from one another. The team is running hard, but the pace is sustainable. You are confident that the team can keep up this pace for a year or more.   The number of surprises in the schedule diminishes to near zero; however, the number of surprises in the requirements does not. Jane and Russ frequently look over the growing system and make recommendations or changes to the existing functionality. But all parties realize that these changes take time and must be scheduled. So the changes do not cause anyone's expectations to be violated. In March, there is a major demonstration of the system to the board of directors. The system is very limited and is not yet in a form good enough to take to the trade show, but progress is steady, and the board is reasonably impressed.   The second release goes even more smoothly than the first. By now, the team has figured out a way to automate Jane's acceptance test scripts. The team has also refactored the design of the system to the point that it is really easy to add new features and change old ones. The second release was done by the end of June and was taken to the trade show. It had less in it than Jane and Russ would have liked, but it did demonstrate the most important features of the system. Although customers at the trade show noticed that certain features were missing, they were very impressed overall. You, Russ, and Jane all returned from the trade show with smiles on your faces. You all felt as though this project was a winner.   Indeed, many months later, you are contacted by Rufus Inc. That company had been working on a system like this for its internal operations. Rufus has canceled the development of that system after a death-march project and is negotiating to license your technology for its environment.   Indeed, things are looking up!

    Read the article

1