Search Results

Search found 8897 results on 356 pages for 'msbuild task'.

Page 10/356 | < Previous Page | 6 7 8 9 10 11 12 13 14 15 16 17  | Next Page >

  • Task Scheduler Crashing MMC

    - by Valrok
    I've been getting errors whenever I try to run the task scheduler for Windows 2008 R2. Each time that I've tried running it, the task scheduler will crash and report the following: Problem signature: Problem Event Name: CLR20r3 Problem Signature 01: mmc.exe Problem Signature 02: 6.1.7600.16385 Problem Signature 03: 4a5bc808 Problem Signature 04: System.Windows.Forms Problem Signature 05: 2.0.0.0 Problem Signature 06: 50c29e85 Problem Signature 07: 151f Problem Signature 08: 18 Problem Signature 09: Exception OS Version: 6.1.7601.2.1.0.16.7 Locale ID: 1033 I've been looking online but so far I keep finding mixed results on what could be the fix for this and was wondering if anyone here has ever ran into this issue before. I read that this issue could be because of Security Update for Microsoft Windows (KB2449742) and that by uninstalling it I would be able to fix this issue, however I was not able to locate this anywhere in the server. Here's the link if interested Patch wise, everything is up to date. Also, I tried running hotfix KB2688730 to see if that would work after doing some research online, however the hotfix is not applicable to the computer. If anyone could provide some information on how to fix this and get the task scheduler running again it would be extremely helpful!

    Read the article

  • Resolving MSBuild 4.0 warnings

    - by Hadi Eskandari
    I've upgraded a solution to use MSBuild 4.0. It compiles but I get lots of warnings, for example: "T:\projects\Castle.Core\buildscripts\Build.proj" (Package target) (1) - "T:\projects\Castle.Core\Castle.Core-vs2008.sln" (Build target) (2:2) - "T:\projects\Castle.Core\src\Castle.DynamicProxy.Tests\Castle.DynamicProxy.Tests-vs2008.csproj" (default target) (3:2) - D:\Windows\Microsoft.NET\Framework\v4.0.30319\Microsoft.Common.targets(847,9): warning MSB3644: The reference assemblies for framework ".NETFramework,Version=v4.0.30319" were not found. To resolve this, install the SDK or Targeting Pack for this framework version or retarget your application to a version of the framework for which you have the SDK or Targeting Pack installed. Note that assemblies will be resolved from the Global Assembly Cache (GAC) and will be used in place of reference assemblies. Therefore your assembly may not be correctly targeted for the framework you intend. [T:\projects\Castle.Core\src\Castle.DynamicProxy.Tests\Castle.DynamicProxy.Tests-vs2008.csproj] How can I fix these warnings? It is related to .NET 4.0 Multitargeting pack or SDK, but there's no SDK for .NET 4.0 AFAIK and Multi-Target pack can not be installed separatly. Any ideas would be appreciated.

    Read the article

  • Error doing an MSBuild on a CLR Storedprocedure project on Build Server

    - by CraftyFella
    Hi, When building a CLR Storedprocedure Project using MSBuild on our build server (Team City) we're getting the following error: error MSB4019: The imported project "C:\WINDOWS\Microsoft.NET\Framework\v2.0.50727\SqlServer.targets" was not found. Confirm that the path in the declaration is correct, and that the file exists on disk I've checked to see if the file exists on disk and sure enough it doesn't. I've checked on my own machine and it does exist. I don't really want to start copying over files manually to the build server. Here's the line from the csproj file which is being imported to the proj file: <Import Project="$(MSBuildToolsPath)\Microsoft.CSharp.targets" /> <Import Project="$(MSBuildToolsPath)\SqlServer.targets" /> Here's the line from the proj file which is begin run by our Team City Server: <Import Project="..\$(ProjectName).csproj"/> My question is really: Where does this file comes from? Is it part of the Visual Studio install for example.. Or is there some re-distribution package somewhere to allow me to compile this project on our build server? Thanks BTW.. if i just copy the file onto the Build server it does actually work. Dave

    Read the article

  • Recommendations for Continuous integration for Mercurial/Kiln + MSBuild + MSTest

    - by TDD
    We have our source code stored in Kiln/Mercurial repositories; we use MSBuild to build our product and we have Unit Tests that utilize MSTest (Visual Studio Unit Tests). What solutions exist to implement a continuous integration machine (i.e. Build machine). The requirements for this are: A build should be kicked of when necessary (i.e. code has changed in the Repositories we care about) Before the actual build, the latest version of the source code must be acquired from the repository we are building from The build must build the entire product The build must build all Unit Tests The build must execute all unit tests A summary of success/failure must be sent out after the build has finished; this must include information about the build itself but also about which Unit Tests failed and which ones succeeded. The summary must contain which changesets were in this build that were not yet in the previous successful (!) build The system must be configurable so that it can build from multiple branches(/Repositories). Ideally, this system would run on a single box (our product isn't that big) without any server components. What solutions are currently available? What are their pros/cons? From the list above, what can be done and what cannot be done? Thanks

    Read the article

  • [MSBuild] Problem with setting properties 's values.

    - by Nam Gi VU
    Let's consider the below example. There, I have: target MAIN call target t then call target tt. target t call target ttt, target tt call target tttt. target t define property aa, target ttt modify aa. target tttt try to print property aa 's value. in short we have: MAIN - {t - {ttt-modify aa, define aa}, tt - tttt - print aa} But in target tttt, we can't "see" aa's updated value (by ttt)! Please help me to make that value visible to target tttt. Thank you! The whole script is as below: <Project xmlns="http://schemas.microsoft.com/developer/msbuild/2003" DefaultTargets="MAIN" > <Target Name="MAIN" > <CallTarget Targets="t" /> <CallTarget Targets="tt" /> </Target> <Target Name="t"> <Message Text="t" /> <PropertyGroup> <aa>1</aa> </PropertyGroup> <CallTarget Targets="ttt" /> </Target> <Target Name="tt"> <Message Text="tt" /> <CallTarget Targets="tttt" /> </Target> <Target Name="ttt"> <PropertyGroup> <aa>122</aa> </PropertyGroup> <Message Text="ttt" /> </Target> <Target Name="tttt"> <Message Text="tttt" /> <Message Text="tttt:$(aa)" /> </Target> </Project>

    Read the article

  • Remotely managing Scheduled Tasks on another computer: Access Denied

    - by Eptin
    I need to remotely create new scheduled tasks from a Windows 7 computer in my company (which according to this Microsoft TechNet article I should be able to do. http://technet.microsoft.com/en-us/library/cc766266.aspx ) From within Task Scheduler, on the menu I click Action Connect to another Computer. I browse for the remote computer's name (I use Check Names to verify that the name is correct) and then I check 'Connect as another user' and enter \Administrator and the local admin password. Whenever I try this, I get the error message Task Scheduler: You do not have permission to access this computer Firewall isn't the problem I am able to use Remote Desktop with this username & password combo, so I would expect it to work when remotely managing as well. The remote computer has firewall exceptions for Remote Scheduled Tasks Management, Remote Service Management, and Remote Desktop among other things. Heck, I even tried turning off the firewall for that individual computer and it still didn't work. More details: I have administrative remote access to several other Windows 7 Enterprise computers, though I log in as the local Administrator (whose administrative rights are only recognized by that local machine, not by the domain). The computer I am managing from is on the domain, and also has administrative rights that are recognized on the domain. More experimentation: If I go the other way around and remote-desktop into the other machine and from there open task scheduler then 'connect to another computer', I am able to connect back to my main computer using the username & password that is recognized by an administrator on the domain, and successfully schedule a task on my main computer. So it's not a company firewall issue that's preventing anything from working. The only permissions requirement Microsoft talks about is "The user credentials that you use to connect to the remote computer must be a member of the Administrators group on the remote computer". I'm logging in as an Administrator on each of the local machines, so why doesn't it work?

    Read the article

  • MSBuild Include Remote File 2008?

    - by ScSub
    TFS 2008, VS 2008. I have a tfsbuild.proj and tfsbuild.msp file in $/MyStuff/TeamBuildTypes/Dev folder. I have a targets file at $/MyStuff/TeamBuildTypes/IncludeFiles/Common/test.xml. test.xml contains an XML fragment that overrides the BeforeGet task. I tried to get the file into my tfsbuild.proj file like this: <Import Project="$/MyStuff/TeamBuildTypes/IncludeFiles/Common/test.xml" /> The build fails because it tries to get the file from a relative path that is way off. How can I specify external/include files from an explicit TFS "remote" path? Thanks.

    Read the article

  • MSBuild.ExtensionPack.FileSystem.Folder with TaskAction="RemoveContent" throws IOException: The dire

    - by nabeelfarid
    Hi guys, I would like to delete all the files and subfolders inside a folder. For this purpose, I am using task in my script with property TaskAction set to "RemoveContent". However there is an inconsistent behaviour. Sometimes when I run the script, it throws IOException with the messsage The directory is not empty. But when i rerun the script it works fine. Any idea why would it be throwing this exception? As I said this does happens occasionally. Regards, Nabeel Farid

    Read the article

  • How to use a specific Windows SDK with MSBuild?

    - by Mac
    I have a large project made of many C++ and C# projects, and a MSBuild (3.5) script to build the whole thing. This script is based on the VCBuild (C++ projects) and MSBuild (C# projects) tasks. It is regularly executed by a Continuous Integration server. I want to be able to select a specific Windows SDK (v6.0A, v7.0, v7.1...) to be used for compilation. As I have many branches in my repository that would ultimately need a different SDK version, I need a way to select the right one before each compilation. On my computer, I have been able to setup a batch script that calls the right SetEnv.cmd before launching the MSBuild script. But this solution is not usable on the CI server as the MSBuild script is executed directly. Do you know of a way to achieve the equivalent of SetEnv.cmd under MSBuild?

    Read the article

  • MSBuild condition across projects

    - by Billy Talented
    I have tried several solutions for this problem. Enough to know I do not know enough about MSBuild to do this elegantly but I feel like there should be a method. I have a set of libraries for working with .net projects. A few of the projects utilize System.Web.Mvc - which recently released Version 2 - and we are looking forward to the upgrade. Currently sites which reference this library reference it directly by the project(csproj) on the developer's computer - not a built version of the library so that changes and source code case easily be viewed when dealing code from this library. This works quite well and would prefer to not have to switch to binary references (but will if this is the only solution). The problem I have is that because of some of the functionality that was added onto the MVC1 based library (view engines, model binders etc) several of the sites reliant on these libraries need to stay on MVC1 until we have full evaluated and tested them on MVC2. I would prefer to not have to fork or have two copies on each dev machine. So what I would like to be able to do is set a property group value in the referencing web application and have this read by the above mentions library with the caviat that when working directly on the library via its containing solution I would like to be able to control this via Configuration Manager by selecting a build type and that property overriding the build behavior of the solution (i.e. 'Debug - MVC1' vs 'Debug -MVC2') - I have this working via: <Choose> <When Condition=" '$(Configuration)|$(Platform)' == 'Release - MVC2|AnyCPU' Or '$(Configuration)|$(Platform)' == 'Debug - MVC2|AnyCPU'"> <ItemGroup> <Reference Include="System.Web.Mvc, Version=2.0.0.0, Culture=neutral, PublicKeyToken=31bf3856ad364e35, processorArchitecture=MSIL"> </Reference> <Reference Include="Microsoft.Web.Mvc, Version=1.0.0.0, Culture=neutral, processorArchitecture=MSIL"> <SpecificVersion>False</SpecificVersion> <HintPath>..\Dependancies\Web\MVC2\Microsoft.Web.Mvc.dll</HintPath> </Reference> </ItemGroup> </When> <Otherwise> <ItemGroup> <Reference Include="System.Web.Mvc, Version=1.0.0.0, Culture=neutral, PublicKeyToken=31bf3856ad364e35, processorArchitecture=MSIL"> <SpecificVersion>False</SpecificVersion> <HintPath>..\Dependancies\Web\MVC\System.Web.Mvc.dll</HintPath> </Reference> </ItemGroup> </Otherwise> The item that I am struggling with is the cross solution issue(solution TheWebsite references this project and needs to control which build property to use) that I have not found a way to work with that I think is a solid solution that enabled the build within visual studio to work as it has to date. Other bits: we are using VS2008, Resharper, TeamCity for CI, SVN for source control.

    Read the article

  • Pass MSBuild condition to library project

    - by Billy Talented
    I have tried several solutions for this problem. Enough to know I do not know enough about MSBuild to do this elegantly but I feel like there should be a method. I have a set of libraries for working with .net projects. A few of the projects utilize System.Web.Mvc - which recently released Version 2 - and we are looking forward to the upgrade. Currently sites which reference this library reference it directly by the project(csproj) on the developer's computer - not a built version of the library so that changes and source code case easily be viewed when dealing code from this library. This works quite well and would prefer to not have to switch to binary references (but will if this is the only solution). The problem I have is that because of some of the functionality that was added onto the MVC1 based library (view engines, model binders etc) several of the sites reliant on these libraries need to stay on MVC1 until we have full evaluated and tested them on MVC2. I would prefer to not have to fork or have two copies on each dev machine. So what I would like to be able to do is set a property group value in the referencing web application and have this read by the above mentions library with the caviat that when working directly on the library via its containing solution I would like to be able to control this via Configuration Manager by selecting a build type and that property overriding the build behavior of the solution (i.e. 'Debug - MVC1' vs 'Debug -MVC2') - I have this working via: <Choose> <When Condition=" '$(Configuration)|$(Platform)' == 'Release - MVC2|AnyCPU' Or '$(Configuration)|$(Platform)' == 'Debug - MVC2|AnyCPU'"> <ItemGroup> <Reference Include="System.Web.Mvc, Version=2.0.0.0, Culture=neutral, PublicKeyToken=31bf3856ad364e35, processorArchitecture=MSIL"> </Reference> <Reference Include="Microsoft.Web.Mvc, Version=1.0.0.0, Culture=neutral, processorArchitecture=MSIL"> <SpecificVersion>False</SpecificVersion> <HintPath>..\Dependancies\Web\MVC2\Microsoft.Web.Mvc.dll</HintPath> </Reference> </ItemGroup> </When> <Otherwise> <ItemGroup> <Reference Include="System.Web.Mvc, Version=1.0.0.0, Culture=neutral, PublicKeyToken=31bf3856ad364e35, processorArchitecture=MSIL"> <SpecificVersion>False</SpecificVersion> <HintPath>..\Dependancies\Web\MVC\System.Web.Mvc.dll</HintPath> </Reference> </ItemGroup> </Otherwise> The item that I am struggling with is the cross solution issue(solution TheWebsite references this project and needs to control which build property to use) that I have not found a way to work with that I think is a solid solution that enabled the build within visual studio to work as it has to date. Other bits: we are using VS2008, Resharper, TeamCity for CI, SVN for source control.

    Read the article

  • How do i write task? (parallel code)

    - by acidzombie24
    I am impressed with intel thread building blocks. I like how i should write task and not thread code and i like how it works under the hood with my limited understanding (task are in a pool, there wont be 100 threads on 4cores, a task is not guaranteed to run because it isnt on its own thread and may be far into the pool. But it may be run with another related task so you cant do bad things like typical thread unsafe code). I wanted to know more about writing task. I like the 'Task-based Multithreading - How to Program for 100 cores' video here http://www.gdcvault.com/sponsor.php?sponsor_id=1 (currently second last link. WARNING it isnt 'great'). My fav part was 'solving the maze is better done in parallel' which is around the 48min mark (you can click the link on the left side). However i like to see more code examples and some API of how to write task. Does anyone have a good resource? I have no idea how a class or pieces of code may look after pushing it onto a pool or how weird code may look when you need to make a copy of everything and how much of everything is pushed onto a pool.

    Read the article

  • Task Parallel Library exception handling

    - by user1680766
    When handling exceptions in TPL tasks I have come across two ways to handle exceptions. The first catches the exception within the task and returns it within the result like so: var task = Task<Exception>.Factory.StartNew( () => { try { // Do Something return null; } catch (System.Exception e) { return e; } }); task.ContinueWith( r => { if (r.Result != null) { // Handle Exception } }); The second is the one shown within the documentation and I guess the proper way to do things: var task = Task.Factory.StartNew( () => { // Do Something }); task.ContinueWith( r => { if (r.Exception != null) { // Handle Aggregate Exception r.Exception.Handle(y => true); } }); I am wondering if there is anything wrong with the first approach? I have received 'unhandled aggregate exception' exceptions every now and again using this technique and was wondering how this can happen?

    Read the article

  • Parallelism in .NET – Part 12, More on Task Decomposition

    - by Reed
    Many tasks can be decomposed using a Data Decomposition approach, but often, this is not appropriate.  Frequently, decomposing the problem into distinctive tasks that must be performed is a more natural abstraction. However, as I mentioned in Part 1, Task Decomposition tends to be a bit more difficult than data decomposition, and can require a bit more effort.  Before we being parallelizing our algorithm based on the tasks being performed, we need to decompose our problem, and take special care of certain considerations such as ordering and grouping of tasks. Up to this point in this series, I’ve focused on parallelization techniques which are most appropriate when a problem space can be decomposed by data.  Using PLINQ and the Parallel class, I’ve shown how problem spaces where there is a collection of data, and each element needs to be processed, can potentially be parallelized. However, there are many other routines where this is not appropriate.  Often, instead of working on a collection of data, there is a single piece of data which must be processed using an algorithm or series of algorithms.  Here, there is no collection of data, but there may still be opportunities for parallelism. As I mentioned before, in cases like this, the approach is to look at your overall routine, and decompose your problem space based on tasks.  The idea here is to look for discrete “tasks,” individual pieces of work which can be conceptually thought of as a single operation. Let’s revisit the example I used in Part 1, an application startup path.  Say we want our program, at startup, to do a bunch of individual actions, or “tasks”.  The following is our list of duties we must perform right at startup: Display a splash screen Request a license from our license manager Check for an update to the software from our web server If an update is available, download it Setup our menu structure based on our current license Open and display our main, welcome Window Hide the splash screen The first step in Task Decomposition is breaking up the problem space into discrete tasks. This, naturally, can be abstracted as seven discrete tasks.  In the serial version of our program, if we were to diagram this, the general process would appear as: These tasks, obviously, provide some opportunities for parallelism.  Before we can parallelize this routine, we need to analyze these tasks, and find any dependencies between tasks.  In this case, our dependencies include: The splash screen must be displayed first, and as quickly as possible. We can’t download an update before we see whether one exists. Our menu structure depends on our license, so we must check for the license before setting up the menus. Since our welcome screen will notify the user of an update, we can’t show it until we’ve downloaded the update. Since our welcome screen includes menus that are customized based off the licensing, we can’t display it until we’ve received a license. We can’t hide the splash until our welcome screen is displayed. By listing our dependencies, we start to see the natural ordering that must occur for the tasks to be processed correctly. The second step in Task Decomposition is determining the dependencies between tasks, and ordering tasks based on their dependencies. Looking at these tasks, and looking at all the dependencies, we quickly see that even a simple decomposition such as this one can get quite complicated.  In order to simplify the problem of defining the dependencies, it’s often a useful practice to group our tasks into larger, discrete tasks.  The goal when grouping tasks is that you want to make each task “group” have as few dependencies as possible to other tasks or groups, and then work out the dependencies within that group.  Typically, this works best when any external dependency is based on the “last” task within the group when it’s ordered, although that is not a firm requirement.  This process is often called Grouping Tasks.  In our case, we can easily group together tasks, effectively turning this into four discrete task groups: 1. Show our splash screen – This needs to be left as its own task.  First, multiple things depend on this task, mainly because we want this to start before any other action, and start as quickly as possible. 2. Check for Update and Download the Update if it Exists - These two tasks logically group together.  We know we only download an update if the update exists, so that naturally follows.  This task has one dependency as an input, and other tasks only rely on the final task within this group. 3. Request a License, and then Setup the Menus – Here, we can group these two tasks together.  Although we mentioned that our welcome screen depends on the license returned, it also depends on setting up the menu, which is the final task here.  Setting up our menus cannot happen until after our license is requested.  By grouping these together, we further reduce our problem space. 4. Display welcome and hide splash - Finally, we can display our welcome window and hide our splash screen.  This task group depends on all three previous task groups – it cannot happen until all three of the previous groups have completed. By grouping the tasks together, we reduce our problem space, and can naturally see a pattern for how this process can be parallelized.  The diagram below shows one approach: The orange boxes show each task group, with each task represented within.  We can, now, effectively take these tasks, and run a large portion of this process in parallel, including the portions which may be the most time consuming.  We’ve now created two parallel paths which our process execution can follow, hopefully speeding up the application startup time dramatically. The main point to remember here is that, when decomposing your problem space by tasks, you need to: Define each discrete action as an individual Task Discover dependencies between your tasks Group tasks based on their dependencies Order the tasks and groups of tasks

    Read the article

  • Windows Server 2008 CMD Task Schedule not running

    - by Jonathan Platovsky
    I have a BAT/CMD file that when run from the command prompt runs completely. When I run it through the Task Scheduler it partially runs. Here is a copy of the file cd\sqlbackup ren Apps_Backup*.* Apps.Bak ren Apps_Was_Backup*.* Apps_Was.Bak xcopy /Y c:\sqlbackup\*.bak c:\sqlbackup\11\*.bak xcopy /y c:\sqlbackup\*.bak \\igweb01\c$\sqlbackup\*.bak Move /y c:\sqlbackup\*.bak "\\igsrv01\d$\sql backup\" The last two lines do not run when the task scheduler calls it. But again, work when manually run from the command line. All the local sever commands run but when it comes to the last two lines where it goes to another server then it does not work.

    Read the article

  • Scheduled Task to show console window when logged on but still run when not logged on

    - by HeartWare
    Is it possible (and if so, how) to set up a task (console application) in Server 2008 so that it'll run both when a user is logged in and when no user is logged in, AND - if the user is logged in (either local or via RDP) - have the console appear on the screen while the program is running? Ie. the program should run under the defined user context and it writes status messages to stdout, which goes to a standard console window. This console window is either shown (if the defined user is currently logged in locally or via RDP), or not shown (but the application is still run). I have access to the source of the console application, so if it needs some additional code (like specifically opening up a new console window or what have you), then that's not a problem. At the moment, I can set up the task as "Run only when user is logged on" which will run the application when the user is logged on (local or RDP) and I can then see the status messages, or I can set it up as "Run whether user is logged or not" and no status output is visible - not even if the user is logged on.

    Read the article

  • Running a scheduled task as SYSTEM with console window open

    - by raoulsson
    I am auto creating scheduled tasks with this line within a batch windows script: schtasks /Create /RU SYSTEM /RP SYSTEM /TN startup-task-%%i /TR %SPEEDWAY_DIR%\%TARGET_DIR%%%i\%STARTUPFILE% /SC HOURLY /MO 1 /ST 17:%%i1:00 I wanted to avoid using specific user credentials and thus decided to use SYSTEM. Now, when checking in the taskmanagers process list or, even better, directly with the C:\> schtasks command itself, all is working well, the tasks are running as intended. However in this particular case I would like to have an open console window where I can see the log flying by. I know I could use C:\> tail -f thelogfile.log if I installed e.g. cygwin (on all machines) or some proprietary tools like Baretail on Windows. But since I only switch to these machines in case of trouble, I would prefer to start the scheduled task in such a way that every user immediately sees the log. Any chance? Thanks!

    Read the article

  • Windows 8 Task Manager without elevating?

    - by Ben Voigt
    In Windows Vista and Windows 7, the task manager ran non-elevated, and you didn't face a UAC prompt unless you chose "View Processes of All Users". In Windows 8 Preview, out of the box the Task Manager starts elevated every time. How can I configure it to start non-elevated so I don't get hit with a UAC prompt every time I check CPU usage or view the list of running processes to see if an application closed completely? (I am not looking for answers which involve weakening UAC, and I ask the community's help in downvoting any such suggestions.)

    Read the article

  • Running a scheduled task as SYSTEM with console window open

    - by raoulsson
    I am auto creating scheduled tasks with this line within a batch windows script: schtasks /Create /RU SYSTEM /RP SYSTEM /TN startup-task-%%i /TR %SPEEDWAY_DIR%\%TARGET_DIR%%%i\%STARTUPFILE% /SC HOURLY /MO 1 /ST 17:%%i1:00 I wanted to avoid using specific user credentials and thus decided to use SYSTEM. Now, when checking in the taskmanagers process list or, even better, directly with the C:\> schtasks command itself, all is working well, the tasks are running as intended. However in this particular case I would like to have an open console window where I can see the log flying by. I know I could use C:\> tail -f thelogfile.log if I installed e.g. cygwin (on all machines) or some proprietary tools like Baretail on Windows. But since I only switch to these machines in case of trouble, I would prefer to start the scheduled task in such a way that every user immediately sees the log. Any chance? Thanks!

    Read the article

  • What is your best solution for task management?

    - by oo
    I have Outlook at work, Gmail at home and a BlackBerry (only syncs with work Outlook). I see that there are a number of online websites that support webbased task lists such as "remember the milk", etc. My biggest issue with Outlook is that I flag a number of emails as tasks and they show up as tasks in Outlook but NOT on my BlackBerry. I still haven't found a workaround to this. I see there is some BlackBerry sync tools but I am not sure if this will work with my corporate network. Any suggestions for getting this to work or another optimal task management solution that works at home, work and on the road?

    Read the article

  • Using Exception Handler in an ADF Task Flow

    - by anmprs
    Problem Statement: Exception thrown in a task flow gets wrapped in an exception that gives an unintelligible error message to the user. Figure 1 Solution 1. Over-writing the error message with a user-friendly error message. Figure 2 Steps to code 1. Generating an exception: Write a method that throws an exception and drop it in the task flow.2. Adding an Exception Handler: Write a method (example below) to overwrite the Error in the bean or data control and drop the method in the task flow. Figure 3 This method is marked as the Exception Handler by Right-Click on method > Mark Activity> Exception Handler or by the button that is displayed in this screenshot Figure 4 The Final task flow should look like this. This will overwrite the exception with the error message in figure 2. Note: There is no need for a control flow between the two method calls (as shown below). Figure 5 Solution 2: Re-Routing the task flow to display an error page Figure 6 Steps to code 1. This is the same as step 1 of solution 1.2. Adding an Exception Handler: The Exception handler is not always a method; in this case it is implemented on a task flow return.  The task flow looks like this. Figure 7 In the figure below you will notice that the task flow return points to a control flow ‘error’ in the calling task flow. Figure 8 This control flow in turn goes to a view ‘error.jsff’ which contains the error message that one wishes to display.  This can be seen in the figure below. (‘withErrorHandling’ is a  call to the task flow in figure 7) Figure 9

    Read the article

  • Task Scheduler : Logon as Batch Job Rights

    - by Brohan
    I'm trying to set up a scheduled task which will work under the Network Administrators account, whether the account is logged in or not (on a specificed computer) According to the Task Scheduler, I need 'Logon as batch job rights'. Attempting to change this setting in the Local Security Policy window has it the option to add the Administrator account to the groups greyed out. Currently, only LOCAL_SERVICE may Logon as Batch job. Attempting to add administrator to this group hasn't worked. How do I make it able to set this permission so that I can run tasks if I'm logged in or not?

    Read the article

  • Powershell, Task Scheduler or loop and sleep

    - by Paddy Carroll
    I have a job that needs to go off every minute or so, it loads a DLL i have written in C# that retrieves state for an SQL Server Mirror (Primary, Mirror and witness) for a number of databases; it allows us to poke DNS to show where the primary instances are. Please don't mention Clustering - We're not doing that. I can't be arsed to write a service, there simply isn't enough time do I Task Scheduler - every minute: Invoke a powershell script that loads the DLL does the business Task scheduler - At Startup : Invoke a similer powershell script that loads the DLL once but then loops and sleeps, refreshing the Object that the DLL exposes. Pros and cons?

    Read the article

  • Introduction to Human Workflow 11g

    - by agiovannetti
    Human Workflow is a component of SOA Suite just like BPEL, Mediator, Business Rules, etc. The Human Workflow component allows you to incorporate human intervention in a business process. You can use Human Workflow to create a business process that requires a manager to approve purchase orders greater than $10,000; or a business process that handles article reviews in which a group of reviewers need to vote/approve an article before it gets published. Human Workflow can handle the task assignment and routing as well as the generation of notifications to the participants. There are three common patterns or usages of Human Workflow: 1) Approval Scenarios: manage documents and other transactional data through approval chains . For example: approve expense report, vacation approval, hiring approval, etc. 2) Reviews by multiple users or groups: group collaboration and review of documents or proposals. For example, processing a sales quote which is subject to review by multiple people. 3) Case Management: workflows around work management or case management. For example, processing a service request. This could be routed to various people who all need to modify the task. It may also incorporate ad hoc routing which is unknown at design time. SOA 11g Human Workflow includes the following features: Assignment and routing of tasks to the correct users or groups. Deadlines, escalations, notifications, and other features required for ensuring the timely performance of a task. Presentation of tasks to end users through a variety of mechanisms, including a Worklist application. Organization, filtering, prioritization and other features required for end users to productively perform their tasks. Reports, reassignments, load balancing and other features required by supervisors and business owners to manage the performance of tasks. Human Workflow Architecture The Human Workflow component is divided into 3 modules: the service interface, the task definition and the client interface module. The Service Interface handles the interaction with BPEL and other components. The Client Interface handles the presentation of task data through clients like the Worklist application, portals and notification channels. The task definition module is in charge of managing the lifecycle of a task. Who should get the task assigned? What should happen next with the task? When must the task be completed? Should the task be escalated?, etc Stages and Participants When you create a Human Task you need to specify how the task is assigned and routed. The first step is to define the stages and participants. A stage is just a logical group. A participant can be a user, a group of users or an application role. The participants indicate the type of assignment and routing that will be performed. Stages can be sequential or in parallel. You can combine them to create any usage you require. See diagram below: Assignment and Routing There are different ways a task can be assigned and routed: Single Approver: task is assigned to a single user, group or role. For example, a vacation request is assigned to a manager. If the manager approves or rejects the request, the employee is notified with the decision. If the task is assigned to a group then once one of managers acts on it, the task is completed. Parallel : task is assigned to a set of people that must work in parallel. This is commonly used for voting. For example, a task gets approved once 50% of the participants approve it. You can also set it up to be a unanimous vote. Serial : participants must work in sequence. The most common scenario for this is management chain escalation. FYI (For Your Information) : task is assigned to participants who can view it, add comments and attachments, but can not modify or complete the task. Task Actions The following is the list of actions that can be performed on a task: Claim : if a task is assigned to a group or multiple users, then the task must be claimed first to be able to act on it. Escalate : if the participant is not able to complete a task, he/she can escalate it. The task is reassigned to his/her manager (up one level in a hierarchy). Pushback : the task is sent back to the previous assignee. Reassign :if the participant is a manager, he/she can delegate a task to his/her reports. Release : if a task is assigned to a group or multiple users, it can be released if the user who claimed the task cannot complete the task. Any of the other assignees can claim and complete the task. Request Information and Submit Information : use when the participant needs to supply more information or to request more information from the task creator or any of the previous assignees. Suspend and Resume :if a task is not relevant, it can be suspended. A suspension is indefinite. It does not expire until Resume is used to resume working on the task. Withdraw : if the creator of a task does not want to continue with it, for example, he wants to cancel a vacation request, he can withdraw the task. The business process determines what happens next. Renew : if a task is about to expire, the participant can renew it. The task expiration date is extended one week. Notifications Human Workflow provides a mechanism for sending notifications to participants to alert them of changes on a task. Notifications can be sent via email, telephone voice message, instant messaging (IM) or short message service (SMS). Notifications can be sent when the task status changes to any of the following: Assigned/renewed/delegated/reassigned/escalated Completed Error Expired Request Info Resume Suspended Added/Updated comments and/or attachments Updated Outcome Withdraw Other Actions (e.g. acquiring a task) Here is an example of an email notification: Worklist Application Oracle BPM Worklist application is the default user interface included in SOA Suite. It allows users to access and act on tasks that have been assigned to them. For example, from the Worklist application, a loan agent can review loan applications or a manager can approve employee vacation requests. Through the Worklist Application users can: Perform authorized actions on tasks, acquire and check out shared tasks, define personal to-do tasks and define subtasks. Filter tasks view based on various criteria. Work with standard work queues, such as high priority tasks, tasks due soon and so on. Work queues allow users to create a custom view to group a subset of tasks in the worklist, for example, high priority tasks, tasks due in 24 hours, expense approval tasks and more. Define custom work queues. Gain proxy access to part of another user's tasks. Define custom vacation rules and delegation rules. Enable group owners to define task dispatching rules for shared tasks. Collect a complete workflow history and audit trail. Use digital signatures for tasks. Run reports like Unattended tasks, Tasks productivity, etc. Here is a screenshoot of what the Worklist Application looks like. On the right hand side you can see the tasks that have been assigned to the user and the task's detail. References Introduction to SOA Suite 11g Human Workflow Webcast Note 1452937.2 Human Workflow Information Center Using the Human Workflow Service Component 11.1.1.6 Human Workflow Samples Human Workflow APIs Java Docs

    Read the article

  • Task Manager always crashes..

    - by tallship
    This is the error report: Problem signature: Problem Event Name: APPCRASH Application Name: taskmgr.exe Application Version: 6.1.7600.16385 Application Timestamp: 4a5bc3ee Fault Module Name: hostv32.dll Fault Module Version: 0.0.0.0 Fault Module Timestamp: 4c5c027d Exception Code: c0000005 Exception Offset: 0000000000068b73 OS Version: 6.1.7600.2.0.0.256.48 Locale ID: 1033 Additional Information 1: bf4f Additional Information 2: bf4f79e8ecbde38b818b2c0e2771a379 Additional Information 3: d246 Additional Information 4: d2464c78aa97e6b203cd0fca121f9a58 Read our privacy statement online: http://go.microsoft.com/fwlink/?linkid=104288&clcid=0x0409 If the online privacy statement is not available, please read our privacy statement offline: C:\Windows\system32\en-US\erofflps.txt Whenever I open the task manager, within a few seconds it crashes, saying it has stopped working with the above report. I took the fault module (hostv32.dll) and scanned it with avast but it found no threat. I also ran a SFC /scannow from an elevated command prompt and it didn't find any corrupted files. This problem is in all two user accounts in this computer (Windows 7). There was one time where task manager seemed to work, but when I closed it and opened it again, it crashed. Any reason/solution to this problem?

    Read the article

< Previous Page | 6 7 8 9 10 11 12 13 14 15 16 17  | Next Page >