Search Results

Search found 24081 results on 964 pages for 'microsoft office 2007'.

Page 115/964 | < Previous Page | 111 112 113 114 115 116 117 118 119 120 121 122  | Next Page >

  • How to generate weekly dates from bi-weekly pay period in Excel

    - by A_Pointar
    I'm trying to convert bi-weekly pay period to weekly dates. Lets say I have 3/2/2012, 3/16/2012, 3/30/2012 and some gaps and then again biweekly dates. generate 3/9/2012, 3/16/2012, 3/23/2012, 3/30/2012 and so on...I was trying to use INDEX and MATCH but it would give me biweekly again. The perfect way would be to match and generate weeks from my randomized biweekly dates. Here is an example of my worksheet:

    Read the article

  • How quickly toggle smart quotes in Word 2010?

    - by KnowItAllWannabe
    I'm working on a long technical document that contains numerous displays of computer code. In running text, I want my quotation marks to be curly, which means that Word's "smart quotes" autoformatting-as-I-type feature is one I want on. But in code displays, curly quotes are incorrect, so in these cases, I want smart-quotes-as-I-type disabled. Is there a fast way to toggle this setting? Or is there a way I can tie it to the paragraph style I'm in? (I use a distinct style for code displays.) Currently, to toggle the setting, I have to click FileOptionsProofingAutoCorrect Options..."Straight quotes" with "smart quotes"OKOK, which is seven mouse clicks. Toggling it back is another seven mouse clicks. Isn't there a faster way? A keyhboard shortcut to do the toggling or a toolbar button that would toggle it with a single click would be great. Having the setting depend on the paragraph style I was in would be even better.

    Read the article

  • Excel 2013: Is it possible to collapse rows only in a specific column?

    - by h7u9i
    In my spreadsheet, I'm trying to figure out a way to collapse rows in a specific column. Right now, if I do Data - Group - Group... - Rows, it'll collapse the entire row. I want to collapse rows only in a specific column. Example: |---------|----------| | hi | + data | |---------|----------| | hello | + data2 | |---------|----------| | | | |---------|----------| | | | And opening data 1 would turn into: |---------|----------| | hi | - data1 | |---------|----------| | hello | point1 | |---------|----------| | | point2 | |---------|----------| | | + data2 | |---------|----------| | | | |---------|----------| | | | Is this possible to do in Excel?

    Read the article

  • How does SSMS and SQL Server Licensing work?

    - by DrewK
    Could not get a efficient enough answer from MSFT or some of their vendors. Trying to determine exactly how the licensing works before dropping the money on it. Looking to get Server/CAL. We will have the server at our datacenter and then be using SSMS remote on each developers computer. That is, installing SSMS on all developers machine. I am not familiar with MSFT licensing (postgresql & mysql). If I were to pay for the server license and 5 CALs does that mean we can install SSMS locally on each machine. Does each CAL have a specific lic. # that is entered when installing SSMS? We were messing with just the trial edition and the only way I know of installing SSMS is using the full sql server install and choosing only SSMS, it still requires a license number. Any information would be very useful.

    Read the article

  • Don't break header/footer when making page landscape format

    - by Steeven
    I have a document with a footer with page numbering and a header with some centered text. Long story short: I flipped one page to landscape format. Long story long: I made a forced page break to get a blank page. I then highlighted this page (that is, I highlighted the empty line on this page) and went to the page proporties menu window, clicked on the landscape format button, and chose to apply this setting for the highlighted text only. The result: All that is of course no big deal, and my page is flipped the 90 degrees as wished - but my header and footer break! They disappear from this page... and actually also from the next page (which is still upright portrait format), which is weird. And then the header and footer is back on the following pages again, though the page numbering restarts from 1. On this screenshot you can see that the previous and the following pages have headers and footers, but not the flipped one and not the page following the flipped one. What just happened here? How can I make the page numbering continue without restarting first of all, and then, how can I keep the header and footer on at least the upright page, that suddenly doesn't have them?

    Read the article

  • Word 2013: Get the page number for the previous page

    - by Mike Anthony
    I'm trying to accomplish something very simple in Word 2013, but the feature does not seem to be available, nor can I work it out with field codes. I simply want to include, on multiple pages, "continued from page n". In terms of field codes, I have tried this: { = PAGE - 1 \* MERGEFORMAT } It just tells me that PAGE is not a defined bookmark. Is there any way that this can be done? Edit: Per documentation I found somewhere, I also tried this - but with no luck: { = { PAGE } - 1 } This just threw Syntax Error, { back, which leads me to assume that it's incompatible with newer versions of Word.

    Read the article

  • How force text-only pasting in emacs?

    - by eaubin
    On my mac I always have an emacs buffer open and occasionally I have to copy content from PowerPoint or Word. Unfortunately, copying to the clipboard and yanking into emacs saves all the ugly formatting (and graphics) from the original document. I only want to paste in the text (and never the formatting). My current solution is to paste into TextWrangler and then repaste into emacs. What's a better way to do this?

    Read the article

  • How to create a new word document from document template in Sharepoint

    - by sjlewis
    Is there an easier way to create a new document (in Word 2010) from a document template in Sharepoint? Right now, this is how I do it: Go to Sharepoint site and edit .dotx in Word. Click "File" from the ribbon and choose "New". From the "Available templates" section, click "New from existing". From the "New from Existing Document" dialog, choose the Sharepoint document, and click "Create New". Once the new document opens, click "File" from the ribbon again, and choose "Save as". The document will be saved as .docx

    Read the article

  • Pivot Table Does Not Refresh Source

    - by AME
    Typically, when selecting a data source for a pivot table in Excel 2013, it is possible to refresh the table by selecting "refresh table" or "refresh all". This triggers an update in the Pivot Table based on changes in the underlying data source. However, I am running into a case where this functionality does not prompt a refresh of the pivot table. What might be causing the pivot table in Excel 2013 to remain static when selecting "refresh data"?

    Read the article

  • How can I sort my data while keeping paired rows together?

    - by Joe Lee Frank
    How can I pair two rows on a spreadsheet, so that for each data entry I can sort the matrix but the pair of rows moves as a single list of data, retaining the structure of the two rows? For example: Original entry A1,1 B1,1 C1,1 D1,1 A1,2 B1,2 C1,2 D1,2 A2,1 B2,1 C2,1 D2,1 A2,2 B2,2 C2,2 D2,2 Sorted reverse order A2,1 B2,1 C2,1 D2,1 A2,2 B2,2 C2,2 D2,2 A1,1 B1,1 C1,1 D1,1 A1,2 B1,2 C1,2 D1,2

    Read the article

  • Adding value of cell X only if cell Y is blank

    - by Graeme Hutchison
    I have a list with three columns A, B, and C. The first two columns are complete (A and B), while the third (C) has many blanked fields. What I want to do is replace all the blank fields in Column C with the same value form cell A in the same row. The List contains over 2000 records, of which 65% have a blank Column C value, so I would like to use a formula/function. Below is an example of what I have and what I want to do (on a much smaller scale)

    Read the article

  • Excel - Referring to a certain cell based off of data in another

    - by Ethan Brouwer
    I have a spreadsheet where there is one table with the headings: Coordinate, Lat, Long Another with headings Triangle, Coordinate 1, Coordinate 2, Coordinate 3, Area What this is for, is taking the triangles formed by the specified three coordinates' area based off of Girard's theorem, as they are all spherical triangles. I need to take the specific latitude and longitude values from the first table based on the coordinate numbers underneath the three coordinate headings in the second table. I hope this makes sense. Here are pictures detailing what the two tables look like: Table 1 Table 2 Thanks in advance. And I really do hope this makes sense.

    Read the article

  • Is there a way to modify the default size of a new side note in OneNote 2010?

    - by user1202747
    I am a fan of OneNote, but there is one aspect of it that makes it less useful than it could be. When I make a new side note (i.e. by clicking the OneNote icon in the system tray or pressing WindowsKey + N), the size of the window of the resulting note that opens is far too large. It probably takes up 20% of my reasonably high-res screen by default. I have to click and drag to resize it, and that's a waste of my time. So, I have a two part question: Is there a way of modifying some settings somewhere (perhaps in the registry?) so that the default window size of a new side note is smaller than the default? I would prefer something more in line with the size of a new "sticky" note in OS X. If not, does anyone know of a fast way to shrink the size of a window using the keyboard? I'd appreciate any advice that anyone can give. Thanks.

    Read the article

  • Use Excel Color Scale Formatting with Text

    - by stumpylog
    I use Excel sheets to track the status of tasks through a set of discrete statuses. I'd like to be able to format these automatically, with the start being red, the end being green and progressing through the combination colors in the middle. Status1 (Red) Status2 (More Red than Green) Status3 (More Green than Red) Status4 (Green) The "Color Scales" option under Conditional Formatting seems like it could be made to work, but it wants numbers. So, my question, can it be done? Using conditional formatting or other formulas to achieve the desired affect?

    Read the article

  • How do I keep Conditional Formatting formulas and ranges from automatically changing?

    - by Iszi
    I've found that Conditional Formatting formulas and ranges will automatically adjust when you copy, delete, or move data around in a spreadsheet. While this is a nice idea, it tends to break things for me in some rather weird ways. To avoid this, I tried writing rules that applied to the entire spreadsheet and keyed off of column headers to highlight the data I wanted to check. Example: =AND(A$1="Check This Column For Blanks),ISBLANK(A1)) applied to =$1:$1048576 However, even with the rule explicitly applied to the entire sheet, it was still automatically adjusting (and breaking in weird ways by doing so) as I worked in the sheet. How can I avoid this?

    Read the article

  • Way to update / refresh / reschedule project plan after adding a vacation / changing calendar

    - by CodeCanvas
    I had created a project plan using MS-Project 2010 (not server). I had set the task schedule mode to "Auto Scheduled" and entered the necessary tasks. Since it is a single person project I also added one person to the Resource of the file and assigned that resource to all the tasks and leveled the project. After the plan was put in and tasks were leveled I figured the calendar was not correctly set (in UAE the weekend is Friday and Saturday instead of Saturday and Sunday). So, I updated the default calendar (Standard) of the project by going to Project-Change Working Time-Work Weeks and changed them as needed. But after doing this, the tasks are still scheduled over Friday and Saturday even though I have marked them as nonworking days in the standard calendar. I tried the following for the tasks to refresh, but I was not successful: Updated all tasks to use the "Standard" calendar in the project Selected option so that tasks do not ignore resource calendars Added a constraint "As Soon As Possible" Executed "Level All" Any help on solving this issue would be much appreciated, thanks in advance.

    Read the article

  • Strange traceroute to msdn.microsoft.com

    - by Jasper
    The problem is I could not view any msdn.microsoft.com/* site and the main site itself on my Ubuntu box on Google Chrome browser. Error is: Error 101 (net::ERR_CONNECTION_RESET): The connection was reset. When I run traceout I get different result: Here is simple one: traceroute msdn.microsoft.com traceroute to msdn.microsoft.com (65.55.11.235), 30 hops max, 60 byte packets 1 10.0.0.138 (10.0.0.138) 0.121 ms 0.131 ms 0.128 ms 2 192.168.0.1 (192.168.0.1) 1.730 ms 1.724 ms 2.024 ms 3 bzq-179-37-1.static.bezeqint.net (212.179.37.1) 18.314 ms 19.277 ms 20.694 ms 4 bzq-218-227-250.red.bezeqint.net (81.218.227.250) 22.806 ms 23.651 ms 24.820 ms 5 bzq-179-75-198.static.bezeqint.net (212.179.75.198) 26.650 ms 27.533 ms 28.791 ms 6 * * * 7 bzq-179-124-122.static.bezeqint.net (212.179.124.122) 76.032 ms 72.968 ms 74.660 ms 8 igblmdistc7504.uk.msft.net (195.66.224.140) 75.708 ms 76.797 ms 78.257 ms 9 ge-5-1-0-0.lts-64cb-1a.ntwk.msn.net (207.46.42.227) 80.125 ms 81.336 ms 82.671 ms 10 ge-7-0-0-0.nyc-64cb-1a.ntwk.msn.net (207.46.47.20) 179.232 ms so-7-1-0-0.ash-64cb-1b.ntwk.msn.net (213.199.144.158) 162.508 ms 163.223 ms 11 xe-0-0-1-0.co1-96c-1b.ntwk.msn.net (207.46.45.29) 227.964 ms ge-7-0-0-0.co1-64c-1b.ntwk.msn.net (207.46.40.90) 228.226 ms xe-0-0-1-0.co1-96c-1b.ntwk.msn.net (207.46.45.29) 212.781 ms 12 10.22.8.54 (10.22.8.54) 215.046 ms xe-5-2-0-0.co1-96c-1a.ntwk.msn.net (207.46.40.167) 214.825 ms 10.22.8.58 (10.22.8.58) 213.251 ms 13 10.22.8.62 (10.22.8.62) 212.745 ms 213.827 ms 10.22.8.50 (10.22.8.50) 215.655 ms 14 10.22.8.62 (10.22.8.62) 211.665 ms !X 10.22.8.50 (10.22.8.50) 214.491 ms !X 10.22.8.54 (10.22.8.54) 218.471 ms !X Line 1,2 : It's me Line from 3-7: It's my Internet provider Line 8 and on: I think I hit MS servers WTF line 12-14 ????? 10.22.8.x ???? then I run this traceroute: sudo traceroute -T msdn.microsoft.com traceroute to msdn.microsoft.com (65.55.11.235), 30 hops max, 60 byte packets 1 10.0.0.138 (10.0.0.138) 0.109 ms 0.127 ms * 2 * * * 3 * * * 4 * * * 5 * * * 6 * 65.55.11.235 (65.55.11.235) 16.019 ms 17.364 ms So I hit MSDN web site already at 6 hop ! WTF ??? This is host -a msdn.microsoft.com from me: host -a msdn.microsoft.com Trying "msdn.microsoft.com" ;; ->>HEADER<<- opcode: QUERY, status: NOERROR, id: 19522 ;; flags: qr rd ra; QUERY: 1, ANSWER: 2, AUTHORITY: 0, ADDITIONAL: 0 ;; QUESTION SECTION: ;msdn.microsoft.com. IN ANY ;; ANSWER SECTION: msdn.microsoft.com. 3274 IN CNAME msdn.microsoft.akadns.net. msdn.microsoft.akadns.net. 600 IN A 65.55.11.235 Received 91 bytes from 127.0.0.1#53 in 108 ms Could someone help me understand and fix it ??

    Read the article

  • PowerPoint avoid animation completion on click & advance slide or start new one

    - by ScottS
    Scenario I have PowerPoint 2010 On the "Transitions" tab the "Advance Slide On Mouse Click" check box is checked. I have a long, slow, timed, non-repeating animation working in the background of the slide. I click to advance the slide before the animation is finished, but ... Instead of advancing the slide, the animation moves to the completed state ... Forcing a second click to actually advance the slide. Additionally If I have other animations on the slide that are initiated by a click, the long animation also advances to a finished state before starting the new animation. Desired Behavior On click, I want the slide to advance or the next on-click animation to start whether the long animation is done or not, and without having that long animation first "complete" itself. In the case of another animation, I simply want the long animation to continue, while also doing the new animation. Ultimate Question Is there a way to either: Set an option somewhere to not have that animation complete on click and simply "continue" to animate with the start of a new animation or to advance the slide (as the case may be)? Create a VBA script that will produce the desired behavior for the long animation?

    Read the article

  • Create a form as a worksheet in Excel that adds records to another worksheet

    - by Holden Fenner
    I am trying to create a form in Excel for vehicle requests. What I want to happen is to create one worksheet that is a recreation of the current paper form, but have a clickable button that will enter all the data for the vehicle request as a record on a second worksheet. Conversely, if you know the record number, I want the form to auto-flll the information from that record number. I have the second part figured out, that should be a simple HLOOKUP, but I don't know how to generate the clickable button. Will I need to use scripting for this, or is there an pre-built way of doing this? (As an aside, I know there are other and better ways of accomplishing database work, but the nature of my work makes Excel the best choice)

    Read the article

  • How do I stop Outlook from stealing mailto protocol from Gmail?

    - by AngryHacker
    In Chrome, when I click on a mailto: link, I'd like to be taken to my Gmail's Compose window. So I downloaded ChromeMailer and it works relatively well. However, after using Outlook 2010, the default for the mailto reverts to Outlook. I went into Outlook's Options, clicked Default Programs... and was greeted with this: As you can see, the checkbox is grayed out and I can't do anything to changed it. Clicking Select All checkbox does nothing either. How do I stop Outlook from stealing the mailto protocol handler?

    Read the article

  • Extract data from delinked Excel plot

    - by danny
    I have a Word file which has some Excel plots in it. Unfortunately I lost the original excel plots and the word file is now 'de-linked'. Is there a way to retrieve the lost data for the plots? Just copying the plot back to Excel does not seem to work, but I can see that the data is still there somewhere, because hovering over a dot on the plot shows the values. I have found a solution 1) Unzip the word/powerpoint file 2) go to word/chart/ and open the xml files in Access

    Read the article

  • View another persons calendar details in Outlook 2010

    - by SqlRyan
    I know how to view somebody else's calendar - there are 100 walk-throughs like this one on Google. However, this feature has changed in Outlook 2010, and you no longer get prompted for rights to view another person's calendar, and Outlook just displays their "Free/Busy" information, which doesn't help me. I'd like to request permissions to view the details of their appointments, but I can't find any place to request permissions on their calendar - Outlook 2010 just gives me "Free/Busy" rights and then appears to have no option to request additional rights. Can anybody point me in the right direction?

    Read the article

< Previous Page | 111 112 113 114 115 116 117 118 119 120 121 122  | Next Page >