Search Results

Search found 14713 results on 589 pages for 'do release upgrade'.

Page 12/589 | < Previous Page | 8 9 10 11 12 13 14 15 16 17 18 19  | Next Page >

  • Overlay scrollbars disabled on upgrade - how to reenable?

    - by Aibara Iduas
    When I upgraded from Natty to Oneiric and then immediately to Precise, for some reason the overlay scrollbars stopped appearing. They were enabled and worked just fine in Natty, and are still enabled in theory. I've purged and reinstalled these packages: overlay-scrollbar, liboverlay-scrollbar-0.2-0, and liboverlay-scrollbar3-0.2-0. That did nothing. I also tried using both Ubuntu Tweak and Unsettings, but both showed that overlay scrollbars were turned on (and turning the settings off and back on again did nothing either). Any ideas how to get them back? Thanks!

    Read the article

  • Extremely slow login after upgrade from 11.10 to 12.04

    - by ocalex86
    I just upgraded my xubuntu 11.10 to 12.04 and now, when I login into the GUI, I have to wait about 3 minutes before the desktop appears. Only the background image is displayed. The login into the console works fine (with ctrl+alt+f2) Even stranger: If I login first in the console and then in the GUI, it boots quickly. If I login first in the GUI, switch to console and login, it takes 3 minutes to boot in the GUI. My machine is a thinkpad T420s.

    Read the article

  • Print jobs to Epson Stylus Photo 640 all stopped after upgrade 10.04 to 12.04

    - by Tessa Sayers
    Upgraded from Ubuntu 10.04 to 12.04 on 19th oct 2012. Now all print jobs end up in the print queue with the label "Stopped". Reinstalled the printer driver - it is gutenberg 5.2.8 pre1. Looking at "http://localhost:631/jobs" shows an error message by each stopped job as follows:"The PPD version (5.2.5 Simplified) is not compatible with Gutenprint 5.2.8-pre1." Found a long bug-fixing history in bugs.launchpad.net which seem to imply that this problem has been fixed. It seems to be a problem with the installation not updating the ppd files. Is there any workaround to fix this problem?

    Read the article

  • Lost power during upgrade, how do I recover?

    - by Ryan McClure
    I was attempting to update my 11.10 install to 12.04beta. During the install step, I accidentally lost power to my laptop (the power cable came unplugged) and it shut down. Whenever I go to boot now, I can select my install via Grub and it loads up to where the sign-in should happen, but I get a display that looks like what you see as soon as you shut down. It looks like it locks after checking for the battery. Is there anyway, with or without Live media, to restore my machine's install/update to 12.04 but still keep my settings/applications/files?

    Read the article

  • Upgrade from 12.04 to 13.10: Computer won't boot

    - by Christian
    I upgraded from 12.04 to 13.10 and my computer boots to a black screen. I hear the drumroll, but there is no functionality after that. I've downloaded a livecd of 12.04 on my other computer, and I changed the BiOS settings to boot from CD/DVD first, but it still does the same thing. I booted advanced options, edited [ro quick splash] to [ro nomodeset] and it started normally. I rebooted the system and it was back to the same junk. What do I need to do while it is operating to make it reliable with every restart? This seems to be a systemic issues with NUMEROUS Ubuntu upgrades, but I haven't read a solution yet. I need some help, please! Thanks.

    Read the article

  • After Upgrade from 13.04 to 13.10 missing user in login screen

    - by Mark
    I have upgraded to 13.10 from 13.04 now after booting (even after updates and rebooting) my user id is not listed. It has a uid higher than the minimum in lightdm.conf. I have the user light display manager , guest , and remote login options in the login screen but not my ususal user id that I have been using from ubuntu 9 something. It is a normal user and an administrator so that I could authorize drivers, updates, etc... I do not have any custom display manager setup. It has been standard unity since unity was available. I can login to my account by logging in as guest opening a termial and using su - user Any insight would be appreciated. Thanks

    Read the article

  • Issues with upgrade to ubuntu 14.04

    - by SUBPUR
    First, I should say that I am a total beginner. When answering, please do not take for granted that I understand even the most basic step. Now for my question: Yesterday, I was given the option to update to ubuntu 14.04. I clicked yes, and the system took about 2.5 hours to accomplish this task. Now, whenever I log into my user account, I get an error message and then I am asked to authenticate my user account. When I try to enter the password, my computer freezes. Please help, what can I do to fix this?

    Read the article

  • Kernel Error When Upgrade 12.10 - VMWare has install in 12.04

    - by sepdau
    I have already upgraded Ubuntu 12.10 from 12.04. I have remove old kernel 3.2.21 in 12.04 ver. On my starting up it have error before login I see a error "vmware ...." In 12.04 I have install vmware 9.0 and in 12.10 when I open vmware workstation to start a virtual machine it error my monito going to black and I must logout and login angain. How to fix it? I related to vmware and kernel or not. Thank for helping!

    Read the article

  • Upgrade to 11.10 left me with Kmail not working

    - by user86186
    On my way from 10.10 to 12.04 I chose to do the step by step (11.04 then 11.10 then 12.04) because I could not figure if I should do that or a direct install of 12.04LTS. After the first step (11.04) all was well. The next day I upgraded to 11.10. Now I seem to have lost my data in KOrganizer and all of my email history in KMail. KMail still has my email accounts but my tree structure of folders is missing as is all of the emails that should be there. Also, when KMail opens I get the following: KMail encountered a fatal error and will terminate now. The error was: Failed to fetch the resource collection. Clicking OK closes KMail. KAlarm appears OK and my browser history is still in place as are various data files. What to do??

    Read the article

  • SQL Server 2008 R2 upgrade fails on upgrade rule check

    - by Tim
    I'm trying to upgrade an evaluation instance of SQL Server 2008 to a fully licensed instance of SQL Server 2008 R2. I made it most of the way through the installer, but I'm getting stopped at the Upgrade Rules page - the SQL Server Analysis Services Upgrade Service Functional Check is failing. The specific error I get: Rule "SQL Server Analysis Services Upgrade Service Functional Check" failed. The current instance of the SQL Server Analysis Services service cannot be upgraded because the Analysis Services service is disabled or not online. Please start the service and then run the upgrade rules check again. Simple enough - just need to start the service. Here's where it gets troublesome. When I open Services and go to start the SQL Server Analysis Services (MSSQLSERVER) service, it provides me the following message: The SQL Server Analysis Services (MSSQLSERVER) service on Local Computer started and then stopped. Some services stop automatically if they are not in use by other services or programs. Trying from the command line as Administrator yields: PS C:\Windows\System32 net start MSSQLServerOLAPService The SQL Server Analysis Services (MSSQLSERVER) service is starting... The SQL Server Analysis Services (MSSQLSERVER) service could not be started. The service did not report an error. More help is available by typing NET HELPMSG 3534. I've tried changing the logon setting of this service to Administrator, a user with admin privileges, and both the Local System and Network Service accounts - nothing works. In addition, when I look at the service through the SQL Server Configuration Manager (also run as Administrator), attempting to change the logon setting for the service results in the message: The server threw an exception. [0x80010105] I have no need for analysis services themselves - all I need is for this one service to be running long enough to do the R2 upgrade, then it can shut down again. Any thoughts on how to get the Analysis Services service running? Update: Checking the event log, I found an error logged to the Application log from the MSSQLServerOLAPService. It has event ID 0, task category (289), and says: The service cannot be started: XML parsing failed at line 1, column 4: Unrecognized input signature.

    Read the article

  • EBS 12.1.1 Test Starter Kit now Available for Oracle Application Testing Suite

    - by Steven Chan
    We've discussed automated testing tools for the E-Business Suite several times on this blog, since testing is such a key part of everyone's implementation lifecycle.  An important part of our testing arsenal in E-Business Suite Development is the Oracle Application Testing Suite.  The Oracle Automated Testing Suite (OATS) is built on the foundation of the e-TEST suite of products acquired from Empirix  in 2008.  The testing suite is comprised of:   1. Oracle Load Testing for scalability, performance, and load testing   2. Oracle Functional Testing for automated functional and regression testing   3. Oracle Test Manager for test process management, test execution, and defect trackingOracle Application Testing Suite 9.0 has been supported for use with the E-Business Suite since 2009.  I'm very pleased to let you know that our E-Business Suite Release 12.1.1 Test Starter Kit is now available for Oracle Application Testing Suite 9.1.  You can download it here:Oracle Application Testing Suite Downloads

    Read the article

  • Failed 11.10 to 12.04 upgrade and drove me crazy!

    - by Ivan
    Please help me with this! I first tried to upgrade my Ubuntu server from 11.10 to 12.04 thru Upgrade Manager, but never succeeded! Then I tried upgrading thru terminal, which took me ~4 hours as I was warned. When I restarted my computer, my login GUI did not show up at all! (Panic I was!) But when I switched to tty6 and it seemed the upgrade has finished, at least partially and got message Ubuntu 12.04LTS and telling me 12.10 is available. There are bunch of unmet dependencies...."apt-get install -f" may resolve the problem. Then I tried: sudo apt-get -f install, did not succeed! Also I tried sudo apt-get update && sudo apt-get upgrade I got bunch of error message too long to list here. Then I tried: sudo do-release-upgrade still bunch of error message there! There seems a lot trouble with the upgrade from 11.10 to 12.04 for me. Did I miss anything? Anyway, can I ask how I can get the gnome login GUI back? Thanks a lot! Yifang

    Read the article

  • Power cut during Ubuntu upgrade to 10.04 - boots to command line, apt-get and dpkg do not work.

    - by Macha
    I was upgrading Ubuntu to 10.04, when a tripswitch tripped, cutting power to the computer. When it was restarted, it booted into a command line prompt. Google tells me to try: sudo dpkg --configure -a This gets me a lot of output that ends with a list of packages. I can't tell you what the output is, as piping the output to more/less does not work (still just all scrolls by and moves to next prompt), and redirecting it to a file just results in an empty file. Google also suggested: sudo apt-get install -f This also didn't work. Is a fresh install the only solution at this point?

    Read the article

  • broken upgrade from 10.04 to 12.04 on a VPS - recoverable?

    - by HorusKol
    I have a VPS hosted 1500 km away. It originally came with 9.10 - and this morning I decided that I really should get to an LTS release, and figured I'd jump to 12.04. Researching, I discovered that there is no direct path between 9.10 and 12.04, but that I could upgrade via 10.04. After backing up my data, I dove in. The upgrade to 10.04 was successful, and I proceeded to upgrade to 12.04. Things started to go wrong. First, I got an error with GLIBC - I retried and got the same error. That's when I stopped the upgrade. I then tried another round of apt-get update && apt-get upgrade and got a list of "unmet dependencies": apt: Depends: ubuntu-keyring but it is not going to be installed Depends: libc6 (>= 2.15) but 2.11.1-0ubuntu7.11 is to be installed Depends: libstdc++6 (>= 4.6) but 4.4.3-4ubuntu5.1 is to be installed PreDepends: dpkg (>= 1.15.7.2) but 1.15.5.6ubuntu4.6 is to be installed apt-utils: Depends: libapt-pkg-libc6.10-6-4.8 libapt-inst1.4: Depends: libc6 (>= 2.14) but 2.11.1-0ubuntu7.11 is to be installed libapt-pkg4.12: Depends: libc6 (>= 2.15) but 2.11.1-0ubuntu7.11 is to be installed Depends: libstdc++6 (>= 4.6) but 4.4.3-4ubuntu5.1 is to be installed libc6: Depends: libc-bin (= 2.11.1-0ubuntu7.11) but 2.15-0ubuntu10.2 is to be installed libept0: Depends: libapt-pkg-libc6.10-6-4.8 libnih-dbus1: Depends: libnih1 (= 1.0.3-4ubuntu9) but 1.0.1-1 is to be installed I tried to see if I could do something about these - using apt-get -f install. This told me that I would need to upgrade my kernel. I found instructions on how to do this, but when I ran apt-get to install the new linux headers, I got the same dependency errors. I found another answer here where someone else had had an interruption in their upgrade - and tried the solution that worked for them: sudo apt-get -f dist-upgrade This resulted in the error: E: Could not perform immediate configuration on 'python2.7-minimal'.Please see man 5 apt.conf under APT::Immediate-Configure for details. (2) I tried to resolve this by: apt-get install -o APT::Immediate-Configure=false -f apt python-minimal But this simply ended up with this last list of dependency errors: apt: Depends: ubuntu-keyring but it is not going to be installed Depends: libc6 (>= 2.15) but 2.11.1-0ubuntu7.11 is to be installed Depends: libstdc++6 (>= 4.6) but 4.4.3-4ubuntu5.1 is to be installed PreDepends: dpkg (>= 1.15.7.2) but 1.15.5.6ubuntu4.6 is to be installed apt-utils: Depends: libapt-pkg-libc6.10-6-4.8 libapt-inst1.4: Depends: libc6 (>= 2.14) but 2.11.1-0ubuntu7.11 is to be installed libapt-pkg4.12: Depends: libc6 (>= 2.15) but 2.11.1-0ubuntu7.11 is to be installed Depends: libstdc++6 (>= 4.6) but 4.4.3-4ubuntu5.1 is to be installed libc6: Depends: libc-bin (= 2.11.1-0ubuntu7.11) but 2.15-0ubuntu10.2 is to be installed libept0: Depends: libapt-pkg-libc6.10-6-4.8 libnih-dbus1: Depends: libnih1 (= 1.0.3-4ubuntu9) but 1.0.1-1 is to be installed python: Depends: python-minimal (= 2.6.5-0ubuntu1) but 2.7.3-0ubuntu2 is to be installed python-apt: Depends: libapt-pkg-libc6.10-6-4.8 python-minimal: Depends: python2.7-minimal (>= 2.7.3) but it is not going to be installed Breaks: python-support (< 1.0.10ubuntu2) but 1.0.4ubuntu1 is to be installed synaptic: Depends: libapt-pkg-libc6.10-6-4.8 Any ideas on how to dig out of this hole?

    Read the article

  • How to dispose of a NET COM interop object on Release()

    - by mhenry1384
    I have a COM object written in managed code (C++/CLI). I am using that object in standard C++. How do I force my COM object's destructor to be called immediately when the COM object is released? If that's not possible, call I have Release() call a MyDispose() method on my COM object? My code to declare the object (C++/CLI): [Guid("57ED5388-blahblah")] [InterfaceType(ComInterfaceType::InterfaceIsIDispatch)] [ComVisible(true)] public interface class IFoo { void Doit(); }; [Guid("417E5293-blahblah")] [ClassInterface(ClassInterfaceType::None)] [ComVisible(true)] public ref class Foo : IFoo { public: void MyDispose(); ~Foo() {MyDispose();} // This is never called !Foo() {MyDispose();} // This is called by the garbage collector. virtual ULONG Release() {MyDispose();} // This is never called virtual void Doit(); }; My code to use the object (native C++): #import "..\\Debug\\Foo.tlb" ... Bar::IFoo setup(__uuidof(Bar::Foo)); // This object comes from the .tlb. setup.Doit(); setup-Release(); // explicit release, not really necessary since Bar::IFoo's destructor will call Release(). If I put a destructor method on my COM object, it is never called. If I put a finalizer method, it is called when the garbage collector gets around to it. If I explicitly call my Release() override it is never called. I would really like it so that when my native Bar::IFoo object goes out of scope it automatically calls my .NET object's dispose code. I would think I could do it by overriding the Release(), and if the object count = 0 then call MyDispose(). But apparently I'm not overriding Release() correctly because my Release() method is never called. Obviously, I can make this happen by putting my MyDispose() method in the interface and requiring the people using my object to call MyDispose() before Release(), but it would be slicker if Release() just cleaned up the object. Is it possible to force the .NET COM object's destructor, or some other method, to be called immediately when a COM object is released? Googling on this issue gets me a lot of hits telling me to call System.Runtime.InteropServices.Marshal.ReleaseComObject(), but of course, that's how you tell .NET to release a COM object. I want COM Release() to Dispose of a .NET object.

    Read the article

  • OTRS upgrade 3.0 to 3.1 fails

    - by Valentin0S
    Today I've started upgrading OTRS from version 2.3 to 2.4 , 2.4 to 3.0 and 3.0 to 3.1. Everything went smoothly except the upgrade from 3.0 to 3.1 OTRS provides a few perl scripts which make the upgrade easier. I've used these scripts for each upgrade step. The upgrade from 3.0 to 3.1 fails at the following after using the upgrade script. scripts/DBUpdate-to-3.1.pl The error is : root@tickets:/opt/otrs# su - otrs $ scripts/DBUpdate-to-3.1.pl Migration started... Step 1 of 24: Refresh configuration cache... If you see warnings about 'Subroutine Load redefined', that's fine, no need to worry! Subroutine Load redefined at /opt/otrs/Kernel/Config/Files/ZZZAAuto.pm line 5. Subroutine Load redefined at /opt/otrs/Kernel/Config/Files/ZZZAuto.pm line 4. done. Step 2 of 24: Check framework version... done. Step 3 of 24: Creating DynamicField tables (if necessary)... done. DBD::mysql::db do failed: Cannot add or update a child row: a foreign key constraint fails (`pp_otrs`.`dynamic_field`, CONSTRAINT `FK_dynamic_field_create_by_id` FOREIGN KEY (`create_by`) REFERENCES `users` (`id`)) at /opt/otrs-3.1.10/Kernel/System/DB.pm line 478. ERROR: OTRS-DBUpdate-to-3.1-10 Perl: 5.14.2 OS: linux Time: Wed Sep 5 15:36:20 2012 Message: Cannot add or update a child row: a foreign key constraint fails (`pp_otrs`.`dynamic_field`, CONSTRAINT `FK_dynamic_field_create_by_id` FOREIGN KEY (`create_by`) REFERENCES `users` (`id`)), SQL: 'INSERT INTO dynamic_field (name, label, field_order, field_type, object_type, config, valid_id, create_time, create_by, change_time, change_by) VALUES (?, ?, ?, 'Text', 'Ticket', '--- {} ', 1, '2012-09-05 15:36:20' , 1, '2012-09-05 15:36:20' , 1)' Traceback (20405): Module: main::_DynamicFieldCreation (v1.85) Line: 466 Module: scripts/DBUpdate-to-3.1.pl (v1.85) Line: 95 Could not create new DynamicField TicketFreeKey1 at scripts/DBUpdate-to-3.1.pl line 477. Step 4 of 24: Create new dynamic fields for free fields (text, key, date)... $ Did anyone else face the same issue? Thanks in advance

    Read the article

  • in-place upgrade Windows Server Standard Edition 2003 to Windows Server Enterprise/Datacentre Editio

    - by Systech
    I recently asked a question about upgrading from 2003 to 2008, but i realised this is a lot harder to do, the only reason i want to upgrade is to have increase the RAM Windows 2003 Standard Edition R2 only supports 4GB Windows 2003 Enterprise Edition R2 supports up to 32GB Windows 2003 Datacentre Edition R2 supports up to 64GB So basically i need to do an in-place upgrade to either Enterpirse or Datacentre without losing any data is this possible? Also is one easier to upgrade to then the other?

    Read the article

  • Nothing happens when trying to upgrade from Linux Mint 12 to 13

    - by Ares
    I am trying to upgrade from Linux Mint 12 to 13 using apt-get. After running the following commands, nothing seems to happen. I am fairly new to linux, what am I doing wrong? user@olympus /etc/default $ sudo apt-get dist-upgrade Reading package lists... Done Building dependency tree Reading state information... Done Calculating upgrade... Done 0 upgraded, 0 newly installed, 0 to remove and 0 not upgraded. user@olympus /etc/default $ sudo apt-get upgrade Reading package lists... Done Building dependency tree Reading state information... Done 0 upgraded, 0 newly installed, 0 to remove and 0 not upgraded.

    Read the article

  • Windows 8 Pro Upgrade but no previous version of Windows installed

    - by Vineet Bhatia
    I have a license for Windows 7 but don't have it currently installed anywhere. I bought the Windows 8 Pro Upgrade. Do I need to install Windows 7 and then upgrade or is there a easier way to install Windows 8 Pro Upgrade? When I try to activate I am getting an error Code: 0xC004F061. Description: The software licensing service determined that the specified product key can only be used for upgrading, not for clean installations.

    Read the article

  • Upgrade PHP to 5.3 in Ubuntu Server 8.04 with Plesk 9.5

    - by alcuadrado
    I have a dedicated server with Ubuntu 8.04, and really need to upgrade php to 5.3 version in order to deploy a new version of the system. This version of php is the default one in ubuntu 10.04, so I considered upgrading the OS, but after trying that, I lost my plesk installation, which annoyed my client. I tried adding the dotdeb.org repositories, but don't know why, after running an apt-get upgrade, I get this error: # apt-get upgrade Reading package lists... Done Building dependency tree Reading state information... Done The following packages have been kept back: libapache2-mod-php5 php5 php5-cgi php5-cli php5-common php5-curl php5-gd php5-imap php5-mysql php5-sqlite php5-xsl 0 upgraded, 0 newly installed, 0 to remove and 11 not upgraded. Any idea why is this happenning? Or do you know any alternative method (except compiling my own binaries) to upgrade php or update ubuntu without loosing plesk? Thanks!

    Read the article

  • Windows 7 Upgrade from an OEM disc

    - by user1026361
    I recently bought a new laptop with Windows 7 Home Premium and a Windows 7 Pro Upgrade key. It also comes with a cavalcade of bloatware. I would like to start with a fresh install of Windows. I understand that I can upgrade to W7Pro using the option in the Home Premium Start menu. However, I also own a Windows 7 Pro OEM installation disc from another computer. Can I use this Windows 7 Pro OEM disc to install Windows, and when it asks me for my key, provide the upgrade key purchased? Or am i required to install Home Premium first and then apply my upgrade key?

    Read the article

  • Windows Upgrade vs Full Install

    - by James Atkinson
    I'm in the process of purchasing a Netbook for use while traveling. The included OS is XP, however, I would like to upgrade(?) to Windows 7. My question: Does a Windows Upgrade have the same physical footprint and performance as a full install? Does an upgrade leave behind non used files/resources that were originally included in XP? If so, are there ways to reduce this? I'm trying to reduce as much OS bloat as possible. Please let me know if my question is unclear. Thanks. Related to http://superuser.com/questions/60646/is-a-clean-install-really-better-than-an-upgrade however, this doesn't address the "leftovers" question.

    Read the article

  • Could one hypothetically upgrade a computer from Windows 95 to Windows 8

    - by JMK
    Hypothetically, could you start with a computer running Windows 95, upgrade this to Windows 98, then upgrade this to Windows XP, then upgrade this to Vista, then to 7 and finally to 8 (consumer preview)? What state would the OS be in after so many upgrades? Would any of the native Windows 95 apps still be sticking around in Windows 8? Has anybody done anything like this before? I don't need to do this, I am just asking out of curiosity! Thanks

    Read the article

  • E-Business Suite Technology Stack Roadmap (April 2010) Now Available

    - by Steven Chan
    Keeping up with our E-Business Suite technology stack roadmap can be challenging.  Regular readers of this blog know that we certify new combinations and versions of Oracle products with the E-Business Suite every few weeks.  We also update our certification plans and roadmap as new third-party products like Microsoft Office 2010 and Firefox are announced or released.  Complicating matters further, various Oracle products leave Premier Support or are superceded by more-recent versions.This constant state of change means that any static representation of our roadmap is really a snapshot in time, and a snapshot that might begin to yellow and fade fairly quickly.  With that caveat in mind, here's this month's snapshot that I presented at the OAUG/Collaborate 2010 conference in Las Vegas last week:EBS Technology Stack Roadmap (April 2010)

    Read the article

  • New Whitepaper: Oracle E-Business Suite on Exadata

    - by Steven Chan
    Our Maximum Availability Architecture (MAA) team has quietly been amassing a formidable set of whitepapers about the Oracle Exadata Database Machine.  They're available here:MAA Best Practices - Exadata Database MachineIf you're one of the lucky ones with access to this hardware platform, you'll be pleased to hear that the MAA team has just published a new whitepaper with best practices for EBS environments:Oracle E-Business Suite on ExadataThis whitepaper covers the following topics:Getting to Exadata -- a high level overview of fresh installation on, and migration to, Exadata Database Machine with pointers to more detailed documentation High Availability and Disaster Recovery -- an overview of our MAA best practices with pointers to our detailed MAA Best Practices documentation Performance and Scalability -- best practices for running Oracle E-Business Suite on Exadata Database Machine based on our internal testing

    Read the article

< Previous Page | 8 9 10 11 12 13 14 15 16 17 18 19  | Next Page >