Search Results

Search found 14292 results on 572 pages for 'high integrity systems'.

Page 131/572 | < Previous Page | 127 128 129 130 131 132 133 134 135 136 137 138  | Next Page >

  • Dummy output after upgrade from 12.04 to 12.10, even though sound card is detected

    - by user115441
    So I just recently upgraded my system from Ubuntu 12.04 to 12.10. However, when I booted into 12.10 for the first time, no sound comes out of my speakers. I checked the sound settings and the Dummy Output was the only thing showing up. I used "hwinfo --sound" to check to see if my sound card was actually installed, and it was installed. hwinfo --sound hal.1: read hal dataprocess 2687: arguments to dbus_move_error() were incorrect, assertion "(dest) == NULL || !dbus_error_is_set ((dest))" failed in file ../../dbus/dbus-errors.c line 282. This is normally a bug in some application using the D-Bus library. libhal.c 3483 : Error unsubscribing to signals, error=The name org.freedesktop.Hal was not provided by any .service files 11: PCI 1b.0: 0403 Audio device [Created at pci.318] Unique ID: u1Nb._aiKlM91Nt0 SysFS ID: /devices/pci0000:00/0000:00:1b.0 SysFS BusID: 0000:00:1b.0 Hardware Class: sound Model: "Intel 82801FB/FBM/FR/FW/FRW (ICH6 Family) High Definition Audio Controller" Vendor: pci 0x8086 "Intel Corporation" Device: pci 0x2668 "82801FB/FBM/FR/FW/FRW (ICH6 Family) High Definition Audio Controller" SubVendor: pci 0x107b "Gateway 2000" SubDevice: pci 0x4040 Revision: 0x04 Driver: "snd_hda_intel" Driver Modules: "snd_hda_intel" Memory Range: 0x50240000-0x50243fff (rw,non-prefetchable) IRQ: 44 (91 events) Module Alias: "pci:v00008086d00002668sv0000107Bsd00004040bc04sc03i00" Driver Info #0: Driver Status: snd_hda_intel is active Driver Activation Cmd: "modprobe snd_hda_intel" Config Status: cfg=new, avail=yes, need=no, active=unknown I'm not sure what to do here. The only time the sound will actually work is when I boot into my Windows partition and then reboot into Ubuntu. I mean I don't want to have to do that every time I want to use Ubuntu. I would really appreciate any help I can get on here.

    Read the article

  • Final agenda - Oracle Exadata & Manageability Partner Community Forum at OpenWorld

    - by Javier Puerta
    Just a few days for Oracle OpenWorld and our Exadata & Manageability Partner Community Forum for EMEA partners. The event will take place on the afternoon of Monday, October 1st, 2012 during the Oracle OpenWorld week. For all partners that have confirmed their attendance to the event, find below the final detailed agenda. I look forward to meeting again in San Francisco with all of you who can attend the event and hope that you will find the sessions useful for your business.   FINAL AGENDAOracle Exadata & ManageabilityEMEA Partner Community Forum at Oracle OpenWorld 2012 in San Francisco, USAMonday, October 1st, 20112 Detailed agenda Time Session Speaker 15:30 Reception of participants - Networking coffe served 16:00 Welcome Hans-Peter Kipfer, VP Engineered Systems, Oracle EMEA 16:10 Next challenges in building and managing clouds Javier Cabrerizo, VP, Global Business Development for Exadata, Oracle Corp. 16:30 Partner experience 1.- IT modernization, simplification and cost reduction: The case of a customer in Transportation & Logistics with custom applications and SAP. The Technological Renewal Model built by aligning the innovation of Oracle's Engineered Systems and Capgemini's service delivery excellence has resulted in significant cost savings for the client. Francisco Bermúdez, Country Leader Infrastructure Services, Capgemini, Spain 16:55 Partner experience 2.- The Nvision cloud project NCloud is an innovative design that combines advanced technical solutions, virtualization, and dynamic management of IT resources, providing a complete "as-a-Service" offering for Infrastructure, Database, Middleware, and Applications. Dmitry Krasilov, Head of Oracle Competence Center, Nvision Group, Russia 17:20 Partner experience 3.- From Exadata Ready to Exadata Optimized: An ISV Experience The experience of WeDo Technologies in the process and benefits that started as an Exadata Ready certification and ended up as an Exadata Optimized. Miguel Alves,  Product Business Solutions Manager, Wedo Technologies, Portugal 17:45 Next steps in engaging with Oracle Cengiz Yilmaz, Director Partner Strategy, Oracle EMEA Engineered SystemsPatrick Rood, Manageability Partner Business, Oracle EMEA 18:00 Wrap-up & Networking Time and Location:Monday, October 1st, 2012, 15:30 - 18:00 PST Grand Hyatt San Francisco, 345 Stockton Street, San Francisco (Conference Theater) (It is a 15 minute walk from OOW Moscone Center. See directions here)  

    Read the article

  • Final agenda - Oracle Exadata & Manageability Partner Community Forum at OpenWorld

    - by Javier Puerta
    Just a few days for Oracle OpenWorld and our Exadata & Manageability Partner Community Forum for EMEA partners. The event will take place on the afternoon of Monday, October 1st, 2012 during the Oracle OpenWorld week. For all partners that have confirmed their attendance to the event, find below the final detailed agenda. I look forward to meeting again in San Francisco with all of you who can attend the event and hope that you will find the sessions useful for your business.   FINAL AGENDAOracle Exadata & ManageabilityEMEA Partner Community Forum at Oracle OpenWorld 2012 in San Francisco, USAMonday, October 1st, 20112 Detailed agenda Time Session Speaker 15:30 Reception of participants - Networking coffe served 16:00 Welcome Hans-Peter Kipfer, VP Engineered Systems, Oracle EMEA 16:10 Next challenges in building and managing clouds Javier Cabrerizo, VP, Global Business Development for Exadata, Oracle Corp. 16:30 Partner experience 1.- IT modernization, simplification and cost reduction: The case of a customer in Transportation & Logistics with custom applications and SAP. The Technological Renewal Model built by aligning the innovation of Oracle's Engineered Systems and Capgemini's service delivery excellence has resulted in significant cost savings for the client. Francisco Bermúdez, Country Leader Infrastructure Services, Capgemini, Spain 16:55 Partner experience 2.- The Nvision cloud project NCloud is an innovative design that combines advanced technical solutions, virtualization, and dynamic management of IT resources, providing a complete "as-a-Service" offering for Infrastructure, Database, Middleware, and Applications. Dmitry Krasilov, Head of Oracle Competence Center, Nvision Group, Russia 17:20 Partner experience 3.- From Exadata Ready to Exadata Optimized: An ISV Experience The experience of WeDo Technologies in the process and benefits that started as an Exadata Ready certification and ended up as an Exadata Optimized. Miguel Alves,  Product Business Solutions Manager, Wedo Technologies, Portugal 17:45 Next steps in engaging with Oracle Cengiz Yilmaz, Director Partner Strategy, Oracle EMEA Engineered SystemsPatrick Rood, Manageability Partner Business, Oracle EMEA 18:00 Wrap-up & Networking Time and Location:Monday, October 1st, 2012, 15:30 - 18:00 PST Grand Hyatt San Francisco, 345 Stockton Street, San Francisco (Conference Theater) (It is a 15 minute walk from OOW Moscone Center. See directions here)  

    Read the article

  • Oracle(R) Buys Pre-Paid Software Assets From eServGlobal

    - by Paulo Folgado
    Oracle to Deliver Scalable Carrier-Grade Pre-Paid Solution Based on Open, Flexible IT-Based Platform News Facts ·        Oracle has agreed to acquire certain pre-paid assets of eServGlobal, a provider of advanced IT-based, pre-paid charging solutions for the communications industry. ·        eServGlobal's Universal Service Platform (USP) includes a pre-paid charging application, a network-services platform and a messaging gateway. The ChargingMax, NumberMax, uVOMS, MessageMax, PromoMax Express and Social Relationship Management software currently supports more than 25 tier-one customers including the world's largest IT-based installation of pre-paid services. ·        The combination of Oracle Communications Billing and Revenue Management and the USP applications is expected to accelerate the shift from network- to IT-based pre-paid systems by providing the first convergent, open IT-based platform from a leading business software and hardware systems company. ·        Customers are expected to benefit from traditional carrier-grade, pre-paid service authorization with IT-grade flexibility that supports any service or network, is easier to deploy and maintain and delivers an overall lower total cost of ownership. ·        The transaction is expected to close in the second half of this year. Supporting Quote ·        "The majority of mobile phone users worldwide use pre-paid plans, and that number is growing exponentially. Oracle Communications applications combined with the pre-paid software assets from eServGlobal will provide our customers with highly available and scalable carrier-grade, pre-paid software on an open, convergent platform. This will enable our customers to deliver traditional pre-paid voice services and easily introduce hybrid pre-paid and post-paid plans with targeted pricing, promotions and service bundles that include voice, data and network services," said Liam Maxwell, vice president of products, Oracle Communications. Supporting Resources About Oracle and eServGlobal USP General Presentation FAQ

    Read the article

  • What is the way to submit a patch to fix all the damage that LP: #600941 causes?

    - by nutznboltz
    What is the best way to submit a patch to fix all the damage that LP: #600941 causes? I ask because LP: #600941 was put into every version of Ubuntu still supported at this time. Should I pick a particular version and run ubuntu-bug on it? Should that version be the LTS or Oneiric or Precise (how can I get Precise if I need it?) The story is that after it was pushed out all of our systems started experiencing Nagios nrpe restart failures. Commands like /etc/init.d/nagios-nrpe-server restart would cause nrpe to stop but not restart. I tracked this down to the way that the /etc/init.d/nagios-nrpe-server script is calling start-stop-daemon. The issue is that the "stop" stanza in the /etc/init.d/nagios-nrpe-server script first calls start-stop-daemon which sends SIGTERM to nrpe and then waits only for one second. If nrpe has not exited by that time the pid file will still exist and the /etc/init.d/nagios-nrpe-server script will remove it. Worse if /etc/init.d/nagios-nrpe-server restart is used not only will the pid file be removed, the attempt to restart nrpe will fail provided that the nrpe daemon is still tardy in shutting down. The attempt to start under those circumstances will fail because nrpe will still be bound to a socket and the second attempt at binding will cause the nrpe startup to abort. They should have wondered why there was a comment about "sometimes the pid file does not get removed". They should have tested on systems that have a heavy load and therefore slow nrpe response times. The fix is to add --retry 10 or such to the invocation of start-stop-daemon ... --stop ... Thanks

    Read the article

  • Have You Ever Wondered How Your Operating System Got Its Name?

    - by Justin Garrison
    Have you ever wondered what “XP” stands for or where “Ubuntu” comes from? Some operating systems get their names from obvious places, but others need some explaining. Read on to find out where your favorite OS got its name. We’ve rounded up the most popular and well-known operating systems, as well as a few lesser-known ones—if you know of another operating system with an interesting story behind its name, make sure to teach your fellow readers in the comments. Latest Features How-To Geek ETC Have You Ever Wondered How Your Operating System Got Its Name? Should You Delete Windows 7 Service Pack Backup Files to Save Space? What Can Super Mario Teach Us About Graphics Technology? Windows 7 Service Pack 1 is Released: But Should You Install It? How To Make Hundreds of Complex Photo Edits in Seconds With Photoshop Actions How to Enable User-Specific Wireless Networks in Windows 7 Dim an Overly Bright Alarm Clock with a Binder Divider Preliminary List of Keyboard Shortcuts for Unity Now Available Bring a Touch of the Wild West to Your Desktop with the Rango Theme for Windows 7 Manage Your Favorite Social Accounts in Chrome and Iron with Seesmic E.T. II – Extinction [Fake Movie Sequel Video] Remastered King’s Quest Games Offer Classic Gaming on Modern Machines

    Read the article

  • My Latest Books &ndash; Professional C# 2010 and Professional ASP.NET 4

    - by Bill Evjen
    My two latest books are out! Professional ASP.NET 4 in C# and VB Professional C# 4 and .NET 4 From the back covers: Take your web development to the next level using ASP.NET 4 ASP.NET is about making you as productive as possible when building fast and secure web applications. Each release of ASP.NET gets better and removes a lot of the tedious code that you previously needed to put in place, making common ASP.NET tasks easier. With this book, an unparalleled team of authors walks you through the full breadth of ASP.NET and the new and exciting capabilities of ASP.NET 4. The authors also show you how to maximize the abundance of features that ASP.NET offers to make your development process smoother and more efficient. Professional ASP.NET 4: Demonstrates ASP.NET built-in systems such as the membership and role management systems Covers everything you need to know about working with and manipulating data Discusses the plethora of server controls that are at your disposal Explores new ways to build ASP.NET, such as working with ASP.NET MVC and ASP.NET AJAX Examines the full life cycle of ASP.NET, including debugging and error handling, HTTP modules, the provider model, and more Features both printed and downloadable C# and VB code examples Start using the new features of C# 4 and .NET 4 right away The new C# 4 language version is indispensable for writing code in Visual Studio 2010. This essential guide emphasizes that C# is the language of choice for your .NET 4 applications. The unparalleled author team of experts begins with a refresher of C# basics and quickly moves on to provide detailed coverage of all the recently added language and Framework features so that you can start writing Windows applications and ASP.NET web applications immediately. Reviews the .NET architecture, objects, generics, inheritance, arrays, operators, casts, delegates, events, Lambda expressions, and more Details integration with dynamic objects in C#, named and optional parameters, COM-specific interop features, and type-safe variance Provides coverage of new features of .NET 4, Workflow Foundation 4, ADO.NET Data Services, MEF, the Parallel Task Library, and PLINQ Has deep coverage of great technologies including LINQ, WCF, WPF, flow and fixed documents, and Silverlight Reviews ASP.NET programming and goes into new features such as ASP.NET MVC and ASP.NET Dynamic Data Discusses communication with WCF, MSMQ, peer-to-peer, and syndication

    Read the article

  • The Other "C" in CRM

    - by [email protected]
    By Brian Dayton on April 5, 2010 7:04 PM Folks who know me know that I rarely, if ever, talk politics. And I never talk politicians. Having grown up in a household with one parent leaning left and the other leaning to the right it was the best way to keep the peace. This isn't about politics. It's about "constituents" and the need to improve the services and service levels for people--at the city, county, state/province, etc. level all the way up to national governments. As a citizen and tax payer it's also important to me that these services be provided at a reasonable cost. If there's a better and more efficient way to do something then it's my hope that a public sector organization takes advantage of technology the same way private sector companies do. Social services organizations have a complex job. They provide the services that people need, from healthcare and children's assistance to helping people find jobs. But many of these organizations are still managing these processes manually or outdated, home-grown applications that could have been written up to 30 years ago. A lot has changed in technology. On the (this is as political as I'm going to get) political front, stakeholders like you and me are expecting greater transparency on where and how funds are spent. I'll admit that most of the time, when I think about CRM systems, I think about my experience as a customer of my bank, utilities company or cable operator. But now that I'm older, have children and a house--I find myself interacting more and more with agencies and services organizations. My experiences are sometimes good and sometimes not so good. Along those lines, last week's announcement of Siebel CRM 8.2 for Public Sector caught my eye. You may not work in the public sector, but you are a constituent of some--actually a lot--of public sector organizations. I don't know which CRM systems city and county utilize but I'm going to start paying closer attention.

    Read the article

  • Deploy code to Windows Azure from Dropbox

    - by Gopinath
    There is a lot of innovation happening at Windows Azure team these days under the leadership of ScottGu. The recent updates to Windows Azure published couple of days ago allows us to deploy code to Windows Azure websites straight from Dropbox. It’s very easy and simple to use. Authorize Windows Azure account to talk to Dropbox and whenever you want to deploy latest code from Dropbox just click it button. Boom! The latest code from Dropbox will be automatically deployed on Windows Azure. Everything works like magic. Wow, isn’t this a cool feature for those who don’t want to maintain their version control systems like Git, Svn or TFS? This is a big deal to many developers who maintain their personal websites source code on Dropbox. Wondering why developers maintain their source code in Dropbox? It’s easy to use Dropbox(zero learning curve) and setting up a source control systems demands lot of administrative activities as well as money for hosting them. Here is a quick walk through of deploying code to Windows Azure from Dropbox. Though I’m not going to user this feature for deploying code of my website coziie.com (I’ve a personal SVN server hosted), I’m going to recommend to all my friends who maintain their source code on Dropbox.  For more details read the detailed post on ScottGu’s blog.

    Read the article

  • In-House Generated Certificates Supported for Signing E-Business Suite JAR Files

    - by Elke Phelps (Oracle Development)
    The E-Business Suite uses Java Archive (JAR) files to deliver certain types of E-Business Suite content desktop clients.  Previously we announced the support of securing JAR files with 3072-bit certificates signed by a third-party Certificate Authority (CA).  We now support securing JAR files with in-house generated certificates.  The new steps to use an in-house Certificate Authority for securing JAR files are provided in: Enhanced Signing of Oracle E-Business Suite JAR Files (Note 1207184.1) This enhancement is great news for those of you familiar with the warning that is triggered when using a self-signed certificate.  As a result of supporting self-signed certificates, the following warning can be avoided: Oracle E-Business Suite Release 12 Certified Platforms Linux x86 (Oracle Linux 4, 5) Linux x86 (RHEL 3, 4, 5) Linux x86 (SLES 9, 10) Linux x86-64 (Oracle Linux 4, 5) Linux x86-64 (RHEL 4, 5) Linux x86-64 (SLES 9, 10)  Oracle Solaris on SPARC (64-bit) (8, 9, 10) IBM AIX on Power Systems (64-bit) (5.3, 6.1) IBM Linux on System z** (RHEL 5, SLES 9, SLES 10) HP-UX Itanium (11.23, 11.31) HP-UX PA-RISC (64-bit) (11.11, 11.23, 11.31) Microsoft Windows Server (32-bit) (2003, 2008 for EBS 12.1 only) Oracle E-Business Suite Release 11i Certified Platforms Linux x86 (Oracle Enterprise Linux 4, 5) Linux x86 (RHEL 3, 4, 5) Linux x86 (SLES 8, 9, 10) Linux x86 (Asianux 1.0) Oracle Solaris on SPARC (64-bit) (8, 9, 10) IBM AIX on Power Systems (64-bit) (5.3, 6.1) HP-UX PA-RISC (64-bit) (11.11, 11.23, 11.31) HP Tru64 (5.1b) Microsoft Windows Server (32-bit) (2000, 2003) References Enhanced Signing of Oracle E-Business Suite JAR Files (Note 1207184.1) Related Articles Two New Options for Signing E-Business Suite JAR Files Now Available What Are the Minimum Desktop Requirements for EBS? Internet Explorer 9 Certified with Oracle E-Business Suite

    Read the article

  • Tuning B2B Server Engine Threads in SOA Suite 11g

    - by Shub Lahiri, A-Team
    Background B2B 11g has a number of parameters that can be tweaked to tune the engine for handling high volumes of messages. These parameters are also known as B2B server properties and managed via the EM console.  This note highlights one aspect of the tuning exercise and describes the different threads, that can be configured to tune the performance of a B2B server. Symptoms The most common indicator of a B2B engine in need of a tuning is reflected in the constant build-up of messages in an internal JMS queue within the B2B server. It is called B2B_EVENT_QUEUE and can be monitored via the Weblogic server console. Whenever such a behaviour is seen, it usually results in general degradation of performance. Remedy There could be many contributing factors behind a B2B server's degradation of performance. However, one of the first places to tune the server from the out-of-the-box, default configuration is to change the number of internal engine threads allocated within the B2B server. Usually the default configuration for the B2B server engine threads is not suitable for high-volume of messaging loads. So, it is necessary to increase the counts for 3 types of such threads, by specifying the appropriate B2B server properties via the EM console, namely, Inbound - b2b.inboundThreadCount Outbound - b2b.outboundThreadCount Default - b2b.defaultThreadCount The function of these threads are fairly self-explanatory. In other words, the inbound threads process the inbound messages that are coming into the B2B server from an external endpoint. Similarly, the outbound threads processes the messages that are sent out from the B2B server. The default threads are responsible for certain B2B server-specific special tasks. In case the inbound and outbound thread counts are not specified, the default thread count also dictates the total number of inbound and outbound threads. As found in any tuning exercise, the optimisation of these threads is usually reached via an iterative process. The best working combination of the thread counts are directly related to the system infrastructure, traffic load and several other environmental factors.

    Read the article

  • Cannot mount USB 3 harddrive

    - by Thijs
    I cannot mount an USB 3 harddrive. When looking at dmesg I got the following error: [ 96.463269] usb 3-2.1: >new low-speed USB device number 10 using xhci_hcd [ 96.485777] usb 3-2.1: >New USB device found, idVendor=046d, idProduct=c025 [ 96.485787] usb 3-2.1: >New USB device strings: Mfr=1, Product=2, SerialNumber=0 [ 96.485792] usb 3-2.1: >Product: USB-PS/2 Optical Mouse [ 96.485797] usb 3-2.1: >Manufacturer: B16_b_02 [ 96.486118] usb 3-2.1: >ep 0x81 - rounding interval to 64 microframes, ep desc says 80 microframes [ 96.490149] input: B16_b_02 USB-PS/2 Optical Mouse as /devices/pci0000:00/0000:00:14.0/usb3/3-2/3-2.1/3-2.1:1.0/input/input12 [ 96.490500] hid-generic 0003:046D:C025.0003: >input,hidraw0: USB HID v1.10 Mouse [B16_b_02 USB-PS/2 Optical Mouse] on usb-0000:00:14.0-2.1/input0 [ 114.088984] usb 3-2.3: >new high-speed USB device number 11 using xhci_hcd [ 114.105041] usb 3-2.3: >New USB device found, idVendor=13fd, idProduct=1618 [ 114.105051] usb 3-2.3: >New USB device strings: Mfr=0, Product=0, SerialNumber=0 [ 257.531777] usb 3-2.3: >USB disconnect, device number 11 [ 258.513912] usb 3-2.4: >new high-speed USB device number 12 using xhci_hcd [ 258.514046] usb 3-2.4: >Device not responding to set address. [ 258.717649] usb 3-2.4: >Device not responding to set address. [ 258.921203] usb 3-2.4: >device not accepting address 12, error -71 [ 258.937388] hub 3-2:1.0: >unable to enumerate USB device on port 4 I have tried to mount the drive on ubuntu-12.04 and it mounts just fine.

    Read the article

  • ArchBeat Link-o-Rama for 2012-03-29

    - by Bob Rhubart
    A surefire recipe for cloud failure | @DavidLinthicum www.infoworld.com "Foundational planning for the use of cloud computing is an architectural problem," says David Linthicum. "You need to consider the enterprise holistically, starting with the applications, data, services, and storage. Understand where it is and what it does." Validating an Oracle IDM Environment (including a Fusion Apps build out) | Brian Eidelman fusionsecurity.blogspot.com Brian Eidelman shows how to "validate an Oracle Identity Management build out containing OID, OVD, OIM, and OAM." Oracle Enterprise Manager Ops Center 12c Launch - Interactive Webcast and Live Chat www.oracle.com Thursday, April 12, 2012. 9 a.m. PT / 12 p.m. ET / 4 p.m. GMT. Learn how your enterprise cloud can achieve 10x improved performance and 12x operational agility. Includes demo session. Speakers: Steve Wilson (VP Systems Management, Oracle) John Fowler (Exec VP Systems, Oracle) Brad Cameron (VP Development, Oracle Fusion Middleware) Bill Nesheim (VP Oracle Solaris) Dennis Reno (VP Customer Portal Experience, Oracle) Mike Wookey (Chief Architect, Oracle Enterprise Manager Ops Center) Prasad Pai (Sr Director, Oracle Enterprise Manager Ops Center) 2012 Real World Performance Tour Dates |Performance Tuning | Performance Engineering www.ioug.org Coming to your town: a full day of real world database performance with Tom Kyte, Andrew Holdsworth, and Graham Wood. Rochester, NY - March 8 Los Angeles, CA - April 30 Orange County, CA - May 1 Redwood Shores, CA - May 3 Thought for the Day "At first sight, the idea of any rules or principles being superimposed on the creative mind seems more likely to hinder than to help, but this is quite untrue in practice. Disciplined thinking focuses inspiration rather than blinkers it." — G. L. Glegg

    Read the article

  • Beyond S&OP: Integrated Business Planning

    - by Paul Homchick
    In most corporations, planning is done at the department level — leaving disconnects and gaps across different departments. Finance sets revenue and profit goals with minimum validation from Manufacturing that the company has the resources, material, capacity, or demand to reach these goals. On the operations side, Manufacturing is developing plans to balance demand and supply but seldom knows if the resulting "plan" will meet the budgets on which the company's revenue and profit goals are based. The Sales department agrees to quotas that meet Finance's revenue goals without a complete understanding of what manufacturing can deliver. Integrated Business Planning (IBP) bridges these gaps in corporate planning systems. Integrated Business Planning integrates the financial planning provided by EPM systems with operations planning provided by Sales and Operations Planning solutions. This means that revenue goals and budgets are validated against a bottom-up operating plan, and that the operating plan is reconciled against financial goals. When detailed changes are made to the operations plan, planners can immediately see the big picture impact of the changes. IBP also addresses one the CFO's big concerns—the reliability of the revenue forecast. Operating plans are updated daily or weekly from a precise forecast based on current market conditions. These updated plans are then made available so that financial analysts are working with data that best represents what is going to happen - not what they projected would happen based on last quarter's data. For a discussion in more depth, see my article: Improve Reliability of Financial Forecasts with Integrated Business Planning in Supply & Demand Chain-Executive Magazine.

    Read the article

  • Beyond S&OP: Integrated Business Planning

    - by Paul Homchick
    In most corporations, planning is done at the department level — leaving disconnects and gaps across different departments. Finance sets revenue and profit goals with minimum validation from Manufacturing that the company has the resources, material, capacity, or demand to reach these goals. On the operations side, Manufacturing is developing plans to balance demand and supply but seldom knows if the resulting "plan" will meet the budgets on which the company's revenue and profit goals are based. The Sales department agrees to quotas that meet Finance's revenue goals without a complete understanding of what manufacturing can deliver. Integrated Business Planning (IBP) bridges these gaps in corporate planning systems. Integrated Business Planning integrates the financial planning provided by EPM systems with operations planning provided by Sales and Operations Planning solutions. This means that revenue goals and budgets are validated against a bottom-up operating plan, and that the operating plan is reconciled against financial goals. When detailed changes are made to the operations plan, planners can immediately see the big picture impact of the changes. IBP also addresses one the CFO's big concerns—the reliability of the revenue forecast. Operating plans are updated daily or weekly from a precise forecast based on current market conditions. These updated plans are then made available so that financial analysts are working with data that best represents what is going to happen - not what they projected would happen based on last quarter's data. For a discussion in more depth, see my article: Improve Reliability of Financial Forecasts with Integrated Business Planning in Supply & Demand Chain-Executive Magazine.

    Read the article

  • MySQL HA Events in the UK, Germany & France

    - by Bertrand Matthelié
    @font-face { font-family: "Arial"; }@font-face { font-family: "Times"; }@font-face { font-family: "Cambria"; }p.MsoNormal, li.MsoNormal, div.MsoNormal { margin: 0cm 0cm 0.0001pt; font-size: 12pt; font-family: "Times New Roman"; }a:link, span.MsoHyperlink { color: blue; text-decoration: underline; }a:visited, span.MsoHyperlinkFollowed { color: purple; text-decoration: underline; }p { margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: "Times New Roman"; }div.Section1 { page: Section1; } Oracle is running MySQL High Availability breakfast seminars in London, Düsseldorf and Paris. During these free seminars, we will review the various options and technologies at your disposal to implement highly available & highly scalable MySQL infrastructures, as well as best practices in terms of architectures. The packed agenda will include High Availability features in MySQL 5.5, MySQL Replication, MySQL Cluster, the newly released Oracle VM Template for MySQL Enterprise Edition as well as what's new in MySQL 5.6 and MySQL Cluster 7.2, including NoSQL access methods to MySQL. There are a few places left for the seminar in London taking place tomorrow, June 29th, Register Now! Learn more and register for the event in Düsseldorf, July 13th. Learn more and register for the event in Paris, September 7th. We hope to see you there!

    Read the article

  • TechEd 2010 Day Two – No SQL Server in Sight

    - by BuckWoody
    Today I worked the booth at TechEd 2010, manning the new “Surface” computer, which is just the coolest object on the planet. After that I didn’t attend a single SQL Server session – instead I’ve been frequenting SharePoint, Microsoft Office, and even the High-Performance Computing sessions. The reason is that I get really high quality SQL Server presentations at PASS, SQL Saturdays, and online from Microsoft and other vendors. While there are SQL Server sessions here (after all, I’m giving one of them!) I tend to try and see things that I don’t normally get to learn about. And the cross-pollination between those technologies and mine is fantastic.     I’ve even managed to go to an Entity Framework presentation for the developers. I actually have (a little) more respect for that technology – and I’ve modified my presentation to encompass more of that information. So whenever you have the chance, take a walk outside your comfort zone. Even at PASS and SQL Saturdays (and certainly online) you can investigate technologies other than the ones you know best.  Share this post: email it! | bookmark it! | digg it! | reddit! | kick it! | live it!

    Read the article

  • Unit Tests as a learning tool - a good idea?

    - by Ekkehard.Horner
    I'm interested in ways and means for learning (a) programming language(s) efficiently. I believe that using Unit Test concepts and infrastructure early in that process is a good thing, even better than starting with "Hello world". Why: To write a decent program even for a toy/restricted problem in a new language, you'll have to master many heterogenous concepts (control flow & variables & IO ...), you are tempted to glance over details just to get your program 'to work'. Putting (your understanding of) the facts about the new language in assertions with good descriptions (=success messages) enforces thinking thru/clearness/precision. Grouping topics and adding assertions to such groups is much easier than incorporation features from the 2. chapter of your "Learning X" book to your chapter 1 program. Why not: 'Real' Unit Tests are meant to output "1234 tests ok; 1 failure: saveWorld() chokes on negative input"; 'didactic' Unit Tests should output relevant facts about the new language like perl6 10-string.t # ### p5chop ... ok 13 - p5chop( "cbä" ) returns "ä" ok 14 - after that, victim is changed to "cb" # ### (p6) chop ... ok 27 - (p6) chop( "cbä" ) returns chopped copy: "cb" ok 18 - after that, victim is unchanged: "cbä" # ### chomp ... So (mis?)using Unit Tests may be counterproductive - practicing actions while learning you wouldn't use professionally. How: Writing 'didactic' Unit Tests in languages with lightweight testing systems (Perl 5/6) is easy; (mis?)using more elaborate systems (JUnit, CppUnit) may be not worth the effort or not suitable for a person just starting with a new language. So Is using Unit Tests as a learning tool a bad idea? Can the Unit Test tool(s) of your favourite language(s) used didactically? Should implementation details (eventually) be discussed here or over at stackoverflow.com?

    Read the article

  • Ubuntu security with services running from /opt

    - by thejartender
    It took me a while to understand what's going on here (I think), but can someone explain to me if there are security risks with regards to my logic of what's going on here as I am trying to set up a home web server as a developer with some good Linux knowledge? Ubuntu is not like other systems, as it has restricted the root user account. You can not log in as root or su to root. This was a problem for me as I have had to install numerous applications and services to /opt as per user documentation (XAMPPfor Linux is a good example). The problem here is that this directory is owned by root:root. I notice that my admin user account does not belong to root group through the following command: groups username so my understanding is that even though the files and services that I place in /opt belong to root, executing them by means of sudo (as required) does not mean that they are run as root? I imagine that the sudo command is hidden somewhere under belonging to the root user and has a 775 permission? So the question I have is if running a service like Tomcat, Apcahe, etc exposes my system like on other systems? Obviously I need to secure these in configurations, but isn't the golden rule to never run something as root? What happens if I have multiple services running under same user/group with regards to a compromised server?

    Read the article

  • Google Loon–A network of balloons to provide internet to everyone

    - by Gopinath
    Google once just a super powerful search engine provider and now they are venturing in to a lot of interesting non software projects like self driving cars, glasses that beam information right on to your eye balls, high speed internet services @ 1 Giga bytes per second. A recent addition to this innovative list is Google Loon – a network of flying balloons that provide internet access to remote parts of the world where it is not feasible for many governments/corporate to provider internet services. Google says there are several billions of people around the world who don’t have access to internet and Google Loon aim is to provide internet facilities to all these people. A pilot project is started couple of days ago by launching 30 balloons into stratosphere from New Zealand. These balloons fly 20 Kilometers above earth(much higher than where aero planes fly) and they beam internet to homes having Loon receiver wirelessly. Checkout the embedded introductory video on Google Loon What is in it for Google? Why is Google getting into these type of projects and what is in it for them? Google is the gateway to web and majority of people find information on web using Google Services/Software. So providing internet facilities to more people means, more people using Google services and it in turn contributes to their revenue growth. Google is not a charity, they do all these projects to earn money just like every other corporate. The best part is while earning money they are touching lives of billions of people in a positive way. Just imagine everyone in the world connected and have ability to take informed decisions irrespective of whether they live in developed countries or underprivileged parts of the world! Wow that will be a beautiful day. Further reading Google Loon website Google unveils its Project Loon Wi-Fi balloons – in pictures Google flies Internet balloons in stratosphere for a “network in the sky” How Google Will Use High-Flying Balloons to Deliver Internet to the Hinterlands Good discussion on Google Loon at Hacker News community

    Read the article

  • What's New in Database Lifecycle Management in Enterprise Manager 12c Release 3

    - by HariSrinivasan
    Enterprise Manager 12c Release 3 includes improvements and enhancements across every area of the product. This blog provides an overview of the new and enhanced features in the Database Lifecycle Management area. I will deep dive into specific features more in depth in subsequent posts. "What's New?"  In this release, we focused on four things: 1. Lifecycle Management Support for new Database12c - Pluggable Databases 2. Management of long running processes, such as a security patch cycle (Change Activity Planner) 3. Management of large number of systems by · Leveraging new framework capabilities for lifecycle operations, such as the new advanced ‘emcli’ script option · Refining features such as configuration search and compliance 4. Minor improvements and quality fixes to existing features · Rollback support for Single instance databases · Improved "OFFLINE" Patching experience · Faster collection of ORACLE_HOME configurations Lifecycle Management Support for new Database 12c - Pluggable Databases Database 12c introduces Pluggable Databases (PDBs), the brand new addition to help you achieve your consolidation goals. Pluggable databases offer unprecedented consolidation at database level and native lifecycle verbs for creating, plugging and unplugging the databases on a container database (CDB). Enterprise Manager can supplement the capabilities of pluggable databases by offering workflows for migrating, provisioning and cloning them using the software library and the deployment procedures. For example, Enterprise Manager can migrate an existing database to a PDB or clone a PDB by storing a versioned copy in the software library. One can also manage the planned downtime related to patching by  migrating the PDBs to a new CDB. While pluggable databases offer these exciting features, it can also pose configuration management and compliance challenges if not managed properly. Enterprise Manager features like inventory management, topology associations and configuration search can mitigate the sprawl of PDBs and also lock them to predefined golden standards using configuration comparison and compliance rules. Learn More ... Management of Long Running datacenter processes - Change Activity Planner (CAP) Currently, customers resort to cumbersome methods to create, execute, track and monitor change activities within their data center. Some customers use traditional tools such as spreadsheets, project planners and in-house custom built solutions. Customers often have weekly sync up meetings across stake holders to collect status and updates. Some of the change activities, for example the quarterly patch set update (PSU) patch rollouts are not single tasks but processes with multiple tasks. Some of those tasks are performed within Enterprise Manager Cloud Control (for example Patch) and some are performed outside of Enterprise Manager Cloud Control. These tasks often run for a longer period of time and involve multiple people or teams. Enterprise Manger Cloud Control supports core data center operations such as configuration management, compliance management, and automation. Enterprise Manager Cloud Control release 12.1.0.3 leverages these capabilities and introduces the Change Activity Planner (CAP). CAP provides the ability to plan, execute, and track change activities in real time. It covers the typical datacenter activities that are spread over a long period of time, across multiple people and multiple targets (even target types). Here are some examples of Change Activity Process in a datacenter: · Patching large environments (PSU/CPU Patching cycles) · Upgrading large number of database environments · Rolling out Compliance Rules · Database Consolidation to Exadata environments CAP provides user flows for Compliance Officers/Managers (incl. lead administrators) and Operators (DBAs and admins). Managers can create change activity plans for various projects, allocate resources, targets, and groups affected. Upon activation of the plan, tasks are created and automatically assigned to individual administrators based on target ownership. Administrators (DBAs) can identify their tasks and understand the context, schedules, and priorities. They can complete tasks using Enterprise Manager Cloud Control automation features such as patch plans (or in some cases outside Enterprise Manager). Upon completion, compliance is evaluated for validations and updates the status of the tasks and the plans. Learn More about CAP ...  Improved Configuration & Compliance Management of a large number of systems Improved Configuration Comparison:  Get to the configuration comparison results faster for simple ad-hoc comparisons. When performing a 1 to 1 comparison, Enterprise Manager will perform the comparison immediately and take the user directly to the results without having to wait for a job to be submitted and executed. Flattened system comparisons reduce comparison setup time and reduce complexity. In addition to the previously existing topological comparison, users now have an option to compare using a “flattened” methodology. Flattening means to remove duplicate target instances within the systems and remove the hierarchy of member targets. The result are much easier to spot differences particularly for specific use cases like comparing patch levels between complex systems like RAC and Fusion Apps. Improved Configuration Search & Advanced EMCLI Script option for Mass Automation Enterprise manager 12c introduces a new framework level capability to be able to script and stitch together multiple tasks using EMCLI. This powerful capability can be leveraged for lifecycle operations, especially when executing a task over a large number of targets. Specific usages of this include, retrieving a qualified list of targets using Configuration Search and then using the resultset for automation. Another example would be executing a patching operation and then re-executing on targets where it may have failed. This is complemented by other enhancements, such as a better usability for designing reusable configuration searches. IN EM 12c Rel 3, a simplified UI makes building adhoc searches even easier. Searching for missing patches is a common use of configuration search. This required the use of the advanced options which are now clearly defined and easy to use. Perform “Configuration Search” using the EMCLI. Users can find and execute Configuration Searches from the EMCLI which can be extremely useful for building sophisticated automation scripts. For an example, Run the Search named “Oracle Databases on Exadata” which finds all Database targets running on top of Exadata. Further filter the results by refining by options like name, host, etc.. emcli get_targets -config_search="Databases on Exadata" –target_name="exa%“ Use this in powerful mass automation operations using the new emcli script option. For example, to solve the use case of – Finding all DBs running on Exadata and housing E-Biz and Patch them. Create a Python script with emcli functions and invoke it in the new EMCLI script option shell. Invoke the script in the new EMCLI with script option directly: $<path to emcli>/emcli @myPSU_Patch.py Richer compliance content:  Now over 50 Oracle Provided Compliance Standards including new standards for Pluggable Database, Fusion Applications, Oracle Identity Manager, Oracle VM and Internet Directory. 9 Oracle provided Real Time Monitoring Standards containing over 900 Compliance Rules across 500 Facets. These new Real time Compliance Standards covers both Exadata Compute nodes and Linux servers. The result is increased Oracle software coverage and faster time to compliance monitoring on Exadata. Enhancements to Patch Management: Overhauled "OFFLINE" Patching experience: Simplified Patch uploads UI to improve the offline experience of patching. There is now a single step process to get the patches into software library. Customers often maintain local repositories of patches, sometimes called software depots, where they host the patches downloaded from My Oracle Support. In the past, you had to move these patches to your desktop then upload them to the Enterprise Manager's Software library through the Enterprise Manager Cloud Control user interface. You can now use the following EMCLI command to upload multiple patches directly from a remote location within the data center: $emcli upload_patches -location <Path to Patch directory> -from_host <HOSTNAME> The upload process filters all of the new patches, automatically selects the relevant metadata files from the location, and uploads the patches to software library. Other Improvements:  Patch rollback for single instance databases, new option in the Patch Plan to rollback the patches added to the patch plans. Upon execution, the procedure would rollback the patch and the SQL applied to the single instance Databases. Improved and faster configuration collection of Oracle Home targets can enable more reliable automation at higher level functions like Provisioning, Patching or Database as a Service. Just to recap, here is a list of database lifecycle management features:  * Red highlights mark – New or Enhanced in the Release 3. • Discovery, inventory tracking and reporting • Database provisioning including o Migration to Pluggable databases o Plugging and unplugging of pluggable databases o Gold image based cloning o Scaling of RAC nodes •Schema and data change management •End-to-end patch management in online and offline modes, including o Patch advisories in online (connected with My Oracle Support) and offline mode o Patch pre-deployment analysis, deployment and rollback (currently only for single instance databases) o Reporting • Upgrade planning and execution of the upgrade process • Configuration management including • Compliance management with out-of-box content • Change Activity Planner for planning, designing and tracking long running processes For more information on Enterprise Manager’s database lifecycle management capabilities, visit http://www.oracle.com/technetwork/oem/lifecycle-mgmt/index.html

    Read the article

  • Oracle Solaris at OpenWorld Tokyo 2012

    - by Markus Weber
    Oracle OpenWorld Tokyo will open its doors on Wednesday, April 4 2012, until Friday, April 6 2012, in Roppongi.I've you been in Tokyo as a Gaijin, or foreigner, you know exactly where that it. Many of Oracle's top executives will be there, including Larry Ellison, Mark Hurd, and John Fowler. The keynotes that they are covering will be very interesting, for sure. Now, whether you will actually be there, or not, you might still find it interesting that several great Solaris-related sessions will be held there, especially as part of the "Oracle Develop" track, such as: "Oracle Solaris 11 - Developers Need To Know" "How to build high performance and high security Oracle Database environment with Oracle SPARC/Solaris" "Oracle Solaris Tuning Contest" "IT Assets preservation and constructive migration with Oracle Solaris virtualization" And of course John Fowler's keynote "Server and Storage Systems Strategy".The complete schedule in English can be found here. We hope you can make it. If not, there will always be the San Francisco one.

    Read the article

  • Jagran Prakashan Increases Staff Productivity by 40%

    - by Michael Snow
    Jagran Prakashan Increases Staff Productivity by 40%, Launches New IT Projects up to 4x Faster, Enables Mobile Service, and Improves Business Agility Oracle Customer: JPL Location:  Uttar Pradesh, India Industry: Media and Entertainment Employees:  10,000 Annual Revenue:  $100 to $500 Million Jagran Prakashan Ltd. (JPL) is one of India's premier media and communications groups with interests spanning print, advertising, event management, and mobile services for weather, cricket scores, and educational activities. It is a major media enterprise, with 300 locations across 15 states. Its impressive stable of print publications includes Dainik Jagran, the world’s most widely read daily newspaper––with a readership of over 55 million––the country’s leading afternoon dailies, and a range of popular local, bilingual, and English language newspapers. JPL was using multiple systems to manage its business processes. Users were resistant to using multiple passwords for various applications, preferring to continue their less efficient, legacy work practices. In addition, there was no single repository for sharing documents across the organization, such as company announcements or project documents. The company relied on e-mail to disseminate up-to-date company information, often missing employees. It was also time-consuming and difficult for managers to track the status of ongoing assignments or projects because collaboration and document sharing was inefficient and ineffective.With diverse businesses and many geographic locations, JPL needed to implement a centralized and user-friendly enterprise portal to improve document sharing and collaboration and increase business agility. The company implemented Oracle WebCenter Portal to create a dynamic, secure, and intuitive self-service enterprise portal to improve the user experience and increase operating efficiency. It improved staff productivity by 40%, accelerated new IT projects by up to 4x, boosted staff morale, and increased business agility.   Increases Staff Productivity by 40%, Launches New Products up to 2x Faster A word from JPL "With Oracle WebCenter Portal, we gained a dynamic, secure, and intuitive self-service enterprise portal that provided an exceptional user experience and enabled us to engage employees in a collaborative environment. It increased IT staff productivity by 40%, delivered new projects up to 4x faster, and enabled mobile service to improve our business agility.” Sarbani Bhatia, Vice President IT, Jagran Prakashahn Ltd Before implementing Oracle WebCenter Portal, JPL stored project-critical information, such as page planning of daily newspaper editions and the launch of new editions or supplements on individual laptops or in the e-mail system. Collaboration between colleagues was limited to physical meetings, telephone discussions, and e-mail. It was difficult to trace and recover important project documents when a staff member resigned, which represented a significant risk to business continuity. Employees were also averse to multiple passwords and resisted using the systems, affecting staff productivity. With Oracle WebCenter Portal, JPL created a dynamic, secure, and intuitive self-service enterprise portal with business activity streams. The portal allowed users to navigate, discover, and access information, such as advertising rates, requisition approvals, ad-hoc queries, and employee surveys from a single entry point with a single password. Managers can also upload important documents, such as new pricing for advertisers or newspaper distributors, and share them through the information and instruction section in the portal. In addition, managers can now easily track and review timelines for projects online rather than gathering information from meetings and e-mails. The company gained the ability to centrally manage information, ensured business continuity, and improved staff productivity by 40%.“In the media industry, news has a very short shelf life, so speed is crucial. Information delayed is like information lost,” said Sarbani Bhatia, vice president IT, Jagran Prakashahn Ltd. “Thanks to Oracle WebCenter Portal’s contextual collaboration tools, we can provide and share feedback for new project launches, such as career or education supplements, up to 2x faster through discussion forums or knowledge groups. Tasks that previously required four months, we now complete in one month.”In addition, the company can broadcast announcements, flash employee birthdays, and promote important events through the message section on the webpage, instead of using the e-mail system. The company can also conduct opinion polls to gauge employee response to organizational issues and improve management decision-making.“With over 10,000 employees across 300 locations, it is critical for management to hear the voice of employees and develop a cohesive organizational culture. Oracle WebCenter Portal enables employees to engage with business processes and systems in a collaborative environment, providing users with an exceptional experience,” Bhatia said. Enables Mobility Access and Increases Business Agility Newspaper advertisements generate the majority of JPL’s revenue. With most sales staff on the move, the company needed to ensure timely approval of print advertisement discounts for specific clients and meet tight publication deadlines.  By integrating Oracle WebCenter Portal seamlessly with its enterprise resource planning (ERP) system and other applications, such as the organizational mass mailing system, business intelligence, and management information system, JPL embedded its approval workflow processes into the enterprise portal and provided users with an integrated and intuitive interface. About 30% of JPL’s sales staff members now have tablets and receive advertising discount approval from managers while in the field and no longer need to return to the office, which has significantly improved efficiency and increased business agility.“Application mobility was critical for sales representatives in the field to meet stringent auditing requirements for online accountability, particularly for our newspaper advertising business. Staff member satisfaction has improved significantly now that the sales team can use tablets to access the portal––a capability we will extend to smart phones in the second stage of the implementation,” Bhatia said. Accelerates Application Development by up to 4x and Cuts Costs by up to 60% With Oracle WebCenter Portal, users can easily create, modify, and upload information to their personalized webpages without IT assistance. By seamlessly integrating Oracle WebCenter Portal with the payroll database, managers can decide which members of their team can access the page and with whom they will share information, a decision based on role or geographical location. A sales representative selling advertising space for a local language daily newspaper, for example, can upload an updated advertising rate relevant only to that particular publication. Users can also easily adapt to the new platform, thanks to its intuitive design and look, reducing the need for training and lowering resistance to using the system.Using Oracle WebCenter Portal’s out-of-the-box reusable components, such as portal pages and templates, provided JPL’s developers with a comprehensive and flexible user experience platform and increased the speed of application development. In less than five months, JPL developed more than 55 workflows. The IT team accelerated deployment of new applications by up to 4x, as they do not need to install them on individual machines now that they have a web-based environment.   “Previously, we would have spent a whole day deploying a new application for each department or location. With a browser-based environment, we have cut costs by up to 60% by reducing deployment time to zero, because our IT team can roll out a new application from a single point, thanks to Oracle WebCenter Portal,” Bhatia said. Challenges Provide a dynamic, secure, and intuitive self-service enterprise portal to improve staff productivity and ensure business continuity Enable seamless integration with multiple enterprise applications to improve workflow efficiency—including approval of print advertisement discounts—and increase business agility Improve engagement with employees and enable collaboration to enhance management decision-making Accelerate time-to-market for new services, such as new advertising programs Solutions Oracle Product and ServicesOracle WebCenter Portal 11g Increased staff productivity by 40% and enhanced user satisfaction by enabling employees to easily navigate, discover, and access information from a single, self-service enterprise portal without IT assistance Launched new products, such as career or education supplements, up to 2x faster by enabling peer collaboration and incorporating feedback generated through discussion forums, thanks to Oracle WebCenter Portal’s out-of-the-box collaboration tools Accelerated application development up to 4x by enabling developers to optimize reusable components for managing and deploying new applications in a browser-based environment rather than spending one day to install applications for each department, cutting costs by up to 60% Ensured business continuity by enabling managers to easily track and review project timelines online rather than storing important documents on individual laptops or relying on the e-mail system Increased business agility and operational efficiency by seamlessly integrating with the in-house, ERP system and embedding business processes into a single portal Boosted company revenue by enabling sales team members to submit print-advertising discount requests through mobile devices instead of waiting to return to office, ensuring timely approval from managers to meet tight publication deadlines Improved management decision-making by enabling employees to easily share and access feedback through opinion polls or forums, boosting staff morale Introduced the single sign-on capability and enhanced security by enabling managers to decide access level for staff members based on role or geographical location Reduced the need for staff training and minimized user resistance to systems by providing a dynamic and intuitive user experience Why Oracle JPL did not consider other products because the company was already using Oracle Database, Enterprise Edition with Real Application Clusters and had a positive experience with Oracle. JPL chose Oracle WebCenter Portal to ensure no compatibility issues for integration with its existing Oracle products and to take advantage of the experience and support of a reputable vendor to ensure business continuity. “We chose Oracle because we knew we could rely on its support and experience. In addition, Oracle WebCenter Portal’s speed, agility, and mobile access features were a perfect fit for our business requirements,” Bhatia said. Implementation Process JPL launched the enterprise portal to 500 users in the first phase of the project, and plans to extend this to 2,000 users when the portal is fully launched. Oracle partner PricewaterhouseCoopers used Oracle Application Development Framework for the intial set-up, user training and to develop and design sample workflows. JPL’s internal IT staff then took charge of the implementation, bringing it to completion on budget. Partner Oracle PartnerPricewaterhouseCoopers (India)

    Read the article

  • Big Data Appliance X4-2 Release Announcement

    - by Jean-Pierre Dijcks
    Today we are announcing the release of the 3rd generation Big Data Appliance. Read the Press Release here. Software Focus The focus for this 3rd generation of Big Data Appliance is: Comprehensive and Open - Big Data Appliance now includes all Cloudera Software, including Back-up and Disaster Recovery (BDR), Search, Impala, Navigator as well as the previously included components (like CDH, HBase and Cloudera Manager) and Oracle NoSQL Database (CE or EE). Lower TCO then DIY Hadoop Systems Simplified Operations while providing an open platform for the organization Comprehensive security including the new Audit Vault and Database Firewall software, Apache Sentry and Kerberos configured out-of-the-box Hardware Update A good place to start is to quickly review the hardware differences (no price changes!). On a per node basis the following is a comparison between old and new (X3-2) hardware: Big Data Appliance X3-2 Big Data Appliance X4-2 CPU 2 x 8-Core Intel® Xeon® E5-2660 (2.2 GHz) 2 x 8-Core Intel® Xeon® E5-2650 V2 (2.6 GHz) Memory 64GB 64GB Disk 12 x 3TB High Capacity SAS 12 x 4TB High Capacity SAS InfiniBand 40Gb/sec 40Gb/sec Ethernet 10Gb/sec 10Gb/sec For all the details on the environmentals and other useful information, review the data sheet for Big Data Appliance X4-2. The larger disks give BDA X4-2 33% more capacity over the previous generation while adding faster CPUs. Memory for BDA is expandable to 512 GB per node and can be done on a per-node basis, for example for NameNodes or for HBase region servers, or for NoSQL Database nodes. Software Details More details in terms of software and the current versions (note BDA follows a three monthly update cycle for Cloudera and other software): Big Data Appliance 2.2 Software Stack Big Data Appliance 2.3 Software Stack Linux Oracle Linux 5.8 with UEK 1 Oracle Linux 6.4 with UEK 2 JDK JDK 6 JDK 7 Cloudera CDH CDH 4.3 CDH 4.4 Cloudera Manager CM 4.6 CM 4.7 And like we said at the beginning it is important to understand that all other Cloudera components are now included in the price of Oracle Big Data Appliance. They are fully supported by Oracle and available for all BDA customers. For more information: Big Data Appliance Data Sheet Big Data Connectors Data Sheet Oracle NoSQL Database Data Sheet (CE | EE) Oracle Advanced Analytics Data Sheet

    Read the article

  • SMART Status Data Interpretation - Disk Utility

    - by Mah
    Last week my external harddisk (Seagate Barracuda 1.5TB in a custom enclosure) showed signs of failure (Disk Utility SMART Pre-failure status - several bad sectors) and I decided to change it. I bought a new HDD (Seagate Barracuda 2TB) and connected it to my Ubuntu box with a SATA to USB cable that could not report SMART status. I copied all the contents of the old HDD to the new HDD (one partition with rsync, the other with parted cp) and then gently replaced the old HDD with the new one inside my aluminum enclosure. For obscure reasons after reconnecting the new HDD through the old enclosure, the Linux box could not detect my partitions. I recovered the partitions with testdisk and restarted the computer. After the restart I checked the SMART status of the new HDD an I get this: Read Error Rate --------------- Normalized 108 Worst 99 Threshold 6 Value 16737944 I got a high value on the Seek Error Rate as well. Wondering why this happens I copied 2 GB directory from one partition to the other and rechecked the SMART status (5 minutes later). This time I got the following: Read Error Rate --------------- Normalized 109 Worst 99 Threshold 6 Value 24792504 As you see there has been an increase in the error rate. I am unable to interpret these numbers. Is my new hard disk already dying? What are the acceptable values in these fields for Seagate hard disks? Then why the assessment is still good? While I could get temperature and airflow temperature data from my old HDD, I can not fetch them for the new one. I noticed that my old hdd had got really hot sometimes. Is it possible that the enclosure is killing the harddisks due to high temperature?... Thanks

    Read the article

< Previous Page | 127 128 129 130 131 132 133 134 135 136 137 138  | Next Page >