Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 169/1407 | < Previous Page | 165 166 167 168 169 170 171 172 173 174 175 176  | Next Page >

  • Facebook Connect in Iphone header include path.

    - by nishantcm
    Hi, I am trying to compile facebook library for my iphone application. But I am getting this error. error: FBConnect/FBConnect.h: No such file or directory I have added the location of the folder in header search paths and yet it is not compiling. This is the path that I have added- /Users/nishant/Downloads/facebook-facebook-iphone-sdk-1059eb6/src. I even tried the copy files to destination folder option, but that also did not work. I know this is a very simple step, but I am getting frustrated, because I have tried this like 20-30 times. Any help.

    Read the article

  • Specifying path in a preference file in Unison

    - by Curious2learn
    I am using Unison to sync a folder on my local computer with one on a server. I am using a unison preference file for this. If I specify the path of the local folder using Method 1 (see below) things work well. But Method 2 does not work. I would like to use something like Method 2 because I want to use the same preference file (synced using Dropbox) on two different computers. But the usernames are different on these two computers and I cannot change the usernames. Any ideas how this can be achieved? Thank you. METHOD 1 (works) root = /Users/username1/Dropbox/path_to_folder/folder METHOD 2a (Does not work) root = ~/Dropbox/path_to_folder/folder METHOD 2b (Does not work) root = $HOME/Dropbox/path_to_folder/folder

    Read the article

  • Wordpress + VMware CSS path problem

    - by Stephen Meehan
    I posted a similar question earlier today but this question is clearer. I want to locally develop my Wordpress websites (on my Mac) and test them in Internet Explorer (6,7,8) on Windows XP. I can get the MAMP welcome screen to show in Windows XP, so I know VMWare is doing it's thing. The local URL for my site (on my Mac) is: URL (http://d3creative:8888/) But the local URL under VMware/Internet Explorer is: URL (http://192.168.2.1:8888/d3creative/) This is the only way I can get it to show up, problem is all the CSS styles are referencing the local Mac URL (http://d3creative:8888/) So understandably the CSS isn't showing up. Is there a way to tell Windows that "http://192.168.2.1:8888/d3creative/" should equal "http://d3creative:8888/" I've tried editing the "hosts" file within in Windows XP and I've rebooted after making any changes, but nothing is working. My software: MAMP Pro (v1.8.2) Wordpress (v2.8.6) Windows XP (SP3) Internet Explorer (6, 7, 8) Any help would be much appreciated. Stephen Meehan

    Read the article

  • when i try to save this file it creates and folder for the entire path

    - by girish
    ZipFileToCreate = "c:\user\desktop\webservice\file.zip"; so, when i try to save this file it creates the folder for the path like user\desktop\webservice\file\ why is it so, FileStream fs = new FileStream(ZipFileToCreate, FileMode.Open); byte[] data = new Byte[fs.Length]; BinaryReader br = new BinaryReader(fs); br.Read(data, 0, data.Length); br.Close(); Response.Clear(); Response.ContentType = "application/x-zip-compressed"; Response.AppendHeader("Content-Disposition", "filename=" + Parameter + ".zip"); DeleteOldFiles(); Response.BinaryWrite(data);

    Read the article

  • Sum of path products in DAG

    - by Jules
    Suppose we have a DAG with edges labeled with numbers. Define the value of a path as the product of the labels. For each (source,sink)-pair I want to find the sum of the values of all the paths from source to sink. You can do this in polynomial time with dynamic programming, but there are still some choices that can be made in how you decompose the problem. In my case I have one DAG that has to be evaluated repeatedly with different labelings. My question is: for a given DAG, how can we pre-compute a good strategy for computing these values for different labelings repeatedly. It would be nice if there was an algorithm that finds an optimal way, for example a way that minimizes the number of multiplications. But perhaps this is too much to ask, I would be very happy with an algorithm that just gives a good decomposition.

    Read the article

  • how to specify the file path in rails over Mongrel web server

    - by erwin
    hi, I have a request to load a swf file, flaMovie.swf from rails. The swf file is located the directory /home/user1/railsproj/flash. I have the code index.rhtml under view directory to show the .swf file, ID=flaMovie WIDTH=250 HEIGHT=250 When I ran the code, I got the error, ActionController::RoutingError (No route matches "/home/user1/railsproj/flash/flaMovie.swf" with {:method=:get}): /vendor/rails/actionpack/lib/action_controller/routing.rb:1441:in recognize_path' /vendor/rails/actionpack/lib/action_controller/routing.rb:1424:inrecognize' /vendor/rails/actionpack/lib/action_controller/dispatcher.rb:170:in handle_request' /vendor/rails/actionpack/lib/action_controller/dispatcher.rb:115:indispatch' /vendor/rails/actionpack/lib/action_controller/dispatcher.rb:126:in dispatch_cgi' /vendor/rails/actionpack/lib/action_controller/dispatcher.rb:9:indispatch' /usr/lib/ruby/gems/1.8/gems/mongrel-1.1.5/bin/../lib/mongrel/rails.rb:76:in process' /usr/lib/ruby/gems/1.8/gems/mongrel-1.1.5/bin/../lib/mongrel/rails.rb:74:insynchronize' My rails project is located in /home/user1/railsproj and the web server is Mongrel web server. How to specify the path in the rhtml file so that Mongrel server is able to locate the file? Thanks a lot,

    Read the article

  • Discover the environment and relative path of the running application

    - by Shyam
    Hi, While playing with RubyCocoa, I keep progressing with my idea for my application. Because my application will be going to use configuration files, I would like to know how I discover the relative path to store these inside my application structure (or if a better idea emerges, please elaborate also the "why"). Also good for me to know is to discover environment variables, such as operating system version, the amount of memory that is available and such. Hyperlinks would be awesome too. Please notice I use RubyCocoa and thank you for your feedback, comments and answers!

    Read the article

  • Unable to set relative path for flash file in ASP.NET MVC using AC_FL_RunContent

    - by Mahesh
    Hi, I have a website using asp.net mvc in which I need to embed a flash file in view. I am unable to set the relative path for the flash file. Given below is the code I am using: AC_FL_RunContent( 'codebase', 'http://download.macromedia.com/pub/shockwave/cabs/flash/swflash.cab#version=7,0,19,0', 'width', '487', 'height', '359', 'menu', 'false', 'movie', 'images/butterfly', 'quality', 'high', 'allowscriptaccess', 'sameDomain', 'pluginspage', 'http://www.macromedia.com/go/getflashplayer' ); where I copied butterfly.swf in a directory called images. images directory resides in the views folder. If I use code behind( default.aspx default.aspx.cs) in a different solution with the same folder strucuture, browser is able to load the flash file. Could you please throw some light on the MVC folder structure issue?? Thanks a lot. Mahesh

    Read the article

  • Cross platform unicode path handling

    - by Matt Joiner
    I'm using boost::filesystem for cross-platform path manipulation, but this breaks down when calls need to be made down into interfaces I don't control that won't accept UTF-8. For example when using the Windows API, I need to convert to UTF-16, and then call the wide-string version of whatever function I was about to call, and then convert any output back to UTF-8. While the wpath, and other w* forms of many of the boost::filesystem functions help keep sanity, are there any suggestions for how best to handle this conversion to wide-string forms where needed, while maintaining consistency in my own code?

    Read the article

  • Adding an overlay to Google maps with path taken

    - by user341652
    Hi, I am trying to write a class to track a person's location(s), and to draw the path they've taken on a MapView. This feature of the program is for the user to track their speed, distance, path, etc. while running/cycling (or whatever else) using their Android phone. This is my first Android application, and I am not sure how to do the Overlay object for the MapView. I also wanted to see if anyone had opinions on the GPS-Tracking part I have written (if it would work, if there is a better way of doing it, code examples would be helpful). I currently have this for my GPSTrackerService: package org.drexel.itrain.logic; import java.util.Vector; import org.drexel.itrain.Constants; import android.app.Notification; import android.app.NotificationManager; import android.app.Service; import android.content.Context; import android.content.Intent; import android.content.SharedPreferences; import android.location.GpsSatellite; import android.location.GpsStatus; import android.location.Location; import android.location.LocationListener; import android.location.LocationManager; import android.location.GpsStatus.Listener; import android.os.Binder; import android.os.Bundle; import android.os.IBinder; import android.preference.PreferenceManager; public class GPSTrackingService extends Service { private static final int MAX_REASONABLE_SPEED = 60; private static final String TAG = "OGT.TrackingService"; private Context mContext; private LocationManager mLocationManager; private NotificationManager mNotificationManager; private Notification mNotification; private int mSatellites = 0; private int mTrackingState = Constants.GPS_TRACKING_UNKNOWN; private float mCurrentSpeed = 0; private float mTotalDistance = 0; private Location mPreviousLocation; private Vector<Location> mTrackedLocations; private LocationListener mLocationListener = null; private Listener mStatusListener = null; private IBinder binder = null; @Override public void onCreate() { super.onCreate(); this.mContext = getApplicationContext(); this.mLocationManager = (LocationManager) this.mContext.getSystemService( Context.LOCATION_SERVICE ); this.mNotificationManager = (NotificationManager) this.mContext.getSystemService( Context.NOTIFICATION_SERVICE ); this.mTrackedLocations = new Vector<Location>(); this.binder = new Binder(); SharedPreferences sharedPreferences = PreferenceManager.getDefaultSharedPreferences(this.mContext); binder = new Binder(); if(mTrackingState != Constants.GPS_TRACKING_UNKNOWN) { createListeners(); } } @Override public void onDestroy() { destroyListeneres(); } @Override public IBinder onBind(Intent intent) { return binder; } @Override public boolean onUnbind(Intent intent) { return true; } public boolean acceptLocation(Location proposedLocation) { if(!(proposedLocation.hasSpeed() || proposedLocation.hasAccuracy())) { return false; } else if(proposedLocation.getSpeed() >= MAX_REASONABLE_SPEED) { return false; } return true; } public void updateNotification() { //TODO Alert that no GPS sattelites are available (or are available) } public void startTracking() { this.mTrackingState = Constants.GPS_TRACKING_STARTED; this.mTotalDistance = 0; this.mCurrentSpeed = 0; this.mTrackedLocations = new Vector<Location>(); this.mPreviousLocation = null; createListeners(); } public void pauseTracking() { this.mTrackingState = Constants.GPS_TRACKING_PAUSED; this.mPreviousLocation = null; this.mCurrentSpeed = 0; } public void resumeTracking() { if(this.mTrackingState == Constants.GPS_TRACKING_STOPPED){ this.startTracking(); } this.mTrackingState = Constants.GPS_TRACKING_STARTED; } public void stopTracking() { this.mTrackingState = Constants.GPS_TRACKING_STOPPED; destroyListeneres(); } private void createListeners() { /** * LocationListener receives locations from */ this.mLocationListener = new LocationListener() { @Override public void onStatusChanged(String provider, int status, Bundle extras) { // TODO Auto-generated method stub } @Override public void onProviderEnabled(String provider) { // TODO Auto-generated method stub } @Override public void onProviderDisabled(String provider) { // TODO Auto-generated method stub } @Override public void onLocationChanged(Location location) { if(mTrackingState == Constants.GPS_TRACKING_STARTED && acceptLocation(location)) { if(mPreviousLocation != null) { //Add the distance between the new location and the previous location mTotalDistance += mPreviousLocation.distanceTo(location); } if(location.hasSpeed()) { mCurrentSpeed = location.getSpeed(); } else { mCurrentSpeed = -1; //-1 means speed N/A } mPreviousLocation = location; mTrackedLocations.add(location); } } }; /** * Receives updates reguarding the GPS Status */ this.mStatusListener = new GpsStatus.Listener() { @Override public synchronized void onGpsStatusChanged(int event) { switch( event ) { case GpsStatus.GPS_EVENT_SATELLITE_STATUS: { GpsStatus status = mLocationManager.getGpsStatus( null ); mSatellites = 0; Iterable<GpsSatellite> list = status.getSatellites(); for( GpsSatellite satellite : list ) { if( satellite.usedInFix() ) { mSatellites++; } } updateNotification(); break; } default: break; } } }; } /** * Destroys the LocationListenere and the GPSStatusListener */ private void destroyListeneres() { this.mLocationListener = null; this.mStatusListener = null; } /** * Gets the total distance traveled by the * * @return the total distance traveled (in meters) */ public float getDistance() { return mTotalDistance; } /** * Gets the current speed of the last good location * * @return the current speed (in meters/second) */ public float getSpeed() { return mCurrentSpeed; } } Any assistance would be much appreciated. This is my group's first Android app, and we are a little pressed for time at the moment. The project is for a class, and is available from SourceForge (currently called iTrain, soon to be renamed). Thanks in Advance, Steve

    Read the article

  • Illegal characters in path exception[closed]

    - by Neir0
    Hi I trying to get page from this url: YandexMarket but WebClient and httpWebRequest throw exception Illegal characters in path. HttpUtility.UrlEncode doesnt work for this symbol "-". Firefox and other browser are correctly open the page. Here is my code: public string GetPage(string url) { var wReq = (HttpWebRequest)WebRequest.Create(url); return new StreamReader(wReq.GetResponse().GetResponseStream()).ReadToEnd(); } How i can get the page? Sorry guys. All ok.

    Read the article

  • The system cannot find the path specified with FileWriter

    - by Nazgulled
    Hi, I have this code: private static void saveMetricsToCSV(String fileName, double[] metrics) { try { FileWriter fWriter = new FileWriter( System.getProperty("user.dir") + "\\output\\" + fileTimestamp + "_" + fileDBSize + "-" + fileName + ".csv" ); BufferedWriter csvFile = new BufferedWriter(fWriter); for(int i = 0; i < 4; i++) { for(int j = 0; j < 5; j++) { csvFile.write(String.format("%,10f;", metrics[i+j])); } csvFile.write(System.getProperty("line.separator")); } csvFile.close(); } catch(IOException e) { System.out.println(e.getMessage()); } } But I get this error: C:\Users\Nazgulled\Documents\Workspace\Só Amigos\output\1274715228419_5000-List-ImportDatabase.csv (The system cannot find the path specified) Any idea why? I'm using NetBeans on Windows 7 if it matters...

    Read the article

  • Excel 2010 Access to path is denied temp

    - by Chris Anderson
    I am using excel data reader to read data from an excel file. FileStream stream = File.Open(filePath, FileMode.Open, FileAccess.Read); //1. Reading from a binary Excel file ('97-2003 format; *.xls) IExcelDataReader excelReader = ExcelReaderFactory.CreateBinaryReader(stream); //2. Reading from a OpenXml Excel file (2007 format; *.xlsx) IExcelDataReader excelReader = ExcelReaderFactory.CreateOpenXmlReader(stream); http://exceldatareader.codeplex.com/ This reads excel 1997-2003 format and excel 2007 format on my local machine and when we move it to our test server. However, when moved to production, it works for excel 97-2003 files, but when I try to read 2007 files I receive the following error: Access to the path 'C:\Documents and Settings\PORTALS03\ASPNET\LOCALS~1\Temp\TMP_Z129388041687919815' is denied. How is it possible that the 97-2003 excel file can be read but the 2007 files throw access is denied?

    Read the article

  • Map the physical file path in asp.net mvc

    - by rmassart
    Hi, I am trying to read an XSLT file from disk in my ASP.Net MVC controller. What I am doing is the following: string filepath = HttpContext.Request.PhysicalApplicationPath; filepath += "/Content/Xsl/pubmed.xslt"; string xsl = System.IO.File.ReadAllText(filepath); However, half way down this thread on forums.asp.net there is the following quote HttpContext.Current is evil and if you use it anywhere in your mvc app you are doing something wrong because you do not need it. Whilst I am not using "Current", I am wondering what is the best way to determine the absolute physical path of a file in MVC? For some reason (I don't know why!) HttpContext doesn't feel right for me. Is there a better (or recommended/best practice) way of reading files from disk in ASP.Net MVC? Thanks for your help, Robin

    Read the article

  • How to add the ImageMagick install to my path on Ubuntu

    - by Josh
    I have had been on a roller coaster trying to get ImageMagick to work on my Ubuntu slice. I Whenever I try to upload an image I get the following error: /tmp/stream.1170.0 is not recognized by the 'identify' command. If I type 'which identify' I get: /usr/local/bin/identify If I run '/usr/local/bin/identify' or just 'identify', I get the following error: /usr/local/bin/identify: error while loading shared libraries: libMagickCore.so.3: cannot open shared object file: No such file or directory If I run '/usr/bin/identify', ImageMagick is run just fine. How can I set my path to where when Paperclip runs the identify command, it points to /usr/bin/identify? Thanks. p.s. I have tried adding this to paperclip.rb: Paperclip.options[:command_path] = '/usr/bin' and Paperclip.options[:command_path] = '/usr/local/bin'

    Read the article

  • C# "Could not find a part of the path" - Creating Local File

    - by Pyronaut
    I am trying to write to a folder that is located on my C:\ drive. I keep getting the error of : Could not find a part of the path .. etc My filepath looks basically like this : C:\WebRoot\ManagedFiles\folder\thumbs\5c27a312-343e-4bdf-b294-0d599330c42d\Image\lighthouse.jpg And I am writing to it like so : using (MemoryStream memoryStream = new MemoryStream()) { thumbImage.Save(memoryStream, ImageFormat.Jpeg); using (FileStream diskCacheStream = new FileStream(cachePath, FileMode.CreateNew)) { memoryStream.WriteTo(diskCacheStream); } memoryStream.WriteTo(context.Response.OutputStream); } Don't worry too much about the memory stream. It is just outputting it (After I save it). Since I am creating a file, I am a bit perplexed as to why it cannot find the file (Shouldn't it just write to where I tell it to, regardless?). The strange thing is, It has no issue when I'm testing it above using File.Exists. Obviously that is returning false, But it means that atleast my Filepath is semi legit. Any help is much appreciated.

    Read the article

  • How to determine the path of the current web site

    - by Velika2
    I wanted to create a function which would return the path of the current web site. This is what I thought was working while running in the IDE: Public Shared Function WebsiteAbsoluteBaseUrl() As String Dim RequestObject As System.Web.HttpRequest = HttpContext.Current.Request Return "http://" & RequestObject.Url.Host & ":" & _ RequestObject.Url.Port & "/" & _ RequestObject.Url.Segments(1) End Function Does this seem like it should work? Is there a more straight forward way?

    Read the article

  • FOR XML PATH Query results to file with SSIS

    - by whimsql
    In SSMS I've gotten my for xml path query written and it's beautiful. I put it in an "Execute SQL Task" in the Control Flow, set the resultset to XML. Now how to I get the results into an actual xml file that I can turn around and FTP to a third party? This should have been so easy! I would put the XML into a variable but we are looking at a HUGE file, possibly 100mb+ Do I need to use a Script Task? (I'd like to avoid that if there is another option.)

    Read the article

  • Getting Path (context root) to the Application in Restlet

    - by Chad Gorshing
    I am needing to get the application root within a Restlet resource class (it extends ServerResource). My end goal is trying to return a full explicit path to another Resource. I am currently using getRequest().getResourceRef().getPath() and this almost gets me what I need. This does not return the full URL (like http://example.com/app), it returns to me /resourceName. So two problems I'm having with that, one is it is missing the schema (the http or https part) and server name, the other is it does not return where the application has been mounted to. So given a person resource at 'http://dev.example.com/app_name/person', I would like to find a way to get back 'http://dev.example.com/app_name'. I am using Restlet 2.0 RC3 and deploying it to GAE.

    Read the article

  • Path issue in wordpress blog

    - by vsingh
    We are having some issue with our relative path in wordpress. Earlier our application was like http://www.skill-guru.com/skill . So if we type the blog address as http://www.skill-guru.com/blog it would add a / at end and open it as http://www.skill-guru.com/blog/ Now our application opens as root in domain http://www.skill-guru.com. Our blog is opening as http://www.skill-guru.com/blog/ but not as http://www.skill-guru.com/blog. I am not able to understand the reason. because of this issue , search is also not working. Can anyone please help me understand what has changed and how it can be fixed ?

    Read the article

  • OpenExeConfiguration Path Issue

    - by Harry
    I'm trying to load an web.config from a server. Its placed at: \server\folders\web.config when i try this: ConfigurationManager.OpenExeConfiguration(@"\\server\folders\web.config"); it searches for: web.config.config and fails. ConfigurationManager.OpenExeConfiguration(@"\\server\folders\web"); it fails, because there is no folder \server\folders\web\ So i tried several things and it seems as its checking wether the file the path is pointing on exists, and afterwards it appliers a .config and gets the config file. Just for fun i created an web.loaders file, and a web.loaders.config file. with ConfigurationManager.OpenExeConfiguration(@"\\server\folders\web.local"); it loads the \server\folders\web.local.config perfectly, but throws Exceptions without the web.local file. So there a many ways to get this small thing loaded, but isn't there a more nice one than using a temp .web file or something? Any help i highly appreciated, yours Harry

    Read the article

  • PHP Dynamic include based on current file path

    - by Adrian M.
    Hello, I want to find a method to include some files based on the current file path.. for example: I have "website.com/templates/name1/index.php", this "index.php should be a unique file that I will use in many different directories on different depths, so I want to make the code universal so I don't need to change anything inside this file.. So if this "index.php" is located in "website.com/templates/name1/index.php" than it should include the file located here: "website.com/content/templates/name1/content.php" another example: "website.com/templates/name2/index.php" than it should include the file located here: "website.com/content/templates/name2/content.php" Also I want to overrun "*Warning: include_once() [function.include-once]: http:// wrapper is disabled in the server configuration by allow_url_include=0*" kind of error.. because is disabled and unsafe.. Is there a way to achieve this? Thank you!

    Read the article

  • Moving a Point along a Path in SQL Server 2008

    - by David Pfeffer
    I have a geography field stored in my database, holding a linestring path. I want to move a point n meters along this linestring, and return the destination. For example, I want the destination point 500 meters along the linestring starting from its beginning. Here's an example -- what is the YourFunctionHere? Or, is there another way? DECLARE @g geography; SET @g = geography::STGeomFromText('LINESTRING(-122.360 47.656, -122.343 47.656, -122.310 47.690)', 4326); SELECT @g.YourFunctionHere(100).ToString();

    Read the article

  • Maven: Multiple class with the same path implemented in different jar

    - by Phuong Nguyen de ManCity fan
    I'm running into trouble with having multiple class with the same path (i.e. same name, same package!!!). For some reason, gwt-dev comes with its own version of org.apache.xerces.jaxp.DocumentBuilderFactoryImpl and javax.xml.parsers.DocumentBuilderFactory. At the same time, spring also depends on these classes but from different jar. I don't know what should be, but look like xalan & xml-api are the two dependencies that spring depends on (these dependency are optional) Funny thing is that eclipse can run the same code (it's a unit test) without problem, but surefire cannot. So I guess the problem is due to the way each runner consider the priority of each jar. Now come to the question: How can I setup my POM so that I can sure that when ever any code running inside my app, then class from a jar will be selected over class from other jar? Thanks.

    Read the article

  • Using Response.Redirect() to a relative path.

    - by Bryan
    I'm working with ASP.net. My website is hosted within a subfolder test under the IIS root directory. So the url of default.aspx is http://localhost/test/Default.aspx. From default.aspx, I want to use Reponse.Redirect() with a relative path to redirect to another url within the same web site, http://localhost/test/whatever. I tried Response.Redirect("/hello"); and Response.Redirect("~/hello"); Both of them redirect to http://localhost/whatever. Note that the Redirect method use http://localhost instead of http://localhost/test/ as the base url. Any ideas? Thanks.

    Read the article

< Previous Page | 165 166 167 168 169 170 171 172 173 174 175 176  | Next Page >