Search Results

Search found 16971 results on 679 pages for 'blogs'.

Page 179/679 | < Previous Page | 175 176 177 178 179 180 181 182 183 184 185 186  | Next Page >

  • Ghost team foundation build controllers

    - by Martin Hinshelwood
    Quite often after an upgrade there are things left over. Most of the time they are easy to delete, but sometimes it takes a little effort. Even rarer are those times when something just will not go away no matter how much you try. We have had a ghost team build controller hanging around for a while now, and it had defeated my best efforts to get rid of it. The build controller was from our old TFS server from before our TFS 2010 beta 2 upgrade and was really starting to annoy me. Every time I try to delete it I get the message: Controller cannot be deleted because there are build in progress -Manage Build Controller dialog   Figure: Deleting a ghost controller does not always work. I ended up checking all of our 172 Team Projects for the build that was queued, but did not find anything. Jim Lamb pointed me to the “tbl_BuildQueue” table in the team Project Collection database and sure enough there was the nasty little beggar. Figure: The ghost build was easily spotted Adam Cogan asked me: “Why did you suspect this one?” Well, there are a number of things that led me to suspect it: QueueId is very low: Look at the other items, they are in the thousands not single digits ControllerId: I know there is only one legitimate controller, and I am assuming that 6 relates to “zzUnicorn” DefinitionId: This is a very low number and I looked it up in “tbl_BuildDefinition” and it did not exist QueueTime: As we did not upgrade to TFS 2010 until late 2009 a date of 2008 for a queued build is very suspect Status: A status of 2 means that it is still queued This build must have been queued long ago when we were using TFS 2008, probably a beta, and it never got cleaned up. As controllers are new in TFS 2010 it would have created the “zzUnicorn” controller to handle any build servers that already exist. I had previously deleted the Agent, but leaving the controller just looks untidy. Now that the ghost build has been identified there are two options: Delete the row I would not recommend ever deleting anything from the database to achieve something in TFS. It is really not supported. Set the Status to cancelled (Recommended) This is the best option as TFS will then clean it up itself So I set the Status of this build to 2 (cancelled) and sure enough it disappeared after a couple of minutes and I was then able to then delete the “zzUnicorn” controller. Figure: Almost completely clean Now all I have to do is get rid of that untidy “zzBunyip” agent, but that will require rewriting one of our build scripts which will have to wait for now.   Technorati Tags: ALM,TFBS,TFS 2010

    Read the article

  • O the Agony - Merging Scrum and Waterfall

    - by John K. Hines
    If there's nothing else to know about Scrum (and Agile in general), it's this: You can't force a team to adopt Agile methods.  In all cases, the team must want to change. Well, sure, you could force a team.  But it's going to be a horrible, painful process with a huge learning curve made even steeper by the lack of training and motivation on behalf of the team.  On a completely unrelated note, I've spent the past three months working on a team that was formed by merging three separate teams.  One of these teams has been adopting and using Agile practices like Scrum since 2007, the other was in continuous bug fix mode, releasing on average one new piece of software per year using semi-Waterfall methods.  In particular, one senior developer on the Waterfall team didn't see anything in Agile but overhead. Fast forward through three months of tension, passive resistance, process pushback, and you have seven people who want to change and one who explicitly doesn't.  It took two things to make Scrum happen: The team manager took a class called "Agile Software Development using Scrum". The team lead explained the point of Agile was to reduce the workload of the senior developer, with another senior developer and the manager present. It's incredible to me how a single person can strongly influence the direction of an entire team.  Let alone if Scrum comes down as some managerial decree onto a functioning team who have no idea what it is.  Pity the fool. On the bright side, I am now an expert at drawing Visio process flows.  And I have some gentle advice for any first-level managers: If you preside over a team process change, it's beneficial to start the discussion on how the team will work as early as possible.  You should have a vision for this and guide the discussion, even if decisions are weeks away.  Don't always root for the underdog.  It's been my experience that managers who see themselves as compassionate and caring spend a great deal of time understanding and advocating for the one person on the team who feels left out.  Remember that by focusing on this one person you risk alienating the rest of the team, allow tension to build, and delay the resolution of the problem. My way would have been to decree Scrum, force all of my processes on everyone else, and use the past three months ironing out the kinks.  Which takes us all the way back to point number one. Technorati tags: Scrum Scrum Process Scrum and Waterfall

    Read the article

  • Customized Database Listener Names Now Supported for EBS

    - by sreelatha.mahendra(at)oracle.com
    The database listener name can now be configured using AutoConfig with newly introduced context variable s_db_listener. Prior to this certification it was not possible to use AutoConfig generated listener.ora files for managing listeners from SRVCTL when there were multiple RAC instances on the same server.To use this feature E-Business Suite customers need to apply the following patch:11.5.10CU2 - Roll Up Patch 9535311 (RUP-U) or higher12.0.x - R12.TXK.A.delta.7 or higher 12.1.x - R12.TXK.B.delta 3 or higher

    Read the article

  • Memory Efficient Windows SOA Server

    - by Antony Reynolds
    Installing a Memory Efficient SOA Suite 11.1.1.6 on Windows Server Well 11.1.1.6 is now available for download so I thought I would build a Windows Server environment to run it.  I will minimize the memory footprint of the installation by putting all functionality into the Admin Server of the SOA Suite domain. Required Software 64-bit JDK SOA Suite If you want 64-bit then choose “Generic” rather than “Microsoft Windows 32bit JVM” or “Linux 32bit JVM” This has links to all the required software. If you choose “Generic” then the Repository Creation Utility link does not show, you still need this so change the platform to “Microsoft Windows 32bit JVM” or “Linux 32bit JVM” to get the software. Similarly if you need a database then you need to change the platform to get the link to XE for Windows or Linux. If possible I recommend installing a 64-bit JDK as this allows you to assign more memory to individual JVMs. Windows XE will work, but it is better if you can use a full Oracle database because of the limitations on XE that sometimes cause it to run out of space with large or multiple SOA deployments. Installation Steps The following flow chart outlines the steps required in installing and configuring SOA Suite. The steps in the diagram are explained below. 64-bit? Is a 64-bit installation required?  The Windows & Linux installers will install 32-bit versions of the Sun JDK and JRockit.  A separate JDK must be installed for 64-bit. Install 64-bit JDK The 64-bit JDK can be either Hotspot or JRockit.  You can choose either JDK 1.7 or 1.6. Install WebLogic If you are using 64-bit then install WebLogic using “java –jar wls1036_generic.jar”.  Make sure you include Coherence in the installation, the easiest way to do this is to accept the “Typical” installation. SOA Suite Required? If you are not installing SOA Suite then you can jump straight ahead and create a WebLogic domain. Install SOA Suite Run the SOA Suite installer and point it at the existing Middleware Home created for WebLogic.  Note to run the SOA installer on Windows the user must have admin privileges.  I also found that on Windows Server 2008R2 I had to start the installer from a command prompt with administrative privileges, granting it privileges when it ran caused it to ignore the jreLoc parameter. Database Available? Do you have access to a database into which you can install the SOA schema.  SOA Suite requires access to an Oracle database (it is supported on other databases but I would always use an oracle database). Install Database I use an 11gR2 Oracle database to avoid XE limitations.  Make sure that you set the database character set to be unicode (AL32UTF8).  I also disabled the new security settings because they get in the way for a developer database.  Don’t forget to check that number of processes is at least 150 and number of sessions is not set, or is set to at least 200 (in the DB init parameters). Run RCU The SOA Suite database schemas are created by running the Repository Creation Utility.  Install the “SOA and BPM Infrastructure” component to support SOA Suite.  If you keep the schema prefix as “DEV” then the config wizard is easier to complete. Run Config Wizard The Config wizard creates the domain which hosts the WebLogic server instances.  To get a minimum footprint SOA installation choose the “Oracle Enterprise Manager” and “Oracle SOA Suite for developers” products.  All other required products will be automatically selected. The “for developers” installs target the appropriate components at the AdminServer rather than creating a separate managed server to house them.  This reduces the number of JVMs required to run the system and hence the amount of memory required.  This is not suitable for anything other than a developer environment as it mixes the admin and runtime functions together in a single server.  It also takes a long time to load all the required modules, making start up a slow process. If it exists I would recommend running the config wizard found in the “oracle_common/common/bin” directory under the middleware home.  This should have access to all the templates, including SOA. If you also want to run BAM in the same JVM as everything else then you need to “Select Optional Configuration” for “Managed Servers, Clusters and Machines”. To target BAM at the AdminServer delete the “bam_server1” managed server that is created by default.  This will result in BAM being targeted at the AdminServer. Installation Issues I had a few problems when I came to test everything in my mega-JVM. Following applications were not targeted and so I needed to target them at the AdminServer: b2bui composer Healthcare UI FMW Welcome Page Application (11.1.0.0.0) How Memory Efficient is It? On a Windows 2008R2 Server running under VirtualBox I was able to bring up both the 11gR2 database and SOA/BPM/BAM in 3G memory.  I allocated a minimum 512M to the PermGen and a minimum of 1.5G for the heap.  The setting from setSOADomainEnv are shown below: set DEFAULT_MEM_ARGS=-Xms1536m -Xmx2048m set PORT_MEM_ARGS=-Xms1536m -Xmx2048m set DEFAULT_MEM_ARGS=%DEFAULT_MEM_ARGS% -XX:PermSize=512m -XX:MaxPermSize=768m set PORT_MEM_ARGS=%PORT_MEM_ARGS% -XX:PermSize=512m -XX:MaxPermSize=768m I arrived at these numbers by monitoring JVM memory usage in JConsole. Task Manager showed total system memory usage at 2.9G – just below the 3G I allocated to the VM. Performance is not stellar but it runs and I could run JDeveloper alongside it on my 8G laptop, so in that sense it was a result!

    Read the article

  • Business Intelligence – Starten Sie durch mit dem „Oracle BI Starterpaket“

    - by A&C Redaktion
    Normal 0 21 false false false DE X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin:0cm; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} Sie wollen in Ihrem Unternehmen eine Business Intelligence (BI) Lösung einführen, doch Ihre Zeit und Ihr Budget sind knapp? Oracle bietet Ihnen jetzt einen schnellen und unkomplizierten Einstieg! Die BI Lösung von Oracle ermöglicht eine schnelle Entscheidungsfindung durch zielgerichtete Informationsverarbeitung in Ihren Geschäftsprozessen. Verbannen Sie Excelauswertungen aus Ihren wichtigen Unternehmensbereichen und setzen auf verlässliche Daten. Ganz einfach – mit dem Oracle BI Starterpaket. Ausgewählte Oracle Partner installieren die aktuelle Oracle Business Intelligence Software und binden Ihre Datenquellen ein. Dies ermöglicht Ihnen, gemeinsam mit den Experten unserer Partner, die ersten Berichte und Dashboards auf Ihrer eigenen Datengrundlage zu erstellen. Die Oracle Lösung besticht durch eine einfach zu bedienende Oberfläche, die eine geringe Einarbeitungszeit garantiert – die beste Ausgangslage für den unternehmensweiten Einsatz. Weitere Informationen zum Oracle BI Starterpaket finden Sie hier.

    Read the article

  • Oracle RDBMS Server 11gR2 Pre-Install RPM for Oracle Linux 6 has been released

    - by Lenz Grimmer
    Now that the certification of the Oracle Database 11g R2 with Oracle Linux 6 and the Unbreakable Enterprise Kernel has been announced, we are glad to announce the availability of oracle-rdbms-server-11gR2-preinstall, the Oracle RDBMS Server 11gR2 Pre-install RPM package (formerly known as oracle-validated). Designed specifically for Oracle Linux 6, this RPM aids in the installation of the Oracle Database. In order to install the Oracle Database 11g R2 on Oracle Linux 6, your system needs to meet a few prerequisites, as outlined in the Linux Installation Guides. Using the Oracle RDBMS Server 11gR2 Pre-install RPM, you can complete most of the pre-installation configuration tasks. which is now available from the Unbreakable Linux Network, or via the Oracle public yum repository. The pre-install package is available for x86_64 only. Specifically, the package: Causes the download and installation of various software packages and specific versions needed for database installation, with package dependencies resolved via yum Creates the user oracle and the groups oinstall and dba, which are the defaults used during database installation Modifies kernel parameters in /etc/sysctl.conf to change settings for shared memory, semaphores, the maximum number of file descriptors, and so on Sets hard and soft shell resource limits in /etc/security/limits.conf, such as the number of open files, the number of processes, and stack size to the minimum required based on the Oracle Database 11g Release 2 Server installation requirements Sets numa=off in the kernel boot parameters for x86_64 machines Please see the release announcement for further details and instructions. Also take a look at Ginny Henningsen's "How I Simplified Oracle Database Installation on Oracle Linux" article on the Oracle Technology Network for a general description on how to perform the installation of the Oracle Database on Oracle Linux. While the article refers to Oracle Linux 5 and the former "oracle-validated" package, the steps for Oracle Linux 6 are still very similar (we're looking into updating that article for Oracle Linux 6).

    Read the article

  • Top Reasons to Take the MySQL Cluster Training

    - by Antoinette O'Sullivan
    Here are the top reasons to take the authorized MySQL Cluster training course: Take training which was developed by MySQL Cluster product team and delivered by the MySQL Cluster experts at Oracle Learn how to develop, deploy, manage and scale your MySQL Cluster applications more efficiently Keep your mission-critical applications and essential services up and running 24x7 Deliver the highest performance and scalability using MySQL Cluster best practices In this 3 day course, experienced database users learn the important details of clustering necessary to get started with MySQL Cluster, to properly configure and manage the cluster nodes to ensure high availability, to install the different nodes and provide a better understanding of the internals of the cluster. To see the schedule for this course, go to the Oracle University Portal (click on MySQL). Should you not see an event for a location/date that suits you, register your interest in additional events. Here is a small sample of the events already on the schedule for the MySQL Cluster course:  Location  Date  Delivery Language  Prague, Czech Republic  17 September 2012  Czech  Warsaw, Poland  1 August 2012  Polish  London, United Kingdom  18 July 2012  English  Lisbon, Portugal  3 December 2012  European Portugese  Nice, France  8 October 2012  French  Barcelona, Spain  25 September 2012  Spanish  Madrid, Spain  20 August 2012  Spanish  Denver, United States  17 October 2012  English  Chicago, United States  22 August 2012  English  Petaling Jaya, Malaysia  10 October 2012  English  Singapore  21 August 2012  English  Mexico City, Mexico  23 July 2012  Spanish

    Read the article

  • Oracle OpenWorld 2013: First glimpses of the new SOA Suite 12c by Lucas Jellema

    - by JuergenKress
    During this week’s Oracle OpenWorld Conference, we were given some sneak peeks into the short term future of the Oracle SOA Suite. During various roadmap sessions, on the demo grounds as well as in the keynote session by Thomas Kurian (the replay of which you can see here, new features were described and demonstrated, allowing us to get a fairly good overview of what is going to come for SOA Suite - later in 2013 and sometime in 2014 (probably the first half of that year). The SOA Suite plays an important part in the three themes Thomas Kurian set down for the Fusion Middleware suite of products: support for mobility, cloud and business user empowerment. Some of the highlighted new aspects of Oracle SOA Suite are: Adapters to connect from on-premise to in-the-cloud – specifically targeting SalesForce, RightNow and also providing an SDK to create custom integrations into the cloud (the first cloud adapters will be released on 11g, before the end of the year) Mobile enablement by exposing RESTful services that communicate using JSON as well as adding the capability to call out to such services (12c functionality) Enhanced functionality on Exalogic (of course it runs faster on Exalogic, up to 20 times) Modular runtime with a lighter footprint. A brief demonstration of the Cloud Adapter was given by Demed L’Her during said keynote. The next screenshot shows the Adapter wizard for the Cloud Adapter. It allows the developer to pick a specific operation for a specific business object exposed by RightNow (or SalesForce) (the adapter knows about the APIs exposed by RightNow and SalesForce): This next screenshot shows the adapter that is used in SOA Suite 12c to expose a RESTful service on top of an SCA Composite or a Service Bus service: Read the full article here. SOA & BPM Partner Community For regular information on Oracle SOA Suite become a member in the SOA & BPM Partner Community for registration please visit www.oracle.com/goto/emea/soa (OPN account required) If you need support with your account please contact the Oracle Partner Business Center. Blog Twitter LinkedIn Facebook Wiki Mix Forum Technorati Tags: Amis,Lucas Jellema,SOA Suite 12c,SOA Community,Oracle SOA,Oracle BPM,Community,OPN,Jürgen Kress

    Read the article

  • Upcoming Webcast: Use Visual Decision Making To Boost the Pace of Product Innovation – October 24, 2013

    - by Gerald Fauteux
    See More, Do More Use Visual Decision Making To Boost the Pace of Product Innovation   Join a Free Webcast hosted by Oracle, featuring QUALCOMM Click here to register for this webcast   Keeping innovation ahead of shrinking product lifecycles continues to be a challenge in today’s fast-paced business environment, but new visualization techniques in the product design and development process are helping businesses widen the gap further.  Innovative visualization methods, including Augmented Business Visualization, can be powerful differentiators for business leaders, especially when it comes to accelerating product cycles.   Don’t miss this opportunity to discover how visualization tied to PLM can help empower visual decision making and enhance productivity across your organization.  See more and do more with the power of Oracle. Join solution experts from Oracle and special guest, Ravi Sankaran, Sr. Staff Systems Analyst, QUALCOMM to discuss how visual decision making can help efficiently ramp innovation efforts throughout the product lifecycle: Advance collaboration with universal access across all document types with robust security measures in place Synthesize product information quickly like cost, quality, compliance, etc. in a highly visual form from multiple sources in a single visual and actionable environment Increase productivity by rendering documents in the appropriate context of specific business processes Drive modern business transformation with new collaboration methods such as Augmented Business Visualization . Date: Thursday, October 24, 2013 Time: 10:00 a.m. PDT / 1:00 p.m. EDT Click here to register for this FREE event

    Read the article

  • Transparent Data Encryption Helps Customers Address Regulatory Compliance

    - by Troy Kitch
    Regulations such as the Payment Card Industry Data Security Standards (PCI DSS), U.S. state security breach notification laws, HIPAA HITECH and more, call for the use of data encryption or redaction to protect sensitive personally identifiable information (PII). From the outset, Oracle has delivered the industry's most advanced technology to safeguard data where it lives—in the database. Oracle provides a comprehensive portfolio of security solutions to ensure data privacy, protect against insider threats, and enable regulatory compliance for both Oracle and non-Oracle Databases. Organizations worldwide rely on Oracle Database Security solutions to help address industry and government regulatory compliance. Specifically, Oracle Advanced Security helps organizations like Educational Testing Service, TransUnion Interactive, Orbitz, and the National Marrow Donor Program comply with privacy and regulatory mandates by transparently encrypting sensitive information such as credit cards, social security numbers, and personally identifiable information (PII). By encrypting data at rest and whenever it leaves the database over the network or via backups, Oracle Advanced Security provides organizations the most cost-effective solution for comprehensive data protection. Watch the video and learn why organizations choose Oracle Advanced Security with transparent data encryption.

    Read the article

  • Iterative and Incremental Principle Series 3: The Implementation Plan (a.k.a The Fitness Plan)

    - by llowitz
    Welcome back to the Iterative and Incremental Blog series.  Yesterday, I demonstrated how shorter interval sets allowed me to focus on my fitness goals and achieve success.  Likewise, in a project setting, shorter milestones allow the project team to maintain focus and experience a sense of accomplishment throughout the project lifecycle.  Today, I will discuss project planning and how to effectively plan your iterations. Admittedly, there is more to applying the iterative and incremental principle than breaking long durations into multiple, shorter ones.  In order to effectively apply the iterative and incremental approach, one should start by creating an implementation plan.   In a project setting, the Implementation Plan is a high level plan that focuses on milestones, objectives, and the number of iterations.  It is the plan that is typically developed at the start of an engagement identifying the project phases and milestones.  When the iterative and incremental principle is applied, the Implementation Plan also identified the number of iterations planned for each phase.  The implementation plan does not include the detailed plan for the iterations, as this detail is determined prior to each iteration start during Iteration Planning.  An individual iteration plan is created for each project iteration. For my fitness regime, I also created an “Implementation Plan” for my weekly exercise.   My high level plan included exercising 6 days a week, and since I cross train, trying not to repeat the same exercise two days in a row.  Because running on the hills outside is the most difficult and consequently, the most effective exercise, my implementation plan includes running outside at least 2 times a week.   Regardless of the exercise selected, I always apply a series of 6-minute interval sets.  I never plan what I will do each day in advance because there are too many changing factors that need to be considered before that level of detail is determined.  If my Implementation Plan included details on the exercise I was to perform each day of the week, it is quite certain that I would be unable to follow my plan to that level.  It is unrealistic to plan each day of the week without considering the unique circumstances at that time.  For example, what is the weather?  Are there are conflicting schedule commitments?  Are there injuries that need to be considered?  Likewise, in a project setting, it is best to plan for the iteration details prior to its start. Join me for tomorrow’s blog where I will discuss when and how to plan the details of your iterations.

    Read the article

  • Announcing Fusion Middleware Innovation Awards

    - by Michelle Kimihira
    Author: Neela Chaudhari Every year at OpenWorld, Oracle announces the winners to its most prestigious awards in Middleware, the Fusion Middleware Innovation Awards. This year, we’ll be announcing the winners and highlighting a few of their original implementations during this key session in the Middleware stream: 11:45 AM on Tuesday, October 2nd, CON9162 Oracle Fusion Middleware: Meet This Year's Most Impressive Customer Projects in Moscone West, 3001. In addition, we’ll give a sneak peak of a few winners during GEN9394: Fusion Middleware General Session with Hasan Rizvi at 10:15 AM on Tuesday, October 2nd in Moscone West, Hall D! What kinds of customers win the Fusion Middleware Innovation Awards? Winners are selected based on the uniqueness of their business case, business benefits, level of impact relative to the size of the organization, complexity and magnitude of implementation, and the originality of architecture. The winners are selected by a panel of judges that score each entry across multiple different scoring categories. This year, the following categories included: Oracle Exalogic Cloud Application Foundation Service Integration (SOA) and BPM WebCenter Identity Management Data Integration Application Development Framework and Fusion Development Business Analytics (BI, EPM and Exalytics) Last year at OpenWorld 2011 we had standing room only in our session, so come early!  We had over 30 innovative customers that won the award, including companies like BT, Choice Hotels, Electronic Arts, Clorox Company, ING, Dunkin Brands, Telenor, Haier, AT&T, Manpower, Herbal Life and many others. Did you miss your chance this year to nominate your company? Come join with us in the awards session to get an edge in your next year’s submission and watch for the next opportunity for 2013 on this blog. There’s other awards as part of Oracle’s Excellence awards program or subscribe to our regular Fusion Middleware newsletter to get the latest reminders.

    Read the article

  • How Are Businesses Advancing with the Experience Revolution?

    - by Charles Knapp
    Businesses worldwide are operating in a new era. Customers are taking charge of their relationships with brands, and the customer experience has become the most important differentiator and driver of business value. Where is the experience heading? And how can businesses take advantage of the customer experience revolution? Find out from the experts at a one-of-a-kind event: the Oracle Customer Experience Summit at Oracle OpenWorld, San Francisco, October 3-5. Our featured speakers are global visionaries including Seth Godin, George Kembel from the Stanford d:School, Bruce Temkin, Kerry Bodine and Paul Hagen from Forrester, and Gene Alvarez from Gartner. Featured industry leaders will include speakers from Athene Group, Bazaarvoice, Comcast, Consortium of Service Innovation, Haworth, Intuit, KPN, Marriott, Nikon, Quicksilver, Royal Caribbean, SapientNitro, Southwest, Stryker, Stuart Concannon, and Twilio. Featured speakers from Oracle will include Oracle President Mark Hurd, Anthony Lye, David Vap, Brian Curran, John Kembel, and Matthew Banks. So, please join us at the Customer Experience Summit at the Oracle OpenWorld Conference.

    Read the article

  • APress Deal of the Day 16/August/2014 - Node.js Recipes

    - by TATWORTH
    Originally posted on: http://geekswithblogs.net/TATWORTH/archive/2014/08/15/apress-deal-of-the-day-16august2014---node.js-recipes.aspxToday’s $10 Deal of the Day from APress at http://www.apress.com/9781430260585 is Node.js Recipes. “Node.js Recipes is your one-stop reference for solving Node.js problems. Filled with useful recipes that follow a problem/solution format, you can look up recipes for many situations that you may come across in your day-to-day server-side development. ”

    Read the article

  • Real-time Big Data Analytics is a reality for StubHub with Oracle Advanced Analytics

    - by Mark Hornick
    What can you use for a comprehensive platform for real-time analytics? How can you process big data volumes for near-real-time recommendations and dramatically reduce fraud? Learn in this video what Stubhub achieved with Oracle R Enterprise from the Oracle Advanced Analytics option to Oracle Database, and read more on their story here. Advanced analytics solutions that impact the bottom line of a business are challenging due to the range of skills and individuals involved in realizing such solutions. While we hear a lot about the role of the data scientist, that role is but one piece of the puzzle. Advanced analytics solutions also have an operationalization aspect that also requires close proximity to where the transactional activity occurs. The data scientist needs access to the right data with which to model the business problem. This involves IT for data collection, management, and administration, as well as ensuring zero downtime (a website needs to be up 24x7). This also involves working with the data scientist to keep predictive models refreshed with the latest scripts. Integrating advanced analytics solutions into enterprise apps involves not just generating predictions, but supporting the whole life-cycle from data collection, to model building, model assessment, and then outcome assessment and feedback to the model building process again. Application and web interface designers need to take into account how end users will see and use the advanced analytics results, e.g., supporting operations staff that need to handle the potentially fraudulent transactions. As just described, advanced analytics projects can be "complicated" from just a human perspective. The extent to which software can simplify the interactions among users and systems will increase the likelihood of project success. The ability to quickly operationalize advanced analytics projects and demonstrate measurable value, means the difference between a successful project and just a nice research report. By standardizing on Oracle Database and SQL invocation of R, along with in-database modeling as found in Oracle Advanced Analytics, expedient model deployment and zero downtime for refreshing models becomes a reality. Meanwhile, data scientists are also able to explore leading edge techniques available in open source. The Oracle solution propels the entire organization forward to realize the value of advanced analytics.

    Read the article

  • Everythings changes, except that it doesn&rsquo;t

    - by Dennis Vroegop
    You may have noticed this. Microsoft launched a new product this week. Well, launched is a strong word, they announced it. They call it.. The Surface! What is it? Well, it’s a cool looking family of tablets designed for Windows 8. And I have to say: they look stunning and I can’t wait to have one. There’s just one thing.. The name..Where have I heard that before? Why, indeed! Yes, it is also the name of a new paradigm in computing: Surface Computing. You may have read something about that, here on this blog for instance. Well, in order to prevent confusion they have decided to rename Surface to Pixelsense. You know, the technology that drives the ‘camera’ inside the Samsung SUR40 for Microsoft Surface…. So now, when we talk about Surface, we mean the new tablet. When we talk about Pixelsense we mean that big table… So there you have it… Welcome PixelSense! For more info see http://www.surface.com for the tablet and http://www.pixelsense.com for Pixelsense.

    Read the article

  • The Oracle Retail Week Awards - Store Manager of the year

    - by user801960
    Below is a video featuring interviews with the nominees for the Oracle Retail Week Awards 2012 Store Manager of the Year Award, in which the nominees talk about the value of being nominated for an Oracle Retail Week Award and what it means to them to be recognised. The video includes interviews with ASDA CEO Andy Clarke, who talks about how important the store managers are to the functioning of a retail business. The nominees interviewed were: Ian Allcock from Homebase in Aylesford David Bickell from Argos in Milton Keynes Karl Lynsdale from Co-operative Food in Heathfield, Sussex Paul Norcross from B&Q in Bristol Darren Parfitt from Boots in Melton Mowbray Helen Smith from H Samuel in Manchester Oracle Retail would like to congratulate the winner, Ian Allcock from Homebase in Aylesford. Well done Ian!

    Read the article

  • New Release of ROracle posted to CRAN

    - by mhornick
    Oracle recently updated ROracle to version 1.1-2 on CRAN with enhancements and bug fixes. The major enhancements include the introduction of Oracle Wallet Manager and support for datetime and interval types.  Oracle Wallet support in ROracle allows users to manage public key security from the client R session. Oracle Wallet allows passwords to be stored and read by Oracle Database, allowing safe storage of database login credentials. In addition, we added support for datetime and interval types when selecting data, which expands ROracle's support for date data.  See the ROracle NEWS for the complete list of updates. We encourage ROracle users to post questions and provide feedback on the Oracle R Forum. In addition to being a high performance database interface to Oracle Database from R for general use, ROracle supports database access for Oracle R Enterprise.

    Read the article

  • Kuppinger Cole Paper on Entitlements Server

    - by Naresh Persaud
    Kuppinger Cole recently released a paper discussing external authorization describing how organizations can "future proof" their enterprise security by deploying Oracle Entitlements Server.  By taking a declarative security approach, security policy can be flexible and distributed across multiple applications consistently. You can get a copy of the report here. In fact Oracle Entitlements Server is being used in many places to secure data and sensitive business transactions. The paper covers the major  use cases for Entitlements Server as well as Kuppinger Cole's assessment of the market. Here are some additional resources that reinforce the cases discussed in the paper. Today applications for cloud and mobile applications can utilize RESTful interfaces. Click on this link to learn how. OES can also be used to secure data in Oracle Databases.   To learn more check out the new Oracle U  OES 11g course.

    Read the article

  • Gilda Garretón, a Java Developer and Parallelism Computing Researcher

    - by Yolande
    In a new interview titled “Gilda Garretón, a Java Developer and Parallelism Computing Research,” Garretón shares her first-hand experience developing with Java and Java 7 for very large-scale integration (VLSI) of computer-aided design (CAD). Garretón gives an insightful overview of how Java is contributing to the parallelism development and to the Electric VLSI Design Systems, an open source VLSI CAD application used as a research platform for new CAD algorithms as well as the research flow for hardware test chips.  Garretón considers that parallelism programming is hard and complex, yet important developments are taking place.  "With the addition of the concurrent package in Java SE 6 and the Fork/Join feature in Java SE 7, developers have a chance to rely more on existing frameworks and dedicate more time to the essence of their parallel algorithms." Read the full article here  

    Read the article

  • OPN PartnerCasts com Stein Surlin

    - by Claudia Costa
      Desde de Abril 2009  Stein Surlin - Senior VP Alliances& Channels EMEA, tem realizado diversas  entrevistas com executivos da Oracle EMEA, em que se têm discutido temas acerca da organização Oracle EMEA, de como está alinhada em trabalhar em conjunto com os seus  parceiros e em apoiá-los na obtenção de novas oportunidades de negócio . Neste link poderá assistir aos OPN PartnerCasts. Aqui poderá encontrar as notícias mais actualizadas sobre a estratégia de parceiros da Oracle, oportunidades de negócio, estratégias de produtos e muito mais! Fique atento ao Portal OPN Partner Casts, mais podcasts estão a caminho!        

    Read the article

  • Microsoft TechDays Canada 2010

    - by David Nudelman
    John Oxley announced that TechDays is returning to Canada in more cities then ever in 2010. Vancouver – September 14/15 at the Vancouver Convention Centre Edmonton – October 5/6 at the Shaw Conference Centre Toronto – October 27/28 at the Metro Toronto Convention Centre Halifax – November 2/3 at the World Trade & Convention Centre Ottawa – November 9/10 at the Hampton Inn & Conference Centre Montreal – November 23/24 at the Palais de Congres Winnipeg – December 7/8 at the Winnipeg Convention Centre Calgary – December 14/15 at the Calgary Stampede Get all the info here Regards, David Nudelman

    Read the article

  • And What's Your Brand Worth? ...anything?

    - by [email protected]
    100 Best Global Brands from Business Week Story: The Great Trust Offensive Slide Show: Top Brands 2009 Methodology: Picking the Winners The recession has presented marketing executives around the world with the toughest test of their careers. Some brands have prospered amid the hard times--or at least held their own. Others have slipped a surprising number of places on our ninth annual ranking, compiled by consultancy Interbrand. But for seven brands, impressive performances saw them race up the charts to take their place on this year's list. Here are the numbers behind the rankings Rank 2009 Rank 2008 Employer 2009 Brand value($millions) 2008 Brand value($millions) Percent change(%) Country of Ownership 1 1 Coca-Cola  68,734  66,667  3 U.S. 2 2 IBM  60,211  59,031  2 U.S. 3 3 Microsoft  56,647  59,007  -4 U.S. 4 4 GE  47,777  53,086  -10 U.S. 5 5 Nokia  34,864  35,942  -3 Finland 6 8 McDonald's  32,275  31,049  4 U.S. 7 10 Google  31,980  25,590  25 U.S. 8 6 Toyota  31,330  34,050  -8 Japan 9 7 Intel  30,636  31,261  -2 U.S. 10 9 Disney  28,447  29,251  -3 U.S. 11 12 Hewlett-Packard  24,096  23,509  2 U.S. 12 11 Mercedes-Benz  23,867  25,577  -7 Germany 13 14 Gillette  22,841  22,069  4 U.S. 14 17 Cisco  22,030  21,306  3 U.S. 15 13 BMW  21,671  23,298  -7 Germany 16 16 Louis Vuitton  21,120  21,602  -2 France 17 18 Marlboro  19,010  21,300  -11 U.S. 18 20 Honda  17,803  19,079  -7 Japan 19 21 Samsung  17,518  17,689  -1 S. Korea 20 24 Apple  15,443  13,724  12 U.S. 21 22 H&M  15,375  13,840  11 Sweden 22 15 American Express  14,971  21,940  -32 U.S. 23 26 Pepsi  13,706  13,249  3 U.S. 24 23 Oracle  13,699  13,831  -1 U.S. 25 28 Nescafe  13,317  13,055  2 Switzerland 26 29 Nike  13,179  12,672  4 U.S. 27 31 SAP  12,106  12,228  -1 Germany 28 35 Ikea  12,004  10,913  10 Sweden 29 25 Sony  11,953  13,583  -12 Japan 30 33 Budweiser  11,833  11,438  3 Belgium 31 30 UPS  11,594  12,621  -8 U.S. 32 27 HSBC  10,510  13,143  -20 Britain 33 36 Canon  10,441  10,876  -4 Japan 34 39 Kellogg's  10,428  9,710  7 U.S. 35 32 Dell  10,291  11,695  -12 U.S. 36 19 Citi  10,254  20,174  -49 U.S. 37 37 JPMorgan  9,550  10,773  -11 U.S. 38 38 Goldman Sachs  9,248  10,331  -10 U.S. 39 40 Nintendo  9,210  8,772  5 Japan 40 44 Thomson Reuters  8,434  8,313  1 Canada 41 45 Gucci  8,182  8,254  -1 Italy 42 43 Philips  8,121  8,325  -2 Netherlands 43 58 Amazon  7,858  6,434  22 U.S. 44 51 L'Oreal  7,748  7,508  3 France 45 47 Accenture  7,710  7,948  -3 U.S. 46 46 eBay  7,350  7,991  -8 U.S. 47 48 Siemens  7,308  7,943  -8 Germany 48 56 Heinz  7,244  6,646  9 U.S. 49 49 Ford  7,005  7,896  -11 U.S. 50 62 Zara  6,789  5,955  14 Spain   Valuations do not represent a guarantee of future performance of the brands or companies. Data: Interbrand, BusinessWeek

    Read the article

  • Silverlight beyond the basics

    - by Braulio Díez Botella
    Once I have learned the basics of Silverlight, I realized that there was still a lot to learn, architecture, patterns & practices, data access technologies… BUT… there’s plenty of material out there and few available time. I have compiled a set of articles/web casts / posts I found pretty useful for me, and defined a “learning roadmap”.   About the learning road map:    About the links: Basics MVVM Pattern: MSDN Magazine Basics RIA Services: RIA Services Intro RIA Services and Visual Studio 2010 MVVM + PRISM: MVVM + PRISM  MEF: MSDN Magazine RIA Services + MVVM: Mix10 RIA Services + MVVM + MEF: Shawn Wildermuth Series (1) Shawn Wildermuth Series (2) Shawn Wildermuth Series (3) Shawn Wildermuth Series (4) Some of them are based on Beta version of the products, but the core concepts are there and quite well explained. Please if you have other superb references add it on the comments section, hope to build a “version 2” of this post including or your feeback, thanks.

    Read the article

  • A Technique for Performing Cross-host Upgrades to FMW 11gR1

    - by reza.shafii
    The main tool used for the upgrade of iAS 10g mid-tier (data not stored in 10g meta-data repository schemas) environments to Fusion Middleware (FMW) 11gR1 is the FMW Upgrade Assistant (UA). This tool performs what we call an out-of-place upgrade which in a nut-shell means the following: Upgrade is performed by pointing the UA to a 10g source topology as well as an 11g destination topology. The destination topology must be created, using the standard FMW 11g installation and configuration process, prior to the execution of the UA. The UA carries over all of the required changes from the source environment to the destination. This approach has a number of advantages rooted in the fact that the source environment - which is presumably working well and serving its needs - is not disturbed during the upgrade process as the UA only performs read-only operations on it. The UA today can only perform such out-of-place upgrades when the source and destination topologies reside on the same machine. This can sometimes be an issue when the host on which the iAS 10g environment is installed is running at full capacity and installing new hardware for the purpose of the upgrade (in most cases what would be needed is extra memory) is completely infeasible. In such cases, upgrade across a different host is still possible by using the following technique: Backup your source environment and restore it on to a target machine. The backup and restore procedures for the iAS 10.1.2 components are described within this section of the release's Administration Guide. As described in the docs, the Oracle Application Server Backup and Recovery Tool provides capabilities for backing up the installation on one machine and restoring it on another which is exactly what you want to do for the purpose of cross host upgrade. Ensure that the restored environment on your target host is fully functional. Go through the upgrade steps on the target machine to perform the out-of-place upgrade using the UA. Although this process does add another big step to the overall upgrade process, it does make it possible to perform a cross-host upgrade to 11gR1 when necessary. The easiest approach would of course be to find a way of ensuring that the required hardware capacity for upgrade is available on the original 10g host. Using techniques such as scheduling the upgrade at low traffic times and/or temporarily stopping other processes running on the machine to clear up some memory might provide you the sufficient memory needed to perform the out-of-place upgrade and save you the need for using the backup/restore technique I have described in this post.

    Read the article

< Previous Page | 175 176 177 178 179 180 181 182 183 184 185 186  | Next Page >