Search Results

Search found 29622 results on 1185 pages for 'deployment project'.

Page 2/1185 | < Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >

  • Error launching application after ClickOnce deployment - "An application for this deployment is alre

    - by digiduck
    As part of my continuous integration build the application is deployed as a ClickOnce application. This works great the first time, but when I try the launch the app after an update has been deployed I get the following error. An application for this deployment is already installed with a different application identity. If I run mage.exe -cc to clear the application cache for all ClickOnce apps then I can launch the application just fine. Has anyone run into this before? How can I fix this? Here are the steps in my build script that publish the ClickOnce application. ./tools/windows_sdk/mage.exe -New Application -Processor msil -ToFile "C:\temp\build\RoadrunnerTrap.exe.manifest" -Name "Roadrunner Trap" -Version 1.0.0.1 -FromDirectory "C:\temp\build" # artifacts from C:\temp\build\ are copied to \\server\publish\v1.0.0.1\ ./tools/windows_sdk/mage.exe -New Deployment -Processor msil -Install false -Publisher "Acme, Inc." -ProviderUrl "\\server\publish\RoadrunnerTrap.application" -Name "Roadrunner Trap" -AppManifest "\\server\publish\v1.0.0.1\RoadrunnerTrap.exe.manifest" -ToFile "\\server\publish\RoadrunnerTrap.application" Note that the version number does change with every deployment.

    Read the article

  • Using Deployment Manager

    - by Jess Nickson
    One of the teams at Red Gate has been working very hard on a new product: Deployment Manager. Deployment Manager is a free tool that lets you deploy updates to .NET apps, services and databases through a central dashboard. Deployment Manager has been out for a while, but I must admit that even though I work in the same building, until now I hadn’t even looked at it. My job at Red Gate is to develop and maintain some of our community sites, which involves carrying out regular deployments. One of the projects I have to deploy on a fairly regular basis requires me to send my changes to our build server, TeamCity. The output is a Zip file of the build. I then have to go and find this file, copy it across to the staging machine, extract it, and copy some of the sub-folders to other places. In order to keep track of what builds are running, I need to rename the folders accordingly. However, even after all that, I still need to go and update the site and its applications in IIS to point at these new builds. Oh, and then, I have to repeat the process when I deploy on production. Did I mention the multiple configuration files that then need updating as well? Manually? The whole process can take well over half an hour. I’m ready to try out a new process. Deployment Manager is designed to massively simplify the deployment processes from what could be lots of manual copying of files, managing of configuration files, and database upgrades down to a few clicks. It’s a big promise, but I decided to try out this new tool on one of the smaller ASP.NET sites at Red Gate, Format SQL (the result of a Red Gate Down Tools week). I wanted to add some new functionality, but given it was a new site with no set way of doing things, I was reluctant to have to manually copy files around servers. I decided to use this opportunity as a chance to set the site up on Deployment Manager and check out its functionality. What follows is a guide on how to get set up with Deployment Manager, a brief overview of its features, and what I thought of the experience. To follow along with the instructions that follow, you’ll first need to download Deployment Manager from Red Gate. It has a free ‘Starter Edition’ which allows you to create up to 5 projects and agents (machines you deploy to), so it’s really easy to get up and running with a fully-featured version. The Initial Set Up After installing the product and setting it up using the administration tool it provides, I launched Deployment Manager by going to the URL and port I had set it to run on. This loads up the main dashboard. The dashboard does a good job of guiding me through the process of getting started, beginning with a prompt to create some environments. 1. Setting up Environments The dashboard informed me that I needed to add new ‘Environments’, which are essentially ways of grouping the machines you want to deploy to. The environments that get added will show up on the main dashboard. I set up two such environments for this project: ‘staging’ and ‘live’.   2. Add Target Machines Once I had created the environments, I was ready to add ‘target machine’s to them, which are the actual machines that the deployment will occur on.   To enable me to deploy to a new machine, I needed to download and install an Agent on it. The ‘Add target machine’ form on the ‘Environments’ page helpfully provides a link for downloading an Agent.   Once the agent has been installed, it is just a case of copying the server key to the agent, and the agent key to the server, to link them up.   3. Run Health Check If, after adding your new target machine, the ‘Status’ flags an error, it is possible that the Agent and Server keys have not been entered correctly on both Deployment Manager and the Agent service.     You can ‘Check Health’, which will give you more information on any issues. It is probably worth running this regardless of what status the ‘Environments’ dashboard is claiming, just to be on the safe side.     4. Add Projects Going back to the main Dashboard tab at this point, I found that it was telling me that I needed to set up a new project.   I clicked the ‘project’ link to get started, gave my new project a name and clicked ‘Create’. I was then redirected to the ‘Steps’ page for the project under the Projects tab.   5. Package Steps The ‘Steps’ page was fairly empty when it first loaded.   Adding a ‘step’ allowed me to specify what packages I wanted to grab for the deployment. This part requires a NuGet package feed to be set up, which is where Deployment Manager will look for the packages. At Red Gate, we already have one set up, so I just needed to tell Deployment Manager about it. Don’t worry; there is a nice guide included on how to go about doing all of this on the ‘Package Feeds’ page in ‘Settings’, if you need any help with setting these bits up.    At Red Gate we use a build server, TeamCity, which is capable of publishing built projects to the NuGet feed we use. This makes the workflow for Format SQL relatively simple: when I commit a change to the project, the build server is configured to grab those changes, build the project, and spit out a new NuGet package to the Red Gate NuGet package feed. My ‘package step’, therefore, is set up to look for this package on our feed. The final part of package step was simply specifying which machines from what environments I wanted to be able to deploy the project to.     Format SQL Now the main Dashboard showed my new project and environment in a rather empty looking grid. Clicking on my project presented me with a nice little message telling me that I am now ready to create my first release!   Create a release Next I clicked on the ‘Create release’ button in the Projects tab. If your feeds and package step(s) were set up correctly, then Deployment Manager will automatically grab the latest version of the NuGet package that you want to deploy. As you can see here, it was able to pick up the latest build for Format SQL and all I needed to do was enter a version number and description of the release.   As you can see underneath ‘Version number’, it keeps track of what version the previous release was given. Clicking ‘Create’ created the release and redirected me to a summary of it where I could check the details before deploying.   I clicked ‘Deploy this release’ and chose the environment I wanted to deploy to and…that’s it. Deployment Manager went off and deployed it for me.   Once I clicked ‘Deploy release’, Deployment Manager started to automatically update and provide continuing feedback about the process. If any errors do arise, then I can expand the results to see where it went wrong. That’s it, I’m done! Keep in mind, if you hit errors with the deployment itself then it is possible to view the log output to try and determine where these occurred. You can keep expanding the logs to narrow down the problem. The screenshot below is not from my Format SQL deployment, but I thought I’d post one to demonstrate the logging output available. Features One of the best bits of Deployment Manager for me is the ability to very, very easily deploy the same release to multiple machines. Deploying this same release to production was just a case of selecting the deployment and choosing the ‘live’ environment as the place to deploy to. Following on from this is the fact that, as Deployment Manager keeps track of all of your releases, it is extremely easy to roll back to a previous release if anything goes pear-shaped! You can view all your previous releases and select one to re-deploy. I needed this feature more than once when differences in my production and staging machines lead to some odd behavior.     Another option is to use the TeamCity integration available. This enables you to set Deployment Manager up so that it will automatically create releases and deploy these to an environment directly from TeamCity, meaning that you can always see the latest version up and running without having to do anything. Machine Specific Deployments ‘What about custom configuration files?’ I hear you shout. Certainly, it was one of my concerns. Our setup on the staging machine is not in line with that on production. What this means is that, should we deploy the same configuration to both, one of them is going to break. Thankfully, it turns out that Deployment Manager can deal with this. Given I had environments ‘staging’ and ‘live’, and that staging used the project’s web.config file, while production (‘live’) required the config file to undergo some transformations, I simply added a web.live.config file in the project, so that it would be included as part of the NuGet package. In this file, I wrote the XML document transformations I needed and Deployment Manager took care of the rest. Another option is to set up ‘variables’ for your project, which allow you to specify key-value pairs for your configuration file, and which environment to apply them to. You’ll find Variables as a full left-hand submenu within the ‘Projects’ tab. These features will definitely be of interest if you have a large number of environments! There are still many other features that I didn’t get a chance to play around with like running PowerShell scripts for more personalised deployments. Maybe next time! Also, let’s not forget that my use case in this article is a very simple one – deploying a single package. I don’t believe that all projects will be equally as simple, but I already appreciate how much easier Deployment Manager could make my life. I look forward to the possibility of moving our other sites over to Deployment Manager in the near future.   Conclusion In this article I have described the steps involved in setting up and configuring an instance of Deployment Manager, creating a new automated deployment process, and using this to actually carry out a deployment. I’ve tried to mention some of the features I found particularly useful, such as error logging, easy release management allowing you to deploy the same release multiple times, and configuration file transformations. If I had to point out one issue, then it would be that the releases are immutable, which from a development point of view makes sense. However, this causes confusion where I have to create a new release to deploy to a newly set up environment – I cannot simply deploy an old release onto a new environment, the whole release needs to be recreated. I really liked how easy it was to get going with the product. Setting up Format SQL and making a first deployment took very little time. Especially when you compare it to how long it takes me to manually deploy the other site, as I described earlier. I liked how it let me know what I needed to do next, with little messages flagging up that I needed to ‘create environments’ or ‘add some deployment steps’ before I could continue. I found the dashboard incredibly convenient. As the number of projects and environments increase, it might become awkward to try and search them and find out what state they are in. Instead, the dashboard handily keeps track of the latest deployments of each project and lets you know what version is running on each of the environments, and when that deployment occurred. Finally, do you remember my complaint about having to rename folders so that I could keep track of what build they came from? This is yet another thing that Deployment Manager takes care of for you. Each release is put into its own directory, which takes the name of whatever version number that release has, though these can be customised if necessary. If you’d like to take a look at Deployment Manager for yourself, then you can download it here.

    Read the article

  • How should I remember what I was doing and why on a project 3 months back?

    - by TheIndependentAquarius
    I was working on this project 3 months back, and then suddenly another urgent project appeared and I was asked to shift my attention there. Now, from tomorrow I'll be heading back to my old project and I realize that I do not remember what exactly was I doing and where to start! I wish to know how to document the project such that anytime I look back it shouldn't take me more than a few minutes to get going from wherever I left!

    Read the article

  • Import SSIS Project in Denali CTP1

    For years Analysis Services has had the ability to take an existing database from a server and reverse engineer it into a BIDS project.  This is extremely useful when all you have is the running instance of the database and the project that created it has long since disappeared.  Reverse engineering has never been a feature of SSIS until now. Let me walk you through the simple steps. The first step is that you obviously have to have a project deployed to an SSIS Catalog.  I will do a video on this soon but in case you can’t wait then my good buddy Jamie Thomson has written it up here As you can see I have a project called imaginatively “Denali1” with one package “Package.dtsx” The next thing we need to do is fire up BIDS and choose the right project type (Integration Services Import Project) Now we just follow the wizard.  We make sure we specify on which server to find the Catalog and in which folder to look for the project. Next the setting are validated and we are greeted with the familiar review screen before the creation of our new project from the deployed project happens Hit Import and away we go The result is just what we wanted.

    Read the article

  • Way to update / refresh / reschedule project plan after adding a vacation / changing calendar

    - by CodeCanvas
    I had created a project plan using MS-Project 2010 (not server). I had set the task schedule mode to "Auto Scheduled" and entered the necessary tasks. Since it is a single person project I also added one person to the Resource of the file and assigned that resource to all the tasks and leveled the project. After the plan was put in and tasks were leveled I figured the calendar was not correctly set (in UAE the weekend is Friday and Saturday instead of Saturday and Sunday). So, I updated the default calendar (Standard) of the project by going to Project-Change Working Time-Work Weeks and changed them as needed. But after doing this, the tasks are still scheduled over Friday and Saturday even though I have marked them as nonworking days in the standard calendar. I tried the following for the tasks to refresh, but I was not successful: Updated all tasks to use the "Standard" calendar in the project Selected option so that tasks do not ignore resource calendars Added a constraint "As Soon As Possible" Executed "Level All" Any help on solving this issue would be much appreciated, thanks in advance.

    Read the article

  • Creating block devices for openstack deployment using MAAS and juju (nova-volume deployment)

    - by Tom Van Hoof
    Hi, I'm currently trying to get a openstack deployment working by using MAAS with 9 nodes and juju. To do this I found this guide, working with ubuntu 12.04 LTS https://help.ubuntu.com/community/UbuntuCloudInfrastructure and followed it as good as I can. After a vigorous amount of trial and error I finally got to the point where I'm supposed to deploy nova-volume using the "custom" config file. However when my node is started and shows up as running in the "juju status" report the service reports the installation failed. I'm trying to install with juju jitsu by the way. I think it has something to do with the following statement in the openstack.cfg file : nova-volume: # This must be a free block device that is writable on the nova-volume host. block-device: "xvdb" overwrite: "true" I did some research and found that (at least I think) this refers to a Xen Virtual Drive/device, and because the device is not present on the node it's being deployed to, the installation fails. What I don't understand is how I am supposed to have such a block device available on a machine which was completely managed by MAAS. Does anyone here have any experience with this and knows of a way to solve this, or am I missing something big here. Some kind of missing link between the MAAS and a separate XEN host ? My MAAS server is ubuntu 12.04LTS Server. All help is welcome. Kind regards, Tom

    Read the article

  • FilePageSetupHeader in MS Project VBA project: Display image dynamically

    - by Anne Schuessler
    I want to display an image when printing a page from MS Page using the FilePageSetupHeader. It all works fine if I pass in the parameter for the Text property as a string as such FilePageSetupHeader Alignment:=pjRight, Text:="&P""C:\filepath\image.gif""" However, I'd prefer to be able to pass the filepath to the image to display as a variable. Somehow I can't get it right. So if I try something like the following: vImagePath = """&P""""" & prjFilePath & "\image.gif"""""" FilePageSetupHeader Alignment:=pjRight, Text:=vImagePath it just displays the path as a string. I'm pretty sure it boils down to something simple like escaping the quotes in the correct way, but I've been playing around with it for a while now and I can't seem to get it right. Any idea how this works?

    Read the article

  • PERT shows relationships between defined tasks in a project without taking into consideration a time line

    The program evaluation and review technique (PERT) shows relationships between defined tasks in a project without taking into consideration a time line. This chart is an excellent way to identify dependencies of tasks based on other tasks. This chart allows project managers to identify the critical path of a project to minimize any time delays to the project. According to Craig Borysowich in his article “Pros & Cons of the PERT/CPM Method stated the following advantages and disadvantages: “PERT/CPM has the following advantages: A PERT/CPM chart explicitly defines and makes visible dependencies (precedence relationships) between the WBS elements, PERT/CPM facilitates identification of the critical path and makes this visible, PERT/CPM facilitates identification of early start, late start, and slack for each activity, PERT/CPM provides for potentially reduced project duration due to better understanding of dependencies leading to improved overlapping of activities and tasks where feasible.  PERT/CPM has the following disadvantages: There can be potentially hundreds or thousands of activities and individual dependency relationships, The network charts tend to be large and unwieldy requiring several pages to print and requiring special size paper, The lack of a timeframe on most PERT/CPM charts makes it harder to show status although colors can help (e.g., specific color for completed nodes), When the PERT/CPM charts become unwieldy, they are no longer used to manage the project.” (Borysowich, 2008) Traditionally PERT charts are used in the initial planning of a project like in a project that is utilizing the waterfall approach. Once the chart was created then project managers could further analyze this data to determine the earliest start time for each stage in the project. This is important because this information can be used to help forecast resource needs during a project and where in the project. However, the agile environment can approach this differently because of their constant need to be in contact with the client and the other stakeholders.  The PERT chart can also be used during project iteration to determine what is to be worked on next, such as a prioritized To-Do list a wife would give her husband at the start of a weekend. In my personal opinion, the COTS-centric environment would not really change how a company uses a PERT chart in their day to day work. The only thing I can is that there would be less tasks to include in the chart because the functionally milestones are already completed when the components are purchased. References: http://www.netmba.com/operations/project/pert/ http://web2.concordia.ca/Quality/tools/20pertchart.pdf http://it.toolbox.com/blogs/enterprise-solutions/pros-cons-of-the-pertcpm-method-22221

    Read the article

  • Common business drivers that lead to creating and sustaining a project

    Common business drivers that lead to creating and sustaining a project include and are not limited to: cost reduction, increased return on investment (ROI), reduced time to market, increased speed and efficiency, increased security, and increased interoperability. These drivers primarily focus on streamlining and reducing cost to make a company more profitable with less overhead. According to Answers.com cost reduction is defined as reducing costs to improve profitability, and may be implemented when a company is having financial problems or prevent problems. ROI is defined as the amount of value received relative to the amount of money invested according to PayperclickList.com.  With the ever increasing demands on businesses to compete in today’s market, companies are constantly striving to reduce the time it takes for a concept to become a product and be sold within the global marketplace. In business, some people say time is money, so if a project can reduce the time a business process takes it in fact saves the company which is always good for the bottom line. The Social Security Administration states that data security is the protection of data from accidental or intentional but unauthorized modification, destruction. Interoperability is the capability of a system or subsystem to interact with other systems or subsystems. In my personal opinion, these drivers would not really differ for a profit-based organization, compared to a non-profit organization. Both corporate entities strive to reduce cost, and strive to keep operation budgets low. However, the reasoning behind why they want to achieve this does contrast. Typically profit based organizations strive to increase revenue and market share so that the business can grow. Alternatively, not-for-profit businesses are more interested in increasing their reach within communities whether it is to increase annual donations or invest in the lives of others. Success or failure of a project can be determined by one or more of these drivers based on the scope of a project and the company’s priorities associated with each of the drivers. In addition, if a project attempts to incorporate multiple drivers and is only partially successful, then the project might still be considered to be a success due to how close the project was to meeting each of the priorities. Continuous evaluation of the project could lead to a decision to abort a project, because it is expected to fail before completion. Evaluations should be executed after the completion of every software development process stage. Pfleeger notes that software development process stages include: Requirements Analysis and Definition System Design Program Design Program Implementation Unit Testing Integration Testing System Delivery Maintenance Each evaluation at every state should consider all the business drivers included in the scope of a project for how close they are expected to meet expectations. In addition, minimum requirements of acceptance should also be included with the scope of the project and should be reevaluated as the project progresses to ensure that the project makes good economic sense to continue. If the project falls below these benchmarks then the project should be put on hold until it does make more sense or the project should be aborted because it does not meet the business driver requirements.   References Cost Reduction Program. (n.d.). Dictionary of Accounting Terms. Retrieved July 19, 2009, from Answers.com Web site: http://www.answers.com/topic/cost-reduction-program Government Information Exchange. (n.d.). Government Information Exchange Glossary. Retrieved July 19, 2009, from SSA.gov Web site: http://www.ssa.gov/gix/definitions.html PayPerClickList.com. (n.d.). Glossary Term R - Pay Per Click List. Retrieved July 19, 2009, from PayPerClickList.com Web site: http://www.payperclicklist.com/glossary/termr.html Pfleeger, S & Atlee, J.(2009). Software Engineering: Theory and Practice. Boston:Prentice Hall Veluchamy, Thiyagarajan. (n.d.). Glossary « Thiyagarajan Veluchamy’s Blog. Retrieved July 19, 2009, from Thiyagarajan.WordPress.com Web site: http://thiyagarajan.wordpress.com/glossary/

    Read the article

  • vs 2010 Deployment without Web Deploy

    - by dritterweg
    with vs 2008 I always used Web Deployment Project to build to three different environments. It is maybe not the best solution, since I still have to xcopy the built files to the server, but it is simple. now with vs 2010 it looks promising, but It looks also complicated. My hosting doesn't have Web Deploy, the newest feature and the flagship technology for deployment in vs2010. My question how can I just build for each environment and copy the files over to the server. Using the Build Deployment Package will create the zip file and when I extract it, it will output so many files and confusing folder structure. Anyone has suggestion?

    Read the article

  • Solutions for Project management [closed]

    - by user14416
    The team consists of 3 people. The method of development is Scrum. The language of the project is C++. The project will be under the control of the git system. The start up budget is 0. The following things have to be chosen: Build and Version Numbering Project documentation ( file with the most common info for current stage of the project, which will be changed every time the new version or subversion of the project emerges ) Project management tool ( like Trac or Redmine, I cannot use them, because there is no hosting ) Code documentation ( I consider Doxygen ) The following questions have arisen: What can you add to the above list of the main solutions for project management in the described project? One of three project participants has linux os (No MS Office), one has Windows and MS Office (does not want to use Libre or Open Office), one has Windows, but does not have MS Office. What formats, tools can u suggest using for project documentation? The variant of using online wiki does not fit, it must be files. OneNote mb is a good tool for project management, but because of the reason mentioned above it is not possible. What can you advise? Offer a system for Build and Version Numbering.

    Read the article

  • Project Server 2010 Beta - can't connect Project client to projects hosted on server

    - by Chris W
    We have a Project 2010 Beta installed on SharePoint 2010 Beta as test set-up whilst we wait for the release versions. Whilst the installation seemed to complete without any issues we're unable to open any projects within the Project 2010 client app. Project pops up an error 'Could not retrieve server initialization data'. My local event logs list some errors from MSSOAP that simply state an unanticipated error occurred during the processing of the request. The server doesn't log any errors. The Sharepoint set up is a farm containing 3 SharePoint servers. I log in to server 'PORTAL' but the Project Server stuff is configured to run on one of the other SharePoint boxes. I presume others have managed to get this working - has anyone got any ideas as to what could be wrong. Everything is patched correctly as far as I can tell.

    Read the article

  • Is there a recognized Deployment Process?

    - by Steve Griff
    Hello there, We have a decent deployment process for our web sites utilized in our company that works pretty well. I was wondering, is there a recognized, standard for deploying? Or is it a case of everyone having their own kind of deployment process that is built from their own experience and how the coding architecture is managed? Regards, Steve Griff

    Read the article

  • Where is the visual studio 2010 setup and deployment project template

    - by Tom Brown
    In VS 2008, when I create a project I can add a setup project easily. File-Add-New Project... then in Project types: select Other Project Types-Setup and Deployment - and there are a whole load of installed templates - including Setup Project to create an MSI installer. But in VS 2010 - there are no templates in the Setup and Deployment - I'm using the Pro edition, not Express or beta: Is this the same for you - or do I have a duff installation of VS 2010? Otherwise how do I create an MSI installer for my projects?

    Read the article

  • Deployment Setup (.Net) - Search target machine -> Registry search (64 bit)

    - by Joonas Kirsebom
    I have a windows installer project which installs some software (winform, service, mce addin). During the installation I need to search the machine for a registry key. This is done with with the "Launch Condition" - "Add Registry Search" (Deployment Project). I have filled out all the properties right, and checked against the regestry that the value actually can be found. The problem is that the "Registry Search" searches in the x86 part of the registry (HKEY_LOCAL_MACHINE\SOFTWARE\Wow6432Node\...) although my system is a x64 and the deployment setup is also set to x64. Does anyone know how to force the "Registry Search" to search the x64 registry? Or know about a workaround? The weird thing about this, is that Registry setting in the deployment setup is writing to the right registry (x64). My idea is that the "Registry Search" program is only developed to the x86 architecture, and therefore can't read the right registry. I found this article from microsoft, so it seams that they know about this problem. https://connect.microsoft.com/VisualStudio/feedback/ViewFeedback.aspx?FeedbackID=110105&wa=wsignin1.0#details My system is: Windows 7 64bit Visual Studio 2008

    Read the article

  • Is measuring software project metrics popular in todays industry?

    - by Russ K
    I encountered a developer who wanted some outside advice on their teams project. I found out they're developing a huge software suite for the companies executives, project manager and developers that can calculate metrics automatically and graph them per iteration. As a student from a computer science background I know very little on metrics and their importance, but my questions are: Do most companies have some way, doesn't have to be an elegant program, to measure meaningful metrics? Which metrics, single or combined, help you narrow down your projects scope and estimates? As a person who analyzes metrics, how often do you base decisions off of them? IE. Tests failed per week is increasing drastically? Do you feel that the introduction of studying metrics has helped you understand the project better? Not sure why but the developers project intrigued me and I must know more. If y

    Read the article

  • Drive project success & financial performance with business critical Enterprise Project Portfolio Management

    - by Sylvie MacKenzie, PMP
    Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:10.0pt; font-family:"Times New Roman","serif";} Oracle Primavera invites you to the first in a series of three webcasts linking Enterprise Project Portfolio Management with enhanced operational performance and better financial results. Few organizations fully understand the impact projects have on their business. Consistently delivering successful projects is vital to the financial success of an asset intensive organization. Enterprise Project Portfolio Management (EPPM) is not a new concept yet for many organizations it is not considered "business critical". Webcast 1: Plan – Aligning project selection and prioritization with corporate objectives This webcast will look at 2 key questions: Are you aligning portfolio decisions with strategic objectives? How do you effectively measure the success of your portfolio decisions? Hear from Accenture who'll present a compelling case for why asset intensive organizations should consider EPPM as business critical. They'll explore: How technology is being used to enhance project delivery How collaboration enhances delivery performance The major challenges associated with the planning phase of a project Next hear from Geoff Roberts, Industry Strategist from Oracle Primavera. With over 30 years experience in project management/project controls in the construction, utilities and oil & gas sectors, Geoff will investigate how EPPM is a best practice and can support an organization through project selection and prioritization ensuring that decisions are aligned with corporate objectives. Don’t miss out, register today!

    Read the article

  • What options do individual have to fork a project?

    - by skrco
    Let's assume our example individual has an idea, engagement, ... to fork project. By project I mean any kind of software - thick client, web site, portal, service, driver, plc, ... - anything that can be programmed. Motto of question: What options do our example individual have to fork this project from the early beginning through getting collaborators and users to mature software? Here are the main subquestions: Sandbox phase: Where can he announce his idea and proposal and receive positive/negative critic and feedback? Development phase: Where can he build his team to work on this project? Yet deployed phase: Where can he schedule tasks, assign tickets and bugs to be solved? and the list can go on... What really interests me is the "sandbox phase question".

    Read the article

  • Salesforce deployment guideline using Sandbox

    - by ybbest
    Create Deployment connection Enable the inbound change set settings on the destination Environment you would like to deploy the solution to. Enable the outbound change set settings on the source Environment where you package your application. The best practice is to Package everything in the changeset and salesforce will only deploy the change into your destination environment. If you only package the change, you could miss some of the changes. You can clone the change set on the source destination however the initial packaging takes some time as you need to go through everything and select the components manually. After the change set is packaged, you need to upload the chagneset so that destination environment can see the change set in its incoming change set list. Click Validate the change set before deployment. References: Development Lifecycle Guide Change Sets Best Practices

    Read the article

  • Safe project development - free repositories

    - by friko
    Some time ago we started a private hobby project. We made a project on javaforge.com, created an svn repository and started developing our app. Right now we are really far with our project, but somehow we never worried if our project is really safe on such free development tool like javaforge ? I mean, what if our project would earn some money and the source code become valuable ? Could it be stolen or could somebody take it over ? We want to be sure that we are not wasting our time and want to be really sure about our project safety. Is it possible to safely develop a project in such free repository ? We would like also to start using redmine, so if you know any safe place for moving our project, please take this under consideration. Thanks a lot.

    Read the article

  • Assigning resources to MS Project 2007

    - by adam
    Hi, I'm planning a redesign of a site in Project 2007. I have three developers to hand, all with the same skills. There are about 80 templates to be rendered as part of the redesign, and each template has been added as a project task. Each of these tasks can be done by any of the 3 devs, and each will take a day (with a few exceptions). There is no order in which the tasks must be completed, so there are no predecessor rules. I'd like to be able to assign tasks to a 'Developer' resource group, and for Project to see that three tasks can be done at once (as the group has three resources members) and queue the tasks as such. Googling leads me to Team Assignment, but that appears to be part of Project Server. Surely I can do this in standalone Project? Thanks, Adam

    Read the article

  • The Future of Project Management is Social

    - by Natalia Rachelson
    Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} A guest post by Kazim Isfahani, Director, Product Marketing, Oracle Rapid Ascent. Breakneck Speed. Lightning Fast. Perhaps even overwhelming. No matter which set of adjectives we use to describe it, social media’s rise into the enterprise mainstream has been unprecedented. Indeed, the big 4 social media powerhouses (Facebook, Google+, LinkedIn, and Twitter), have nearly 2 Billion users between them. You may be asking (as you should really) “That’s all well and good for the consumer, but for me at my company, what’s your point? Beyond the fact that I can check and post updates, that is.” Good question, kind sir. Impact of Social and Collaboration on Project Management I’ll dovetail this discussion to the project management realm, since that’s what I’m writing about. Speed is a big challenge for project-driven organizations. Anything that can help speed up project delivery - be it a new product introduction effort or a geographical expansion project - fast is a good thing. So where does this whole social thing fit particularly since there are already a host of tools to help with traditional project execution? The fact is companies have seen improvements in their productivity by deploying departmental collaboration and other social-oriented solutions. McKinsey’s survey on social tools shows we have reached critical scale: 72% of respondents report that their companies use at least one and over 40% say they are using social networks and blogs. We don’t hear as much about the impact of social media technologies at the project and project manager level, but that does not mean there is none. Consider the new hire. The type of individual entering the workforce and executing on projects is a generation of worker expecting visually appealing, easy to use and easy to understand technology meshing hand-in-hand with business processes. Consider the project manager. The social era has enhanced the role that the project manager must play. Today’s project manager must be a supreme communicator, an influencer, a sympathizer, a negotiator, and still manage to keep all stakeholders in the loop on project progress. Social tools play a significant role in this effort. Now consider the impact to the project team. The way that a project team functions has changed, with newer, social oriented technologies making the process of information dissemination and team communications much more fluid. It’s clear that a shift is occurring where “social” is intersecting with project management. The Rise of Social Project Management We refer to the melding of project management and social networking as Social Project Management. Social Project Management is based upon the philosophy that the project team is one part of an integrated whole, and that valuable and unique abilities exist within the larger organization. For this reason, Social Project Management systems should be integrated into the collaborative platform(s) of an organization, allowing communication to proceed outside the project boundaries. What makes social project management "social" is an implicit awareness where distributed teams build connected links in ways that were previously restricted to teams that were co-located. Just as critical, Social Project Management embraces the vision of seamless online collaboration within a project team, but also provides for, (and enhances) the use of rigorous project management techniques. Social Project Management acknowledges that projects (particularly large projects) are a social activity - people doing work with people, for other people, with commitments to yet other people. The more people (larger projects), the more interpersonal the interactions, and the more social affects the project. The Epitome of Social - Fusion Project Portfolio Management If I take this one level further to discuss Fusion Project Portfolio Management, the notion of Social Project Management is on full display. With Fusion Project Portfolio Management, project team members have a single place for interaction on projects and access to any other resources working within the Fusion ERP applications. This allows team members the opportunity to be informed with greater participation and provide better information. The application’s the visual appeal, and highly graphical nature makes it easy to navigate information. The project activity stream adds to the intuitive user experience. The goal of productivity is pervasive throughout Fusion Project Portfolio Management. Field research conducted with Oracle customers and partners showed that users needed a way to stay in the context of their core transactions and yet easily access social networking tools. This is manifested in the application so when a user executes a business process, they not only have the transactional application at their fingertips, but also have things like e-mail, SMS, text, instant messaging, chat – all providing a number of different ways to interact with people and/or groups of people, both internal and external to the project and enterprise. But in the end, connecting people is relatively easy. The larger issue is finding a way to serve up relevant, system-generated, actionable information, in real time, which will allow for more streamlined execution on key business processes. Fusion Project Portfolio Management’s design concept enables users to create project communities, establish discussion threads, manage event calendars as well as deliver project based work spaces to organize communications within the context of a project – all within a secure business environment. We’d love to hear from you and get your thoughts and ideas about how Social Project Management is impacting your organization. To learn more about Oracle Fusion Project Portfolio Management, please visit this link

    Read the article

  • Custom Profile Provider with Web Deployment Project

    - by Ben Griswold
    I wrote about implementing a custom profile provider inside of your ASP.NET MVC application yesterday. If you haven’t read the article, don’t sweat it.  Most of the stuff I write is rubbish anyway. Since you have joined me today, though, I might as well offer up a little tip: you can run into trouble, like I did, if you enable your custom profile provider inside of an application which is deployed using a Web Deployment Project.  Everything will run great on your local machine and you’ll probably take an early lunch because you got the code running in no time flat and the build server is happy and all tests pass and, gosh, maybe you’ll just cut out early because it is Friday after all.  But then the first user hits the integration machine and, that’s right, yellow screen of death. Lucky you, just as you’re walking out the door, the user kindly sends the exception message and stack trace: Value cannot be null. Parameter name: type Description: An unhandled exception occurred during the execution of the current web request. Please review the stack trace for more information about the error and where it originated in the code. Stack Trace: [ArgumentNullException: Value cannot be null. Parameter name: type] System.Activator.CreateInstance(Type type, Boolean nonPublic) +2796915 System.Web.Profile.ProfileBase.CreateMyInstance(String username, Boolean isAuthenticated) +76 System.Web.Profile.ProfileBase.Create(String username, Boolean isAuthenticated) +312 User error?  Not this time. Damn! One hour later… you notice the harmless “Treat as library component (remove the App_Code.compiled file)” setting on the Output Assemblies Tab of your Web Deployment Project. You have no idea why, but you uncheck it.  You test and everything works great both locally and on the integration machine.  Application users think you’re the best and you’re still going to catch the last half hour of happy hour.  Happy Friday.

    Read the article

  • AIA - Server Topologien und Deployment

    - by Hans Viehmann
    Es gibt ein neues White Paper, in dem die verschiedenen Varianten von AIA Topologien ausführlich beschrieben sind. Die unterschiedlichen Möglichkeiten ergeben sich vor allem aus dem Betrieb mehrerer AIA Instanzen parallel (z.B. Aufteilung in Dev/Test/Prod, Aufteilung zur Lastverteilung, Zuordnung zu unterschiedlichen Geografien, ...). Weitere Variationsmöglichkeiten bietet die Verteilung der unterschiedlichen Bestandteile des DB-Schemas (AIA Metadaten, Cross-Referencing Daten, AIA Lifecycle Repository, JMS Schema, etc.). Und schließlich können auch verschiedene Topologien der SOA Laufzeitumgebung, wie beispielsweise SOA Cluster, unterstützt werden. Diese Varianten mit ihren typischen Einsatzfeldern werden in dem Dokument ebenso beschrieben, wie deren Umsetzung mit Hilfe des Installers.In einem zweiten Teil befasst sich das White Paper mit dem Deployment der AIA Artefakte in diese Topologien, und zwar insbesondere mit dem Tool-Support durch die "Project Lifecycle Workbench" und dem "AIA Installation Driver". Erstere ist eine neue Komponente in AIA 11gR1, die in der Lage ist, am Ende des Entwicklungszyklus Deployment Pläne zu generieren, während der ebenfalls neue "AIA Installation Driver" dann die Artefakte dann in die Zielumgebung überträgt.Das White Paper ist noch nicht auf oracle.com verfügbar und ist leider so umfangreich, dass es nicht auf auf blogs.oracle.com hochgeladen werden kann. Bei Interesse verschicke ich es aber gern per Mail.

    Read the article

  • What deployment framework to use?

    - by jeruki
    We are trying to figure out what deployment method/framework to use with a python application, it has a basic wsgi server to make some REST resources available and a set of static web pages with the interface that are served through apache. The situation is as follows: My team works in isolated parts of the program and sometimes together in specific modules, we have different testing servers and one master server, we all work locally, sync the code using git, and then run a bash script that copies the files from the windows machines to the indicated linux server(using ssh) and then restarts the app. After thinking about it this doesn't seem to be the right way to do it, the script overwrites all the files in the server with the local files everytime. We want to be able to work in the same server without the worry of overwriting other people's code and we need to deploy to different servers to avoid restarting the service while others work with it and in the near future we need to deploy to the master or several clones of the master server when the application reaches a more mature state. We found serveral options capistrano, kwate, chef or fortress, even fleet but we wanted to have opinions from people that has used them to be sure it is what we need. So this are the main questions: Are these the kind of programs we should be looking at to achive a safe concurrent deployment process? Which one have you used/recommend and why? do you think it would help in our actual situation? Thank you so much for your feedback and advice on this.

    Read the article

< Previous Page | 1 2 3 4 5 6 7 8 9 10 11 12  | Next Page >