Search Results

Search found 654 results on 27 pages for 'upgrades'.

Page 22/27 | < Previous Page | 18 19 20 21 22 23 24 25 26 27  | Next Page >

  • Performance of ClearCase servers on VMs?

    - by Garen
    Where I work, we are in need of upgrading our ClearCase servers and it's been proposed that we move them into a new (yet-to-be-deployed) VMmare system. In the past I've not noticed a significant problem with performance with most applications when running in VMs, but given that ClearCase "speed" (i.e. dynamic-view response times) is so latency sensitive I am concerned that this will not be a good idea. VMWare has numerous white-papers detailing performance related issues based on network traffic patterns that re-inforces my hypothesis, but nothing particularly concrete for this particular use case that I can see. What I can find are various forum posts online, but which are somewhat dated, e.g.: ClearCase clients are supported on VMWare, but not for performance issues. I would never put a production server on VM. It will work but will be slower. The more complex the slower it gets. accessing or building from a local snapshot view will be the fastest, building in a remote VM stored dynamic view using clearmake will be painful..... VMWare is best used for test environments (via http://www.cmcrossroads.com/forums?func=view&catid=31&id=44094&limit=10&start=10) and: VMware + ClearCase = works but SLUGGISH!!!!!! (windows)(not for production environment) My company tried to mandate that all new apps or app upgrades needed to be on/moved VMware instances. The VMware instance could not handle the demands of ClearCase. (come to find out that I was sharing a box with a database server) Will you know what else would be on that box besides ClearCase? Karl (via http://www.cmcrossroads.com/forums?func=view&id=44094&catid=31) and: ... are still finding we can't get the performance using dynamic views to below 2.5 times that of a physical machine. Interestingly, speaking to a few people with much VMWare experience and indeed from running builds, we are finding that typically, VMWare doesn't take that much longer for most applications and about 10-20% longer has been quoted. (via http://www.cmcrossroads.com/forums?func=view&catid=31&id=44094&limit=10&start=10) Which brings me to the more direct question: Does anyone have any more recent experience with ClearCase servers on VMware (if not any specific, relevant performance advice)?

    Read the article

  • Multiple OS's and GRUB chainloading

    - by Kent
    Hi, I want to have multiple OS installations and I have been advised that chain loading using GRUB is a good way to handle this. I have looked at tutorials on the web but I still have some questions before I can start. I want: Windows XP: 20 GB. For running some school stuff and a game which does not work through WINE. Xubuntu 9.04: 85 GB. My main OS. Another Linux distribution: 15 GB . For experimenting and trying Linux distributions out. I will: Wipe and install various distributions quite often on the 15 Use dd to make a copy of my Windows partition after installing it and getting things to work as I like. My experience is that Windows needs to be re-installed maybe once per year to not get bloated and slow. I have been told: To use GRUB chain loading. It will make it easier when kernel upgrades are made in the Linux distributions, as they modify the GRUB boot-menu. To my understanding I need to: (I might very well be mistaken) Install Windows first. Then install Xubuntu and let it write over the MBR with GRUB (I guess this is the default). Get the GRUB on the MBR start Windows XP if I want to (it's done by default), start Xubuntu using the kernel of my choice or defer execution to the boot sector of my other Linux distribution. The actual chain loading will only occur when I want to start my experimental install of Linux. I wonder: Is step 3 above correct and a good way to handle this? Is it also a good way to use chain-loading for both Xubuntu and my experimental Linux installation? How do I get a Linux distribution to install the boot loader it comes with to the boot sector of its partition and not to the MBR? If I can't get it to not touch the MBR. Then I could make a backup of the MBR using dd and then write it back after installing my experimental Linux installation. But then, how would I get the boot loader (lets say GRUB) into the boot sector of the experimental Linux installation? How would it work if said Linux installation gets a new kernel update and needs to update the GRUB menu?

    Read the article

  • What are the most likely bottlenecks determining the performance of CamStudio screen recording?

    - by Steve314
    When doing screen recording, I can get a frame rate of maybe 15 frames per second for the full screen on my 1080p monitor using the XVID codec. I can increase the speed a bit by recording a region, changing screen modes, and tweaking other settings, but I'm curious what hardware upgrades might give me the biggest bang for my buck. My PC is budget, but modern... Athlon 2 X4 645 (3.1GHz, quad core, limited cache) processor. 4GB single channel DDR3 1066 RAM. ASRock motherboard with NVidia GeForce 7025/nForce 630a Chipset. ATI Radeon HD 5450 graphics card - 512MB on board, not configured to steal system RAM. I dual-boot Windows XP and Windows 7. For the moment, XP is my bigger performance concern as it's still my getting-things-done O/S as opposed to my browser-host O/S. My goal is to make a few programming-related tutorials. For a lot of that I don't need screen recording - I can make up some slides, record audio with the PC switched off, yada yada. When I do need screen recording, I'll mostly be recording Notepad++, Visual Studio or a command prompt. Occasionally, I may be recording some kind of graphics or diagram program and using my pre-Bamboo cheap Wacom tablet - I have the CS2 versions of Photoshop and Illustrator, but I'd much more likely be using Microsoft Paint. Basically, what I'll be recording won't be making huge demands on the machine - but recording a fair number of pixels (720p preferred) will be useful. What's particularly wierd - not so long ago I still had a five-year-old Pentium 4 based PC. And (with the same 1080p monitor) it could record at not far from the same frame rate. So clearly the performance issues are more subtle than just throw-money-at-it. My first guess would be that the main bottleneck is the bandwidth for transferring data to/from the graphics card. Is that likely to be correct? In support of that, see this [Radeon HD 5450 review][1] - the memory bandwidth is only 12.8 GB/s. If you can't get data out of graphics memory quickly, you can't transfer it back to the system memory quickly. Apparently, that's slower than some top-end cards in 2002.

    Read the article

  • Hyper-V Ubuntu Networking Problems Copying Large Amounts of Data

    - by Anonymous
    I am trying to copy a large amount (about 50 GB) of data over my network from a Hyper-V-hosted virtual machine running Ubuntu 11.04 (Natty Narwhal) to another (non-virtual) Ubuntu host that I plan to use for testing upgrades to one of our web applications. The problem I am having is with the virtual machine, which I shall refer to in what follows as "source.host". This machine is running 64-bit Ubuntu Server with the 2.6.38-8-server kernel and the Microsoft Linux Integration Components for Hyper-V kernel modules (hv_utils, hv_timesource, hv_netvsc, hv_blkvsc, hv_storvsc, and hv_vmbus) loaded. It uses a Hyper-V "synthetic network adapter" for its networking interface. To do the copy, I log on to the machine with the data and run the following commands (Call the remote machine "destination.host".): $ cd /path/to/data $ tar -cvf - datafolder/ | ssh [email protected] "cat > ~/data.tar" This runs for a while and then suddenly stops after transferring somewhere from 2-6 GB. The terminal on the source.host machine displays a Write failed: broken pipe error. The odd part is this: after this occurs, the "source.host" machine is no longer able to talk to the rest of the network. I cannot ping any other hosts on the network from the "source.host" machine, and I cannot ping the "source.host" machine from any other host on the network. I am equally unable to access the any of the web services hosted on "source.host". Running ifconfig on "source.host" shows the network adapter to be up and running as usual with the correct IP address and everything. I tried restarting the networking service with $ /etc/init.d/networking restart but the problem does not go away. Restarting the machine makes it capable of talking to the network again -- it can ping and be pinged by other hosts, and the web services are also accessible and usable as normal -- but attempting the copy operation again results in the same failure, requiring another restart. As an experiment, I tried replacing the tar -- ssh pipeline above with a straight scp: $ scp -r datafolder/ [email protected]:~ but to no avail Thinking that the issue might have to do with the kernel packet-send buffers filling up, I tried increasing the buffer size to 12 MB (up from the 128 KB default) with # echo 12582911 > /proc/sys/net/core/wmem_max but this also had no effect. I'm guessing at this point that it might be a problem with the Microsoft synthetic network driver, but I don't really know. Does anyone have any suggestions? Thank you very much in advance!

    Read the article

  • Incremental RPM package version "numbers" for x.y.z > x.y.z-beta (or alpha, rc, etc)

    - by Jonathan Clarke
    In order to publish RPM packages of several different versions of some software, I'm looking for a way to specify version "numbers" that are considered "upgrades", and include the differentiation of several pre-release versions, such as (in order): "2.4.0 alpha 1", "2.4.0 alpha 2", "2.4.0 alpha 3", "2.4.0 beta 1", "2.4.0 beta 2", "2.4.0 release candidate", "2.4.0 final", "2.4.1", "2.4.2", etc. The main issue I have with this is that RPM considers that "2.4.0" comes earlier than "2.4.0.alpha1", so I can't just add the suffix on the end of the final version number. I could try "2.4.0.alpha1", "2.4.0.beta1", "2.4.0.final", which would work, except for the "release candidate" that would be considered later than "2.4.0.final". An alternative I considered is using the "epoch:" section of the RPM version number (the epoch: prefix is considered before the main version number so that "1:2.4.0" is actually earlier than "2:1.0.0"). By putting a timestamp in the epoch: field, all the versions get ordered as expected by RPM, because their versions appear to increment in time. However, this fails when new releases are made on several major versions at the same time (for example, 2.3.2 is released after 2.4.0, but their version for RPM are "20121003:2.3.2" and "20120928:2.4.0" and systems on 2.3.2 can't get "upgraded" to 2.4.0, because rpm sees it as an older version). In this case, yum/zypper/etc refuse to upgrade to 2.4.0, thus my problem. What version numbers can I use to achieve this, and make sure that RPM always considers the version numbers to be in order. Or if not version numbers, other mechanism in RPM packaging? Note 1: I would like to keep the "Release:" field of the spec file for it's original purpose (several releases of packages, including packaging changes, for the same version of the packaged software). Note 2: This should work on current production versions of major distributions, such as RHEL/CentOS 6 and SLES 11. But I'm interested in solutions that don't, too, so long as they don't involve recompiling rpm! Note 3: On Debian-like systems, dpkg uses a special component in the version number which is the "~" (tilde) character. This causes dpkg to count the suffix as "negative" ordering, so that "2.4.0~anything" will come before "2.4.0". Then, normal ordering applies after the "~", so "2.4.0~alpha1" comes before "2.4.0~beta1" because "alpha" comes before "beta" alphabetically. I'm not necessarily looking to use the same scheme for RPM packages (I'm pretty sure no such equivalent exists), so this is just FYI.

    Read the article

  • Clean Up the New Ubuntu Grub2 Boot Menu

    - by Trevor Bekolay
    Ubuntu adopted the new version of the Grub boot manager in version 9.10, getting rid of the old problematic menu.lst. Today we look at how to change the boot menu options in Grub2. Grub2 is a step forward in a lot of ways, and most of the annoying menu.lst issues from the past are gone. Still, if you’re not vigilant with removing old versions of the kernel, the boot list can still end up being longer than it needs to be. Note: You may have to hold the SHIFT button on your keyboard while booting up to get this menu to show. If only one operating system is installed on your computer, it may load it automatically without displaying this menu. Remove Old Kernel Entries The most common clean up task for the boot menu is to remove old kernel versions lying around on your machine. In our case we want to remove the 2.6.32-21-generic boot menu entries. In the past, this meant opening up /boot/grub/menu.lst…but with Grub2, if we remove the kernel package from our computer, Grub automatically removes those options. To remove old kernel versions, open up Synaptic Package Manager, found in the System > Administration menu. When it opens up, type the kernel version that you want to remove in the Quick search text field. The first few numbers should suffice. For each of the entries associated with the old kernel (e.g. linux-headers-2.6.32-21 and linux-image-2.6.32-21-generic), right-click and choose Mark for Complete Removal. Click the Apply button in the toolbar and then Apply in the summary window that pops up. Close Synaptic Package Manager. The next time you boot up your computer, the Grub menu will not contain the entries associated with the removed kernel version. Remove Any Option by Editing /etc/grub.d If you need more fine-grained control, or want to remove entries that are not kernel versions, you must change the files located in /etc/grub.d. /etc/grub.d contains files that hold the menu entries that used to be contained in /boot/grub/menu.lst. If you want to add new boot menu entries, you would create a new file in this folder, making sure to mark it as executable. If you want to remove boot menu entries, as we do, you would edit files in this folder. If we wanted to remove all of the memtest86+ entries, we could just make the 20_memtest86+ file non-executable, with the terminal command sudo chmod –x 20_memtest86+ Followed by the terminal command sudo update-grub Note that memtest86+ was not found by update-grub because it will only consider executable files. However, instead, we’re going to remove the Serial console 115200 entry for memtest86+… Open a terminal window Applications > Accessories > Terminal. In the terminal window, type in the command: sudo gedit /etc/grub.d/20_memtest86+ The menu entries are found at the bottom of this file. Comment out the menu entry for serial console 115200 by adding a “#” to the start of each line. Save and close this file. In the terminal window you opened, enter in the command sudo update-grub Note: If you don’t run update-grub, the boot menu options will not change! Now, the next time you boot up, that strange entry will be gone, and you’re left with a simple and clean boot menu. Conclusion While changing Grub2’s boot menu may seem overly complicated to legacy Grub masters, for normal users, Grub2 means that you won’t have to change the boot menu that often. Fortunately, if you do have to do it, the process is still pretty easy. For more detailed information about how to change entries in Grub2, this Ubuntu forum thread is a great resource. If you’re using an older version of Ubuntu, check out our article on how to clean up Ubuntu grub boot menu after upgrades. Similar Articles Productive Geek Tips Clean Up Ubuntu Grub Boot Menu After UpgradesReinstall Ubuntu Grub Bootloader After Windows Wipes it OutChange the GRUB Menu Timeout on UbuntuHow To Switch to Console Mode for Ubuntu VMware GuestSet Windows as Default OS when Dual Booting Ubuntu TouchFreeze Alternative in AutoHotkey The Icy Undertow Desktop Windows Home Server – Backup to LAN The Clear & Clean Desktop Use This Bookmarklet to Easily Get Albums Use AutoHotkey to Assign a Hotkey to a Specific Window Latest Software Reviews Tinyhacker Random Tips VMware Workstation 7 Acronis Online Backup DVDFab 6 Revo Uninstaller Pro Daily Motivator (Firefox) FetchMp3 Can Download Videos & Convert Them to Mp3 Use Flixtime To Create Video Slideshows Creating a Password Reset Disk in Windows Bypass Waiting Time On Customer Service Calls With Lucyphone MELTUP – "The Beginning Of US Currency Crisis And Hyperinflation"

    Read the article

  • Upgrading to Oracle Enterprise Manager 12c Release 2: Top Tips One Must Know

    - by AnkurGupta
    Recently Oracle announced incremental release of Enterprise Manager 12c called Enterprise Manager 12c Release 2 (EM12c R2) which includes several new exciting features (Press announcement). Right before the official release, we upgraded an internal production site from EM 12c R1 to EM 12c R2 and had an extremely pleasant experience. Let me share few key takeaways as well as few tips from this upgrade exercise. I - Why Should You Upgrade To Enterprise Manager 12c Release 2 While an upgrade is usually recommended primarily to take benefit of the latest features (which is valid for this upgrade as well), I found several other compelling reasons purely from deployment perspective. Standardize your EM deployment:  Enterprise Manager comprises of several different components (OMS, agents, plug-ins, etc) and it might be possible that these are at varied patch levels in your environment. For instance, in case of an environment containing Bundle Patch 1 (customer announcement), there is a good chance that you may not have all the components up-to-date. There are two possible reasons. Bundle Patch 1 involved patching different components (OMS, agents, plug-ins) with multiple one-off patches which may not have been applied to all components yet. Bundle Patch 1 for different platforms were not released together. Which means you may not have got the chance to patch all the components on different platforms. Note: BP1 patches are not mandatory to upgrade to EM12c R2 release EM 12c R2 provides an excellent opportunity to standardize your Cloud Control environment (OMS, repository and agents) and plug-ins to latest versions in single shot. All platform releases are made available simultaneously: For the very first time in the history of EM release, all the platforms were released on day one itself, which means you do not need to wait for platform specific binaries for EM OMS or Agent to perform install or upgrades in a heterogeneous environment. Highly refined and automated process – Upgrade process is by far the smoothest and the cleanest as compared to previous releases of Enterprise manager. Following are the ones that stand out. Automatic Plug-in management – Plug-in upgrade along with new plug-in deployment is supported in upgrade installer wizard which means bulk of the updates to OMS and repository can be done in the same workflow. Saves time and minimizes user inputs. Plug-in Upgrade or Migrate Auto Update: While doing the OMS and repository upgrade, you can use Auto Update screen in Oracle Universal Installer to check for any updates/patches. That will help you to avoid the know issues and will make sure that your upgrade is successful. Allows mass upgrade of EM Agents – A new dedicated menu has been added in the EM console for agent upgrade. Agent upgrade workflow is extremely simple that requires agent name as the only input. ADM / JVMD Manager/Agent upgrade – complete process is supported via UI screens. EM12c R2 Upgrade Guide is much simpler to follow as compared to those for earlier releases. This is attributed to the simpler upgrade process. Robust and Performing Platform: EM12c R2 release not only includes several new features, but also provides a more stable platform which incorporates several fixes and enhancements in the Enterprise Manager framework. II - Few Tips To Remember In my last post (blog link) I shared few tips and tricks from my experience applying the Bundle Patch. Recently I upgraded the same site to EM 12c R2 and found few points that you must take note of, while planning this upgrade. The tips below are also applicable to EM 12c R1 environments that do not have Bundle Patch 1 patches applied. Verify the monitored application certification – Specific targets like E-Business Suite have not yet been certified as managed target in EM 12c R2. Therefore make sure to recheck the Enterprise Manager certification Matrix on My Oracle Support before planning the upgrade. Plan downtime – Because EM 12c R2 is an incremental release of EM 12c, for EM 12c R1 to EM 12c R2 upgrade supports only 1-system upgrade approach, which mean there will be downtime. OMS name change after upgrade – In case of multi OMS environments, additional OMS is renamed after upgrade, which has few implications when you upgrade JVMD and ADP agents on OMS. This is well documented in upgrade guide but make sure you read through all the notes. Upgrading BI Publisher– EM12c R2 is certified with BI Publisher 11.1.1.6.0 only. Therefore in case you are using EM 12c R1 which is integrated with BI Publisher 11.1.1.5.0, you must upgrade the BI Publisher to 11.1.1.6.0. Follow the steps from Advanced Installation and Configuration Guide here. Perform Post upgrade Tasks – Make sure to perform post upgrade steps mentioned in documentation here. These include critical changes that must be done right after upgrade to get the right configuration. For instance Database plug-in should be upgraded to Revision 3 (12.1.0.2.0 [u120804]). Delete old OMS Home – EM12c R1 to EM12c R2 is an out of place upgrade, which means it creates a new oracle home for OMS, plug-ins, etc. Therefore please ensure that You have sufficient extra space for new OMS before starting the upgrade process. You clean up the old OMS home after the upgrade process. Steps are available here. DO NOT remove the agent home on OMS host, because agent is upgraded in-place. If you have standby OMS setup then do look into the steps to upgrade the standby OMS from the upgrade guide before going ahead. Read the right documentation – Make sure to follow the Upgrade guide which provides the most comprehensive information on EM12c R2 upgrade process. Additionally you can refer other resources to get familiar with upgrade concepts. Recorded webcast - Oracle Enterprise Manager Cloud Control 12c Release 2 Installation and Upgrade Overview Presentation - Understanding Enterprise Manager 12.1.0.2 Upgrade We are very excited about this latest release and will look forward to hear back any feedback from your upgrade experience!

    Read the article

  • 11gR2 11.2.0.3 Database Certified with E-Business Suie

    - by Elke Phelps (Oracle Development)
    The 11gR2 11.2.0.2 Database was certified with E-Business Suite (EBS) 11i and EBS 12 almost one year ago today.  I’m pleased to announce that 11.2.0.3, the second patchset for the 11gR2 Database is now certified. Be sure to review the interoperability notes for R11i and R12 for the most up-to-date requirements for deployment. This certification announcement is important as you plan upgrades to the technology stack for your environment. For additional upgrade direction, please refer to the recently published EBS upgrade recommendations article. Database support implications may also be reviewed in the database patching and support article. Oracle E-Business Suite Release 11i Prerequisites 11.5.10.2 + ATG PF.H RUP 6 and higher Certified Platforms Linux x86 (Oracle Linux 4, 5) Linux x86 (RHEL 4, 5) Linux x86 (SLES 10) Linux x86-64 (Oracle Linux 4, 5) -- Database-tier only Linux x86-64 (RHEL 4, 5) -- Database-tier only Linux x86-64 (SLES 10--Database-tier only) Oracle Solaris on SPARC (64-bit) (10) Oracle Solaris on x86-64 (64-bit) (10) -- Database-tier only Pending Platform Certifications Microsoft Windows Server (32-bit) Microsoft Windows Server (64-bit) HP-UX PA-RISC (64-bit) HP-UX Itanium IBM: Linux on System z  IBM AIX on Power Systems Oracle E-Business Suite Release 12 Prerequisites Oracle E-Business Suite Release 12.0.4 or later; or,Oracle E-Business Suite Release 12.1.1 or later Certified Platforms Linux x86 (Oracle Linux 4, 5) Linux x86 (RHEL 4, 5) Linux x86 (SLES 10) Linux x86-64 (Oracle Linux 4, 5) Linux x86-64 (RHEL 4, 5) Linux x86-64 (SLES 10) Oracle Solaris on SPARC (64-bit) (10) Oracle Solaris on x86-64 (64-bit) (10)  -- Database-tier only Pending Platform Certifications Microsoft Windows Server (32-bit) Microsoft Windows Server (64-bit) HP-UX PA-RISC (64-bit) IBM: Linux on System z IBM AIX on Power Systems HP-UX Itanium Database Feature and Option CertificationsThe following 11gR2 11.2.0.2 database options and features are supported for use: Advanced Compression Active Data Guard Advanced Security Option (ASO) / Advanced Networking Option (ANO) Database Vault  Database Partitioning Data Guard Redo Apply with Physical Standby Databases Native PL/SQL compilation Oracle Label Security (OLS) Real Application Clusters (RAC) Real Application Testing SecureFiles Virtual Private Database (VPD) Certification of the following database options and features is still underway: Transparent Data Encryption (TDE) Column Encryption 11gR2 version 11.2.0.3 Transparent Data Encryption (TDE) Tablespace Encryption 11gR2 version 11.2.0.3 About the pending certifications Oracle's Revenue Recognition rules prohibit us from discussing certification and release dates, but you're welcome to monitor or subscribe to this blog for updates, which I'll post as soon as soon as they're available.     EBS 11i References Interoperability Notes - Oracle E-Business Suite Release 11i with Oracle Database 11g Release 2 (11.2.0) (Note 881505.1) Using Oracle 11g Release 2 Real Application Clusters with Oracle E-Business Suite Release 11i (Note 823586.1) Encrypting Oracle E-Business Suite Release 11i Network Traffic using Advanced Security Option and Advanced Networking Option (Note 391248.1) Using Transparent Data Encryption with Oracle E-Business Release 11i (Note 403294.1) Integrating Oracle E-Business Suite Release 11i with Oracle Database Vault 11gR2 (Note 1091086.1) Using Oracle E-Business Suite with a Split Configuration Database Tier on Oracle 11gR2 Version 11.2.0.1.0 (Note 946413.1) Export/Import Process for Oracle E-Business Suite Release 11i Database Instances Using Oracle Database 11g Release 1 or 2 (Note 557738.1) Database Initialization Parameters for Oracle Applications Release 11i (Note 216205.1) EBS 12 References Interoperability Notes - Oracle E-Business Suite Release 12 with Oracle Database 11g Release 2 (11.2.0) (Note 1058763.1) Database Initialization Parameters for Oracle Applications Release 12 (Note 396009.1) Using Oracle 11g Release 2 Real Application Clusters with Oracle E-Business Suite Release 12 (Note 823587.1) Using Transparent Data Encryption with Oracle E-Business Suite Release 12 (Note 732764.1) Integrating Oracle E-Business Suite Release 12 with Oracle Database Vault 11gR2 (Note 1091083.1) Export/Import Process for Oracle E-Business Suite Release 12 Database Instances Using Oracle Database 11g Release 1 or 11g Release 2 (Note 741818.1) Enabling SSL in Oracle Applications Release 12 (Note 376700.1) Related Articles 11gR2 Database Certified with E-Business Suite 11i 11gR2 Database Certified with E-Business Suite 12 11gR2 11.2.0.2 Database Certified with E-Business Suite 12 Can E-Business Users Apply Database Patch Set Updates? On Apps Tier Patching and Support: A Primer for E-Business Suite Users On Database Patching and Support:  A Primer for E-Business Suite Users Quarterly E-Business Suite Upgrade Recommendations;  October 2011 Edition The preceding is intended to outline our general product direction.  It is intended for information purposes only, and may not be incorporated into any contract.   It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decision.  The development, release, and timing of any features or functionality described for Oracle's products remains at the sole discretion of Oracle.

    Read the article

  • Verizon Wireless Supports its Mission-Critical Employee Portal with MySQL

    - by Bertrand Matthelié
    Normal 0 false false false EN-US X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin:0cm; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Cambria","serif"; mso-ascii-font-family:Cambria; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Cambria; mso-hansi-theme-font:minor-latin;} Verizon Wireless, the #1 mobile carrier in the United States, operates the nation’s largest 3G and 4G LTE network, with the most subscribers (109 millions) and the highest revenue ($70.2 Billion in 2011). Verizon Wireless built the first wide-area wireless broadband network and delivered the first wireless consumer 3G multimedia service in the US, and offers global voice and data services in more than 200 destinations around the world. To support 4.2 million daily wireless transactions and 493,000 calls and emails transactions produced by 94.2 million retail customers, Verizon Wireless employs over 78,000 employees with area headquarters across the United States. The Business Challenge Seeing the stupendous rise in social media, video streaming, live broadcasting…etc which redefined the scope of technology, Verizon Wireless, as a technology savvy company, wanted to provide a platform to its employees where they could network socially, view and host microsites, stream live videos, blog and provide the latest news. The IT team at Verizon Wireless had abundant experience with various technology platforms to support the huge number of applications in the company. However, open-source products weren’t yet widely used in the organization and the team had the ambition to adopt such technologies and see if the architecture could meet Verizon Wireless’ rigid requirements. After evaluating a few solutions, the IT team decided to use the LAMP stack for Vzweb, its mission-critical, 24x7 employee portal, with Drupal as the front end and MySQL on Linux as the backend, and for a few other internal websites also on MySQL. The MySQL Solution Verizon Wireless started to support its employee portal, Vzweb, its online streaming website, Vztube, and internal wiki pages, Vzwiki, with MySQL 5.1 in 2010. Vzweb is the main internal communication channel for Verizon Wireless, while Vztube hosts important company-wide webcasts regularly for executive-level announcements, so both channels have to be live and accessible all the time for its 78,000 employees across the United States. However during the initial deployment of the MySQL based Intranet, the application experienced performance issues. High connection spikes occurred causing slow user response time, and the IT team applied workarounds to continue the service. A number of key performance indexes (KPI) for the infrastructure were identified and the operational framework redesigned to support a more robust website and conform to the 99.985% uptime SLA (Service-Level Agreement). The MySQL DBA team made a series of upgrades in MySQL: Step 1: Moved from MyISAM to InnoDB storage engine in 2010 Step 2: Upgraded to the latest MySQL 5.1.54 release in 2010 Step 3: Upgraded from MySQL 5.1 to the latest GA release MySQL 5.5 in 2011, and leveraging MySQL Thread Pool as part of MySQL Enterprise Edition to scale better After making those changes, the team saw a much better response time during high concurrency use cases, and achieved an amazing performance improvement of 1400%! In January 2011, Verizon CEO, Ivan Seidenberg, announced the iPhone launch during the opening keynote at Consumer Electronic Show (CES) in Las Vegas, and that presentation was streamed live to its 78,000 employees. The event was broadcasted flawlessly with MySQL as the database. Later in 2011, Hurricane Irene attacked the East Coast of United States and caused major life and financial damages. During the hurricane, the team directed more traffic to its west coast data center to avoid potential infrastructure damage in the East Coast. Such transition was executed smoothly and even though the geographical distance became longer for the East Coast users, there was no impact in the performance of Vzweb and Vztube, and the SLA goal was achieved. “MySQL is the key component of Verizon Wireless’ mission-critical employee portal application,” said Shivinder Singh, senior DBA at Verizon Wireless. “We achieved 1400% performance improvement by moving from the MyISAM storage engine to InnoDB, upgrading to the latest GA release MySQL 5.5, and using the MySQL Thread Pool to support high concurrent user connections. MySQL has become part of our IT infrastructure, on which potentially more future applications will be built.” To learn more about MySQL Enterprise Edition, Get our Product Guide.

    Read the article

  • SQLAuthority News – Storing Data and Files in Cloud – Dropbox – Personal Technology Tip

    - by pinaldave
    I thought long and hard about doing a Personal Technology Tips series for this blog.  I have so many tips I’d like to share.  I am on my computer almost all day, every day, so I have a treasure trove of interesting tidbits I like to share if given the chance.  The only thing holding me back – which tip to share first?  The first tip obviously has the weight of seeming like the most important.  But this would mean choosing amongst my favorite tricks and shortcuts.  This is a hard task. Source: Dropbox.com My Dropbox I have finally decided, though, and have determined that the first Personal Technology Tip may not be the most secret or even trickier to master – in fact, it is probably the easiest.  My today’s Personal Technology Tip is Dropbox. I hope that all of you are nodding along in recognition right now.  If you do not use Dropbox, or have not even heard of it before, get on the internet and find their site.  You won’t be disappointed.  A quick recap for those in the dark: Dropbox is an online storage site with a lot of additional syncing and cloud-computing capabilities.  Now that we’ve covered the basics, let’s explore some of my favorite options in Dropbox. Collaborate with All The first thing I love about Dropbox is the ability it gives you to collaborate with others.  You can share files easily with other Dropbox users, and they can alter them, share them with you, all while keeping track of different versions in on easy place.  I’d like to see anyone try to accomplish that key idea – “easily” – using e-mail versions and multiple computers.  It’s even difficult to accomplish using a shared network. Afraid that this kind of ease looks too good to be true?  Afraid that maybe there isn’t enough storage space, or the user interface is confusing?  Think again.  There is plenty of space – you can get 2 GB with just a free account, and upgrades are inexpensive and go up to 100 GB of storage.  And the user interface is so easy that anyone can learn to use it. What I use Dropbox for I love Dropbox because I give a lot of presentations and often they are far from home.  I can keep my presentations on Dropbox and have easy access to them anywhere, without needing to have my whole computer with me.  This is just one small way that you can use Dropbox. You can sync your entire hard drive, or hard drives if you have multiple computers (home, work, office, shared), and you can set Dropbox to automatically sync files on a certain timeline, or whenever Dropbox notices that they’ve been changed. Why I love Dropbox Dropbox has plenty of storage, but 2 GB still has a hard time competing with the average desktop’s storage space.  So what if you want to sync most of your files, but only the ones you use the most and share between work and home, and not all your files (especially large files like pictures and videos)?  You can use selective sync to choose which files to sync. Above all, my favorite feature is LanSync.  Dropbox will search your Local Area Network (LAN) for new files and sync them to Dropbox, as well as downloading the new version to all the shared files across the network.  That means that if move around on different computers at work or at home, you will have the same version of the file every time.  Or, other users on the LAN will have access to the new version, which makes collaboration extremely easy. Ref: rzfeeser.com Dropbox has so many other features that I feel like I could create a Personal Technology Tips series devoted entirely to Dropbox.  I’m going to create a bullet list here to make things shorter, but I strongly encourage you to look further into these into options if it sounds like something you would use. Theft Recover Home Security File Hosting and Sharing Portable Dropbox Sync your iCal calendar Password Storage What is your favorite tool and why? I could go on and on, but I will end here.  In summary – I strongly encourage everyone to investigate Dropbox to see if it’s something they would find useful.  If you use Dropbox and know of a great feature I failed to mention, please share it with me, I’d love to hear how everyone uses this program. Reference: Pinal Dave (http://blog.SQLAuthority.com) Filed under: PostADay, SQL, SQL Authority, SQL Query, SQL Server, SQL Tips and Tricks, SQLAuthority News, T SQL, Technology Tagged: Personal Technology

    Read the article

  • Pella Increases Online Appointment Scheduling and Rapidly Personalizes and Updates Marketing Initiatives

    - by Michael Snow
    Originally posted on Oracle Customers page.Oracle Customer: Pella CorporationLocation:  Pella, IowaIndustry: Industrial Manufacturing Employees:  7,100 Pella Corporation is an innovative leader in creating a better view for homes and businesses by designing, testing, manufacturing, and installing quality windows and doors for new construction, remodeling, and replacement applications. A family-owned company, Pella has an 88-year history of innovation and, today, is the second-largest manufacturer in the country of windows and doors, including patio, entry, and storm doors. The company has 10 manufacturing facilities in United States and window and door showrooms across the United States and Canada. In-home consultations are an important part of Pella’s sales process. Several years ago, the company launched an online appointment scheduling tool to improve customer convenience. While the functionality worked well, the company wanted to increase online conversion rates and decrease the number of incomplete, online appointment schedules. It also wanted to give its business analysts and other line-of-business personnel the ability to update the scheduling tool and interface quickly, without needing IT team intervention and recoding, to better capitalize on opportunities and personalize the interface for specific markets. Pella also looked to reduce IT complexity by selecting a system that integrated easily with its Oracle E-Business Suite Release 12.1 enterprise applications.Pella, which has a large Oracle footprint, selected Oracle WebCenter Sites as the foundation for its new, real-time appointment scheduling application. It used the solution to re-engineer the scheduling process and the information required to set up an appointment. Just a few months after launch, it is seeing improvement in the number of appointments booked online and experiencing fewer abandoned appointments during the scheduling process. As important, Pella can now quickly and easily make changes to images, video, and content displayed on the scheduling tool interface, delivering greater business agility. Previously, such changes required a developer and weeks of coding and testing. Today, a member of Pella’s business analyst team can complete the changes in hours. This capability enables Pella to personalize the Web experience for customers. For example, it can display different products or images for clients in different regions.The solution is also highly scalable. Pella is using Oracle WebCenter Sites for appointment scheduling now and plans to migrate Pella.com, its configurator tool, and dealer microsites onto the platform. Further, Pella plans to leverage the solution to optimize mobile devices. “Moving ahead, we expect to extensively leverage Oracle WebCenter Sites to gain greater flexibility in updating the Web experience, thanks to the ability to make updates quickly without developer resources. Segmentation and targeting capabilities will allow us to create a more personalized experience across both traditional and mobile platforms,” said Teri Lancaster, IT manager, customer experience applications, Pella Corporation. A word from Pella Corporation "Oracle WebCenter Sites?from the start?delivered important benefits. We’ve redesigned the online scheduling process and are seeing more potential customers completing consultation bookings online. More important, the solution opens a world of other possibilities as we plan to migrate Pella.com and our dealer microsites to the platform, and leverage it to optimize the Web experience for our mobile devices.” – Teri Lancaster, IT Manager, Customer Experience Applications, Pella Corporation Oracle Product and Services Oracle WebCenter Sites Why Oracle Pella has a long-standing relationship with Oracle. “We look to Oracle first for a solution. Our Oracle account team came to us with several solutions, and Oracle WebCenter Sites delivered the scalability, ease-of-use, flexibility, and scalability that we required for the appointment scheduling initiative and other Web projects on the horizon, including migrating Pella.com and optimizing our site for mobile platforms,”said Teri Lancaster, IT manager, customer experience applications, Pella Corporation. Implementation Process The Pella implementation team, working with Oracle partner Element Solutions, LLC, integrated the appointment setting application with Pella.com as well as the company’s Oracle E-Business Suite customer relationship management applications. Using Oracle WebCenter Site’s development tools and subversion capabilities to develop the application, the Element Solutions and Pella teams could work remotely and collaboratively, accelerating deployment. Pella went live with the new scheduling tool in just six months. Partner Oracle PartnerElement Solutions, LLC Element Solutions was instrumental at every major stage of the project, including design creation and approval, development, training, and rollout. “Element Solutions was a vital partner for our Oracle WebCenter Sites initiative. The team provided guidance, and more important, critical knowledge transfer at every stage?which equipped us to get the most out of this powerful and versatile solution. We were definitely collaboration partners,” Lancaster said. Resources Pella Corporation Upgrades Enterprise Applications to Continue to Improve Manufacturing Efficiency Thousands of Customers Successfully and Smoothly Upgrade to Oracle E-Business Suite 12.1 for New Functionality, Lower Operating Costs and Improved Shared Operations Managing the Virtual World

    Read the article

  • Dual Boot Oracle Solaris 11/11 and Linux (Ubuntu 11.10/grub2)

    - by HartmutStreppel
    After having worked with Open Solaris on my laptop first, then with an upgrade to Oracle Solaris 11 Express, I finally did a fresh install of Oracle Solaris 11/11, when it became available. I am not a big fan of upgrades as I know that I am not the perfect administrator and my system gets spoiled with unclean configurations, outdated packages and wrong settings that cannot be reversed. So I prefer to start from scratch. Especially with Oracle Solaris 11 I wanted to have a system just like a customer would have it in production. The installation was smooth - more or less, if I had only read the documentation a bit better in advance. For a number of reasons I prefer a dual boot system. The most important one is, that especially with mobile devices you often run into network problems. And you have a hard time figuring out where the problem is: in your laptop hardware, in the OS you are running, or really within the network. If you have an alternate OS to boot, you can exclude the OS and your hardware. This makes you feel better. The second OS should be a Linux variant - and for some not so obvious reason I decided to go with the latest Ubuntu release (11.10). It replaced a very old Open Suse installation that had not been booted for a while. I knew that it was probably best to install Ubuntu first and then Oracle Solaris 11, as this would put the right boot information for Oracle Solaris  into the MBR and onto the root partition. But then, how to enable dual boot with the 2 OSes. Searching the web one mainly finds information about dual boot of: Linux and Linux Linux and Windows I do not want to explain which wrong configurations I worked through, but I prefer to explain the final setup, which is extremely simple, and I am wondering why this is not covered as the easiest solution for most dual boot setups. I use chainloader from and to both OS'es, with the only disadvantage that I have to confirm two grub menus each time I want to boot the "other" OS. Still there were some hurdles to jump over: Ubuntu did not like getting its boot blocks being placed on the partition instead of the disk; I must admit that I do not fully understand why. But using the --force option you could get that done Ubuntu needs an active partition; that was easy to achieve grub2 uses a different numbering scheme for the partitions. That is in the docs, if you read them. BTW: The usual disclaimer is valid. There is  no guarantee that what I describe works or works well. Please back up your data carefully before trying any of this. So, Oracle Solaris 11 is installed on the first partition and Ubuntu on the third. With Ubtuntu things initially were a bit more complicated, as I did not know how to boot it. And the live CD did not offer the capability to boot the on-disk image (at least I did not find it). So I booted the live CD, mounted the Ubuntu installation at /mnt and wrote the boot blocks into the partition. This is something that does not seem to be recommended, at least grub-install refrained from doing what I intended. After a bit more research I was bold enough to use the --force option and wrote the boot blocks to /dev/sda3 using grub-install --boot-directory=/mnt/boot --force --no-floppy /dev/sda3 So, I now had a system with the Solaris boot loader in the MBR, Solaris specific boot blocks on the Solaris root partition and Ubuntu specific boot blocks in the Ubuntu partition. I just had to chain them together and I was done. Oracle Solaris 11: I have added the following lines to /rpool/boot/grub/menu.lst (be aware of the /rpool!!!!) title Ubuntu 11.10root (hd0,2)makeactivechainloader +1boot The Ubuntu root file system sits on the third partition (/dev/sda3). Ubuntu: I have added the following lines to /etc/grub.d/40_custom: menuentry "Solaris 11/11" {      set root=(hd0,1)      chainloader +1} Two things need to be mentioned: a) grub2 starts numbering partitions with 1; so my /dev/sda1 is partition 1. b) Oracle Solaris boots without the partition being made active (btw: the command to make a partition active with grub2 is "parttool (hd0,1) boot+", which currently does not work for me). As debugging grub is a bit complicated, I used the grub CLI to perform some tests and also used a tool, that I found on sourceforge.net that was able to prepare a list of all boot loaders on all partitions. This told me that the basic setup was correct. Unfortunately I lost it in the live CD environment. I hope this is helpful for some of the readers.Hartmut

    Read the article

  • Oracle Delivers Latest Release of Oracle Enterprise Manager 12c

    - by Scott McNeil
    Richer Service Catalog for Database and Middleware as a Service; Enhanced Database and Middleware Management Help Drive Enterprise-Scale Private Cloud Adoption News Summary IT organizations are adopting private clouds as a stepping-stone to business-driven, self-service IT. Successful implementations hinge on the ability to efficiently deploy and manage cloud services at enterprise scale. Having a complete cloud management solution integrated with an enterprise-class technology stack is a fundamental requirement for IT. Oracle Enterprise Manager 12c Release 4 meets that requirement by helping businesses become more agile and responsive, while reducing cost, complexity, and risk. News Facts Oracle Enterprise Manager 12c Release 4, available today, lets organizations rapidly adopt Oracle-based, enterprise-scale private clouds. New capabilities provide advanced technology stack management, secure database administration, and enterprise service governance, enabling Oracle customers and partners to maximize database and application performance and drive innovation using self-service IT platforms. The enhancements have been driven by customers and the growing Oracle Enterprise Manager Ecosystem, comprised of more than 750 Oracle PartnerNetwork (OPN) Specialized partners. Oracle and its partners and customers have built over 140 plug-ins and connectors for Oracle Enterprise Manager. Watch the video highlights. Automation for Broader Cloud Services Oracle Enterprise Manager 12c Release 4 allows for a rapid enterprise-wide adoption of database, middleware and infrastructure services in the private cloud, driven by an enhanced API-enabled service catalog. The release features “push button” style provisioning of complete environments such as SOA and Oracle Active Data Guard, and fast data cloning that enables rapid deployment and testing of enterprise applications. Out-of-the-box capabilities to detect data and configuration vulnerabilities provide enhanced cloud service governance along with greater operational control through a flexible and extensible showback mechanism. Enhanced Database Management A new performance warehouse enables predictive database diagnostics and trend analysis and helps identify database problems before they occur. New enterprise data-governance capabilities enhance security by helping systematically discover and protect sensitive data. Step-by-step orchestration of upgrades with the ability to rollback changes enables faster adoption of Oracle Database 12c. Expanded Fusion Middleware Management A new consolidated view of Oracle Fusion Middleware 12c deployments with a guided management capability lets administrators apply best management practices to diverse middleware environments and identify performance issues quickly. A Java VM Diagnostics as a Service feature allows governed access to diagnostics data for IT workers across multiple disciplines for accelerated DevOps resolutions of defects and performance optimization. New automated provisioning for SOA lets middleware administrators perform mass SOA provisioning with ease. Superior Enterprise-Grade Management Private roles and preferred credentials have been added to Oracle Enterprise Manager to provide additional fine-grained security for organizations with complex access control requirements. A new security console provides a single point of control for managing the security of Oracle Enterprise Manager environments. Support for the latest industry standard SNMP v3 protocol, including encryption, enables more secure heterogeneous management. “Smart monitoring” adapts to observed environmental changes and adds self-management capabilities to help Oracle Enterprise Manager run at peak performance, while demanding less IT supervision. Supporting Quotes “Lawrence Livermore National Laboratory has a strong tradition of technology breakthroughs and leadership. As a member of Oracle’s Customer Advisory Board for Oracle Enterprise Manager, we have consistently provided feedback and guidance in the areas of enterprise-scale cloud, self-diagnosability, and secure administration for the product,” said Tim Frazier, CIO, NIF and Photon Sciences, Lawrence Livermore National Laboratory. “We intend to take advantage of the Release 4 features that support enterprise-scale availability and fine-grained security capabilities for private cloud deployments.” “IDC's most recent CloudTrack survey shows that most enterprises plan to adopt hybrid cloud architectures over the next three years,” said Mary Johnston Turner, Research Vice President, Enterprise System Management Software, IDC. “These organizations plan to deploy a wide range of workloads into cloud environments including mission critical database and middleware services that require high levels of fault tolerance and disaster recovery. Such capabilities were traditionally custom configured for each application but cloud offers the possibility to incorporate such properties within the service definition, enabling organizations to adopt cloud without compromise. With the latest release of Oracle Enterprise Manager 12c, Oracle is providing customers with an out-of-the-box experience for delivering highly-resilient cloud services for databases and applications.” “Since its inception, Oracle has been leading the way in innovative, scalable and high performance solutions for the enterprise. With this release of Oracle Enterprise Manager, we are extending this leadership by providing enterprise-scale capabilities for planning, delivering, and managing private clouds. We call this ‘zero-to-cloud – accelerated.’ These enhancements help our customers to expedite their adoption of cloud computing and prepares them for the next generation of self-service IT,” said Prakash Ramamurthy, senior vice president of Systems and Cloud Management at Oracle. Supporting Resources Oracle Enterprise Manager 12c Video: Cerner Delivers High Performance Private Cloud Video: BIAS Achieves Outstanding Results with Private Cloud Press Release Stay Connected: Twitter | Facebook | YouTube | Linkedin | Newsletter Download the Oracle Enterprise Manager 12c Mobile app

    Read the article

  • ACORD LOMA Session Highlights Policy Administration Trends

    - by [email protected]
    Helen Pitts, senior product marketing manager for Oracle Insurance, attended and is blogging from the ACORD LOMA Insurance Forum this week. Above: Paul Vancheri, Chief Information Officer, Fidelity Investments Life Insurance Company. Vancheri gave a presentation during the ACORD LOMA Insurance Systems Forum about the key elements of modern policy administration systems and how insurers can mitigate risk during legacy system migrations to safely introduce new technologies. When I had a few particularly challenging honors courses in college my father, a long-time technology industry veteran, used to say, "If you don't know how to do something go ask the experts. Find someone who has been there and done that, don't be afraid to ask the tough questions, and apply and build upon what you learn." (Actually he still offers this same advice today.) That's probably why my favorite sessions at industry events, like the ACORD LOMA Insurance Forum this week, are those that include insight on industry trends and case studies from carriers who share their experiences and offer best practices based upon their own lessons learned. I had the opportunity to attend a particularly insightful session Wednesday as Craig Weber, senior vice president of Celent's Insurance practice, and Paul Vancheri, CIO of Fidelity Life Investments, presented, "Managing the Dynamic Insurance Landscape: Enabling Growth and Profitability with a Modern Policy Administration System." Policy Administration Trends Growing the business is the top issue when it comes to IT among both life and annuity and property and casualty carriers according to Weber. To drive growth and capture market share from competitors, carriers are looking to modernize their core insurance systems, with 65 percent of those CIOs participating in recent Celent research citing plans to replace their policy administration systems. Weber noted that there has been continued focus and investment, particularly in the last three years, by software and technology vendors to offer modern, rules-based, configurable policy administration solutions. He added that these solutions are continuing to evolve with the ongoing aim of helping carriers rapidly meet shifting business needs--whether it is to launch new products to market faster than the competition, adapt existing products to meet shifting consumer and /or regulatory demands, or to exit unprofitable markets. He closed by noting the top four trends for policy administration either in the process of being adopted today or on the not-so-distant horizon for the future: Underwriting and service desktops New business automation Convergence of ultra-configurable and domain content-rich systems Better usability and screen design Mitigating the Risk When Making the Decision to Modernize Third-party analyst research from advisory firms like Celent was a key part of the due diligence process for Fidelity as it sought a replacement for its legacy policy administration system back in 2005, according to Vancheri. The company's business opportunities were outrunning system capability. Its legacy system had not been upgraded in several years and was deficient from a functionality and currency standpoint. This was constraining the carrier's ability to rapidly configure and bring new and complex products to market. The company sought a new, modern policy administration system, one that would enable it to keep pace with rapid and often unexpected industry changes and ahead of the competition. A cross-functional team that included representatives from finance, actuarial, operations, client services and IT conducted an extensive selection process. This process included deep documentation review, pilot evaluations, demonstrations of required functionality and complex problem-solving, infrastructure integration capability, and the ability to meet the company's desired cost model. The company ultimately selected an adaptive policy administration system that met its requirements to: Deliver ease of use - eliminating paper and rework, while easing the burden on representatives to sell and service annuities Provide customer parity - offering Web-based capabilities in alignment with the company's focus on delivering a consistent customer experience across its business Deliver scalability, efficiency - enabling automation, while simplifying and standardizing systems across its technology stack Offer desired functionality - supporting Fidelity's product configuration / rules management philosophy, focus on customer service and technology upgrade requirements Meet cost requirements - including implementation, professional services and licenses fees and ongoing maintenance Deliver upon business requirements - enabling the ability to drive time to market for new products and flexibility to make changes Best Practices for Addressing Implementation Challenges Based upon lessons learned during the company's implementation, Vancheri advised carriers to evaluate staffing capabilities and cultural impacts, review business requirements to avoid rebuilding legacy processes, factor in dependent systems, and review policies and practices to secure customer data. His formula for success: upfront planning + clear requirements = precision execution. Achieving a Return on Investment Vancheri said the decision to replace their legacy policy administration system and deploy a modern, rules-based system--before the economic downturn occurred--has been integral in helping the company adapt to shifting market conditions, while enabling growth in its direct channel sales of variable annuities. Since deploying its new policy admin system, the company has reduced its average time to market for new products from 12-15 months to 4.5 months. The company has since migrated its other products to the new system and retired its legacy system, significantly decreasing its overall product development cycle. From a processing standpoint Vancheri noted the company has achieved gains in automation, information, and ease of use, resulting in improved real-time data edits, controls for better quality, and tax handling capability. Plus, with by having only one platform to manage, the company has simplified its IT environment and is well positioned to deliver system enhancements for greater efficiencies. Commitment to Continuing the Investment In the short and longer term future Vancheri said the company plans to enhance business functionality to support money movement, wire automation, divorce processing on payout contracts and cost-based tracking improvements. It also plans to continue system upgrades to remain current as well as focus on further reducing cycle time, driving down maintenance costs, and integrating with other products. Helen Pitts is senior product marketing manager for Oracle Insurance focused on life/annuities and enterprise document automation.

    Read the article

  • A new SQL, a new Analysis Services, a new Workshop! #ssas #sql2012

    - by Marco Russo (SQLBI)
    One week ago Microsoft SQL Server 2012 finally debuted with a virtual launch event and you can find many intro sessions there (20 minutes each). There is a lot of new content available if you want to learn more about SQL 2012 and in this blog post I’d like to provide a few link to sessions, documents, bits and courses that are available now or very soon. First of all, the release of Analysis Services 2012 has finally released PowerPivot 2012 (many of us called it PowerPivot v2 before this official name) and also the new Data Mining Add-in for Microsoft Office 2010, now available also for Excel 64bit! And, of course, don’t miss the Microsoft SQL Server 2012 Feature Pack, there are a lot of upgrades for both DBAs and developers. I just discovered there is a new LocalDB version of SQL Express that can run in user mode without any setup. Is this the end of SQL CE? But now, back to Analysis Services: if you want some tutorial on Tabular, the Microsoft Virtual Academy has a whole track dedicated to Analysis Services 2012 but you will probably be interested also in the one about Reporting Services 2012. If you think that virtual is good but it’s not enough, there are plenty of conferences in the coming months – these are just those where I and Alberto will deliver some SSAS Tabular presentations: SQLBits X, London, March 29-31, 2012: if you are in London or want a good reason to go, this is the most important SQL Server event in Europe this year, no doubts about it. And not only because of the high number of attendees, but also because there is an impressive number of speakers (excluding me, of course) coming from all over the world. This is an event second only to PASS Summit in Seattle so there are no good reasons to not attend it. Microsoft SQL Server & Business Intelligence Conference 2012, Milan, March 28-29, 2012: this is an Italian conference so the language might be a barrier, but many of us also speak English and the food is good! Just a few seats still available. TechEd North America, Orlando, June 11-14, 2012: you know, this is a big event and it contains everything – if you want to spend a whole day learning the SSAS Tabular model with me and Alberto, don’t miss our pre-conference day “Using BISM Tabular in Microsoft SQL Server Analysis Services 2012” (be careful, it is on June 10, a nice study-Sunday!). TechEd Europe, Amsterdam, June 26-29, 2012: the European version of TechEd provides almost the same content and you don’t have to go overseas. We also run the same pre-conference day “Using BISM Tabular in Microsoft SQL Server Analysis Services 2012” (in this case, it is on June 25, that’s a regular Monday). I and Alberto will also speak at some user group meeting around Europe during… well, we’re going to travel a lot in the next months. In fact, if you want to get a complete training on SSAS Tabular, you should spend two days with us in one of our SSAS Tabular Workshop! We prepared a 2-day seminar, a very intense one, that start from the simple tabular modeling and cover architecture, DAX, query, advanced modeling, security, deployment, optimization, monitoring, relationships with PowerPivot and Multidimensional… Really, there are a lot of stuffs here! We announced the first dates in Europe and also an online edition optimized for America’s time zone: Apr 16-17, 2012 – Amsterdam, Netherlands Apr 26-27, 2012 – Copenhagen, Denmark May 7-8, 2012 – Online for America’s time zone May 14-15, 2012 – Brussels, Belgium May 21-22, 2012 – Oslo, Norway May 24-25, 2012 – Stockholm, Sweden May 28-29, 2012 – London, United Kingdom May 31-Jun 1, 2012 – Milan, Italy (Italian language) Also Chris Webb will join us in this workshop and in every date you can find who is the speaker on the web site. The course is based on our upcoming book, almost 600 pages (!) about SSAS Tabular, an incredible effort that will be available very soon in a preview (rough cuts from O’Reilly) and will be on the shelf in May. I will provide a link to order it as soon as we have one! And if you think that this is not enough… you’re right! Do you know what is the only thing you can do to optimize your Tabular model? Optimize your DAX code. Learning DAX is easy, mastering DAX requires some knowledge… and our DAX Advanced Workshop will provide exactly the required content. Public classes will be available later this year, by now we just deliver it on demand.

    Read the article

  • A new SQL, a new Analysis Services, a new Workshop! #ssas #sql2012

    - by Marco Russo (SQLBI)
    One week ago Microsoft SQL Server 2012 finally debuted with a virtual launch event and you can find many intro sessions there (20 minutes each). There is a lot of new content available if you want to learn more about SQL 2012 and in this blog post I’d like to provide a few link to sessions, documents, bits and courses that are available now or very soon. First of all, the release of Analysis Services 2012 has finally released PowerPivot 2012 (many of us called it PowerPivot v2 before this official name) and also the new Data Mining Add-in for Microsoft Office 2010, now available also for Excel 64bit! And, of course, don’t miss the Microsoft SQL Server 2012 Feature Pack, there are a lot of upgrades for both DBAs and developers. I just discovered there is a new LocalDB version of SQL Express that can run in user mode without any setup. Is this the end of SQL CE? But now, back to Analysis Services: if you want some tutorial on Tabular, the Microsoft Virtual Academy has a whole track dedicated to Analysis Services 2012 but you will probably be interested also in the one about Reporting Services 2012. If you think that virtual is good but it’s not enough, there are plenty of conferences in the coming months – these are just those where I and Alberto will deliver some SSAS Tabular presentations: SQLBits X, London, March 29-31, 2012: if you are in London or want a good reason to go, this is the most important SQL Server event in Europe this year, no doubts about it. And not only because of the high number of attendees, but also because there is an impressive number of speakers (excluding me, of course) coming from all over the world. This is an event second only to PASS Summit in Seattle so there are no good reasons to not attend it. Microsoft SQL Server & Business Intelligence Conference 2012, Milan, March 28-29, 2012: this is an Italian conference so the language might be a barrier, but many of us also speak English and the food is good! Just a few seats still available. TechEd North America, Orlando, June 11-14, 2012: you know, this is a big event and it contains everything – if you want to spend a whole day learning the SSAS Tabular model with me and Alberto, don’t miss our pre-conference day “Using BISM Tabular in Microsoft SQL Server Analysis Services 2012” (be careful, it is on June 10, a nice study-Sunday!). TechEd Europe, Amsterdam, June 26-29, 2012: the European version of TechEd provides almost the same content and you don’t have to go overseas. We also run the same pre-conference day “Using BISM Tabular in Microsoft SQL Server Analysis Services 2012” (in this case, it is on June 25, that’s a regular Monday). I and Alberto will also speak at some user group meeting around Europe during… well, we’re going to travel a lot in the next months. In fact, if you want to get a complete training on SSAS Tabular, you should spend two days with us in one of our SSAS Tabular Workshop! We prepared a 2-day seminar, a very intense one, that start from the simple tabular modeling and cover architecture, DAX, query, advanced modeling, security, deployment, optimization, monitoring, relationships with PowerPivot and Multidimensional… Really, there are a lot of stuffs here! We announced the first dates in Europe and also an online edition optimized for America’s time zone: Apr 16-17, 2012 – Amsterdam, Netherlands Apr 26-27, 2012 – Copenhagen, Denmark May 7-8, 2012 – Online for America’s time zone May 14-15, 2012 – Brussels, Belgium May 21-22, 2012 – Oslo, Norway May 24-25, 2012 – Stockholm, Sweden May 28-29, 2012 – London, United Kingdom May 31-Jun 1, 2012 – Milan, Italy (Italian language) Also Chris Webb will join us in this workshop and in every date you can find who is the speaker on the web site. The course is based on our upcoming book, almost 600 pages (!) about SSAS Tabular, an incredible effort that will be available very soon in a preview (rough cuts from O’Reilly) and will be on the shelf in May. I will provide a link to order it as soon as we have one! And if you think that this is not enough… you’re right! Do you know what is the only thing you can do to optimize your Tabular model? Optimize your DAX code. Learning DAX is easy, mastering DAX requires some knowledge… and our DAX Advanced Workshop will provide exactly the required content. Public classes will be available later this year, by now we just deliver it on demand.

    Read the article

  • Announcing the New Windows Azure Web Sites Shared Scaling Tier

    - by Clint Edmonson
    Windows Azure Web Sites has added a new pricing tier that will solve the #1 blocker for the web development community. The shared tier now supports custom domain names mapped to shared-instance web sites. This post will outline the plan changes and elaborate on how the new pricing model makes Windows Azure Web Sites an even richer option for web development shops of all sizes. Free Shared Reserved # of Sites 10 100 100 Egress 165MB/Day 5GB/Month Included 5GB/Month Included Storage 1GB 1GB 10GB Throttling CPU/Memory/Egress CPU/Memory Unlimited Price Free $.02/hr per site, per instance $.08/hr per core Setting the Stage In June, we released the first public preview of Windows Azure Web Sites, which gave web developers a great platform on which to get web sites running using their web development framework of choice. PHP, Node.js, classic ASP, and ASP.NET developers can all utilize the Windows Azure platform to create and launch their web sites. Likewise, these developers have a series of data storage options using Windows Azure SQL Databases, MySQL, or Windows Azure Storage. The Windows Azure Web Sites free offer enabled startups to get their site up and running on Windows Azure with a minimal investment, and with multiple deployment and continuous integration features such as Git, Team Foundation Services, FTP, and Web Deploy.  The response to the Windows Azure Web Sites offer has been overwhelmingly positive. Since the addition of the service on June 12th, tens of thousands of web sites have been deployed to Windows Azure and the volume of adoption is increasing every week. Preview Feedback In spite of the growth and success of the product, the community has had questions about features lacking in the free preview offer. The main question web developers asked regarding Windows Azure Web Sites relates to the lack of the free offer’s support for domain name mapping. During the preview launch period, customer feedback made it obvious that the lack of domain name mapping support was an area of concern. We’re happy to announce that this #1 request has been delivered as a feature of the new shared plan. New Shared Tier Portal Features In the screen shot below, the “Scale” tab in the portal shows the new tiers – Free, Shared, and Reserved – and gives the user the ability to quickly move any of their free web sites into the shared tier. With a single mouse-click, the user can move their site into the shared tier. Once a site has been moved into the shared tier, a new Manage Domains button appears in the bottom action bar of the Windows Azure Portal giving site owners the ability to manage their domain names for a shared site. This button brings up the domain-management dialog, which can be used to enter in a specific domain name that will be mapped to the Windows Azure Web Site. Shared Tier Benefits Startups and large web agencies will both benefit from this plan change. Here are a few examples of scenarios which fit the new pricing model: Startups no longer have to select the reserved plan to map domain names to their sites. Instead, they can use the free option to develop their sites and choose on a site-by-site basis which sites they elect to move into the shared plan, paying only for the sites that are finished and ready to be domain-mapped Agencies who manage dozens of sites will realize a lower cost of ownership over the long term by moving their sites into reserved mode. Once multi-site companies reach a certain price point in the shared tier, it is much more cost-effective to move sites to a reserved tier.  Long-term, it’s easy to see how the new Windows Azure Web Sites shared pricing tier makes Windows Azure Web Sites it a great choice for both startups and agency customers, as it enables rapid growth and upgrades while keeping the cost to a minimum. Large agencies will be able to have all of their sites in their own instances, and startups will have the capability to scale up to multiple-shared instances for minimal cost and eventually move to reserved instances without worrying about the need to incur continually additional costs. Customers can feel confident they have the power of the Microsoft Windows Azure brand and our world-class support, at prices competitive in the market. Plus, in addition to realizing the cost savings, they’ll have the whole family of Windows Azure features available. Continuous Deployment from GitHub and CodePlex Along with this new announcement are two other exciting new features. I’m proud to announce that web developers can now publish their web sites directly from CodePlex or GitHub.com repositories. Once connections are established between these services and your web sites, Windows Azure will automatically be notified every time a check-in occurs. This will then trigger Windows Azure to pull the source and compile/deploy the new version of your app to your web site automatically. Walk-through videos on how to perform these functions are below: Publishing to an Azure Web Site from CodePlex Publishing to an Azure Web Site from GitHub.com These changes, as well as the enhancements to the reserved plan model, make Windows Azure Web Sites a truly competitive hosting option. It’s never been easier or cheaper for a web developer to get up and running. Check out the free Windows Azure web site offering and see for yourself. Stay tuned to my twitter feed for Windows Azure announcements, updates, and links: @clinted

    Read the article

  • Getting a handle on mobile data

    - by Eric Jensen
    Normal 0 false false false EN-US X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin;} written by Ashok Joshi The proliferation of mobile devices in the corporate world is both a blessing as well as a challenge.  Mobile devices improve productivity and the velocity of business for the end users; on the other hand, IT departments need to manage the corporate data and applications that run on these devices. Oracle Database Mobile Server (DMS for short) provides a simple and effective way to deal with the management challenge.  DMS supports data synchronization between a central Oracle database server and data on mobile devices.  It also provides authentication, encryption and application and device management.  Finally, DMS is a highly scalable solution that can be used to manage hundreds of thousands of devices.   Here’s a simplified outline of how such a solution might work. Each device runs local sync and mgmt agents that handle bidirectional data flow with an Oracle enterprise backend, run remote commands, and provide status to the management console. For example, mobile admins could monitor multiple networks of mobile devices, upgrade their software remotely, and even destroy the local database on a compromised device. DMS supports either Oracle Berkeley DB or SQLite for device-local storage, and runs on a wide variety of mobile platforms. The schema for the device-local database is pretty simple – it contains the name of the application that’s installed on the device as well as details such as product name, version number, time of last access etc. Each mobile user has an account on the monitoring system.  DMS supports authentication via the Oracle database authentication mechanisms or alternately, via an external authentication server such as Oracle Identity Management. DMS also provides the option of encrypting the data on disk as well as while it is being synchronized. Whenever a device connects with DMS, it sends the list of all local application changes to the server; the server updates the central repository with this information.  Synchronization can be triggered on-demand, whenever there’s a change on the device (e.g. new application installed or an existing application removed) or via a rule-based schedule (e.g. every Saturday). Synchronization is very fast and efficient, since only the changes are propagated.  This includes resume capability; should synchronization be interrupted for any reason, the next synchronization will resume where the previous synchronization was interrupted. If the device should be lost or stolen, DMS has the capability to remove the applications and/or data from the device. This ability to control access to sensitive data and applications is critical in the corporate environment. The central repository also allows the IT manager to track the kinds of applications that mobile users use and recommend patches and upgrades, while still allowing the mobile user full control over what applications s/he downloads and uses on the device.  This is useful since most devices are used for corporate as well as personal information. In certain restricted use scenarios, the IT manager can also control whether a certain application can be installed on a mobile device.  Should an unapproved application be installed, it can easily be removed the next time the device connects with the central server. Oracle Database mobile server provides a simple, effective and highly secure and scalable solution for managing the data and applications for the mobile workforce.

    Read the article

  • Where Facebook Stands Heading Into 2013

    - by Mike Stiles
    In our last blog, we looked at how Twitter is positioned heading into 2013. Now it’s time to take a similar look at Facebook. 2012, for a time at least, seemed to be the era of Facebook-bashing. Between a far-from-smooth IPO, subsequent stock price declines, and anxiety over privacy, the top social network became a target for comedians, politicians, business journalists, and of course those who were prone to Facebook-bash even in the best of times. But amidst the “this is the end of Facebook” headlines, the company kept experimenting, kept testing, kept innovating, and pressing forward, committed as always to the user experience, while concurrently addressing monetization with greater urgency. Facebook enters 2013 with over 1 billion users around the world. Usage grew 41% in Brazil, Russia, Japan, South Korea and India in 2012. In the Middle East and North Africa, an average 21 new signups happen per minute. Engagement and time spent on the site would impress the harshest of critics. Facebook, while not bulletproof, has become such an integrated daily force in users’ lives, it’s getting hard to imagine any future mass rejection. You want to see a company recognizing weaknesses and shoring them up. Mobile was a weakness in 2012 as Facebook was one of many caught by surprise at the speed of user migration to mobile. But new mobile interfaces, better mobile ads, speed upgrades, standalone Messenger and Pages mobile apps, and the big dollar acquisition of Instagram, were a few indicators Facebook won’t play catch-up any more than it has to. As a user, the cool thing about Facebook is, it knows you. The uncool thing about Facebook is, it knows you. The company’s walking a delicate line between the public’s competing desires for customized experiences and privacy. While the company’s working to make privacy options clearer and easier, Facebook’s Paul Adams says data aggregation can move from acting on what a user is engaging with at the moment to a more holistic view of what they’re likely to want at any given time. To help learn about you, there’s Open Graph. Embedded through diverse partnerships, the idea is to surface what you’re doing and what you care about, and help you discover things via your friends’ activities. Facebook’s Director of Engineering, Mike Vernal, says building mobile social apps connected to Facebook in such ways is the next wave of big innovation. Expect to see that fostered in 2013. The Facebook site experience is always evolving. Some users like that about Facebook, others can’t wait to complain about it…on Facebook. The Facebook focal point, the News Feed, is not sacred and is seeing plenty of experimentation with the insertion of modules. From upcoming concerts, events, suggested Pages you might like, to aggregated “most shared” content from social reader apps, plenty could start popping up between those pictures of what your friends had for lunch.  As for which friends’ lunches you see, that’s a function of the mythic EdgeRank…which is also tinkered with. When Facebook changed it in September, Page admins saw reach go down and the high anxiety set in quickly. Engagement, however, held steady. The adjustment was about relevancy over reach. (And oh yeah, reach was something that could be charged for). Facebook wants users to see what they’re most likely to like, based on past usage and interactions. Adding to the “cream must rise to the top” philosophy, they’re now even trying out ordering post comments based on the engagement the comments get. Boy, it’s getting competitive out there for a social engager. Facebook has to make $$$. To do that, they must offer attractive vehicles to marketers. There are a myriad of ad units. But a key Facebook marketing concept is the Sponsored Story. It’s key because it encourages content that’s good, relevant, and performs well organically. If it is, marketing dollars can amplify it and extend its reach. Brands can expect the rollout of a search product and an ad network. That’s a big deal. It takes, as Open Graph does, the power of Facebook’s user data and carries it beyond the Facebook environment into the digital world at large. No one could target like Facebook can, and some analysts think it could double their roughly $5 billion revenue stream. As every potential revenue nook and cranny is explored, there are the users themselves. In addition to Gifts, Facebook thinks users might pay a few bucks to promote their own posts so more of their friends will see them. There’s also word classifieds could be purchased in News Feeds, though they won’t be called classifieds. And that’s where Facebook stands; a wildly popular destination, a part of our culture, with ever increasing functionalities, the biggest of big data, revenue strategies that appeal to marketers without souring the user experience, new challenges as a now public company, ongoing privacy concerns, and innovations that carry Facebook far beyond its own borders. Anyone care to write a “this is the end of Facebook” headline? @mikestilesPhoto via stock.schng

    Read the article

  • Availability Best Practices on Oracle VM Server for SPARC

    - by jsavit
    This is the first of a series of blog posts on configuring Oracle VM Server for SPARC (also called Logical Domains) for availability. This series will show how to how to plan for availability, improve serviceability, avoid single points of failure, and provide resiliency against hardware and software failures. Availability is a broad topic that has filled entire books, so these posts will focus on aspects specifically related to Oracle VM Server for SPARC. The goal is to improve Reliability, Availability and Serviceability (RAS): An article defining RAS can be found here. Oracle VM Server for SPARC Principles for Availability Let's state some guiding principles for availability that apply to Oracle VM Server for SPARC: Avoid Single Points Of Failure (SPOFs). Systems should be configured so a component failure does not result in a loss of application service. The general method to avoid SPOFs is to provide redundancy so service can continue without interruption if a component fails. For a critical application there may be multiple levels of redundancy so multiple failures can be tolerated. Oracle VM Server for SPARC makes it possible to configure systems that avoid SPOFs. Configure for availability at a level of resource and effort consistent with business needs. Effort and resource should be consistent with business requirements. Production has different availability requirements than test/development, so it's worth expending resources to provide higher availability. Even within the category of production there may be different levels of criticality, outage tolerances, recovery and repair time requirements. Keep in mind that a simple design may be more understandable and effective than a complex design that attempts to "do everything". Design for availability at the appropriate tier or level of the platform stack. Availability can be provided in the application, in the database, or in the virtualization, hardware and network layers they depend on - or using a combination of all of them. It may not be necessary to engineer resilient virtualization for stateless web applications applications where availability is provided by a network load balancer, or for enterprise applications like Oracle Real Application Clusters (RAC) and WebLogic that provide their own resiliency. It's (often) the same architecture whether virtual or not: For example, providing resiliency against a lost device path or failing disk media is done for the same reasons and may use the same design whether in a domain or not. It's (often) the same technique whether using domains or not: Many configuration steps are the same. For example, configuring IPMP or creating a redundant ZFS pool is pretty much the same within the guest whether you're in a guest domain or not. There are configuration steps and choices for provisioning the guest with the virtual network and disk devices, which we will discuss. Sometimes it is different using domains: There are new resources to configure. Most notable is the use of alternate service domains, which provides resiliency in case of a domain failure, and also permits improved serviceability via "rolling upgrades". This is an important differentiator between Oracle VM Server for SPARC and traditional virtual machine environments where all virtual I/O is provided by a monolithic infrastructure that itself is a SPOF. Alternate service domains are widely used to provide resiliency in production logical domains environments. Some things are done via logical domains commands, and some are done in the guest: For example, with Oracle VM Server for SPARC we provide multiple network connections to the guest, and then configure network resiliency in the guest via IP Multi Pathing (IPMP) - essentially the same as for non-virtual systems. On the other hand, we configure virtual disk availability in the virtualization layer, and the guest sees an already-resilient disk without being aware of the details. These blogs will discuss configuration details like this. Live migration is not "high availability" in the sense of "continuous availability": If the server is down, then you don't live migrate from it! (A cluster or VM restart elsewhere would be used). However, live migration can be part of the RAS (Reliability, Availability, Serviceability) picture by improving Serviceability - you can move running domains off of a box before planned service or maintenance. The blog Best Practices - Live Migration on Oracle VM Server for SPARC discusses this. Topics Here are some of the topics that will be covered: Network availability using IP Multipathing and aggregates Disk path availability using virtual disks defined with multipath groups ("mpgroup") Disk media resiliency configuring for redundant disks that can tolerate media loss Multiple service domains - this is probably the most significant item and the one most specific to Oracle VM Server for SPARC. It is very widely deployed in production environments as the means to provide network and disk availability, but it can be confusing. Subsequent articles will describe why and how to configure multiple service domains. Note, for the sake of precision: an I/O domain is any domain that has a physical I/O resource (such as a PCIe bus root complex). A service domain is a domain providing virtual device services to other domains; it is almost always an I/O domain too (so it can have something to serve). Resources Here are some important links; we'll be drawing on their content in the next several articles: Oracle VM Server for SPARC Documentation Maximizing Application Reliability and Availability with SPARC T5 Servers whitepaper by Gary Combs Maximizing Application Reliability and Availability with the SPARC M5-32 Server whitepaper by Gary Combs Summary Oracle VM Server for SPARC offers features that can be used to provide highly-available environments. This and the following blog entries will describe how to plan and deploy them.

    Read the article

  • The Arab HEUG is now a reality, and other random thoughts

    - by user9147039
    I just returned from Doha, Qatar where the first of its kind HEUG (Higher Education User Group) meeting for institutions in the Middle East and North Africa was held at Qatar University and jointly hosted by Damman University from Saudi Arabia. Over 80 delegates attended including representation from education institutions in Oman, Saudi Arabia, Lebanon, and Qatar. There are many other regional HEUG organizations in place (in Australia/New Zealand, APAC, EMEA, as well as smaller regional HEUG’s in the Netherlands, South Africa, and in regions of the US), but it was truly an accomplishment to see this Middle East/North Africa group organize and launch their chapter with a meeting of this quality. To be known as the Arab HEUG going forward, I am excited about the prospects for sharing between the institutions and for the growth of Oracle solutions in the region. In particular the hosts for the event (Qatar University) did a masterful job with logistics and organization, and the quality of the event was a testament to their capabilities. Among the more interesting and enlightening presentations I attended were one from Dammam University on the lessons learned from their implementation of Campus Solutions and transition off of Banner, as well as the use by Qatar University E-business Suite for grants management (both pre-and post-award). The most notable fact coming from this latter presentation was the fit (89%) of e-Business Suite Grants to the university’s requirements. In a few weeks time we will be convening the 5th meeting of the Oracle Education & Research Industry Strategy Council in Redwood Shores (5th since my advent into my current role). The main topics of discussion will be around our Higher Education Applications Strategy for the future (including cloud approaches to ERP (HCM, Finance, and Student Information Systems), how some cases studies on the benefits of leveraging delivered functionality and extensibility in the software (versus customization). On the second day of the event we will turn our attention to Oracle in Research and also budgeting and planning in higher education. Both of these sessions will include significant participation from council members in the form of panel discussions. Our EVP’s for Systems (John Fowler) and for Global Cloud Services and North America application sales (Joanne Olson) will join us for the discussion. I recently read a couple of articles that were surprising to me. The first was from Inside Higher Ed on October 15 entitled, “As colleges prepare for major software upgrades, Kuali tries to woo them from corporate vendors.” It continues to disappointment that after all this time we are still debating whether it is better to build enterprise software through open or community source initiatives when fully functional, flexible, supported, and widely adopted options exist in the marketplace. Over a decade or more ago when these solutions were relatively immature and there was a great deal of turnover in the market I could appreciate the initiatives like Kuali. But let’s not kid ourselves – the real objective of this movement is to counter a perceived predatory commercial software industry. Again, when commercial solutions are deployed as written without significant customization, and standard business processes are adopted, the cost of these solutions (relative to the value delivered) is quite low, and certain much lower than the massive investment (and risk) in in-house developers to support a bespoke community source system. In this era of cost pressures in education and the need to refocus resources on teaching, learning, and research, I believe it’s bordering on irresponsible to continue to pursue open-source ERP. Many of the adopter’s total costs are staggering and have little to show for their efforts and expended resources. The second article was recently in the Chronicle of Higher Education and was entitled “’Big Data’ Is Bunk, Obama Campaign’s Tech Guru Tells University Leaders.” This one was so outrageous I almost don’t want to legitimize it by referencing it here. In the article the writer relays statements made by Harper Reed, President Obama’s former CTO for his 2012 re-election campaign, that big data solutions in education have no relevance and are akin to snake oil. He goes on to state that while he’s a fan of data-driven decision making in education, most of the necessary analysis can be accomplished in Excel spreadsheets. Yeah… right. This is exactly what ails education (higher education in particular). Dozens of shadow and siloed systems running on spreadsheets with limited-to-no enterprise wide initiatives to harness the data-rich environment that is a higher ed institution and transform the data into useable information. I’ll grant Mr. Reed that “Big Data” is overused and hackneyed, but imperatives like improving student success in higher education are classic big data problems that data-mining and predictive analytics can address. Further, higher ed need to be producing a massive amount more data scientists and analysts than are currently in the pipeline, to further this discipline and application of these tools to many many other problems across multiple industries.

    Read the article

  • How to Achieve Real-Time Data Protection and Availabilty....For Real

    - by JoeMeeks
    There is a class of business and mission critical applications where downtime or data loss have substantial negative impact on revenue, customer service, reputation, cost, etc. Because the Oracle Database is used extensively to provide reliable performance and availability for this class of application, it also provides an integrated set of capabilities for real-time data protection and availability. Active Data Guard, depicted in the figure below, is the cornerstone for accomplishing these objectives because it provides the absolute best real-time data protection and availability for the Oracle Database. This is a bold statement, but it is supported by the facts. It isn’t so much that alternative solutions are bad, it’s just that their architectures prevent them from achieving the same levels of data protection, availability, simplicity, and asset utilization provided by Active Data Guard. Let’s explore further. Backups are the most popular method used to protect data and are an essential best practice for every database. Not surprisingly, Oracle Recovery Manager (RMAN) is one of the most commonly used features of the Oracle Database. But comparing Active Data Guard to backups is like comparing apples to motorcycles. Active Data Guard uses a hot (open read-only), synchronized copy of the production database to provide real-time data protection and HA. In contrast, a restore from backup takes time and often has many moving parts - people, processes, software and systems – that can create a level of uncertainty during an outage that critical applications can’t afford. This is why backups play a secondary role for your most critical databases by complementing real-time solutions that can provide both data protection and availability. Before Data Guard, enterprises used storage remote-mirroring for real-time data protection and availability. Remote-mirroring is a sophisticated storage technology promoted as a generic infrastructure solution that makes a simple promise – whatever is written to a primary volume will also be written to the mirrored volume at a remote site. Keeping this promise is also what causes data loss and downtime when the data written to primary volumes is corrupt – the same corruption is faithfully mirrored to the remote volume making both copies unusable. This happens because remote-mirroring is a generic process. It has no  intrinsic knowledge of Oracle data structures to enable advanced protection, nor can it perform independent Oracle validation BEFORE changes are applied to the remote copy. There is also nothing to prevent human error (e.g. a storage admin accidentally deleting critical files) from also impacting the remote mirrored copy. Remote-mirroring tricks users by creating a false impression that there are two separate copies of the Oracle Database. In truth; while remote-mirroring maintains two copies of the data on different volumes, both are part of a single closely coupled system. Not only will remote-mirroring propagate corruptions and administrative errors, but the changes applied to the mirrored volume are a result of the same Oracle code path that applied the change to the source volume. There is no isolation, either from a storage mirroring perspective or from an Oracle software perspective.  Bottom line, storage remote-mirroring lacks both the smarts and isolation level necessary to provide true data protection. Active Data Guard offers much more than storage remote-mirroring when your objective is protecting your enterprise from downtime and data loss. Like remote-mirroring, an Active Data Guard replica is an exact block for block copy of the primary. Unlike remote-mirroring, an Active Data Guard replica is NOT a tightly coupled copy of the source volumes - it is a completely independent Oracle Database. Active Data Guard’s inherent knowledge of Oracle data block and redo structures enables a separate Oracle Database using a different Oracle code path than the primary to use the full complement of Oracle data validation methods before changes are applied to the synchronized copy. These include: physical check sum, logical intra-block checking, lost write validation, and automatic block repair. The figure below illustrates the stark difference between the knowledge that remote-mirroring can discern from an Oracle data block and what Active Data Guard can discern. An Active Data Guard standby also provides a range of additional services enabled by the fact that it is a running Oracle Database - not just a mirrored copy of data files. An Active Data Guard standby database can be open read-only while it is synchronizing with the primary. This enables read-only workloads to be offloaded from the primary system and run on the active standby - boosting performance by utilizing all assets. An Active Data Guard standby can also be used to implement many types of system and database maintenance in rolling fashion. Maintenance and upgrades are first implemented on the standby while production runs unaffected at the primary. After the primary and standby are synchronized and all changes have been validated, the production workload is quickly switched to the standby. The only downtime is the time required for user connections to transfer from one system to the next. These capabilities further expand the expectations of availability offered by a data protection solution beyond what is possible to do using storage remote-mirroring. So don’t be fooled by appearances.  Storage remote-mirroring and Active Data Guard replication may look similar on the surface - but the devil is in the details. Only Active Data Guard has the smarts, the isolation, and the simplicity, to provide the best data protection and availability for the Oracle Database. Stay tuned for future blog posts that dive into the many differences between storage remote-mirroring and Active Data Guard along the dimensions of data protection, data availability, cost, asset utilization and return on investment. For additional information on Active Data Guard, see: Active Data Guard Technical White Paper Active Data Guard vs Storage Remote-Mirroring Active Data Guard Home Page on the Oracle Technology Network

    Read the article

  • About Solaris 11 and UltraSPARC II/III/IV/IV+

    - by nospam(at)example.com (Joerg Moellenkamp)
    I know that I will get the usual amount of comments like "Oh, Jörg ? you can't be negative about Oracle" for this article. However as usual I want to explain the logic behind my reasoning. Yes ? I know that there is a lot of UltraSPARC III, IV and IV+ gear out there. But there are some very basic questions: Does your application you are currently running on this gear stops running just because you can't run Solaris 11 on it? What is the need to upgrade a system already in production to Solaris 11? I have the impression, that some people think that the systems get useless in the moment Oracle releases Solaris 11. I know that Sun sold UltraSPARC IV+ systems until 2009. The Sun SF490 introduced 2004 for example, that was a Sun SF480 with UltraSPARC IV and later with UltraSPARC IV+. And yes, Sun made some speedbumps. At that time the systems of the UltraSPARC III to IV+ generations were supported on Solaris 8, on Solaris 9 and on Solaris 10. However from my perspective we sold them to customers, which weren't able to migrate to Solaris 10 because they used applications not supported on Solaris 9 or who just didn't wanted to migrate to Solaris 10. Believe it or not ? I personally know two customers that migrated core systems to Solaris 10 in ? well 2008/9. This was especially true when the M3000 was announced in 2008 when it closed the darned single socket gap. It may be different at you site, however that's what I remember about that time when talking with customers. At first: Just because there is no Solaris 11 for UltraSPARC III, IV and IV+, it doesn't mean that Solaris 10 will go away anytime soon. I just want to point you to "Expect Lifetime Support - Hardware and Operating Systems". It states about Premier Support:Maintenance and software upgrades are included for Oracle operating systems and Oracle VM for a minimum of eight years from the general availability date.GA for Solaris 10 was in 2005. Plus 8 years ? 2013 ? at minimum. Then you can still opt for 3 years of "Extended Support" ? 2016 ? at minimum. 2016 your systems purchased in 2009 are 7 years old. Even on systems purchased at the very end of the lifetime of that system generation. That are the rules as written in the linked document. I said minimum The actual dates are even further in the future: Premier Support for Solaris 10 ends in 2015, Extended support ends 2018. Sustaining support ? indefinite. You will find this in the document "Oracle Lifetime Support Policy: Oracle Hardware and Operating Systems".So I don't understand when some people write, that Oracle is less protective about hardware investments than Sun. And for hardware it's the same as with Sun: Service 5 years after EOL as part of Premier Support. I would like to write about a different perspective as well: I have to be a little cautious here, because this is going in the roadmap area, so I will mention the public sources here: John Fowler told last year that we have to expect at at least 3x the single thread performance of T3 for T4. We have 8 cores in T4, as stated by Rick Hetherington. Let's assume for a moment that a T4 core will have the performance of a UltraSPARC core (just to simplify math and not to disclosing anything about the performance, all existing SPARC cores are considered equal). So given this pieces of information, you could consolidate 8 V215, 4 or 8 V245, 2 full blown V445,2 full blown 490, 2 full blown M3000 on a single T4 SPARC processor. The Fowler roadmap prezo talked about 4-socket systems with T4. So 32 V215, 16 to 8 V245, 8 fullblown V445, 8 full blown V490, 8 full blown M3000 in a system image. I think you get the idea. That said, most of the systems we are talking about have already amortized and perhaps it's just time to invest in new systems to yield other advantages like reduced space consumptions, like reduced power consumption, like some of the neat features sun4v gives you, and yes ? reduced number of processor licenses for Oracle and less money for Oracle HW/SW support. As much as I dislike it myself that my own UltraSPARC III and UltraSPARC II based systems won't run on Solaris 11 (and I have quite a few of them in my personal lab), I really think that the impact on production environments will be much less than most people think now. By the way: The reason for this move is a quite significant new feature. I will tell you that it was this feature, when it's out. I assume, telling just a word more could lead to much more time to blog.

    Read the article

  • What to do after a servicing fails on TFS 2010

    - by Martin Hinshelwood
    What do you do if you run a couple of hotfixes against your TFS 2010 server and you start to see seem odd behaviour? A customer of mine encountered that very problem, but they could not just, or at least not easily, go back a version.   You see, around the time of the TFS 2010 launch this company decided to upgrade their entire 250+ development team from TFS 2008 to TFS 2010. They encountered a few problems, owing mainly to the size of their TFS deployment, and the way they were using TFS. They were not doing anything wrong, but when you have the largest deployment of TFS outside of Microsoft you tend to run into problems that most people will never encounter. We are talking half a terabyte of source control in TFS with over 80 proxy servers. Its certainly the largest deployment I have ever heard of. When they did their upgrade way back in April, they found two major flaws in the product that meant that they had to back out of the upgrade and wait for a couple of hotfixes. KB983504 – Hotfix KB983578 – Patch KB2401992 -Hotfix In the time since they got the hotfixes they have run 6 successful trial migrations, but we are not talking minutes or hours here. When you have 400+ GB of data it takes time to copy it around. It takes time to do the upgrade and it takes time to do a backup. Well, last week it was crunch time with their developers off for Christmas they had a window of opportunity to complete the upgrade. Now these guys are good, but they wanted Northwest Cadence to be available “just in case”. They did not expect any problems as they already had 6 successful trial upgrades. The problems surfaced around 20 hours in after the first set of hotfixes had been applied. The new Team Project Collection, the only thing of importance, had disappeared from the Team Foundation Server Administration console. The collection would not reattach either. It would not even list the new collection as attachable! Figure: We know there is a database there, but it does not This was a dire situation as 20+ hours to repeat would leave the customer over time with 250+ developers sitting around doing nothing. We tried everything, and then we stumbled upon the command of last resort. TFSConfig Recover /ConfigurationDB:SQLServer\InstanceName;TFS_ConfigurationDBName /CollectionDB:SQLServer\instanceName;"Collection Name" -http://msdn.microsoft.com/en-us/library/ff407077.aspx WARNING: Never run this command! Now this command does something a little nasty. It assumes that there really should not be anything wrong and sets about fixing it. It ignores any servicing levels in the Team Project Collection database and forcibly applies the latest version of the schema. I am sure you can imagine the types of problems this may cause when the schema is updated leaving the data behind. That said, as far as we could see this collection looked good, and we were even able to find and attach the team project collection to the Configuration database. Figure: After attaching the TPC it enters a servicing mode After reattaching the team project collection we found the message “Re-Attaching”. Well, fair enough that sounds like something that may need to happen, and after checking that there was disk IO we left it to it. 14+ hours later, it was still not done so the customer raised a priority support call with MSFT and an engineer helped them out. Figure: Everything looks good, it is just offline. Tip: Did you know that these logs are not represented in the ~/Logs/* folder until they are opened once? The engineer dug around a bit and listened to our situation. He knew that we had run the dreaded “tfsconfig restore”, but was not phased. Figure: This message looks suspiciously like the wrong servicing version As it turns out, the servicing version was slightly out of sync with the schema. KB Schema Successful           KB983504 341 Yes   KB983578 344 sort of   KB2401992 360 nope   Figure: KB, Schema table with notation to its success The Schema version above represents the final end of run version for that hotfix or patch. The only way forward The problem was that the version was somewhere between 341 and 344. This is not a nice place to be in and the engineer give us the  only way forward as the removal of the servicing number from the database so that the re-attach process would apply the latest schema. if his sounds a little like the “tfsconfig recover” command then you are exactly right. Figure: Sneakily changing that 3 to a 1 should do the trick Figure: Changing the status and dropping the version should do it Now that we have done that we should be able to safely reattach and enable the Team Project Collection. Figure: The TPC is now all attached and running You may think that this is the end of the story, but it is not. After a while of mulling and seeking expert advice we came to the opinion that the database was, for want of a better term, “hosed”. There could well be orphaned data in there and the likelihood that we would have problems later down the line is pretty high. We contacted the customer back and made them aware that in all likelihood the repaired database was more like a “cut and shut” than anything else, and at the first sign of trouble later down the line was likely to split in two. So with 40+ hours invested in getting this new database ready the customer threw it away and started again. What would you do? Would you take the “cut and shut” to production and hope for the best?

    Read the article

  • WSS 3.0 to SharePoint 2010: Tips for delaying the Visual Upgrade

    - by Kelly Jones
    My most recent project has been to migrate a bunch of sites from WSS 3.0 (SharePoint 2007) to SharePoint Server 2010.  The users are currently working with WSS 3.0 and Office 2003, so the new ribbon based UI in 2010 will be completely new.  My client wants to avoid the new SharePoint 2010 look and feel until they’ve had time to train their users, so we’ve been testing the upgrades by keeping them with the 2007 user interface. Permission to perform the Visual Upgrade One of the first things we noticed was the default permissions for who was allowed to switch the UI from 2007 to 2010.  By default, site collection administrators and site owners can do this.  Since we wanted to more tightly control the timing of the new UI, I added a few lines to the PowerShell script that we are using to perform the migration.  This script creates the web application, sets the User Policy, and then does a Mount-SPDatabase to attach the old 2007 content database to the 2010 farm.  I added the following steps after the Mount-SPDatabase step: #Remove the visual upgrade option for site owners # it remains for Site Collection administrators foreach ($sc in $WebApp.Sites){ foreach ($web in $sc.AllWebs){ #Visual Upgrade permissions for the site/subsite (web) $web.UIversionConfigurationEnabled = $false; $web.Update(); } } These script steps loop through each Site Collection in a particular web application ($WebApp) and then it loops through each subsite ($web) in the Site Collection ($sc) and disables the Site Owner’s permission to perform the Visual Upgrade. This is equivalent to going to the Site Collection administrator settings page –> Visual Upgrade and selecting “Hide Visual Upgrade”. Since only IT people have Site Collection administrator privileges, this will allow IT to control the timing of the new 2010 UI rollout. Newly created subsites Our next issue was brought to our attention by SharePoint Joel’s blog post last week (http://www.sharepointjoel.com/Lists/Posts/Post.aspx?ID=524 ).  In it, he lists some updates about the 2010 upgrade, and his fourth point was one that I hadn’t seen yet: 4. If a 2007 upgraded site has not been visually upgraded, the sites created underneath it will look like 2010 sites – While this is something I’ve been aware of, I think many don’t realize how this impacts common look and feel for master pages, and how it impacts good navigation and UI. As well depending on your patch level you may see hanging behavior in the list picker. The site and list creation Silverlight control in Internet Explorer is looking for resources that don’t exist in the galleries in the 2007 site, and hence it continues to spin and spin and eventually time out. The work around is to upgrade to SP1, or use Chrome or Firefox which won’t attempt to render the Silverlight control. When the root site collection is a 2007 site and has it’s set of galleries and the children are 2010 sites there is some strange behavior linked to the way that the galleries work and pull from the parent. Our production SharePoint 2010 Farm has SP1 installed, as well as the December 2011 Cumulative Update, so I think the “hanging behavior” he mentions won’t affect us. However, since we want to control the roll out of the UI, we are concerned that new subsites will have the 2010 look and feel, no matter what the parent site has. Ok, time to dust off my developer skills. I first looked into using feature stapling, but I couldn’t get that to work (although I’m pretty sure I had everything wired up correctly).  Then I stumbled upon SharePoint 2010’s web events – a great way to handle this. Using Visual Studio 2010, I created a new SharePoint project and added a Web Event Receiver: In the Event Receiver class, I used the WebProvisioned method to check if the parent site is a 2007 site (UIVersion = 3), and if so, then set the newly created site to 2007:   /// <summary> /// A site was provisioned. /// </summary> public override void WebProvisioned(SPWebEventProperties properties) { base.WebProvisioned(properties);   try { SPWeb curweb = properties.Web;   if (curweb.ParentWeb != null) {   //check if the parent website has the 2007 look and feel if (curweb.ParentWeb.UIVersion == 3) { //since parent site has 2007 look and feel // we'll apply that look and feel to the current web curweb.UIVersion = 3; curweb.Update(); } } } catch (Exception) { //TODO: Add logging for errors } }   This event is part of a Feature that is scoped to the Site Level (Site Collection).  I added a couple of lines to my migration PowerShell script to activate the Feature for any site collections that we migrate. Plan Going Forward The plan going forward is to perform the visual upgrade after the users for a particular site collection have gone through 2010 training. If we need to do several site collections at once, we’ll use a PowerShell script to loop through each site collection to update the sites to 2010.  If it’s just one or two, we’ll be using the “Update All Sites” button on the Visual Upgrade page for Site Collection Administrators. The custom code for newly created sites won’t need to be changed, since it relies on the UI version of the parent site.  If the parent is 2010, then the new site will look 2010.

    Read the article

< Previous Page | 18 19 20 21 22 23 24 25 26 27  | Next Page >