Search Results

Search found 5152 results on 207 pages for 'scheduled tasks'.

Page 23/207 | < Previous Page | 19 20 21 22 23 24 25 26 27 28 29 30  | Next Page >

  • Scheduling jobs from a web environment on Linux

    - by Anders Feder
    Hi. I am developing an application in PHP on Linux/Apache. I want to be able to schedule PHP jobs (scripts) for execution at some specific time in the future from within the application. I know that many people will recommend cron and at, but first of all I don't need recurrence (cron) and secondly and most importantly, I need the solution to be able to scale. At was not designed with race condititions in mind, and if two users try to add a job at the same time one or both may fail. It's also important that jobs are executed at their specified time, and not just 'polled' once per minute or so. Can anyone please suggest solutions for this task? Thank you.

    Read the article

  • [Android] GPS can't run inside TimerTask

    - by user568553
    Hi, I am trying to write an android app that acquires a GPS signal at a fix time interval, for example every 1 minute. Since the requestLocationUpdate function does not exactly implement that, I tried to use task to accomplished it. public class getGPS extends TimerTask{ public void run(){ System.out.println("Running a GPS task"); locHandler = new locationUpdateHandler(); myManager.requestLocationUpdates(provider, 60000, 0, locHandler); } } public void LoadCoords(){ Timer timer = new Timer(); timer.scheduleAtFixedRate(new getGPS(), 0, 60000); } However, from what I've seen, requestLocationUpdates would run fine if I put it inside LoadCoords(), but would not run if I put it inside the TimerTask (ie no green icon on the task bar to show that GPS is looking for a fix). Can anyone please suggest an alternative approach or pseudo-code, or correct my mistake if there is one ? Thank you in advance.

    Read the article

  • How can I schedule a daily backup with SQL Server Express?

    - by edosoft
    I'm running a small web application with SQL server express (2005) as backend. I can create a backup with a SQL script, however, I'd like to schedule this on a daily basis. As extra option (should-have) I'd like to keep only the last X backups (for space-saving reasons obviously) Any pointers? [edit] SQL server agent is unavailable in SQL server express...

    Read the article

  • Running interrelated methods continously using java

    - by snehalata
    I have written application which downloads data from a website every 10 mins and writes to a file.Then these files are merged into one file and then R program is run on this merged file to perform sentiment analysis and result is stored in hbase. I want the process of merging files,running R and then storing to HBase to run continuosly on the downloaded data. For running R,we are running R script from java program.We have used Runtime.getRuntime().exec() method to run R program but it doesn't wait for R program to complete and method in the next line starts executing.Using p.waitFor() did not help . What approach should I use to do merge then run R and finally store results in Hbase?Should I use timer class??

    Read the article

  • How to add Eclipse Task Tags programmatically (Eclipse Plugin development)?

    - by sebnem
    Hi, I am developing an Eclipse Plugin. I want to add my custom Task Tag programmatically within the plugin. (Lets say DOTHIS) Later, i want to list the lines marked with DOTHIS tag in my custom taskView I know that it is done using the Eclipse UI from Project Properties Java Compiler Task Tags New. and then in the task view by Configure Contents but how can i do these arranegments within the plugin? Thanks in advance.

    Read the article

  • In Scrum, should tasks such as development environment set-up and capability development be managed as subtasks within actual user stories?

    - by Asim Ghaffar
    Sometimes in projects we need to spend time on tasks such as: exploring alternate frameworks and tools learning the framework and tools selected for the project setting up the servers and project infrastructure (version control, build environments, databases, etc) If we are using User Stories, where should all this work go? One option is to make them all part of first user story (e.g. make the homepage for application). Another option is to do a spike for these tasks. A third option is to make task part of an Issue/Impediment (e.g. development environment not selected yet) rather than a user Story.

    Read the article

  • Five new junior developers and lots of complex tasks. What's now?

    - by mxe
    Our company has hired five new junior developers to help me to developer our product. Unfortunately the new features and incoming bug fixes usually require deeper knowledge than a recently graduated developer usually has (threading/concurrency, debugging performance bottlenecks in a complex system, etc.) Delegating (and planning) tasks which they (probably) can solve, answering their questions, mentoring/managing them, reviewing their code use up all of my time and I often feel that I could solve the issues less time than the whole delegating process takes (counting only my time). In addition I don't have time to solve the tasks which require deeper system knowledge/more advanced skills and it does not seem that it will change in the near future. So, what's now? What should I do to use their and my time effectively?

    Read the article

  • What tasks should an Architect NOT do or limit to be effective?

    - by GBH
    There are plenty of questions/answers about what an architect does, but what should someone in an Architect role NOT do? What are the boundaries/limits to maintain to be an effective Architect? I'm thinking here of Architect vs Developer and Architect vs Project Manager For example, I'm finding myself in a role where my title is Architect but I am also the coding/development lead and project manager on multiple small enterprise projects. I'm struggling with all the task switching and now I want to limit task switching. Trying to wear every hat just isn't working. What tasks should an Architect not do at all? What tasks should an Architect limit? I do think an Architect needs to keep coding, but how to define an appropriate limit for coding work?

    Read the article

  • need some concrete examples on user stories, tasks and how they relate to functional and technical specifications

    - by gideon
    Little heads up, Im the only lonely dev building/planning/mocking my project as I go. Ive come up with a preview release that does only the core aspects of the system, with good business value and I've coded most of the UI as dirty throw-able mockups over nicely abstracted and very minimal base code. In the end I know quite well what my clients want on the whole. I can't take agile-ish cowboying anymore because Im completely dis-organized and have no paper plan and since my clients are happy, things are getting more complex with more features and ideas. So I started using and learning Agile & Scrum Here are my problems: I know what a functional spec is.(sample): Do all user stories and/or scenarios become part of the functional spec? I know what user stories and tasks are. Are these kinda user stories? I dont see any Business Value reason added to them. I made a mind map using freemind, I had problems like this: Actor : Finance Manager Can Add a Financial Plan into the system because well thats the point of it? What Business Value reason do I add for things like this? Example : A user needs to be able to add a blog article (in the blogger app) because..?? Its the point of a blogger app, it centers around that feature? How do I go into the finer details and system definitions: Actor: Finance Manager Action: Adds a finance plan. This adding is a complicated process with lots of steps. What User Story will describe what a finance plan in the system is ?? I can add it into the functional spec under definitions explaining what a finance plan is and how one needs to add it into the system, but how do I get to the backlog planning from there? Example: A Blog Article is mostly a textual document that can be written in rich text in the system. To add a blog article one must...... But how do you create backlog list/features out of this? Where are the user stories for what a blog article is and how one adds/removes it? Finally, I'm a little confused about the relations between functional specs and user stories. Will my spec contain user stories in them with UI mockups? Now will these user stories then branch out tasks which will make up something like a technical specification? Example : EditorUser Can add a blog article. Use XML to store blog article. Add a form to add blog. Add Windows Live Writer Support. That would be agile tasks but would that also be part of/or form the technical specs? Some concrete examples/answers of my questions would be nice!!

    Read the article

  • Tasks, jobs, activities, operations... which term to use when?

    - by Paul Stovell
    My application has a number of different asynchronous 'things' that it performs: There are things that fire off a schedule (every 5 minutes) There are things that are fired when a user clicks a button There are things that are triggered by an incoming web service call I use the terms like this: Scheduled things = Jobs User-triggered things = Tasks Web service-triggered things = Operations Tasks are quite complicated, so they're implemented using a hierarchy of different objects which I call Activities (operations and jobs may also begin to use these Activities as their building blocks). I feel like I might be using the wrong terms - for example, would you expect something that happens every 5 minutes automatically to be a Job or a Task? Is there an industry standard for this? All of the words seem to mean the same thing.

    Read the article

  • How to prioritize tasks when you have multiple programming projects running in parallel?

    - by Vinko Vrsalovic
    Say you have 5 customers, you develop 2 or 3 different projects for each. Each project has Xi tasks. Each project takes from 2 to 10 man weeks. Given that there are few resources, it is desired to minimize the management overhead. Two questions in this scenario: What tools would you use to prioritize the tasks and track their completion, while tending to minimize the overhead? What criteria would you take into consideration to determine which task to assign to the next available resource given that the primary objective is to increase throughput (more projects finished per time unit, this objective conflicts with starting one project and finishing it and then moving on to the next)? Ideas, management techniques, algorithms are welcome

    Read the article

  • What user is the script run as after Carbon Copy Cloner ends scheduled task?

    - by Paolo
    On Mac OS X I keep data on a local server mirrored with the same data on a remote server with a scheduled backup task done with Carbon Copy Cloner. After the backup is done a bash script is run as specified in the scheduled task options of CCC. Is the script run as root? Or differently and more generally: as my script writes to a log file, what command should I put on my script to see on the log if the script is running as root or something else?

    Read the article

  • How can I import tasks into Project that have already been started?

    - by unknown
    I am writing a feature to import tasks from an online bug tracking / project management tool into Microsoft Project, primarily for resource leveling. Currently I am importing all tasks in as Fixed work, and giving them an assignment to a single resource for 100% of the work. The duration is then dynamically calculated, which at import time is equal to the amount of work. However, I am not a project manager by any means, and am having difficulty on how to get the start dates to calculate correctly. I've never used Project either. I am using Schedule From Start and setting the Project Start Date to the date the contract was signed / work was approved. However, this can be in the past, and I do not want current tasks scheduled from that date. Should it be today then? Another problem I have is with tasks that were already started. I have remaining work set, and I was placing a constraint on them to be started on the day the work was first applied. However, the remaining work for the task would be scheduled from that date, which was sometimes in the past. Using task constraints, a project start date, and whatever other settings available to me that I don't know about, what is the correct way to have the tasks scheduled?

    Read the article

  • How to Create a Task From an Email Message in Outlook 2013

    - by Lori Kaufman
    If you need to do something related to an email message you received, you can easily create a task from the message in Outlook. A task can be created that contains all the content of the message without requiring you to re-enter the information. Creating a task in Outlook from an email message is different from flagging the message. As it says on Microsoft’s site: “When you flag an email message, the message appears in the To-Do List in Tasks and on the Tasks peek. However, if you delete the message, it also disappears from the To-Do List in Tasks and on the Tasks peek. Flagging a message doesn’t create a separate task.” Using the method described below to create a task from an email message, the task is separate from the message. The original message can be deleted or changed and the related task will not be affected. In Outlook, make sure the Mail section is active. If not, click Mail on the Navigation Bar at the bottom of the Outlook window. Then, click on the message you want to add to a task and drag it to Tasks on the Navigation Bar. A new Task window displays containing the email message and allowing you to enter the subject of the task, the Start and Due dates, Status, Priority, among other settings. When you have specified the settings for the task, click Save & Close in the Actions section of the Task tab. When the Task window closes, the Mail section is still active. If you move your mouse over Tasks on the Navigation Bar, a snippet from the new task displays in a popup window (the Task peek). Click Tasks to go to the Tasks section of Outlook. The To-Do List displays with your newly-added task listed in the middle pane. The right pane displays the details of the task and the contents of the message included in the task (as pictured at the beginning of this article). Click on Tasks to see a complete listing of all your tasks, including the one you just added from your email message. Note that attachments in an email message added to a new task are not copied to the task. You can also create new tasks by dragging contacts, calendar items, and notes to Tasks on the Navigation Bar.     

    Read the article

  • What to use to wait on a indeterminate number of tasks?

    - by Scott Chamberlain
    I am still fairly new to parallel computing so I am not too sure which tool to use for the job. I have a System.Threading.Tasks.Task that needs to wait for n number number of tasks to finish before starting. The tricky part is some of its dependencies may start after this task starts (You are guaranteed to never hit 0 dependent tasks until they are all done). Here is kind of what is happening Parent thread creates somewhere between 1 and (NUMBER_OF_CPU_CORES - 1) tasks. Parent thread creates task to be run when all of the worker tasks are finished. Parent thread creates a monitoring thread Monitoring thread may kill a worker task or spawn a new task depending on load. I can figure out everything up to step 4. How do I get the task from step 2 to wait to run until any new worker threads created in step 4 finish?

    Read the article

  • Is it okay to use a language that isn't supported by your company for some tasks?

    - by systempuntoout
    I work for a company that supports several languages: COBOL, VB6, C# and Java. I use those languages for my primary work, but I often find myself to coding some minor programs (e.g. scripts) in Python because I found it to be the best tool for that type of task. For example: An analyst gives me a complex CSV file to populate some DB tables, so I would use Python to parse it and create a DB script. What's the problem? The main problem I see is that a few parts of these quick & dirty scripts are slowly gaining importance and: My company does not support Python They're not version controlled (I back them up in another way) My coworkers do not know Python The analysts have even started referencing them in email ("launch the script that exports..."), so they are needed more often than I initially thought. I should add that these scripts are just utilities that are not part of the main project; they simply help to get trivial tasks done in less time. For my own small tasks they help a lot. In short, if I were a lottery winner to be in a accident, my coworkers would need to keep the project alive without those scripts; they would spend more time in fixing CSV errors by hand for example. Is this a common scenario? Am I doing something wrong? What should I do?

    Read the article

  • Eclipse throwing error when copying and pasting

    - by hoffmandirt
    I am using Eclipse 3.5 SR2 for Java EE developers. Each time I press control+C or control+V for the first time after I open a file I get an error. After I close the error, I can successfully copy and paste. The error message made me believe that it was related to the Mylyn plugin, but I uninstalled it and still no difference. Has anyone else experience this problem? I also have the subclipse, adobe flex builder, and maven plugins installed. The 'org.eclipse.mylyn.tasks.ui.hyperlinks.detectors.url' extension from plug-in 'org.eclipse.mylyn.tasks.ui' to the 'org.eclipse.ui.workbench.texteditor.hyperlinkDetectors' extension point failed to load the hyperlink detector. Plug-in org.eclipse.mylyn.tasks.ui was unable to load class org.eclipse.mylyn.internal.tasks.ui.editors.TaskUrlHyperlinkDetector. An error occurred while automatically activating bundle org.eclipse.mylyn.tasks.ui (520). The 'org.eclipse.mylyn.java.hyperlink.detector.stack' extension from plug-in 'org.eclipse.mylyn.java.tasks' to the 'org.eclipse.ui.workbench.texteditor.hyperlinkDetectors' extension point failed to load the hyperlink detector. Plug-in org.eclipse.mylyn.java.tasks was unable to load class org.eclipse.mylyn.internal.java.tasks.JavaStackTraceHyperlinkDetector. org/eclipse/mylyn/tasks/ui/AbstractTaskHyperlinkDetector The 'org.eclipse.mylyn.tasks.ui.hyperlinks.detectors.task' extension from plug-in 'org.eclipse.mylyn.tasks.ui' to the 'org.eclipse.ui.workbench.texteditor.hyperlinkDetectors' extension point failed to load the hyperlink detector. Plug-in org.eclipse.mylyn.tasks.ui was unable to load class org.eclipse.mylyn.internal.tasks.ui.editors.TaskHyperlinkDetector. An error occurred while automatically activating bundle org.eclipse.mylyn.tasks.ui (520).

    Read the article

  • Python and only Python for almost any programming tasks!

    - by Wassim
    Am I wrong if I think that Python is all I need to master, in order to solve most of the common programming tasks? EDIT I'm not OK with learning new programming languages if they don't teach me new concepts of programming and problem solving; hence the idea behind mastering a modern, fast evolving, with a rich set of class libraries, widely used and documented, and of course has a "friendly" learning curve programming language. I think that in the fast evolving tech industry, specialization is key to success.

    Read the article

  • How can I show Thunderbird Lightning tasks and events in the Gnome Clock applet?

    - by Niriel
    We used to have this functionality with Evolution: clicking on the date-time in the gnome panel would show a list of events/tasks/appointments from the Evolution Calendar. As an interesting side effect, one would receive alarm notifications even when Evolution wasn't running. Now that Thunderbird is the default email client, I'd imagine that there is a similar functionality for Lightning (Thunberbird's calendar). I just can't find it. Maybe it's not ready ?

    Read the article

  • Best language on Linux to replace manual tasks that use SSH/Telnet? [on hold]

    - by Calab
    I've been tasked to create and maintain a web browser based interface to replace several of the manual tasks that we perform now. I currently have a "shakey" but working program written in Perl (2779 lines) that uses basic Expect coding, but it has some limitations that require a great deal of coding to get around. Because of this I am going to do a complete rewrite and want to do it "right" this time. My question is this... What would be the best language to use to create a web based interface to perform SSH/Telnet tasks that we would normally do manually? Keep in mind the following requirements: Runs on a CentOS Linux system v5.10 Http will be served by Apache2 This is an INTRANET site and only accessible within our organization. User load will be light. No more that 5 users accessing it at one time. perl 5.8.8, php 5.3.3, python 2.7.2 are available... Not sure what other languages to check for, or what modules might be installed in each language. The web interface will need to provide progress indicators and text output produced by the remote connection, in real time as it is generated. If we are running our process on multiple hosts, they should be in individual threads so that they can run side by side, not sequentially. I want the ability to "trap" on specific text generated by the remote host and display an alert to the user - such as when the remote host generates an error message. I would like to avoid as much client side scripting (javascript/vbscript) as I can. Most users will be on Windows PC's using Chrome or IE as a browser. Users will be downloading the resulting output so they can process it as they see fit. I currently have no experience with "Ajax" or the like. Most of my coding experience is old 6809 assembly, Visual Basic 6, and whatever I can cut/paste from online examples in various languages (hence my "shaky" Perl program) My coding environment is Eclipse for remote code editing, but I prefer stuff like UltraEdit if I can get a decent syntax file for the language I'm using. I do have su access on the server, but I'm not the only one using this server so I can't just upgrade/install blindly as I might impact other software currently running on the machine. One reason that I'm asking here, instead of searching (which I did) is that most replies were, "use language 'xyz', but you need to use an external SSH connection" - like I'm using Expect in my Perl script. Most also did not agree on what language that 'xyz' should be. ...so, after this long posting, can someone offer some advice?

    Read the article

  • Shows how to use the new Tasks namespace to download multiple documents in parallel.

    In C# 4.0, Task parallelism is the lowest-level approach to parallelization with PFX. The classes for working at this level are defined in the System.Threading.Tasks namespace.  read moreBy Peter BrombergDid you know that DotNetSlackers also publishes .net articles written by top known .net Authors? We already have over 80 articles in several categories including Silverlight. Take a look: here.

    Read the article

< Previous Page | 19 20 21 22 23 24 25 26 27 28 29 30  | Next Page >