Search Results

Search found 10533 results on 422 pages for 'task organization'.

Page 23/422 | < Previous Page | 19 20 21 22 23 24 25 26 27 28 29 30  | Next Page >

  • SQL Maintenance Cleanup Task Working but Not Deleting

    - by Alex
    I have a Maintenance Plan that is suppose to go through the BACKUP folder and remove all .bak older than 5 days. When I run the job, it gives me a success message but older .bak files are still present. I've tried the step at the following question: SQL Maintenance Cleanup Task 'Success' But not deleting files Result is column IsDamaged = 0 I've verified with the following question and this is not my issue: Maintenance Cleanup Task(s) running 'successfully' but not deleting back up files. I've also tried deleting the Job and Maintenance Plan and recreating, but to no avail. Any ideas?

    Read the article

  • How to specify character encoding for Ant Task parameters in Java

    - by räph
    I'm writing an ANT task in Java. In my build.xml I specify parameters, which should be read from my java class. Problems occur, when I use special characters, like german umlauts (Ö,Ä,Ü) in these parameters. In my java task they appear as ?-characters (using System.out.print). All my files are encoded as UTF-8. and my build.xml has the corresponding declaration: <?xml version="1.0" encoding="UTF-8" ?> For the details of writing the task: I do it according to http://ant.apache.org/manual/develop.html (especially Point 5 nested elements). I have nested elements in my task like: <parameter name="test" value="ÖÄÜtest"/> and a java method: public void addConfiguredParameter(Parameter prop) { System.out.println(prop.getValue()); //prints ???test } to read the parameter values.

    Read the article

  • Hadoop reduce task gets hung

    - by user806098
    I set up a hadoop cluster with 4 nodes, When running a map-reduce task, the map task finishes quickly, while the reduce task hangs at 27% percent. I checked the log, it's that the reduce task fails to fetch map output from map nodes. The job tracker log of master shows messages like this: 2011-06-27 19:55:14,748 INFO org.apache.hadoop.mapred.JobTracker: Adding task (REDUCE) 'attempt_201106271953_0001_r_000000_0' to tip task_201106271953_0001_r_000000, for tracker 'tracker_web30.bbn.com.cn:localhost/127.0.0.1:56476' And the name node log of master shows messages like this: 2011-06-27 14:00:52,898 INFO org.apache.hadoop.ipc.Server: IPC Server handler 4 on 54310, call register(DatanodeRegistration(202.106.199.39:50010, storageID=DS-1989397900-202.106.199.39-50010-1308723051262, infoPort=50075, ipcPort=50020)) from 192.168.225.19:16129: error: java.io.IOException: verifyNodeRegistration: unknown datanode 202.106.199.3 9:50010 However, neither the "web30.bbn.com.cn" or 202.106.199.39, 202.106.199.3 is the slave node. I think such ip/domains appear because hadoop fails to resolve a node(first in the Intranet DNS server), then it goes to a higher-level DNS server, later to the top, still fails, then the "junk" ip/domains are returned. But I checked my config, it goes like this: /etc/hosts: 127.0.0.1 localhost.localdomain localhost ::1 localhost6.localdomain6 localhost6 192.168.225.16 master 192.168.225.66 slave1 192.168.225.20 slave5 192.168.225.17 slave17 conf/core-site.xml: hadoop.tmp.dir /root/hadoop_tmp/hadoop_${user.name} fs.default.name hdfs://master:54310 io.sort.mb 1024 hdfs-site.xml: dfs.replication 3 masters: master slaves: master slave1 slave5 slave17 Also, all firewalls(iptables) are turned off, and ssh between each 2 nodes is ok. so I don't know where exact the error comes from. Please help. Thanks a lot.

    Read the article

  • Scheduled task username changed

    - by Ernst
    I posted this originally on stack overflow where I was told I should ask it here: Hi, I created a user on our exchange server, but later changed the username. Now, when I create a scheduled task for that user, and change it's settings (run only when logged on), the username is automatically changed back to the old username. What's causing this and how do I make sure the correct, new username is used for the task (otherwise it won't run), security settings are okay. I did already log in with a different user to delete the profile on the computer and tried again with this user to no avail. The OS is windows xp, the exchange server is on windows server 2003. Thanks

    Read the article

  • how to time out an ant task

    - by Christopher Dancy
    Without writing a custom ant task is there a way to use a timeout on a regular ant target? To give some background info ... we are using the delete task to remove all contents of a given directory. Sometimes this directory is massive with lots of generated folders and files. We wanted to have that task say timeout after 5 minutes. I could not find anything online anywhere ... any ideas?

    Read the article

  • Cannot schedule task to run under domain user account other than current user

    - by Filburt
    On our Win 2008 machines I can't schedule tasks for domain users because the domain name does not resolve to network name but the AD dc name. The "network name" looks like ABCDEFGE-HIJKLM and the "dc" / "name" would look like ABCDEFGE-HIJKLMN. When selecting the domain user account the account qualifier will look like ABCDEFGE-HIJKLMN\task.user. This results in an "invalid account" error. When however keeping the currently logged in user it will display ABCDEFGE-HIJKLM\current.user. Does this behaviour result from the presumable "illegal" domain name? Is there a workaround for this? update I could of course log in as the desired domain account and create the task but since this account is a account used for running services I want to avoid creating a user profile on the machine.

    Read the article

  • TFS Project Organization

    - by pm_2
    I'm relatively new to TFS and am wondering other people deal with organising TFS where there are many projects? For example, does anyone know if it's possible to put TFS projects inside folders or do people use prefixes / suffixes?

    Read the article

  • powershell task scheduler or loop and sleep

    - by Paddy Carroll
    I have a job that needs to go off every minute or so, it loads a DLL written in C# that retrieves state for an SQL Server Mirror (Primary, Mirror and witness) for a number of databases; it allows us to poke DNS to show where the primary instances are. Please don't mention Clustering - We're not doing that. I can't be arsed to write a service, there simply isn't enough time do I Task Scheduler - every minute: Invoke a powershell script that loads the DLL does the business Task scheduler - At Startup : Invoke a similer powershell script that loads the DLL once but then loops and sleeps, refreshing the Object that the DLL exposes. Pros and cons?

    Read the article

  • jQuery internals: Organization of the jQuery Object

    - by sonofdelphi
    I was going through the source code of jQuery. I'm having trouble understanding the wrapping strategy for the jQuery object. (function( window, undefined ) { // Define a local copy of jQuery var jQuery = function( selector, context ) { // The jQuery object is actually just the init constructor 'enhanced' return new jQuery.fn.init( selector, context ); }, .... .... .... // Expose jQuery to the global object window.jQuery = window.$ = jQuery; })(window); Specifically, what I'm not able to understand stems from the first line. What is the outermost unnamed container function? Why is it required? Why is the container function anonymous? What is the need for the outermost '(' parantheses ?

    Read the article

  • SSIS - 'Execute SQL' Task and Record Sets

    - by Mick Walker
    Hi, How can I access a 'RecordSet' within a 'Execute SQL' task when using SSIS? I have looked at the parameter mapping options within the Execute SQL Task Editor and cannot find a type of object to allow me to pass the variable holding my record set to the task.

    Read the article

  • Making only one task run at a time in celerybeat

    - by Noufal Ibrahim
    I have a task which I execute once a minute using celerybeat. It works fine. Sometimes though, the task takes a few seconds more than a minute to run because of which two instances of the task run. This leads to some race conditions that mess things up. I can (and probably should) fix my task to work properly but I wanted to know if celery has any builtin ways to ensure this. My cursory Google searches and RTFMs yielded no results.

    Read the article

  • NoSQL for filesystem storage organization and replication?

    - by wheaties
    We've been discussing design of a data warehouse strategy within our group for meeting testing, reproducibility, and data syncing requirements. One of the suggested ideas is to adapt a NoSQL approach using an existing tool rather than try to re-implement a whole lot of the same on a file system. I don't know if a NoSQL approach is even the best approach to what we're trying to accomplish but perhaps if I describe what we need/want you all can help. Most of our files are large, 50+ Gig in size, held in a proprietary, third-party format. We need to be able to access each file by a name/date/source/time/artifact combination. Essentially a key-value pair style look-up. When we query for a file, we don't want to have to load all of it into memory. They're really too large and would swamp our server. We want to be able to somehow get a reference to the file and then use a proprietary, third-party API to ingest portions of it. We want to easily add, remove, and export files from storage. We'd like to set up automatic file replication between two servers (we can write a script for this.) That is, sync the contents of one server with another. We don't need a distributed system where it only appears as if we have one server. We'd like complete replication. We also have other smaller files that have a tree type relationship with the Big files. One file's content will point to the next and so on, and so on. It's not a "spoked wheel," it's a full blown tree. We'd prefer a Python, C or C++ API to work with a system like this but most of us are experienced with a variety of languages. We don't mind as long as it works, gets the job done, and saves us time. What you think? Is there something out there like this?

    Read the article

  • Schedled Tasks and Environment Variables

    - by Andrew J. Brehm
    I have a scheduled task, a batch file, that uses an environment variables which is set system-wide. On server 1, the scheduled task runs under a domain account and the environment variable works. The environment variable also exists in my session and when I runas as the service account. On server 2, the scheduled task runs under a different domain account and the environment variable DOES NOT work. However, the environment variable does exist in my session and when I runas as the service account. On both servers the environment variable has been set system-wide by the same script originally. The script runs again every now and then and as far as I can see noone has tempered with the environment variable. The scheduled tasks are set up identically on the two servers (using the same XML file) and the two service accounts are identically configured (as far as I know). What am I doing wrong?

    Read the article

  • Looking for a good free or cheap task tracking system

    - by JWood
    I've finally decided that pen and paper/whiteboards are not up to the job as my workload increases so I'm looking for a good task tracking system. I need something that can track tasks in categories (projects) and allow me to assign priority to each task. I've tried iTeamWork which requires projects to have an end time which is no good for me as at least one of my projects is ongoing. I also tried Teamly which was required tasks to be set to a specific day which is no good as tasks sometimes take more than a day and I would like them organised by priority rather than specific days. Preferably looking for something hosted but I'm happy to install on our servers if it supports PHP/MySQL. Oh, and an iPhone client would be the icing on the cake! Can anyone recommend anything?

    Read the article

  • SQL Databases and table design/organization

    - by John McMullen
    (NOOB disclaimer) I'm working on a system (a type of map), that is accessed mostly via 3 fields: ID (auto incremented), X coordinate, and Y coordinate. As it is right now, i have all data on the map, stored in 1 table. Whenever the map display is loaded it simply queries the database for contents in x and y, and the DB gives the data (other fields in the same entry). If an item on the map is doing something, it has a flag saying its doing something, and then has an ID of the action in another table holding that type of 'actions'. Essentially, for all map data, its stored in 1 table. All actions of a certain type are stored in their own table. I'm a noob, and i'm wondering what the most effective/efficient structure for such a design? (a map that has items, and each item has stats/actions). I'm using PHP atm, using standard SQL queries to get my data. Should i split up the tables so that there are only x number of entries on a table? (coord range limits)? Should it just keep growing and growing? There's a lot of queries to the table... so just tryin to see what is best :/

    Read the article

  • GAE Task Queue rate

    - by bach
    Hi, Is there a way to guarantee a task to be performed in X minutes (or after X min) ? (rate would mean the intervals between tasks but what about the first task, would the first task starts after the 'rate' time?)

    Read the article

  • Dedicating all processor power to a task

    - by Yktula
    Let's say we have a very processor-intensive task at hand which could be effectively parallelized. How can we dedicate all or almost all available processor power to performing that task? The task could be a variety of things, and iterative Fibonacci number generation that saves recorded numbers would be just one example.

    Read the article

  • Unit Test Organization

    - by cam
    I'm using Nunit for unit testing, and added another project called "Unit Testing" to my current solution. I referenced Nunit, and changed the Namespace to the same namespace used in the main project. I can't seem to figure out how to get access to all the classes, files, etc in the main project. Is there something I have to do to link two projects?

    Read the article

  • Linq to SQL duplicating entry when referencing FK

    - by Oscar
    Hi! I am still facing some problems when using LINQ-to-SQL. I am also looking for answers by myself, but this problem is so akward that I am having problems to find the right keywords to look for it. I have this code here: public CustomTask SaveTask(string token, CustomTask task) { TrackingDataContext dataConext = new TrackingDataContext(); //Check the token for security if (SessionTokenBase.Instance.ExistsToken(Convert.ToInt32(token)) == null) return null; //Populates the Task - the "real" Linq to SQL object Task t = new Task(); t.Title = task.Title; t.Description = task.Description; //****The next 4 lines are important**** if (task.Severity != null) t.Severity = task.Severity; else t.SeverityID = task.SeverityID; t.StateID = task.StateID; if (task.TeamMember != null) t.TeamMember = task.TeamMember; else t.ReporterID = task.ReporterID; if (task.ReporterTeam != null) t.Team = task.ReporterTeam; else t.ReporterTeamID = task.ReporterTeamID; //Saves/Updates the task dataConext.Tasks.InsertOnSubmit(t); dataConext.SubmitChanges(); task.ID = t.ID; return task; } The problem is that I am sending the ID of the severity, and then, when I get this situation: DB State before calling the method: ID Name 1 high 2 medium 3 low Call the method selecting "medium" as severity DB State after calling the method: ID Name 1 high 2 medium 3 low 4 medium The point is: -It identified that the ID was related to the Medium entry (and for this reason it could populate the "Name" Column correctly), but if duplicated this entry. The problem is: Why?!! Some explanation about the code: CustomTask is almost the same as Task, but I was having problems regarding serialization as can be seen here I don't want to send the Severity property populated because I want my message to be as small as possible. Could anyone clear to my, why it recognize the entry, but creates a new entry in the DB?

    Read the article

  • Organization of linking to external libraries in C++

    - by Nicholas Palko
    In a cross-platform (Windows, FreeBSD) C++ project I'm working on, I am making use of two external libraries, Protocol Buffers and ZeroMQ. In both projects, I am tracking the latest development branch, so these libraries are recompiled / replaced often. For a development scenario, where is the best place to keep libprotobuf.{a,lib} and zeromq.{so,dll}? Should I have my build script copy them from their respective project directories into my local project's directory (say MyProjectRoot/lib or MyProjectRoot/bin) before I build my project? This seems preferable to tossing things into /usr/local/lib, as I wouldn't want to replace a system-wide stable version with the latest experimental one. Cmake warns me whenever I specify a relative path for linking, so I would suspect copying is a better solution then relative linking? Is this the best approach? Thanks for your help!

    Read the article

  • Sharepoint Workflow task with title (external participant)

    - by Mina Samy
    Hi all I made a custom sharepoint workflow with Visual studio, the workflow starts when a new item is inserted in a list I assigned the title of the task to reference a field in the new item TaskProps.Title = "Please prepare Hardware for project " + workflowProperties.Item["Contract"].ToString().Split('#')[1]; the task title is correct but i find the string (exteranl participant) concatenated the title of the task what can be the reason for this ? thanks

    Read the article

  • Mercurial Branching Model for task features

    - by Stan
    My development env: Windows 7, TortoiseHg, ASP.NET 4.0/MVC3 Test branch: code on test server Prod branch: code on production server This is my current branching model. The reason to branch out every task (feature) is because some features go to live slower. So in above graph, task 1 finished earlier (changeset #5), and merge into test branch for testing. However, due to bug or modification of original request, changesets #10, #12 have been made. While task 2 has finished testing #8 and pushed to live #9 already. My problem is every time when modifying task branch (like #10, #12), I have to do another merge to test branch (#11, #13), this makes the graph very messy. Is there any way to solve this issue? Or any better branching model?

    Read the article

< Previous Page | 19 20 21 22 23 24 25 26 27 28 29 30  | Next Page >