Search Results

Search found 29645 results on 1186 pages for 'personal project'.

Page 25/1186 | < Previous Page | 21 22 23 24 25 26 27 28 29 30 31 32  | Next Page >

  • Dynamically add files to visual studio deployment project.

    - by Graeme Yeo
    I've been desperately looking for the answer to this and I feel I'm missing something obvious. I need to copy a folder full of data files into the TARGETDIR of my deployment project at compile time. I can see how I would add individual files (ie. right click in File System and go to Add-File) but I have a folder full of data files which constantly get added to. I'd prefer not to have to add the new files each time I compile. I have tried using a PreBuildEvent to copy the files: copy $(ProjectDir)..\Data*.* $(TargetDir)Data\ which fails with error code 1 when I build. I can't help but feel I'm missing the point here though. Any suggestions? Thanks in advance. Graeme

    Read the article

  • pubsub link with Project Rome

    - by itsadok
    I want to use Project Rome to create an RSS feed, using the code from the tutorial as base. I would like to add a pubsubhubbub discovery link, but there doesn't seem to be a general way to do so. I can use a Link object if I create an atom feed (which I don't want to limit myself to), or I can just add foreign markup, like this: // import org.jdom.Element Element element = new Element("link"); element.setAttribute("rel", "hub"); element.setAttribute("href", "https://myhub.example.com/endpoint"); feed.setForeignMarkup(Arrays.asList(element)); But it feels ugly. Is this really the best way to do this?

    Read the article

  • Specify Windows Service Name on install with Setup Project

    - by sympatric greg
    Objective: In support of a Windows Service that may have multiple instances on a single machine, use a Setup Project to create an MSI capable of: Receiving user input for Service Name Installing service Serializing Service Name from 1 (so that the proper name can be used in logging and uninstall) My initial hope was to set Service Name in App.config (and then retrieve it during uninstall upon instantiation of the ServiceInstaller. This seems to have been naive, because it is not accessible during the install. If MyInstaller extends Installer, it can call base.Install(); however, my attempts to write to app.config (within MyInstaller.Install() and after base.Install()) are inneffective. So while the service can be installed with a custom Service Name, that name is not serialized and the installer is most displeased upon uninstall. How should this be done?

    Read the article

  • source control when starting up a new project

    - by jaras
    when starting with a project and using source control i find it hard to separate the things people are working on so they don't either write duplicate code or think it should be named one thing and so on. this problem diminishes over time because the general foundation is in place and it's easier to separate the tasks so they don't overlap as much how do you manage working with source control in the beginning phase? EDIT: I can see that it don't really have anything to do with source control, but it gets more apparent when you have source control too. so the question becomes more along the lines of "how do you manage to separate the tasks so they don't overlap too much. I think it's really hard and i haven't really seen much about how to do it.

    Read the article

  • Visual Studio 2010 SQL Server Database Project - Ignore Stored Procedures and Functions

    - by Carter
    I really like the new SQL Server Database projects in Visual Studio 2010. I also like using the "Generate DROP statements for objects that are in the target database but that are not in the database project" option in the deployment properties. However, I do not want to manage Stored Procedures and Functions using this interface; I have another tool for that. Every time I do a build and deploy, VS will drop my stored procedures that I have created with my external program. I would like to essentially "ignore" stored procedures and functions. Is there a way to ignore stored procedures and functions when building SQL Server Database projects? I won't be able to use the "Generate DROP statements..." option if I want to use my external tool for stored procedures and functions.

    Read the article

  • Web Setup Project - Getting the Current Machine Name

    - by Shane Kenney
    I've got a web setup project with a custom screen in it that asks for a machine name. Is there anyway to prepopulate this field with the current machines name? For the case that I need it for just including "Localhost" does not meet my requirements. "Environment.MachineName" will return the machine name within a code block which would be fine if I was needing it in a custom action. But it seems custom actions don't excecute until after you go through the installation wizard... So I cant actually use it. Anyway let me know what you think.

    Read the article

  • more ruby way of doing project euler #2

    - by aharon
    I'm trying to learn Ruby, and am going through some of the Project Euler problems. I solved two as such: def fib(n) return n if n < 2 vals = [0, 1] n.times do vals.push(vals[-1]+vals[-2]) end return vals.last end i = 1 s = 0 while((v = fib(i)) < 4_000_000) s+=v if v%2==0 i+=1 end puts s While that works, it seems not very ruby-ish—I couldn't come up with any good purely Ruby answer like I could with the first one ( puts ( (0..999).inject{ |sum, n| n%3==0||n%5==0 ? sum : sum+n } )).

    Read the article

  • Project organization in perforce

    - by Chupa
    Hello. I created several web applications that use the same static files (css, js, images). When I use svn for version control, I use an external repository (svn: externals) to add files to the current project. For example: - Project_1 ---- Webapp -------- Static (external to static's repo) - Project_2 ---- Webapp -------- Static (external to static's repo) I could easily use it in their web pages by adding a link like /static/ ... But now our company has moved to perforce. How can I support the current structure? We also use maven, I think to pack these files as a jar and use as a dependency, but then my editor (idea) does not see that this dependence are js-scripts and styles. And i need to repackage and deploy jar file when create minor changes. How to use maven correctly?

    Read the article

  • folder structure for project documentation

    - by Qiulang
    Hi all, I saw some questions raised about the folder structure of source codes, but I never see the question about folder structure of project documentation. I googled it and still do not see many articles talk about. Here is one http://www.projectperfect.com.au/downloads/Info/info_project_folder_structure.pdf To quote some of its words: "There are two broad approaches: Organize by phase so that each top directory is a phase. For example, you might have directories for Feasibility, Business Analysis, Design etc. or whatever your phases are called. Organize by function so that the top directory level are functions. For example, Risks, Requirements, Scope, Change Control, Development. Most times a mix of both are used..." So any thought about it? I believe this is also an important issue!

    Read the article

  • Burn setup project to CD

    - by OCER
    Hello all, I've never burnt a visual studio program to a CD before. I've made a setup project with all my program files, and it works fine. Do I simply need to burn the following installer files onto the CD and give it to someone? The installer is a folder containing: -DotNetFX35 (Folder): Contains .net requirements for my program. -WIndowsInstaller3_1 (Folder): WindowsInstaller-KB893803-v2-x86.exe -setup.exe -My Installer.msi Sorry for the seemingly easy question. I'm double checking as I have one CD and an impatient employer. Thanks!

    Read the article

  • Structure of open source project's repository

    - by hokkaido
    I'm in the beginning of starting a small open source project. When cloning the main repository one gets a complete build environment with all the libraries and all the tools needed to make an official installer file, with correct version numbers. I like the fact that anyone who wants to contribute can clone the repository and get started with anything they want. But I'm thinking this makes it to easy for Evil People to create malicious installers and release into the wild. How should it be structured? What do you recommend including in the repository, versus keeping on the build server only?

    Read the article

  • Project hosting vs. my own SVN

    - by BigG
    I'm working on different projects with some small teams (2-3 people for each). Those projects are about some scientific stuff, most (probably all) the code will be released under GPL after the publication of some results and we don't want to spend money for this. My first question is: should i keep my local SVN server or you know some good service for this? Both of them have some disadvantages and services like xp-dev.com looks pretty interesting but should i trust them? [i'll get only the free plan] Online services give you some tools for project management, what do you think about them?

    Read the article

  • Project management software

    - by fahadsadah
    Hello I am looking for a decent web application that performs project management, and am hoping you guys can help me out. Requirements: Free, open source software. Runs from a Linux server (no ASP.NET). Git integration. GitHub integration is a plus. Tracks bugs and feature requests. Version tracking/scheduling, ie being able to say that a feature will be implemented for version X. I was looking at Redmine, but I don't know about the last item. Is there a plugin for that, perhaps?

    Read the article

  • Retrieve data like rework %, schedule and effort varience from Microsoft Project

    - by Ram
    Hi, I need to generate various metric from my MS project file for the period of one month. I need to generate following reports Schedule Variance Effort Variance Rework Percentage Wasted Efforts For rework percentage, I am using condition like the task.Start date should be greater than or equal to the start date and task.Finish date should be less than or equal to finish date. but I am concerned about the tasks those are starting before the start date and ending before the end date. In such situation I only need the rework % for the number of hrs spent during start and end and not for the hrs spent before start date. Same thing applies to the task which are starting before end date but ending after end date. Any pointer would be great help. Thanks

    Read the article

  • How can we plan projects realistically while accounting for support issues?

    - by Thomas Clayson
    We're having a problem at work: we're trying to schedule work so that we can assess time scales and get deadline dates. The problem is that it's difficult to plan for a project without knowing everything that's going to happen. For instance, right now we've planned all our projects through the start of December, however in that time we will have various in house and external meetings, teleconferences and extra work. It's all well and good to say that a project will take three weeks, but if there is a week's worth of interruption in that time then the date of completion will be pushed back a week. The problem is 3 fold: When we schedule projects the time scales are taken literally. If we estimate three weeks, the deadline is set for three week's time, the client is told, and there is no room for extension. Interim work and such means that we lose productive time working on the project. Sometimes clients don't have the time that we need to take to do the work, so they'll sometimes come to us and say they need a project done by the end of the month even when we think that the work will take two months - not to mention we already have work to be doing. We have a Gantt chart which we are trying to fill in with all the projects we have and we fill in timesheets, but they're not compared to the Gantt chart at all. This makes it difficult to say "Well, we scheduled 3 weeks for this project, but we've lost a week here so the deadline has to move back a week." It's also not professional to keep missing deadlines we've communicated to the client. How do other people deal with this type of situation? How do you manage the planning of projects? How much "extra" time do you schedule into a project to account for non-project work that occurs during a project? How do you deal with support issues and bugs and stuff? Things you can't account for during planning? UPDATE Lots of good answers thank you.

    Read the article

  • Do we need to adopt a black-box asset our project is inheriting from its predecessor?

    - by Tom Anderson
    Our client has an eCommerce site which was developed by an in-house team, and is now showing its age. I work for a firm brought in as external contractors to build a replacement. Part of the current site is a Flash viewer applet which displays media about the product - zoom-able images, 360-degree views, movies, and so on. We need to show the same media the current site does, so we are simply reusing the viewer. The viewer is embedded on a page in the usual way, and told what media to show by means of an XML file it loads from our server, which is pretty simple for us to generate. We've got this working; it was pretty straightforward. But what else do we need to do? The thing is, as far as we're concerned, the viewer is a binary blob which is served from the client's content-distribution network. We embed it, feed it some XML, and it does its job, but we have no power over its internals. It's completely opaque to us - a black box. We can use it to do what it does, but we can't change it, so if we ever need to do something different, we're stuffed. We're building this site for the client, and when we're done, we'll hand it over for them to maintain. We won't be doing the maintenance ourselves. There's a small team within the client who are working as part of our team, and who will be the ones doing the maintenance. That team only includes one person from the team that built the old site, and it's not someone who knows the image viewer. The people who do know the image viewer are not slated to join our team when our system replaces theirs - they'll be moved to other projects. The documentation on the viewer is extremely thin, and as far as i know doesn't cover the internals at all. My worry is that if someone doesn't take some positive action, all knowledge of the internal workings of the viewer - even down to where the source code for it is - will be lost. It's possible it already has been. Is this something to worry about? If so, whose job is it to worry about it? What should they do about it once they've got worried?

    Read the article

  • Rule of thumb for cost vs. savings for code re-use

    - by Styler
    Is it a good rule of thumb to always write code for the intent of re-using it somewhere down the road? Or, depending on the size of the component you are writing, is it better practice to design it for re-use when it makes sense with regards to time spent on it. What is a good rule of thumb for spending extra time on analysis and design on project components that have "some probability" of being needed later down the road for other things that may or may need this part. For example, if I have the need for project X to do things A, and B. A definitely needs to be written for re-use because it just makes sense to do so. B is very project specific at the moment, and I can hack it all together in a couple days to finish the project on time and give everyone kudos for being a great team, etc. Or if we say, lets spend a whole friggin' 2 weeks figuring out what project Y/Z might need this thing for and spend a load of extra time on on part B because someday we might need to use it on project Y/Z (where the savings will be realized). I'd imagine a perfect world situation would be a nicely crafted combination of project specific vs. re-use architected components given the project. However some code shops might feel it would be a great idea to write everything for the intention of using it at some point down the road.

    Read the article

  • How does the ETVDX model fit in with project management?

    - by peter_gent
    In a lecture, the lecturer described the following model : E - entry (the preconditions to a task). T - task - doing the task V - verifying the tasks quality D - Delivering the tasks X - Exit. or ETVDX If anyone is familiar with this 'generic compliance model', how does it fit into software development exactly? I presume it's equivalent to the waterfall model of negotiating requirements defining/decompose stage estimating effort estimating resources developing schedule.

    Read the article

  • Development process for an embedded project with significant hardware changes

    - by pierr
    I have a good idea about Agile development process but it seems it does not fit well with a embedded project with significant hardware changes. I will describe below what we are currently doing (Ad-hoc way, no defined process yet). The changes are divided into three categories and different processes are used for each of them: complete hardware change example : use a different video codec IP a) Study the new IP b) RTL/FPGA simulation c) Implement the legacy interface - go to b) d) Wait until hardware (tape out) is ready f) Test on the real hardware hardware improvement example : enhance the image display quality by improving the underlying algorithm a) RTL/FPGA simulation b) Wait until hardware and test on the hardware Minor change example : only change hardware register mapping a) Wait until hardware and test on the hardware The worry is it seems we don't have too much control and confidence about software maturity for the hardware changes as the bring-up schedule is always very tight and the customer desired a seamless change when updating to a new version of hardware. How did you manage this kind of hardware change? Did you solve that by a Hardware Abstraction Layer (HAL)? Did you have a automatic test for the HAL layer? How did you test when the hardware platform is not even ready? Do you have well-documented processes for this kind of change?

    Read the article

  • Ideas for networking project

    - by Chris Thompson
    Hi all, I'm a graduating senior in computer science taking a computer networks class and I'm trying to figure out my final project. I normally am not at a loss for ideas but be it senioritis or straight burn out, I've got nothing. I've done some fun stuff in the past, but I just can't seem to come up with a good idea. Given the mass of brilliance on this site, I figured it would be a good place to request some suggestions. To give you an idea of scope, it's due in about a month and I would consider myself proficient with mobile architectures like Android (although I have no iPhone experience) along with Java, C++, etc. If you can suggest an idea, I'd be happy to make it work in whatever language I know. Like I said, I'm a senior and will be graduating so I'd rather not take on something that would kill me... Also, I'd be happy to make it open source if it's an idea you'd always wanted to work on but didn't have the time to start. Thanks in advance for the help! Chris Edit 1: Thanks so much for the suggestions everyone! Unfortunately I've actually already written a chat client (for a network security class) and I think I'd run into some honor code issues if I did that again, although that's always a great option. I like the game idea and that's actually something I've never attempted before (in any capacity) although given that, I'm a little scared about time...

    Read the article

  • Computer science final year project ideas

    - by roul
    I'm a Computer Science undergraduate student in UK and should be deciding the subject of my final year project soon. The school is pretty flexible with the subject... "The topic can be any area of the subject which is of mutual interest to both the student and supervisor. Topics can range from purely theoretical studies to practical work building a system for some third party, although most projects aim to provide a balance between the theoretical and practical aspects of the subject." ...so I'm a bit lost since I want to do something in software engineering but have no idea what (subject) or with what (languages)! :) a) Languages: I've had experience with Java, C# and ASP.NET mostly but I would definitely be interested in learning new languages/frameworks. I'm kind of drawn by the idea of dynamic languages at the moment so IronPython seems likely. b) Subject: Anything that will keep me interested through the year and will give me the opportunity to learn a lot of stuff. Maybe something that has to do with music, or a fancy website, or a website about music :P anything really. Open to any thoughts/ideas, geeky or cool! Edit: Professors do usually supervise projects in their research areas but I currently have the choice to approach any of them according to my interest - whatever that is.

    Read the article

  • Project ideas for automated deduction/automated theorem proving?

    - by wsh
    Dear Stack Overflow brethren, I'm a second-semester junior who will embark upon my thesis soon, and I have an interest in automated deduction and automated theorem provers. As in, I'd like to advance the art in some way (I don't mean that pretentiously, but I do want to do something productive). I've Googled pretty far and wide and so far few promising ideas have emerged. There are a few student project idea pages, but most seem either horribly outdated or too advanced (I was originally going to attempt to synthesize postmodernist thought (hahaha) and abstract its logical content, build a complete and consistent model (if possible, of course), and attempt to automate it, grounding said model as possible in a nonstandard logic a la these. My advisor thought that gave postmodernist thought too much credit (a while ago I reimplemented the Postmodernism Generator in Haskell with Parsec, so that is in part where the idea came from); I am tempted to concur.) So, yeah. Does anyone have ideas? I apologize if there is some obvious gap in my approach here/if I haven't appropriately done my homework (and if there is one, please tell me!), but in large part I don't even know where to start, and thank you for reading all that.

    Read the article

  • Project Euler: Programmatic Optimization for Problem 7?

    - by bmucklow
    So I would call myself a fairly novice programmer as I focused mostly on hardware in my schooling and not a lot of Computer Science courses. So I solved Problem 7 of Project Euler: By listing the first six prime numbers: 2, 3, 5, 7, 11, and 13, we can see that the 6th prime is 13. What is the 10001st prime number? I managed to solve this without problem in Java, but when I ran my solution it took 8 and change seconds to run. I was wondering how this could be optimized from a programming standpoint, not a mathematical standpoint. Is the array looping and while statements the main things eating up processing time? And how could this be optimized? Again not looking for a fancy mathematical equation..there are plenty of those in the solution thread. SPOILER My solution is listed below. public class PrimeNumberList { private ArrayList<BigInteger> primesList = new ArrayList<BigInteger>(); public void fillList(int numberOfPrimes) { primesList.add(new BigInteger("2")); primesList.add(new BigInteger("3")); while (primesList.size() < numberOfPrimes){ getNextPrime(); } } private void getNextPrime() { BigInteger lastPrime = primesList.get(primesList.size()-1); BigInteger currentTestNumber = lastPrime; BigInteger modulusResult; boolean prime = false; while(!prime){ prime = true; currentTestNumber = currentTestNumber.add(new BigInteger("2")); for (BigInteger bi : primesList){ modulusResult = currentTestNumber.mod(bi); if (modulusResult.equals(BigInteger.ZERO)){ prime = false; break; } } if(prime){ primesList.add(currentTestNumber); } } } public BigInteger get(int primeTerm) { return primesList.get(primeTerm - 1); } }

    Read the article

  • Developmnet process for an embedded project with significant Hardware change

    - by pierr
    Hi, I have a good idea about Agile development process but it seems it does not fit well with a embedded project with significant hardware change. I will describe below what we are currently doing (Ad-hoc way , no defined process yet). The change are divided to three categories and different process are used for them : complete hardware change example : use a different video codec IP a) Study the new IP b) RTL/FPGA simulation c) Implement the leagcy interface - go to b) d) Wait until hardware (tape out) is ready f) Test on the real Hardware hardware improvement example : enhance the image display quaulity by improving the underlie algorithm a)RTL/FPGA simulation b)Wait until hardware and test on the hardware Mino change exmaple : only change hardware register mapping a)Wait until hardware and test on the hardware The worry is it seems we don't have too much control and confidence about software maturity for the hardware change as the bring up schedule is always very tight and the customer desired a seemless change when updating to a new version hardware. How did you manage this kind of hardware hardware change? Did you solve that by a Hardware Abstraction Layer (HAL)? Did you have a automatical test for the HAL layer? How did you test when the hardware platform is not even ready? Do you have well documented process for this kind of change? Thanks for your insight.

    Read the article

  • Project Euler 7 Scala Problem

    - by Nishu
    I was trying to solve Project Euler problem number 7 using scala 2.8 First solution implemented by me takes ~8 seconds def problem_7:Int = { var num = 17; var primes = new ArrayBuffer[Int](); primes += 2 primes += 3 primes += 5 primes += 7 primes += 11 primes += 13 while (primes.size < 10001){ if (isPrime(num, primes)) primes += num if (isPrime(num+2, primes)) primes += num+2 num += 6 } return primes.last; } def isPrime(num:Int, primes:ArrayBuffer[Int]):Boolean = { // if n == 2 return false; // if n == 3 return false; var r = Math.sqrt(num) for (i <- primes){ if(i <= r ){ if (num % i == 0) return false; } } return true; } Later I tried the same problem without storing prime numbers in array buffer. This take .118 seconds. def problem_7_alt:Int = { var limit = 10001; var count = 6; var num:Int = 17; while(count < limit){ if (isPrime2(num)) count += 1; if (isPrime2(num+2)) count += 1; num += 6; } return num; } def isPrime2(n:Int):Boolean = { // if n == 2 return false; // if n == 3 return false; var r = Math.sqrt(n) var f = 5; while (f <= r){ if (n % f == 0) { return false; } else if (n % (f+2) == 0) { return false; } f += 6; } return true; } I tried using various mutable array/list implementations in Scala but was not able to make solution one faster. I do not think that storing Int in a array of size 10001 can make program slow. Is there some better way to use lists/arrays in scala?

    Read the article

< Previous Page | 21 22 23 24 25 26 27 28 29 30 31 32  | Next Page >