Search Results

Search found 6232 results on 250 pages for 'excel 2013'.

Page 28/250 | < Previous Page | 24 25 26 27 28 29 30 31 32 33 34 35  | Next Page >

  • Releasing Excel after using Interop

    - by figus
    Hi everyone I've read many post looking for my answer, but all are similar to this: http://stackoverflow.com/questions/1610743/reading-excel-files-in-vb-net-leaves-excel-process-hanging My problem is that I don't quit the app... The idea is this: If a User has Excel Open, if he has the file I'm interested in open... get that Excel instance and do whatever I want to do... But I don't to close his File after I'm done... I want him to keep working on it, the problem is that when he closes Excel... The process keeps running... and running... and running after the user closes Excel with the X button... this is how I try to do it This piece is used to know if he has Excel open, and in the For I check for the file name I'm interested in. Try oApp = GetObject(, "Excel.Application") libroAbierto = True For Each libro As Microsoft.Office.Interop.Excel.Workbook In oApp.Workbooks If libro.Name = EquipoASeccionIdSeccion.Text & ".xlsm" Then Exit Try End If Next libroAbierto = False Catch ex As Exception oApp = New Microsoft.Office.Interop.Excel.Application End Try here would be my code... if he hasn't Excel open, I create a new instance, open the file and everything else. My code ends with this: If Not libroAbierto Then libroSeccion.Close(SaveChanges:=True) oApp.Quit() Else oApp.UserControl = True libroSeccion.Save() End If System.Runtime.InteropServices.Marshal.FinalReleaseComObject(libroOriginal) System.Runtime.InteropServices.Marshal.FinalReleaseComObject(libroSeccion) System.Runtime.InteropServices.Marshal.FinalReleaseComObject(origen) System.Runtime.InteropServices.Marshal.FinalReleaseComObject(copiada) System.Runtime.InteropServices.Marshal.FinalReleaseComObject(oApp) libroOriginal = Nothing libroSeccion = Nothing oApp = Nothing origen = Nothing copiada = Nothing nuevosGuardados = True So you can see that, if I opened the file, I call oApp.Quit() and everything else and the Excel Process ends after a few seconds (maybe 5 aprox.) BUT if I mean the user to keep the file open (not calling Quit()), Excel process keeps running after the user closes Excel with the X button. Is there any way to do what I try to do?? Control a open instance of excel and releasing everything so when the user closes it with the X button, the Excel Process dies normally??? Thanks!!!

    Read the article

  • Upcoming Technical Training by PTS

    - by Javier Puerta
    See below upcoming technical sessions for partners delivered by PTS (Partner Technology Solutions): Database 12c Technical Training for Partners by PTS November 12-13, 2013: Lisbon, Portugal November 20-21, 2013: Dubai, UAE November 26-27, 2013: Riga, Latvia December 11-12, 2013: Hertzliya, Israel Oracle 12c Database In-Memory Session Beta event  November 26, 2013: Munich, Germany November 28, 2013: Reading, England Upgrade Your Solution to Oracle Database 12c November 26-27, 2013: Athens, Greece To register for any of the above sessions please contact your local enablement manager. 

    Read the article

  • Upcoming Technical Training by PTS

    - by Javier Puerta
    See below upcoming technical sessions for partners delivered by PTS (Partner Technology Solutions): Database 12c Technical Training for Partners by PTS November 12-13, 2013: Lisbon, Portugal November 20-21, 2013: Dubai, UAE November 26-27, 2013: Riga, Latvia December 11-12, 2013: Hertzliya, Israel Oracle 12c Database In-Memory Session Beta event  November 26, 2013: Munich, Germany November 28, 2013: Reading, England Upgrade Your Solution to Oracle Database 12c November 26-27, 2013: Athens, Greece To register for any of the above sessions please contact your local enablement manager. 

    Read the article

  • Stop Excel from changing cell contents, ever

    - by Enable Manual-Correct
    I work with card numbers, like credit card and ID numbers. We do not do any calculations with card numbers, obviously. They are "text." I format them as text, I type them like text. I know how that works. Excel doesn't care. 16 digit card numbers get their last digit turned into a zero, changed into scientific notation, stupid stuff that I did not tell Excel to do. I need to do things like Find/Remove spaces from cells in files downloaded from our currently imperfect web-system. The system sends me files with 16 digit numbers, cells formatted as text, but due to bugs there are spaces at the end. I do Find/Remove all spaces and all my card numbers are transformed into scientific notation and the last digit turned into a 0. THEY ARE TEXT, they are formatted as text, I yelled into the screen that they are text, why does Excel refuse to acknowledge that they are text? (I would rather find a way to stop Excel's action than find a way to tell our programmers to put an apostrophe in every cell) How do I make it so that Excel just STOPS doing anything that I didn't tell it to do? Or at least stop it from doing anything to numbers it doesn't like. Maybe I can write a macro for whenever it discovers "Uhoh I should change that number to something different!" I'll make it format that cell to text a thousand times instead. Give me an error when I try calculating with a number larger than 15 digits, make my computer explode violently, that's fine. Just stop changing the numbers. Is it possible? I have many thousands of numbers that need changing in many different scenarios. I just want to stop it from trying to help. I can't understand why that would be difficult. I have 2007, but answers for other versions would be great as well. Thank you!

    Read the article

  • In-memory Database in Excel

    - by user329174
    Hello, I am looking for a way to import a datatable from Access into an Excel variable and then run queries through this variable to speed up the process. I am trying to migrate from C# .NET where I read a data table from an access database into memory and then used LINQ to query this dataset. It is MUCH faster than how I have it currently coded in VBA where I must make lots of calls to the actual database, which is slow. I have seen the QueryTable mentioned, but it appears that this requires pasting the data into the excel sheet. I would like to keep everything in memory and minimize the interaction between the Excel Sheet and the VBA code as much as possible. I wish we didn't need to use Excel+VBA to do this, but we're kind of stuck with that for now. Thanks for the help!

    Read the article

  • Exporting only visible datagridview columns to excel

    - by Suresh E
    Need help on exporting only visible DataGridView columns to excel, I have this code for hiding columns in DataGridView. this.dg1.Columns[0].Visible = false; And then I have button click event for exporting to excel. // creating Excel Application Microsoft.Office.Interop.Excel._Application app = new Microsoft.Office.Interop.Excel._Application(); // creating new WorkBook within Excel application Microsoft.Office.Interop.Excel._Workbook workbook = app.Workbooks.Add(Type.Missing); // creating new Excelsheet in workbook Microsoft.Office.Interop.Excel._Worksheet worksheet = null; // see the excel sheet behind the program app.Visible = true; // get the reference of first sheet. By default its name is Sheet1. // store its reference to worksheet worksheet = workbook.Sheets["Sheet1"]; worksheet = workbook.ActiveSheet; // changing the name of active sheet worksheet.Name = "PIN korisnici"; // storing header part in Excel for (int i = 1; i < dg1.Columns.Count + 1; i++) { worksheet.Cells[1, i] = dg1.Columns[i - 1].HeaderText; } // storing Each row and column value to excel sheet for (int i = 0; i < dg1.Rows.Count - 1; i++) { for (int j = 0; j < dg1.Columns.Count; j++) { worksheet.Cells[i + 2, j + 1] = dg1.Rows[i].Cells[j].Value.ToString(); } } but I want to export only visible columns, while I get all of them, anyone, help on this.

    Read the article

  • Tell AppleScript to go to a specific window in Excel

    - by Nick
    I've got a script that pulls information from an Excel(Mac Excel'04) spreadsheet, and processes it through a local database. My problem(which is temporary, pending a dedicated scripting machine w/ Excel '08) is when I need to work on another spreadsheet in Excel. I want to ensure that the AppleScript continues reading data from the correct spreadsheet. Is there a way to pass reference to the specific Excel file in AppleScript, as opposed to just telling the Application in general? Or possibly just referencing the spreadsheet without having to have it open ... ?

    Read the article

  • Exchange 2013 really slow outside of localhost

    - by ItsJustJP
    We've got a 12 core xeon, 24GB of ram 2012 server. We've recently migrated from exchange 2010 (which was on another server) to exchange 2013 which resides on our new 12 core server. Accessing the OWA on the exchange server is fine; it's very quick and responsive however accessing it via any other computer connect to the domain via a 1 gpbs connection and it'll take 10-15 seconds to load. Also running slow is public calenders that people in my place need to access, again taking 10-15 seconds to access and can sometimes cause outlook to not respond. Further to that we have phones that connect via the internet (of course) to the exchange so people can get work emails when they are out of the office. Guess what, this is also running slow. I've have search for many solutions and have tried changing outlook authentication methods but there is no change in speed. The old exchange 2010 server no longer exists but there was no problem before the migration. Has anyone got any suggestions? Thanks :) Must also mention that server 2012 that exchange 2013 is installed on is also the DC. Update: It would appear that any connection via https is slow. It took more than 15 mins for an outlook client to download 50MB of emails (outlook anywhere).

    Read the article

  • How to Fix “Error occurred in deployment step ‘Activate Features’: System.TimeoutException:”

    - by ybbest
    Problem: When deploying a SharePoint2013 workflow using Visual Studio, I got the following Error: Error occurred in deployment step ‘Activate Features’: System.TimeoutException: The HTTP request has timed out after 20000 milliseconds. —> System.Net.WebException: The request was aborted: The request was canceled. at System.Net.HttpWebRequest.EndGetResponse(IAsyncResult asyncResult) at Microsoft.Workflow.Client.HttpGetResponseAsyncResult`1.OnGotResponse(IAsyncResult result) — End of inner exception stack trace — at Microsoft.Workflow.Common.AsyncResult.End[TAsyncResult](IAsyncResult result) at Microsoft.Workflow.Client.Ht Analysis: After reading AC’s blogpost and I find out the issue is to do with the service bus. Then I found out the following services are not started Solution: So I start the Service Bus Gateway and Service Bus Message Broker and the problem goes away. References: SharePoint 2013 Workflow – Advanced Workflow Debugging with Fiddler

    Read the article

  • Upgrading VSIX extensions from VS2012 to VS2013

    - by Tarun Arora [Microsoft MVP]
    Originally posted on: http://geekswithblogs.net/TarunArora/archive/2013/06/27/upgrading-vsix-extensions-from-vs2012-to-vs2013.aspx  As consumers of your Visual Studio extensions start to move over to VS 2013, you will have to upgrade the Visual Studio extensions you build for Visual Studio 2012 to Visual Studio 2013 and republish to the Visual Studio extension gallery. Failing which, it will not be possible for your consumers to install and use your extensions on Visual Studio 2013.   Objective In this blog post, I’ll show you how simple it is to upgrade your Visual Studio 2012 extension to Visual Studio 2013. There aren’t any reported breaking changes between VS 2012 SDK and VS 2013 SDK, the upgrade usually involves, rebuilding the extension against VS 2013 SDK and updating the vsix manifest file.              Walkthrough Download the Visual Studio 2013 SDK - You will need to download the Visual Studio 2013 SDK in order to open up the Visual Studio extension project in Visual Studio 2013. The SDK can be downloaded from here. Install the SDK before you proceed.                2. Once the VS 2013 SDK has been installed, open up your package project. For the purposes of this blog post, I’ll open up the Avanade Extension – Software Inventory in Visual Studio 2013. You will notice that Visual Studio doesn’t load the project but let’s you know that the project needs to be Migrated.                  3. Right click the project and choose the option ‘Reload Project’ from the Context Menu.                  4. Choosing the Reload Project option brings up an upgrade window, telling you that the upgrade is a one way only upgrade i.e. the project will be changed to work with Visual Studio 2013 and you will not be able to open the project up in Visual Studio 2012. My recommendation would be to create a Visual Studio 2013 branch and upgrading the project in that branch only, so if you need to go back to Visual Studio 2012 project at some point, you have a handy reference in a separate branch.             5. Upon clicking Ok, the project is updated. See below, the following changes are made at the time of upgrade,           - The runtime version is updated in the Resources.Designer.cs file                      - The Minimum version of Visual Studio in the package project file is changed from 11.0 to 12.0                    6. Reference VS 2013 dll’s rather than VS 2012 dll’s. So reference Microsoft.TeamFoundation.Client.dll and Microsoft.TeamFoundation.Controls.dll from C:\Program Files (x86)\Microsoft Visual Studio 12.0\Common7\IDE\ReferenceAssemblies\v2.0 and C:\Program Files (x86)\Microsoft Visual Studio 12.0\Common7\IDE\ReferenceAssemblies\v4.5. If you have any other API references, then change the references to point to VS 2013 instead of VS 2012.                          7. Rebuild your solution to ensure there are no breaking changes. Success!                8. Update VSIX Manifest file (the file source.extnsion.vsixmanifest contains the meta data for your VSIX).          - Update the Install Targets from 11.0 to 12.0. This basically enforces that the extension can be installed on Visual Studio 2013 version of Visual Studio.                         - Update the Dependencies from Visual Studio MPF 11.0 to Visual Studio MPF 12.0              9. Rebuild the solution and open up the bin folder for the Package project and look for the file *.vsix file [Microsoft Visual Studio Extension].         - This is basically the installer for your extension.                 - Double click the installer to launch the installer wizard. Viola! You can see the package installation wizard opens up and gives you the option to install the extension for Visual Studio 2013.                    - Click Install to Continue                    - Note – If you run into the exception “23/06/2013 10:42:18 - Install Error : Microsoft.VisualStudio.ExtensionManager.InstallByMsiException: The InstalledByMSI element in extension Avanade Extensions cannot be 'true' when installing an extension through the Extensions and Updates Installer.  The element can only be 'true' when an MSI lays down the extension manifest file.” Ensure you have the option “This VSIX is installed by Windows Installer” unchecked in the Install Targets tab.        10. Verifying that the extension has installed correctly.           - Open Extension Manager and verify that the installed extension shows up in the extension manager “list of installed VSIX”.                      11. First Look at the updated Extension                         - The links have now been moved to the context menu, so to see the navigation links, you’ll have to right click on the icon and select the option from the context menu.                                        Note – The Avanade Extension being used in the demo has been developed by Utkarsh and Tarun. The Software Inventory Extension for Visual Studio 2012…  allows you to see the list of Software installed on the hosted build server right from with in Visual Studio,  the extension also allows you to export this list to excel. More details on how this has been implemented can be found here.   I hope you found this useful. In case you have any questions or feedback, feel free to reach out on Visual Studio extensibility MSDN forums or via Microsoft Visual Studio feedback forum. Thank you for taking the time out and reading this blog post. If you enjoyed the post, remember to subscribe to http://feeds.feedburner.com/TarunArora. Stay tuned!

    Read the article

  • PASS Summit Survey

    - by andyleonard
    One item mentioned in the PASS Board Q & A was the PASS Summit survey, which should be in your Inbox today if you attended the PASS Summit 2013. Charlotte? Did you enjoy having the Summit in Charlotte? If so, the PASS Summit Survey is your primary and most effective means of communicating this fact to the PASS Board and PASS HQ. The same holds if you didn’t like the Summit in Charlotte. Would you rather have the Summit remain forever in Seattle? Would you like to see the Summit in Seattle two...(read more)

    Read the article

  • Search for the Content You Don't Want to Miss

    - by Oracle OpenWorld Blog Team
    by Meg Ehman The Oracle OpenWorld 2013 content catalog is now live—more accessible than ever with all you need to know about sessions, speakers, demos, labs, user groups, exhibitors, and more. This year, for the first time, you’ll find all Oracle conference content in a single catalog. You can browse the entire catalog at one time, or filter your search by conference, product, session, speaker, or other keywords.  If you find a session you think friends or colleagues would like to attend, share it with them through Facebook or Twitter. Start checking out Oracle OpenWorld content now to make sure you know how to plan your week at the conference. Then when Schedule Builder goes live in early August you’ll be ready to sign up quickly to have the best chance for getting into all of the great sessions you want to.   Search Content Catalog NowLearn More about Oracle OpenWorldRegister for Oracle OpenWorld

    Read the article

  • how to create a wind rose in excel 2007

    - by Patrick
    I am attempting to create a wind rose graph (i.e.- here or here). My data is wind speed and cardinal wind direction in separate columns: Wind (mph) Wind Direction 3.66 SE 2.69 SE 2.62 SW 2.76 SW 2.11 NW 3.13 NW 3.55 SW 3.62 W My final goal is to actually create the graph with a VBA macro, but I am unsure how to even create the graph manually. I can, if need be, convert the cardinal directions to degrees. Any help is greatly appreciated

    Read the article

  • Excel - working with multiple workbooks

    - by cKK
    Got about 50 workbooks that cannot be merged but need to make the data available in a nice easy way. Aany ideas how to open and close multiple workbook modally i.e control remains in some interface / menu window? all workbooks have multiple sheets and need to be opened read-only. thanks

    Read the article

  • Excel Help: Userforms

    - by B-Ballerl
    I have developed a macro that does a whole bunch of things for me based on a few things. (Importing files). The file names are dated dd_mm_yyyy and right now I enter them into a sheet where the macro can call the information. Not really wanting this I designed a userform where the user could enter the "dd", "mm", "yyyy" and how many consecutive days of files there were. Ex. Say 28_06_2011.txt 29_06_2011.txt there would be one consecutive day. I want to be able to call the information entered in the user-form (day, month, year, and consecutive days) to use in the macro and have been unsuccessful because I don't know how to call that information. Is it similar to referring to a range in a worksheet? Thanks in Advance for any Help.

    Read the article

  • find the next due date after today within a group in an Excel PivotTable

    - by Dennis George
    I have got a table set up in one sheet with "transactions". Each row contains a name of a vendor, the amount owed or paid depending on transaction type, and the due date/transaction date. Here is some simplified sample data: Vendor Date Invoice Payment Vendor A 6/30 $200 Vendor A 6/30 ($200) Vendor B 7/5 $500 Vendor B 7/5 ($500) Vendor C 10/28 $50 Vendor A 10/30 $100 Vendor C 11/15 $50 I have already built a PivotTable from that table to group these transactions by vendor and sum the remainder owed. What I'm trying to figure out is how to, for each vendor, get the next due date (min date of the group, excluding dates < Today()), or if there is no next due date then I want to see the max date for that group. Here is what my PivotTable looks like, plus the date column I'd like to add (assuming Today() = 10/23): Vendor Date Owed Vendor B 7/5 - Vendor C 10/28 $100 Vendor A 10/30 $100 I know calling it next due date might not be so accurate if I end up with the date of a payment in that column, but I'm ok with that. tl;dr : I want to find the next earliest date within each group, or the last date. How do I do this?

    Read the article

  • embed file in Excel cell

    - by Crash893
    I'm working on a simple "DB" for some people at work and I don't want to do anything fancy. the fields should be something like name , number , notes , File:resume, notes (where file:notes is the acutall embedded resume. I cant see any obvious way to do this but i thought i would ask just the same. Is there a way to take a (pdf , doc , docx , txt) and throw it into a cell so a user can click on it and it will open the file in the approate program note: this db is going to be floating around between multiple sites so linking won't work.

    Read the article

  • How to generate weekly dates from bi-weekly pay period in Excel

    - by A_Pointar
    I'm trying to convert bi-weekly pay period to weekly dates. Lets say I have 3/2/2012, 3/16/2012, 3/30/2012 and some gaps and then again biweekly dates. generate 3/9/2012, 3/16/2012, 3/23/2012, 3/30/2012 and so on...I was trying to use INDEX and MATCH but it would give me biweekly again. The perfect way would be to match and generate weeks from my randomized biweekly dates. Here is an example of my worksheet:

    Read the article

  • Excel: ROUND & MOD giving me strange DATE results

    - by Mike
    This is sort of related to a previous question. My formula, which seemed to work fine yesterday now gives strange results. Today is the 30th of March (30/03/10). It's 10:11am on the clock that the computer is using for the time stamp in the NOW() part of my worksheet. Below is the formula and a screen shot of the results/columns. QUESTION: Why ddoes it show 1/2 day, and also where does 23 1/2 come from? The NOW() is in a hidden column (F2)...which I forgot to unhide before I took the screen shot. =IF(ISBLANK(I2),ROUND(MOD(H2-F2,24),2),ROUND(MOD(I2-F2,24),2)) Thanks Mike

    Read the article

  • Comparing columns in Excel

    - by Regan
    I needed to take columns A, B, and C and compare D, E and F. Here's an example: A B C D E F Jump Smith 5 Jump Smith 8 Run Naylor 2 Swim Fran 4 Swim Fran 7 Jog Dylan 1 Jump Fran 3 Jog Smith 4 So I want to match column A and B with D and E but still have both number related C for 2011 and F for 2012. Can anyone please help with that formula? My data is from A3-C4344 and D3 - D4470.

    Read the article

  • How can I copy cells in Excel 2007 and paste with formatting

    - by John
    I am wanting to be able to copy cells in a worksheet and paste them elsewhere in the same worksheet while maintaining the original formatting. I also want to be able to paste into Word and Outlook and keep the same formatting. Everything I have tried discards the the formatting and only pastes unformatted text. Paste Option buttons do not appear even though they have been defined in the setting to appear. Also Format Painter does not seem to do anything at all. Is there a setting that needs to be changed to resolve this?

    Read the article

  • Excel 2011 for Mac VLOOKUP Date Issue

    - by Mitch
    I'm fairly proficient in using vlookups, but I'm having an issue vlooking up dates between two different spreadsheets. =VLOOKUP(B6,'[example.xlsx]Sheet1'!$B$1:$AA$260, 19, FALSE) My formula is retrieving a date fine, but the date is different when the cell is formatted for a date. Yet, when I change the formatting on each spreadsheet to display the date as a number, the number is the same (40115). The dates are displaying differently in each spreadsheet and I can't figure out why, they differ by about 3 years and 1 day (10/30/13 vs. 10/29/09). One was previously .xls, but I saved both a .xlsx. Thanks.

    Read the article

  • Compare 2 sets of data in Excel and returning a value when multiple columns match

    - by Susan C
    I have a data set for employees that contains name and 3 attributes (job function, job grade and location). I then have a data set for open positions that contains the requisition number and 3 attributes (job function, job grade and job location). For every employee, i would like the three attributes associated with them compared to the same three attributes of the open positions and have the cooresponding requisition numbers displayed for each employee where there is a match.

    Read the article

< Previous Page | 24 25 26 27 28 29 30 31 32 33 34 35  | Next Page >