Search Results

Search found 685 results on 28 pages for 'growth'.

Page 28/28 | < Previous Page | 24 25 26 27 28 

  • How do I get more separation between the end of the 1st div and the start of the 2nd div?

    - by user3075987
    I'm trying to get the 2nd div (the picture of the orange and copy) to go below the 1st div (the picture of the pear and copy), but see how the Orange copy is going up into the Pear copy. How can I have the Orange copy start below the Pear picture? Here's my jsfiddle: http://jsfiddle.net/huskydawgs/g8mbgr1e/4/ Here's my code: <div class="alignleft"> <p><img alt="Pear" src="http://eofdreams.com/data_images/dreams/pear/pear-01.jpg" width="144" height="150" /></p> The pear is native to coastal and mildly temperate regions of the Old World, from western Europe and north Africa east right across Asia. It is a medium-sized tree, reaching 10–17 metres (33–56 ft) tall, often with a tall, narrow crown; a few species are shrubby. The fruit is composed of the receptacle or upper end of the flower-stalk (the so-called calyx tube) greatly dilated. Enclosed within its cellular flesh is the true fruit: five cartilaginous carpels, known colloquially as the "core". From the upper rim of the receptacle are given off the five sepals[vague], the five petals, and the very numerous stamens. In ancient Egypt, artists used an orange mineral pigment called realgar for tomb paintings, as well as other uses. It was also used later by Medieval artists for the colouring of manuscripts. Pigments were also made in ancient times from a mineral known as orpiment. Orpiment was an important item of trade in the Roman Empire and was used as a medicine in China although it contains arsenic and is highly toxic. It was also used as a fly poison and to poison arrows. Because of its yellow-orange colour, it was also a favourite with alchemists searching for a way to make gold, both in China and the West. The pineapple is a herbaceous perennial which grows to 1.0 to 1.5 meters (3.3 to 4.9 ft) tall, although sometimes it can be taller. In appearance, the plant itself has a short, stocky stem with tough, waxy leaves. When creating its fruit, it usually produces up to 200 flowers, although some large-fruited cultivars can exceed this. Once it flowers, the individual fruits of the flowers join together to create what is commonly referred to as a pineapple. After the first fruit is produced, side shoots (called 'suckers' by commercial growers) are produced in the leaf axils of the main stem. These may be removed for propagation, or left to produce additional fruits on the original plant.[4] Commercially, suckers that appear around the base are cultivated. It has 30 or more long, narrow, fleshy, trough-shaped leaves with sharp spines along the margins that are 30 to 100 centimeters (1.0 to 3.3 ft) long, surrounding a thick stem. In the first year of growth, the axis lengthens and thickens, bearing numerous leaves in close spirals. After 12 to 20 months, the stem grows into a spike-like inflorescence up to 15 cm (6 in) long with over 100 spirally arranged, trimerous flowers, each subtended by a bract. Flower colors vary, depending on variety, from lavender, through light purple to red. Here's my CSS: .alignleft { float: left; margin: 0px 30px 20px 0px; } .alignright { float: right; margin: 0px 0px 20px 30px; }

    Read the article

  • JavaScript Optimisation

    - by Jayie
    I am using JavaScript to work out all the combinations of badminton doubles matches from a given list of players. Each player teams up with everyone else. EG. If I have the following players a, b, c & d. Their combinations can be: a & b V c & d a & c V b & d a & d V b & c I am using the code below, which I wrote to do the job, but it's a little inefficient. It loops through the PLAYERS array 4 times finding every single combination (including impossible ones). It then sorts the game out into alphabetical order and stores it in the GAMES array if it doesn't already exist. I can then use the first half of the GAMES array to list all game combinations. The trouble is if I have any more than 8 players it runs really slowly because the combination growth is exponential. Does anyone know a better way or algorithm I could use? The more I think about it the more my brain hurts! var PLAYERS = ["a", "b", "c", "d", "e", "f", "g"]; var GAMES = []; var p1, p2, p3, p4, i1, i2, i3, i4, entry, found, i; var pos = 0; var TEAM1 = []; var TEAM2 = []; // loop through players 4 times to get all combinations for (i1 = 0; i1 < PLAYERS.length; i1++) { p1 = PLAYERS[i1]; for (i2 = 0; i2 < PLAYERS.length; i2++) { p2 = PLAYERS[i2]; for (i3 = 0; i3 < PLAYERS.length; i3++) { p3 = PLAYERS[i3]; for (i4 = 0; i4 < PLAYERS.length; i4++) { p4 = PLAYERS[i4]; if ((p1 != p2 && p1 != p3 && p1 != p4) && (p2 != p1 && p2 != p3 && p2 != p4) && (p3 != p1 && p3 != p2 && p3 != p4) && (p4 != p1 && p4 != p2 && p4 != p3)) { // sort teams into alphabetical order (so we can compare them easily later) TEAM1[0] = p1; TEAM1[1] = p2; TEAM2[0] = p3; TEAM2[1] = p4; TEAM1.sort(); TEAM2.sort(); // work out the game and search the array to see if it already exists entry = TEAM1[0] + " & " + TEAM1[1] + " v " + TEAM2[0] + " & " + TEAM2[1]; found = false; for (i=0; i < GAMES.length; i++) { if (entry == GAMES[i]) found = true; } // if the game is unique then store it if (!found) { GAMES[pos] = entry; document.write((pos+1) + ": " + GAMES[pos] + "<br>"); pos++; } } } } } } Thanks in advance. Jason.

    Read the article

  • Transformation of Product Management in Telecommunications for Rapid Launch of Next Generation Products

    - by raul.goycoolea
    @font-face { font-family: "Arial"; }@font-face { font-family: "Courier New"; }@font-face { font-family: "Wingdings"; }@font-face { font-family: "Cambria"; }p.MsoNormal, li.MsoNormal, div.MsoNormal { margin: 0cm 0cm 0.0001pt; font-size: 12pt; font-family: "Times New Roman"; }a:link, span.MsoHyperlink { color: blue; text-decoration: underline; }a:visited, span.MsoHyperlinkFollowed { color: purple; text-decoration: underline; }p.MsoListParagraph, li.MsoListParagraph, div.MsoListParagraph { margin: 0cm 0cm 0.0001pt 36pt; font-size: 12pt; font-family: "Times New Roman"; }p.MsoListParagraphCxSpFirst, li.MsoListParagraphCxSpFirst, div.MsoListParagraphCxSpFirst { margin: 0cm 0cm 0.0001pt 36pt; font-size: 12pt; font-family: "Times New Roman"; }p.MsoListParagraphCxSpMiddle, li.MsoListParagraphCxSpMiddle, div.MsoListParagraphCxSpMiddle { margin: 0cm 0cm 0.0001pt 36pt; font-size: 12pt; font-family: "Times New Roman"; }p.MsoListParagraphCxSpLast, li.MsoListParagraphCxSpLast, div.MsoListParagraphCxSpLast { margin: 0cm 0cm 0.0001pt 36pt; font-size: 12pt; font-family: "Times New Roman"; }div.Section1 { page: Section1; }ol { margin-bottom: 0cm; }ul { margin-bottom: 0cm; } The Telecom industry continues to evolve through disruptive products, uncertain markets, shorter product lifecycles and convergence of technologies. Today’s market has moved from network centric to consumer centric and focuses primarily on the customer experience. It has resulted in several product management challenges such as an increased complexity and volume of offerings, creating product variants, accelerating time-to-market, ability to provide multiple product views for varied stakeholders, leveraging OSS intelligence to BSS layer, product co-creation and increasing audit and security concerns for service providers. The document discusses how enterprise product management enabled by PLM-based product catalogue solutions helps to launch next generation products rapidly in the context of the Telecommunication Industry.   1.0.       Introduction   Figure 1: Business Scenario   Modern business demands the launch of complex products in a very short timeframe and effecting changes in the price plan faster without IT intervention. One of the key transformation initiatives companies are focusing on is in the area of product management transformation and operational efficiency improvement. As part of these initiatives, companies are investing in best- in-class COTs-based Product Management solutions developed on industry-wide standards.   The new COTs packages are planned to integrate with existing or new B/OSS systems to provide a strategic end-to-end agile solution for reduced time-to-market and order journey time. In addition, system rationalization is being undertaken to phase out legacy systems and migrate to strategic systems.   2.0.       An Overview of Product Management in Telecom   Product data in telecom is multi- dimensional and difficult to manage. It increased significantly due to the complexity of the product, product offerings on the converged network, increased volume of offerings, bundled offering structures and ever increasing regulatory requirements.   In addition, the shrinking product lifecycle in telecom makes it difficult to manage the dynamic product data. Mergers and acquisitions coupled with organic growth pose major challenges in product portfolio management. It is a roadblock in the journey towards becoming an agile organization.       Figure 2: Complexity in Product Management   Network Technology’ is the new dimension in telecom product management where the same products are realized through different networks i.e., Soiled network to Converged network. Consequently, the product solution is different.     Figure 3: Current Scenario - Pain Points in Product Management   The major business implications arising out of the current scenario are slow time-to-market and an inefficient process that affects innovation.   3.0. Transformation of Next Generation Product Management   Companies must focus on their Product Management Transformation Journey in the areas of:   ·       Management of single truth of product information across the organization/geographies which is currently managed in heterogeneous systems   ·       Management of the Intellectual Property (IP) on the product concept and partnership in the design of discrete components to integrate into the system   ·       Leveraging structured and unstructured product data within the extended enterprise to extract consumer insights and drive innovation   ·       Management of effective operational separation to comply with regulatory bodies   ·       Reuse of existing designs and add relevant features such as value-added services to enable effective product bundling     Figure 4: Next generation needs   PLM-based Enterprise Product Catalogue solutions efficiently address the above requirements and act as an enabler towards product management transformation and rapid product launch.   4.0. PLM-based Enterprise Product Management     Figure 5: PLM-based Enterprise Product Mastering   Enterprise Product Management (EPM) enables the business to manage complex product attributes of data in complex environments. Product Mastering helps create a 'single view' of the product by creating a business-driven, IT-supported environment where a global 'single truth record' is created, managed and reused.   4.1 The Business Case for Telco PLM-based solutions for Enterprise Product Management   ·       Telco PLM-based Product Mastering solutions provide a centralized authoring environment for product definition and control of all product data and rules   ·       PLM packages are designed to support multiple perspectives of product data (ordering perspective, billing perspective, provisioning perspective)   ·       Maintains relationships/links between different elements of the entire product definition   ·       Telco PLM packages are specialized in next generation lifecycle management requirements of products such as revision and state management, test and release management, role management and impact analysis)   ·       Takes into consideration all aspects of OSS product requirements compared to CRM product catalogue solutions where the product data managed is mostly order oriented and transactional     ·       New breed of Telco PLM packages are designed with 'open' standards such as SID and eTOM. They are interoperable, support integration frameworks such as subscription and notification.   ·       Telco PLM packages have developed good collaboration frameworks to integrate suppliers and partners into the product development value chain   4.2 Various Architectures/Approaches for Product Mastering using Telco PLM systems   4. 2.a Single Central Product Management (Mastering) Approach   Figure 6: Single Central Product Management (Master) Approach       This approach is implemented across verticals such as aerospace and automotive. It focuses on a physically centralized product master to which other sources are dependent on. The product definition data (Product bundles, service bundles, price plans, offers and discounts, product configuration rules and market campaigns) is created and maintained physically in a centralized environment. In addition, the product definition/authoring environment is centralized. The existing legacy product definition data available in CRM product catalogue, billing catalogue and the legacy product catalogue is migrated to the centralized PLM-based Enterprise Product Management solution.   Architectural changes must be made in the existing business landscape of applications to create and revise data because the applications have to refer to the central repository for approvals and validation of product configurations. It is achieved by modifying how the applications write data or how the applications can be adapted to use the rules to be managed and published.   Complete product configuration validation will be done in enterprise / central product catalogue and final configuration will be sent to the B/OSS system through the SOA compliant product distribution architecture. The approach/architecture enables greater control in terms of product data management and product data governance.   4.2.b Federated Product Management (Mastering) Architecture     Figure 7: Federated Product Management (Mastering) Architecture   In the federated product mastering approach, the basic unique product definition data (product id, description product hierarchy, basic price plans and simple product design rules) will be centrally created and will be maintained. And, the advanced product definition (Product bundling, promotions, offers & discount plans) will be created in respective down stream OSS systems. The advanced product definition (Product bundling, promotions, offers and discount plans) will be created in respective downstream OSS systems.   For example, basic product definitions such as attributes, product hierarchy and basic price plans will be created and maintained in Enterprise/Central product reference catalogue and distributed to downstream OSS systems. Respective downstream OSS systems build product bundles, promotions, advanced price plans over the basic product definition and master the advanced product definition. Central reference database accesses the respective other source product master data and assembles a point-in-time consolidated view of the product. The approach is typically adapted in some merger and acquisition scenarios where there is a low probability of a central physical authority managing the data. In addition, the migration effort in this case is minimal and there are no big architectural changes to the organization application landscape. However, this approach will not result in better product data management and data governance.   5.0 Customer Scenario – Before EPC deployment   A leading global telecommunications service provider wanted to launch a quad play and triple play service offering in the shortest possible lead time. The service provider was offering Broadband and VoIP services to customers. The company wanted to reuse a majority of the Broadband services and price plans and bundle them with new wireless and IPTV services for quad play and triple play. The challenges in launching the new service offerings were:       Figure 8: Triple Play Plan   ·       Broadband product data was stored in multiple product catalogues (CRM catalogue, Billing catalogue, spread sheets)   ·       Product managers spent a lot of time performing tasks involving duplication or re-keying of data. Manual effort caused errors, cost and time over-runs.   ·       No effective product and price data governance mechanism. Price change issues arising from the lack of data consistency across systems resulted in leakage of customer value and revenue.   ·       Product data had re-usability issues and was not in a structured format. It resulted in uncontrolled product portfolio creation and product management issues.   ·       Lack of enterprise product model resulted into product distribution challenges and thus delays in product launch.   ·       Designers are constrained by existing legacy product management solutions to model product/service requirements and product configuration rules such as upgrading, downgrading and cross selling.    5.1 Customer Scenario - After EPC deployment     Figure 9: SOA-based end-to-end EPC Solution   The company deployed PLM-based Enterprise Product Catalogue solutions to launch quad play service after evaluating various product catalogues. The broadband product offering, service and price data were migrated to the new system, and the product and price plan hierarchy for new offerings were created using the entities defined in the Enterprise Product Model. Supplier product catalogue data such as routers and set up boxes were loaded onto the new solution through SOA-based web service. Price plans and configuration rules were built in the new system. The validated final product configurations were extracted from the product catalogue in a SID format and were distributed to the downstream B/OSS systems through exposed SOA-based web services. The transformations required for the B/OSS system were handled using the transformation layer as part of the solution.   6.0 How PLM enabled Product Management Transformation         Figure 10: Product Management Transformation     PLM-based Product Catalogue Solution helped the customer reduce the product launch cycle time by 30% and enable transformation of Product Management for next generation services.   7.0 Conclusion   On the one hand, the telecom industry is undergoing changes due to disruptions, uncertain product markets and increased complexity of products. On the other hand, the ARPU is decreasing year-on-year. Communications Service Providers are embarking on convergence, bundled service offerings, flexibility to cross-sell and up-sell, introduce new value-added services, leverage Web 2.0 concepts and network capabilities. Consequently, large scale IT transformation initiatives to improve their ARPU supporting network and business transformations are a business imperative. Product Management has become a focus area. Companies are investing in best-in- class COTS solutions to reduce time-to-market, ensure rapid service delivery and improve operational efficiency. An efficient PLM-based enterprise product mastering solution plays a key role in achieving zero touch automation and rapid product launch.   References:   1.     Preston G.Smith, Donald G.Reineristsem, Van Nostrand Reinhold “Developing Products in Half the time”.   2.     John G. Innes, "Achieving Successful Product Change", Pitman Publishing.   3.     D T Pham and R M Setchi (16th Jan, 2001) "Authoring environment for documentation development" University of Wales Cardiff, U.K., Proceedings on Institution of Mechanical Engineers, Vol. 215, Part B.   4.     Oracle Product Hub for Communications:   http://www.oracle.com/us/products/applications/master-data-management/product-hub-082059.html  

    Read the article

  • CodePlex Daily Summary for Tuesday, June 14, 2011

    CodePlex Daily Summary for Tuesday, June 14, 2011Popular ReleasesSizeOnDisk: 1.0.9.0: Can handle Right-To-Left languages (issue 316) About box (issue 310) New language: Deutsch (thanks to kyoka) Fix: file and folder context menuTerrariViewer: TerrariViewer v2.6: This is a temporary release so that people can edit their characters for the newest version of Terraria. It does not include the newest items or the ability to add social slot items. Those will come in TerrariViewer v3.0, which I am currently working on.DropBox Linker: DropBox Linker 1.1: Added different popup descriptions for actions (copy/append/update/remove) Added popup timeout control (with live preview) Added option to overwrite clipboard with the last link only Notification popup closes on user click Notification popup default timeout increased to 3 sec. Added codeplex link to about .NET Framework 4.0 Client Profile requiredMobile Device Detection and Redirection: 1.0.4.1: Stable Release 51 Degrees.mobi Foundation is the best way to detect and redirect mobile devices and their capabilities on ASP.NET and is being used on thousands of websites worldwide. We’re highly confident in our software and we recommend all users update to this version. Changes to Version 1.0.4.1Changed the BlackberryHandler and BlackberryVersion6Handler to have equal CONFIDENCE values to ensure they both get a chance at detecting BlackBerry version 4&5 and version 6 devices. Prior to thi...Kouak - HTTP File Share Server: Kouak Beta 3 - Clean: Some critical bug solved and dependecy problems There's 3 package : - The first, contains the cli server and the graphical server. - The second, only the cli server - The third, only the graphical client. It's a beta release, so don't hesitate to emmit issue ;pRawr: Rawr 4.1.06: This is the Downloadable WPF version of Rawr!For web-based version see http://elitistjerks.com/rawr.php You can find the version notes at: http://rawr.codeplex.com/wikipage?title=VersionNotes Rawr AddonWe now have a Rawr Official Addon for in-game exporting and importing of character data hosted on Curse. The Addon does not perform calculations like Rawr, it simply shows your exported Rawr data in wow tooltips and lets you export your character to Rawr (including bag and bank items) like Char...AcDown????? - Anime&Comic Downloader: AcDown????? v3.0 Beta6: ??AcDown?????????????,?????????????,????、????。?????Acfun????? ????32??64? Windows XP/Vista/7 ????????????? ??:????????Windows XP???,?????????.NET Framework 2.0???(x86)?.NET Framework 2.0???(x64),?????"?????????"??? ??v3.0 Beta6 ?????(imanhua.com)????? ???? ?? ??"????","?????","?????","????"?????? "????"?????"????????"?? ??????????? ?????????????? ?????????????/???? ?? ????Windows 7???????????? ????????? ?? ????????????? ???????/??????????? ???????????? ?? ?? ?????(imanh...Microsoft Ajax Minifier: Microsoft Ajax Minifier 4.22: Added lots of optimizations related to expression optimization. Combining adjacent expression statements into a single statement means more if-, for-, and while-statements can get rid of the curly-braces. Then more if-statements can be converted to expressions, and more expressions can be combined with return- and for-statements. Moving functions to the top of their scopes, followed by var-statements, provides more opportunities for expression-combination. Added command-line option to remove ...Pulse: Pulse Beta 2: - Added new wallpapers provider http://wallbase.cc. Supports english search, multiple keywords* - Improved font rendering in Options window - Added "Set wallpaper as logon background" option* - Fixed crashes if there is no internet connection - Fixed: Rewalls downloads empty images sometimes - Added filters* Note 1: wallbase provider supports only english search. Rewalls provider supports only russian search but Pulse automatically translates your english keyword into russian using Google Tr...???? (Internet Go Game for Android): goapp.3.0.apk: Refresh UI and bugfixPhalanger - The PHP Language Compiler for the .NET Framework: 2.1 (June 2011) for .NET 4.0: Release of Phalanger 2.1 - the opensource PHP compiler for .NET framework 4.0. Installation package also includes basic version of Phalanger Tools for Visual Studio 2010. This allows you to easily create, build and debug Phalanger web or application inside this ultimate integrated development environment. You can even install the tools into the free Visual Studio 2010 Shell (Integrated). To improve the performance of your application using MySQL, please use Managed MySQL Extension for Phala...WPF Application Framework (WAF): WPF Application Framework (WAF) 2.0.0.7: Version: 2.0.0.7 (Milestone 7): This release contains the source code of the WPF Application Framework (WAF) and the sample applications. Requirements .NET Framework 4.0 (The package contains a solution file for Visual Studio 2010) The unit test projects require Visual Studio 2010 Professional Remark The sample applications are using Microsoft’s IoC container MEF. However, the WPF Application Framework (WAF) doesn’t force you to use the same IoC container in your application. You can use ...SimplePlanner: v2.0b: For 2011-2012 Sem 1 ???2011-2012 ????Visual Studio 2010 Help Downloader: 1.0.0.3: Domain name support for proxy Cleanup old packages bug Writing to EventLog with UAC enabled bug Small fixes & Refactoring32feet.NET: 3.2: 32feet.NET v3.2 - Personal Area Networking for .NET Build 3.2.0609.0 9th June 2011 This library provides a .NET networking API for devices and desktop computers running the Microsoft or Broadcom/Widcomm Bluetooth stacks, Microsoft Windows supported IrDA devices and associated Object Exchange (OBEX) services for both these mediums. Online documentation is integrated into your Visual Studio help. The object model has been designed to promote consistency between Bluetooth, IrDA and traditional ...Media Companion: MC 3.406b weekly: With this version change a movie rebuild is required when first run -else MC will lock up on exit. Extract the entire archive to a folder which has user access rights, eg desktop, documents etc. Refer to the documentation on this site for the Installation & Setup Guide Important! If you find MC not displaying movie data properly, please try a 'movie rebuild' to reload the data from the nfo's into MC's cache. Fixes Movies Readded movie preference to rename invalid or scene nfo's to info ext...Windows Azure VM Assistant: AzureVMAssist V1.0.0.5: AzureVMAssist V1.0.0.5 (Debug) - Test Release VersionNetOffice - The easiest way to use Office in .NET: NetOffice Release 0.9: Changes: - fix examples (include issue 16026) - add new examples - 32Bit/64Bit Walkthrough is now available in technical Documentation. Includes: - Runtime Binaries and Source Code for .NET Framework:......v2.0, v3.0, v3.5, v4.0 - Tutorials in C# and VB.Net:..............................................................COM Proxy Management, Events, etc. - Examples in C# and VB.Net:............................................................Excel, Word, Outlook, PowerPoint, Access - COMAddi...Reusable Library: V1.1.3: A collection of reusable abstractions for enterprise application developerVidCoder: 0.9.2: Updated to HandBrake 4024svn. This fixes problems with mpeg2 sources: corrupted previews, incorrect progress indicators and encodes that incorrectly report as failed. Fixed a problem that prevented target sizes above 2048 MB.New ProjectsASP.NET MVC / Windows Workflow Foundation Integration: This project will product libraries, activities and examples that demonstrate how you can use Windows Workflow Foundation with ASP.NET MVCBing Maps Spatial Data Service Loader: Bing Maps Spatial Data Service Loader is a simple tool that helps you to load your set of data (CSV) into the Spatial Data Service included in Bing Maps licensing.Blend filter and Pencil sketch effect in C#: This project contains a filter for blending one image over an other using effects like Color Dodge, Lighten, Darken, Difference, etc. And an example of how to use that to do a Pencil Sketch effect in C# using AForge frameworkBugStoryV2: student project !CAIXA LOTERIAS: Projeto destinado a integrar resultado dos sorteios da Caixa em VB.NET, C#, ASP.NETCSReports: Report authoring tool. It supports dinamyc grouping, scripting formulas in vbscript, images from db and sub-sections. The report definition is saved to file in xml format and can be exported to pdf, doc and xls format.EasyLibrary: EasyLibraryFreetime Development Platform: Freetime Development Platform is a set of reusable design used to develop Web and Desktop based applications. IISProcessScheduler: Schedule processes from within IIS.LitleChef: LitleChefLLBLGen ANGTE (ASP.Net GUI Templates Extended): LLBLGen ANGTE (ASP.Net GUI Templates Extended) makes possible to use LLBLGen template system to generate a reasonable ASP.Net GUI that you can use as the base of your project or just as a prototyping tool. It generates APS.Net code with C# as code behind using .Net 2.0Memory: Memory Game for AndroidNCU - Book store: Educational project for a software engineering bootcamp at Northern Caribbean UniversityOrderToList Extension for IEnumerable: An extension method for IEnumerable<T> that will sort the IEnumerable based on a list of keys. Suppose you have a list of IDs {10, 5, 12} and want to use LINQ to retrieve all People from the DB with those IDs in that order, you want this extension. Sort is binary so it's fastp301: Old project.Pang: A new pong rip off; including some power ups. Will be written in C# using XNA.Ring2Park Online: Ring2Park is a fully working ASP.NET reference application that simulates the online purchase and management of Vehicle Parking sessions. It is developed using the latest ASP.NET MVC 3 patterns and capabilities. It includes a complete set of Application Lifecycle Management (ALM) assets, including requirements, test and deployment.rITIko: Questo progetto è stato creato come esperimento dalla classe 4G dell'ITIS B. Pascal di Cesena. Serve (per ora) solo per testate il funzionamento di CodePlex e del sistema SVN. Forse un giorno conterrà qualcosa di buono, rimanete aggiornati.Rug.Cmd - Command Line Parser and Console Application Framework: Rugland Console Framework is a collection of classes to enable the fast and consistent development of .NET console applications. Parse command line arguments and write your applications usage. If you are developing command line or build process tools in .NET then this maybe the lightweight framework for you. It is developed in C#.SamaToursUSA: sama tours usaSamcrypt: .Security System: With this program you will be able to secure your screen from prying eyes. In fact as soon as the block will not be unlocked only with your password. Perfect for when you go to have a coffee in the break. :)Sharp Temperature Conversor: Sharp Temperature Conversor has the objective of providing a easy, fast and a direct way to convert temperatures from one type to another. The project is small, uses C#, Visual Studio 2010. The project is small. However, the growth is possible. Silverlight Star Rating Control: A simple star rating control for editing or displaying ratings in Silverlight. Supports half-filled stars. Includes the star shape as a separate control.Silverware: Silverware is a set of libraries to enhance and make application development in Silverlight easier.Simple & lightweight fluent interface for Design by Contract: This project try to focus on make a good quality code for your project. It try to make sure all instance and variables must be satisfy some conditions in Design by Contract.SimpleAspect: A simple Aspect library for PostSharpTespih: Basit tespih uygulamasi. Kendi evrad u ezkar listenizi olusturup seçtiginiz bir evrat üzerinden tespih çekebilirsiniz.Texticize: Texticize is a fast, extensible, and intuitive object-to-text template engine for .NET. You can use Texticize to quickly create dynamic e-mails, letters, source code, or any other text documents using predefined text templates substituting placeholders with properties of CLR objects in realtime.The Dragon riders: a mmorgh game with free play in creaction. FantasyWPF ObservableCollection: WPF ObservableCollection Idle use.X9.37 Image Cash Letter file viewer: x9.37 Image Cash Letter viewer. Developed using VB.Net. Currently allows viewing and searching of X9 files. The code also has image manipulation code, specifically multi page TIF file handling that you might find useful,

    Read the article

  • e-interview: SunSpace to WebCenter migration

    - by me
    I had the pleasure to do an e-interview with Ana Neves around the SunSpace to WebCenter migration project.  Below is the english version of the interview.  Enjoy   Peter, you joined Oracle in 2009 through the acquisition of Sun. Becoming a part of Oracle meant many changes. The internal collaboration platform was one of them, as per a post you wrote back in 2011. Sun had SunSpace. How would you describe SunSpace? SunSpace was the internal Community and Social Collaboration platform for the Sun's Global Sales and Services Organization. SunSpace served around 600 communities with a main focus around technology, products and services. SunSpace was a big success. Within 3 months of its launch SunSpace had over 20,000 users and it won the Atlassian "Not just another wiki" Award for the best use of Confluence (https://blogs.oracle.com/peterreiser/entry/goodbye_sunspace_hello_webcenter). What made SunSpace so special? 1. People centric versus  Web centric The main concept of SunSpace put the person in the middle of everything. All relevant information, resources  etc. where dynamically pushed to a person's  myProfile ( Facebook like interface) based on the person's interest and  needs.  2. Ease to use  SunSpace was really easy to use. We spent a lot of time on social interaction design to optimize the user experience.  Also we integrated some sophisticated technology to hide complexity from the user. As example - when a user added a document to SunSpace - we analyzed the content of the document and suggested related metadata and tags to the user based on a sophisticated algorithm which was integrated with the corporate taxonomy. Based on this metadata the document was automatically shared with the relevant communities.  3. Easy to find One of the main use cases for SunSpace was that  a user could quickly find the content and information they needed for their job.  The search implementation was based on:  optimized search engine algorithm using social value based ranking enhancements community facilitated search optimization  faceted search which recommended highly relevant  content like products, communities and experts 4. Social Adoption  - How to build vibrant communities You can deploy the coolest social technology but what if the users are not using it?   To drive user adoption we implemented two  complementary models: 4.1 Community Methodology  We developed a set of best practices on how to create, run and sustain communities including: community structure and types (e.g. Community of Practice, Community of Interest etc.) & tips and tricks on how to build a "vibrant " communities, Community Health check etc.  These best practices where constantly tuned and updated by the community of community drivers. 4.2. Social Value System To drive user adoption there is ONE key  question you  have to answer for each individual user: What's In It For Me (WIIFM) We developed a Social Value System called Community Equity which measures the social value flow between People, Content and Metadata. Based on this technology we added "Gamfication" techniques (although at that time this term did not exist ) to SunSpace to honor people for the active contribution and participation.  As example: All  social credentials a user earned trough active community participation where dynamically displayed on her/his myProfile. How would you describe WebCenter? Oracle WebCenter (@oraclewebcenter) is the Oracle's  user engagement platform for social business. It helps people work together more efficiently through contextual collaboration tools that optimize connections between people, information, and applications and ensures users have access to the right information in the context of the business process in which they are engaged. Oracle WebCenter can help your organization deliver contextual and targeted Web experiences to users and enable employees to access information and applications through intuitive portals, composite applications, and mash-ups. How does it compare to SunSpace in terms of functionality? Before I answer this question, I would like to point out some limitation we started to see with the current SunSpace implementation. Due to the massive growth of the user population (>20,000 users), we experienced  performance and scalability challenges with the current technology. Also at the time - Sun Internal Communications and SunIT planned to replace the entire Sun Intranet with SunSpace. We  kicked-off a project to evaluate the enterprise level technology which eventually would replace the good old static Intranet.  And then Oracle acquired Sun. We already had defined the functional requirements for the Intranet replacement with a Social Enterprise Stack and we just needed to evaluate the functional requirements against WebCenter   Below are the summary of this evaluation  MyProfile SunSpace WebCenter How WebCenter Works Home MyProfile: to access, click on your name at the top of any WebCenter page Your name, title, and reporting line are displayed.  Sub-tabs show your activity stream (Activities); people in your network (Connections); files you have uploaded (Documents); your contact information (Organization); and any personal information you wish to share (About).   Files MyFiles Allows you to upload, download and store documents or wiki pages within folders and subfolders.  The WebDav interface allows you to download / upload files / folders with a simple drag and drop to / from your local machine.  Tagging is supported and recommended. Network HomeMyConnections Home: displays the activity stream of individuals in your network.MyConnections: shows individuals in your network.  Click on a person's name to see their contact info and link to their profile. Status Updates MyProfle > Activties Add and displays  your recent activties and status updates. Watches Preferences > Subscriptions > Current Subscriptions Receive email notifications when  pages / spaces you watch are modified. Drafts N/A WebCenter does not support Drafts Settings Preferences: to access, click on 'Preferences' at the top of any WebCenter page Set your general preferences, as well as your WebCenter messaging, search and mail settings. MyCommunities MySpaces: to access, click on 'Spaces' at the top of any WebCenter page Displays MySpaces (communities you are a member of); and Recent Spaces (communities you have recently visited). Community SunSpace Webcenter How Webcenter Works Home Home Displays a community introduction and activity stream.  Members can add messages, links or documents via the Community Message Board. No Top Contributors widget. People Members Lists members of the community. The Mail All Members feature allows moderators and participants to send a message to all members of the community. Membership Management can be found under > Manage > Members News News Members can post and access latest community news and they can subscribe to news using an RSS reader Documents Documents Allows community members to upload, download and store documents or wiki pages within folders and subfolders.  The WebDav interface allows participants to download / upload files / folders with a simple drag and drop to / from your local machine.  Tagging is supported and recommended. Wiki Wiki Allows community members to create and update web pages with a WYSIWYG editor.  Note: WebCenter does not support macros or portlet embedding. Forum Forum Post community forum topics. Contribute to community forum conversations.  N/A Calendar Update and/or view the Community Calendar. N/A Analytics Displays detailed analytics data (views,downloads, unique users etc.) for Pages, Wiki, Documents, and Forum in a given community space. What is the adoption of WebCenter at Oracle? The entire Intranet serving around 100,000 users  is running on WebCenter Content.  For professional communities we use WebCenter Portal and Spaces. Currently we have around 6,000 community spaces with  around 40,000 members.  Does Oracle have any metrics to assess usage and impact of WebCenter? Can you give us some examples? Sure -  we have a lot of metrics   For the Intranet we use traditional metrics like pageviews, monthly unique visitors and unique visits.  For Communities we use the WebCenter Portal/Spaces analytics service which gives as a wealth of data. The key metrics we track are: Space traffic (PageViews, Unique Users) Wiki,Documents (views, downloads etc.) Forum (users, views, posts etc.) Registered members over time  Depending on the community we can filter/segment the metrics by User Properties e.g. Country, Organization, Job Role etc. What are you doing to improve usage and impact? 1. We  integrating the WebCenter social services/fabric into all  main business applications. As example The Fusion CRM deployment is seamless integrated with Oracle Social Network (OSN) and all conversation around an opportunity or customer engagement is  done in OSN (see youtube video). 2. We drive Social Best Practice trough a program called "Social Networking & Business Collaboration (SNBC) program" You worked both with WebCenter and SunSpace. Knowing what you know today, if you had the chance to choose between the two, which one would you choose? Why? That's a tricky question   In the early days of  the Social Enterprise implementation (we started SunSpace in 2006), we needed an agile and easy to deploy technology to keep up with the users requirements. Sometimes we pushed two releases per day  and we were in a permanent perpetual beta mode - SunSpace was perfect for that.  After the social implementation matured over time - community generated content became business critical and we saw a change in the  requirements from agile to stability, scalability and reliability  of the infrastructure.  WebCenter is the right choice for such an enterprise-level deployment.  You are a WebCenter Evangelist at Oracle. What do you do as part of that role? Our  role is to help position Oracle as one of the key thought leaders and solutions provider for Social Business. In addition we drive social innovation trough our Oracle Appslab  team. Is that a full time role? Yes  How many other Evangelists are there in Oracle? We are currently 5 people in the WebCenter evangelist team (@webcentervoices): Christian Finn (@cfinn) leads the team - Christian came from the Microsoft Sharepoint product management team and is a recognized expert in Social Business and Enterprise Collaboration. Noël Jaffré  (@noeljaffre) is our Web Experience Management (WEM) guru and came to Oracle via FatWire acquisition (now WebCenter Sites). Jake Kuramoto (@theapplab) is part of the Oracle AppsLab innovation  team - Jake is well known as  the driving force behind  http://theappslab.com  a blog around social and innovation.  Noel Portugal (@noelportugal) is a developer in the Oracle AppsLab innovation team - he is the inventor of OraTweet - Oracle's internal tweeting platform  Peter Reiser (@peterreiser) is  a Social Business guru and the inventor of SunSpace and Community Equity.  What area of the business do you and the rest of the Evangelists sit in? What area of the organisation is responsible for WebCenter? We are part of the WebCenter product management  organization.  Is WebCenter part of the Knowledge Management strategy? Oracle WebCenter is the Oracle's user engagement platform for social business. It brings together the most complete portfolio of portal, web experience management, content, social and collaboration technologies into a single product suite and is the product foundation of the Oracle Knowledge Management strategy.  I am aware Oracle also uses Beehive internally. How would you describe Beehive? Oracle Beehive provides an integrated set of communication and collaboration services built on a single scalable, secure, enterprise-class platform Beehive is  internally used for enterprise wide mail, calendar and real collaboration (Web conferencing) services.  Are Beehive and WebCenter connected? Historically Beehive and WebCenter Portal & Content had some overlap in functionally. (Hey - if  a company has an acquisition strategy to strengthen its product offering and accelerate  innovation, it's pretty normal that functional overlap exists  :- )) A key objective of the WebCenter strategy is  to combine all social and collaboration offerings under the WebCenter product family. That means that certain Beehive components  will be integrated into the overall WebCenter product offering.  Are there any other internal collaboration tools at Oracle? Which ones There here are two other main social tools which are widely used at Oracle  Oracle Connect was the first social tool the Oracle AppsLab team created in 2007 - see (Jake's blog post for details). It is still extensively used. ... and as a former Sun guy I like this quote from the blog post:  "Traffic to Connect peaked right after the Sun merger in 2010, when it served several hundred thousand pageviews each month; since then, traffic has subsided, but still averages tens of thousands of pageviews to several thousand users each month." Oratweet - Oracle internal microblogging platform has been used since June 2008 and it is still growing.  It's entirely written in Oracle Application Express (APEX) which is a rapid web application development tool for the Oracle database. Wanna try it out? Here you can download the code.  What is Oracle's strategy regarding (all these) collaboration tools? Pretty straight forward. The strategy is to seamless  integrate the WebCenter social & collaboration services into all Business Applications to help customers to socialize their enterprise. 

    Read the article

  • Convert C++Builder AnsiString to std::string via boost::lexical_cast

    - by David Klein
    For a school assignment I have to implement a project in C++ using Borland C++ Builder. As the VCL uses AnsiString for all GUI Components I have to convert all of my std::strings to AnsiString for the sake of displaying. std::string inp = "Hello world!"; AnsiString outp(inp.c_str()); works of course but is a bit tedious to write and code duplication I want to avoid. As we use Boost in other contexts I decided to provide some helper functions go get boost::lexical_cast to work with AnsiString. Here is my implementation so far: std::istream& operator>>(std::istream& istr, AnsiString& str) { istr.exceptions(std::ios::badbit | std::ios::failbit | std::ios::eofbit); std::string s; std::getline(istr,s); str = AnsiString(s.c_str()); return istr; } In the beginning I got Access Violation after Access Violation but since I added the .exceptions() stuff the picture gets clearer. When the conversion is performed I get the following Exception: ios_base::eofbit set [Runtime Error/std::ios_base::failure] Does anyone have an idea how to fix it and can explain why the error occurs? My C++ experience is very limited. The conversion routine the other way round would be: std::ostream& operator<<(std::ostream& ostr,const AnsiString& str) { ostr << (str.c_str()); return ostr; } Maybe someone will spot an error here too :) With best regards! Edit: At the moment I'm using the edited version of Jem, it works in the beginning. After a while of using the programm the Borland Codeguard mentions some pointer arithmetic in already freed regions. Any ideas how this could be related? The Codeguard log (I'm using the german version, translations marked with stars): ------------------------------------------ Fehler 00080. 0x104230 (r) (Thread 0x07A4): Zeigerarithmetik in freigegebenem Speicher: 0x0241A238-0x0241A258. **(pointer arithmetic in freed region)** | d:\program files\borland\bds\4.0\include\dinkumware\sstream Zeile 126: | { // not first growth, adjust pointers | _Seekhigh = _Seekhigh - _Mysb::eback() + _Ptr; |> _Mysb::setp(_Mysb::pbase() - _Mysb::eback() + _Ptr, | _Mysb::pptr() - _Mysb::eback() + _Ptr, _Ptr + _Newsize); | if (_Mystate & _Noread) Aufrufhierarchie: **(stack-trace)** 0x00411731(=FOSChampion.exe:0x01:010731) d:\program files\borland\bds\4.0\include\dinkumware\sstream#126 0x00411183(=FOSChampion.exe:0x01:010183) d:\program files\borland\bds\4.0\include\dinkumware\streambuf#465 0x0040933D(=FOSChampion.exe:0x01:00833D) d:\program files\borland\bds\4.0\include\dinkumware\streambuf#151 0x00405988(=FOSChampion.exe:0x01:004988) d:\program files\borland\bds\4.0\include\dinkumware\ostream#679 0x00405759(=FOSChampion.exe:0x01:004759) D:\Projekte\Schule\foschamp\src\Server\Ansistringkonverter.h#31 0x004080C9(=FOSChampion.exe:0x01:0070C9) D:\Projekte\Schule\foschamp\lib\boost_1_34_1\boost/lexical_cast.hpp#151 Objekt (0x0241A238) [Größe: 32 Byte] war erstellt mit new **(Object was created with new)** | d:\program files\borland\bds\4.0\include\dinkumware\xmemory Zeile 28: | _Ty _FARQ *_Allocate(_SIZT _Count, _Ty _FARQ *) | { // allocate storage for _Count elements of type _Ty |> return ((_Ty _FARQ *)::operator new(_Count * sizeof (_Ty))); | } | Aufrufhierarchie: **(stack-trace)** 0x0040ED90(=FOSChampion.exe:0x01:00DD90) d:\program files\borland\bds\4.0\include\dinkumware\xmemory#28 0x0040E194(=FOSChampion.exe:0x01:00D194) d:\program files\borland\bds\4.0\include\dinkumware\xmemory#143 0x004115CF(=FOSChampion.exe:0x01:0105CF) d:\program files\borland\bds\4.0\include\dinkumware\sstream#105 0x00411183(=FOSChampion.exe:0x01:010183) d:\program files\borland\bds\4.0\include\dinkumware\streambuf#465 0x0040933D(=FOSChampion.exe:0x01:00833D) d:\program files\borland\bds\4.0\include\dinkumware\streambuf#151 0x00405988(=FOSChampion.exe:0x01:004988) d:\program files\borland\bds\4.0\include\dinkumware\ostream#679 Objekt (0x0241A238) war Gelöscht mit delete **(Object was deleted with delete)** | d:\program files\borland\bds\4.0\include\dinkumware\xmemory Zeile 138: | void deallocate(pointer _Ptr, size_type) | { // deallocate object at _Ptr, ignore size |> ::operator delete(_Ptr); | } | Aufrufhierarchie: **(stack-trace)** 0x004044C6(=FOSChampion.exe:0x01:0034C6) d:\program files\borland\bds\4.0\include\dinkumware\xmemory#138 0x00411628(=FOSChampion.exe:0x01:010628) d:\program files\borland\bds\4.0\include\dinkumware\sstream#111 0x00411183(=FOSChampion.exe:0x01:010183) d:\program files\borland\bds\4.0\include\dinkumware\streambuf#465 0x0040933D(=FOSChampion.exe:0x01:00833D) d:\program files\borland\bds\4.0\include\dinkumware\streambuf#151 0x00405988(=FOSChampion.exe:0x01:004988) d:\program files\borland\bds\4.0\include\dinkumware\ostream#679 0x00405759(=FOSChampion.exe:0x01:004759) D:\Projekte\Schule\foschamp\src\Server\Ansistringkonverter.h#31 ------------------------------------------ Ansistringkonverter.h is the file with the posted operators and line 31 is: std::ostream& operator<<(std::ostream& ostr,const AnsiString& str) { ostr << (str.c_str()); **(31)** return ostr; } Thanks for your help :)

    Read the article

  • Spam Assassin on windows

    - by ebeworld
    I just installed spam assassin and run for its sample ham mail as spamassassin sample-nonspam.txt, but it ended up marking it as a spam. What configuration am i missing to change? Result of the check is: From: Keith Dawson To: [email protected] Subject: **SPAM** TBTF ping for 2001-04-20: Reviving Date: Fri, 20 Apr 2001 16:59:58 -0400 Message-Id: X-Spam-Flag: YES X-Spam-Checker-Version: SpamAssassin 3.2.3 (2007-08-08) on ebeworld-PC X-Spam-Level: **** X-Spam-Status: Yes, score=10.5 required=6.3 tests=DCC_CHECK,DIGEST_MULTIPLE, DNS_FROM_OPENWHOIS,RAZOR2_CF_RANGE_51_100,RAZOR2_CF_RANGE_E4_51_100, RAZOR2_CHECK shortcircuit=no autolearn=no version=3.2.3 MIME-Version: 1.0 Content-Type: multipart/mixed; boundary="----------=_4BF17E8E.BF8E0000" This is a multi-part message in MIME format. ------------=_4BF17E8E.BF8E0000 Content-Type: text/plain; charset=iso-8859-1 Content-Disposition: inline Content-Transfer-Encoding: 8bit This mail is probably spam. The original message has been attached intact in RFC 822 format. Content preview: -----BEGIN PGP SIGNED MESSAGE----- TBTF ping for 2001-04-20: Reviving T a s t y B i t s f r o m t h e T e c h n o l o g y F r o n t [...] Content analysis details: (10.5 points, 6.3 required) 2.4 DNS_FROM_OPENWHOIS RBL: Envelope sender listed in bl.open-whois.org. 1.5 RAZOR2_CF_RANGE_E4_51_100 Razor2 gives engine 4 confidence level above 50% [cf: 58] 2.5 RAZOR2_CHECK Listed in Razor2 (http://razor.sf.net/) 0.5 RAZOR2_CF_RANGE_51_100 Razor2 gives confidence level above 50% [cf: 58] 3.6 DCC_CHECK Listed in DCC (http://rhyolite.com/anti-spam/dcc/) 0.0 DIGEST_MULTIPLE Message hits more than one network digest check ------------=_4BF17E8E.BF8E0000 Content-Type: message/rfc822; x-spam-type=original Content-Description: original message before SpamAssassin Content-Disposition: inline Content-Transfer-Encoding: 8bit Return-Path: Delivered-To: [email protected] Received: from europe.std.com (europe.std.com [199.172.62.20]) by mail.netnoteinc.com (Postfix) with ESMTP id 392E1114061 for ; Fri, 20 Apr 2001 21:34:46 +0000 (Eire) Received: (from daemon@localhost) by europe.std.com (8.9.3/8.9.3) id RAA09630 for tbtf-outgoing; Fri, 20 Apr 2001 17:31:18 -0400 (EDT) Received: from sgi04-e.std.com (sgi04-e.std.com [199.172.62.134]) by europe.std.com (8.9.3/8.9.3) with ESMTP id RAA08749 for ; Fri, 20 Apr 2001 17:24:31 -0400 (EDT) Received: from world.std.com (world-f.std.com [199.172.62.5]) by sgi04-e.std.com (8.9.3/8.9.3) with ESMTP id RAA8278330 for ; Fri, 20 Apr 2001 17:24:31 -0400 (EDT) Received: (from dawson@localhost) by world.std.com (8.9.3/8.9.3) id RAA26781 for [email protected]; Fri, 20 Apr 2001 17:24:31 -0400 (EDT) Received: from sgi04-e.std.com (sgi04-e.std.com [199.172.62.134]) by europe.std.com (8.9.3/8.9.3) with ESMTP id RAA07541 for ; Fri, 20 Apr 2001 17:12:06 -0400 (EDT) Received: from world.std.com (world-f.std.com [199.172.62.5]) by sgi04-e.std.com (8.9.3/8.9.3) with ESMTP id RAA8416421 for ; Fri, 20 Apr 2001 17:12:06 -0400 (EDT) Received: from [208.192.102.193] (ppp0c199.std.com [208.192.102.199]) by world.std.com (8.9.3/8.9.3) with ESMTP id RAA14226 for ; Fri, 20 Apr 2001 17:12:04 -0400 (EDT) Mime-Version: 1.0 Message-Id: Date: Fri, 20 Apr 2001 16:59:58 -0400 To: [email protected] From: Keith Dawson Subject: TBTF ping for 2001-04-20: Reviving Content-Type: text/plain; charset="us-ascii" Sender: [email protected] Precedence: list Reply-To: [email protected] -----BEGIN PGP SIGNED MESSAGE----- TBTF ping for 2001-04-20: Reviving T a s t y B i t s f r o m t h e T e c h n o l o g y F r o n t Timely news of the bellwethers in computer and communications technology that will affect electronic commerce -- since 1994 Your Host: Keith Dawson ISSN: 1524-9948 This issue: < http://tbtf.com/archive/2001-04-20.html > To comment on this issue, please use this forum at Quick Topic: < http://www.quicktopic.com/tbtf/H/kQGJR2TXL6H > ________________________________________________________________________ Q u o t e O f T h e M o m e n t Even organizations that promise "privacy for their customers" rarely if ever promise "continued privacy for their former customers..." Once you cancel your account with any business, their promises of keeping the information about their customers private no longer apply... you're not a customer any longer. This is in the large category of business behaviors that individuals would consider immoral and deceptive -- and businesses know are not illegal. -- "_ankh," writing on the XNStalk mailing list ________________________________________________________________________ ..TBTF's long hiatus is drawing to a close Hail subscribers to the TBTF mailing list. Some 2,000 [1] of you have signed up since the last issue [2] was mailed on 2000-07-20. This brief note is the first of several I will send to this list to excise the dead addresses prior to resuming regular publication. While you time the contractions of the newsletter's rebirth, I in- vite you to read the TBTF Log [3] and sign up for its separate free subscription. Send "subscribe" (no quotes) with any subject to [email protected] . I mail out collected Log items on Sun- days. If you need to stay more immediately on top of breaking stories, pick up the TBTF Log's syndication file [4] or read an aggregator that does. Examples are Slashdot's Cheesy Portal [5], Userland [6], and Sitescooper [7]. If your news obsession runs even deeper and you own an SMS-capable cell phone or PDA, sign up on TBTF's WebWire- lessNow portal [8]. A free call will bring you the latest TBTF Log headline, Jargon Scout [9] find, or Siliconium [10]. Two new columnists have bloomed on TBTF since last summer: Ted By- field's roving_reporter [11] and Gary Stock's UnBlinking [12]. Late- ly Byfield has been writing in unmatched depth about ICANN, but the roving_reporter nym's roots are in commentary at the intersection of technology and culture. Stock's UnBlinking latches onto topical sub- jects and pursues them to the ends of the Net. These writers' voices are compelling and utterly distinctive. [1] http://tbtf.com/growth.html [2] http://tbtf.com/archive/2000-07-20.html [3] http://tbtf.com/blog/ [4] http://tbtf.com/tbtf.rdf [5] http://www.slashdot.org/cheesyportal.shtml [6] http://my.userland.com/ [7] http://www.sitescooper.org/ [8] http://tbtf.com/pull-wwn/ [9] http://tbtf.com/jargon-scout.html [10] http://tbtf.com/siliconia.html [11] http://tbtf.com/roving_reporter/ [12] http://tbtf.com/unblinking/ ________________________________________________________________________ S o u r c e s For a complete list of TBTF's email and Web sources, see http://tbtf.com/sources.html . ________________________________________ B e n e f a c t o r s TBTF is free. If you get value from this publication, please visit the TBTF Benefactors page < http://tbtf.com/the-benefactors.html > and consider contributing to its upkeep. ________________________________________________________________________ TBTF home and archive at http://tbtf.com/ . To unsubscribe send the message "unsubscribe" to [email protected]. TBTF is Copy- right 1994-2000 by Keith Dawson, <[email protected]>. Commercial use prohibited. For non-commercial purposes please forward, post, and link as you see fit. _______________________________________________ Keith Dawson [email protected] Layer of ash separates morning and evening milk. -----BEGIN PGP SIGNATURE----- Version: PGPfreeware 6.5.2 for non-commercial use http://www.pgp.com iQCVAwUBOuCi3WAMawgf2iXRAQHeAQQA3YSePSQ0XzdHZUVskFDkTfpE9XS4fHQs WaT6a8qLZK9PdNcoz3zggM/Jnjdx6CJqNzxPEtxk9B2DoGll/C/60HWNPN+VujDu Xav65S0P+Px4knaQcCIeCamQJ7uGcsw+CqMpNbxWYaTYmjAfkbKH1EuLC2VRwdmD wQmwrDp70v8= =8hLB -----END PGP SIGNATURE----- ------------=_4BF17E8E.BF8E0000--

    Read the article

  • Microsoft Introduces WebMatrix

    - by Rick Strahl
    originally published in CoDe Magazine Editorial Microsoft recently released the first CTP of a new development environment called WebMatrix, which along with some of its supporting technologies are squarely aimed at making the Microsoft Web Platform more approachable for first-time developers and hobbyists. But in the process, it also provides some updated technologies that can make life easier for existing .NET developers. Let’s face it: ASP.NET development isn’t exactly trivial unless you already have a fair bit of familiarity with sophisticated development practices. Stick a non-developer in front of Visual Studio .NET or even the Visual Web Developer Express edition and it’s not likely that the person in front of the screen will be very productive or feel inspired. Yet other technologies like PHP and even classic ASP did provide the ability for non-developers and hobbyists to become reasonably proficient in creating basic web content quickly and efficiently. WebMatrix appears to be Microsoft’s attempt to bring back some of that simplicity with a number of technologies and tools. The key is to provide a friendly and fully self-contained development environment that provides all the tools needed to build an application in one place, as well as tools that allow publishing of content and databases easily to the web server. WebMatrix is made up of several components and technologies: IIS Developer Express IIS Developer Express is a new, self-contained development web server that is fully compatible with IIS 7.5 and based on the same codebase that IIS 7.5 uses. This new development server replaces the much less compatible Cassini web server that’s been used in Visual Studio and the Express editions. IIS Express addresses a few shortcomings of the Cassini server such as the inability to serve custom ISAPI extensions (i.e., things like PHP or ASP classic for example), as well as not supporting advanced authentication. IIS Developer Express provides most of the IIS 7.5 feature set providing much better compatibility between development and live deployment scenarios. SQL Server Compact 4.0 Database access is a key component for most web-driven applications, but on the Microsoft stack this has mostly meant you have to use SQL Server or SQL Server Express. SQL Server Compact is not new-it’s been around for a few years, but it’s been severely hobbled in the past by terrible tool support and the inability to support more than a single connection in Microsoft’s attempt to avoid losing SQL Server licensing. The new release of SQL Server Compact 4.0 supports multiple connections and you can run it in ASP.NET web applications simply by installing an assembly into the bin folder of the web application. In effect, you don’t have to install a special system configuration to run SQL Compact as it is a drop-in database engine: Copy the small assembly into your BIN folder (or from the GAC if installed fully), create a connection string against a local file-based database file, and then start firing SQL requests. Additionally WebMatrix includes nice tools to edit the database tables and files, along with tools to easily upsize (and hopefully downsize in the future) to full SQL Server. This is a big win, pending compatibility and performance limits. In my simple testing the data engine performed well enough for small data sets. This is not only useful for web applications, but also for desktop applications for which a fully installed SQL engine like SQL Server would be overkill. Having a local data store in those applications that can potentially be accessed by multiple users is a welcome feature. ASP.NET Razor View Engine What? Yet another native ASP.NET view engine? We already have Web Forms and various different flavors of using that view engine with Web Forms and MVC. Do we really need another? Microsoft thinks so, and Razor is an implementation of a lightweight, script-only view engine. Unlike the Web Forms view engine, Razor works only with inline code, snippets, and markup; therefore, it is more in line with current thinking of what a view engine should represent. There’s no support for a “page model” or any of the other Web Forms features of the full-page framework, but just a lightweight scripting engine that works with plain markup plus embedded expressions and code. The markup syntax for Razor is geared for minimal typing, plus some progressive detection of where a script block/expression starts and ends. This results in a much leaner syntax than the typical ASP.NET Web Forms alligator (<% %>) tags. Razor uses the @ sign plus standard C# (or Visual Basic) block syntax to delineate code snippets and expressions. Here’s a very simple example of what Razor markup looks like along with some comment annotations: <!DOCTYPE html> <html>     <head>         <title></title>     </head>     <body>     <h1>Razor Test</h1>          <!-- simple expressions -->     @DateTime.Now     <hr />     <!-- method expressions -->     @DateTime.Now.ToString("T")          <!-- code blocks -->     @{         List<string> names = new List<string>();         names.Add("Rick");         names.Add("Markus");         names.Add("Claudio");         names.Add("Kevin");     }          <!-- structured block statements -->     <ul>     @foreach(string name in names){             <li>@name</li>     }     </ul>           <!-- Conditional code -->        @if(true) {                        <!-- Literal Text embedding in code -->        <text>         true        </text>;    }    else    {        <!-- Literal Text embedding in code -->       <text>       false       </text>;    }    </body> </html> Like the Web Forms view engine, Razor parses pages into code, and then executes that run-time compiled code. Effectively a “page” becomes a code file with markup becoming literal text written into the Response stream, code snippets becoming raw code, and expressions being written out with Response.Write(). The code generated from Razor doesn’t look much different from similar Web Forms code that only uses script tags; so although the syntax may look different, the operational model is fairly similar to the Web Forms engine minus the overhead of the large Page object model. However, there are differences: -Razor pages are based on a new base class, Microsoft.WebPages.WebPage, which is hosted in the Microsoft.WebPages assembly that houses all the Razor engine parsing and processing logic. Browsing through the assembly (in the generated ASP.NET Temporary Files folder or GAC) will give you a good idea of the functionality that Razor provides. If you look closely, a lot of the feature set matches ASP.NET MVC’s view implementation as well as many of the helper classes found in MVC. It’s not hard to guess the motivation for this sort of view engine: For beginning developers the simple markup syntax is easier to work with, although you obviously still need to have some understanding of the .NET Framework in order to create dynamic content. The syntax is easier to read and grok and much shorter to type than ASP.NET alligator tags (<% %>) and also easier to understand aesthetically what’s happening in the markup code. Razor also is a better fit for Microsoft’s vision of ASP.NET MVC: It’s a new view engine without the baggage of Web Forms attached to it. The engine is more lightweight since it doesn’t carry all the features and object model of Web Forms with it and it can be instantiated directly outside of the HTTP environment, which has been rather tricky to do for the Web Forms view engine. Having a standalone script parser is a huge win for other applications as well – it makes it much easier to create script or meta driven output generators for many types of applications from code/screen generators, to simple form letters to data merging applications with user customizability. For me personally this is very useful side effect and who knows maybe Microsoft will actually standardize they’re scripting engines (die T4 die!) on this engine. Razor also better fits the “view-based” approach where the view is supposed to be mostly a visual representation that doesn’t hold much, if any, code. While you can still use code, the code you do write has to be self-contained. Overall I wouldn’t be surprised if Razor will become the new standard view engine for MVC in the future – and in fact there have been announcements recently that Razor will become the default script engine in ASP.NET MVC 3.0. Razor can also be used in existing Web Forms and MVC applications, although that’s not working currently unless you manually configure the script mappings and add the appropriate assemblies. It’s possible to do it, but it’s probably better to wait until Microsoft releases official support for Razor scripts in Visual Studio. Once that happens, you can simply drop .cshtml and .vbhtml pages into an existing ASP.NET project and they will work side by side with classic ASP.NET pages. WebMatrix Development Environment To tie all of these three technologies together, Microsoft is shipping WebMatrix with an integrated development environment. An integrated gallery manager makes it easy to download and load existing projects, and then extend them with custom functionality. It seems to be a prominent goal to provide community-oriented content that can act as a starting point, be it via a custom templates or a complete standard application. The IDE includes a project manager that works with a single project and provides an integrated IDE/editor for editing the .cshtml and .vbhtml pages. A run button allows you to quickly run pages in the project manager in a variety of browsers. There’s no debugging support for code at this time. Note that Razor pages don’t require explicit compilation, so making a change, saving, and then refreshing your page in the browser is all that’s needed to see changes while testing an application locally. It’s essentially using the auto-compiling Web Project that was introduced with .NET 2.0. All code is compiled during run time into dynamically created assemblies in the ASP.NET temp folder. WebMatrix also has PHP Editing support with syntax highlighting. You can load various PHP-based applications from the WebMatrix Web Gallery directly into the IDE. Most of the Web Gallery applications are ready to install and run without further configuration, with Wizards taking you through installation of tools, dependencies, and configuration of the database as needed. WebMatrix leverages the Web Platform installer to pull the pieces down from websites in a tight integration of tools that worked nicely for the four or five applications I tried this out on. Click a couple of check boxes and fill in a few simple configuration options and you end up with a running application that’s ready to be customized. Nice! You can easily deploy completed applications via WebDeploy (to an IIS server) or FTP directly from within the development environment. The deploy tool also can handle automatically uploading and installing the database and all related assemblies required, making deployment a simple one-click install step. Simplified Database Access The IDE contains a database editor that can edit SQL Compact and SQL Server databases. There is also a Database helper class that facilitates database access by providing easy-to-use, high-level query execution and iteration methods: @{       var db = Database.OpenFile("FirstApp.sdf");     string sql = "select * from customers where Id > @0"; } <ul> @foreach(var row in db.Query(sql,1)){         <li>@row.FirstName @row.LastName</li> } </ul> The query function takes a SQL statement plus any number of positional (@0,@1 etc.) SQL parameters by simple values. The result is returned as a collection of rows which in turn have a row object with dynamic properties for each of the columns giving easy (though untyped) access to each of the fields. Likewise Execute and ExecuteNonQuery allow execution of more complex queries using similar parameter passing schemes. Note these queries use string-based queries rather than LINQ or Entity Framework’s strongly typed LINQ queries. While this may seem like a step back, it’s also in line with the expectations of non .NET script developers who are quite used to writing and using SQL strings in code rather than using OR/M frameworks. The only question is why was something not included from the beginning in .NET and Microsoft made developers build custom implementations of these basic building blocks. The implementation looks a lot like a DataTable-style data access mechanism, but to be fair, this is a common approach in scripting languages. This type of syntax that uses simple, static, data object methods to perform simple data tasks with one line of code are common in scripting languages and are a good match for folks working in PHP/Python, etc. Seems like Microsoft has taken great advantage of .NET 4.0’s dynamic typing to provide this sort of interface for row iteration where each row has properties for each field. FWIW, all the examples demonstrate using local SQL Compact files - I was unable to get a SQL Server connection string to work with the Database class (the connection string wasn’t accepted). However, since the code in the page is still plain old .NET, you can easily use standard ADO.NET code or even LINQ or Entity Framework models that are created outside of WebMatrix in separate assemblies as required. The good the bad the obnoxious - It’s still .NET The beauty (or curse depending on how you look at it :)) of Razor and the compilation model is that, behind it all, it’s still .NET. Although the syntax may look foreign, it’s still all .NET behind the scenes. You can easily access existing tools, helpers, and utilities simply by adding them to the project as references or to the bin folder. Razor automatically recognizes any assembly reference from assemblies in the bin folder. In the default configuration, Microsoft provides a host of helper functions in a Microsoft.WebPages assembly (check it out in the ASP.NET temp folder for your application), which includes a host of HTML Helpers. If you’ve used ASP.NET MVC before, a lot of the helpers should look familiar. Documentation at the moment is sketchy-there’s a very rough API reference you can check out here: http://www.asp.net/webmatrix/tutorials/asp-net-web-pages-api-reference Who needs WebMatrix? Uhm… good Question Clearly Microsoft is trying hard to create an environment with WebMatrix that is easy to use for newbie developers. The goal seems to be simplicity in providing a minimal development environment and an easy-to-use script engine/language that makes it easy to get started with. There’s also some focus on community features that can be used as starting points, such as Web Gallery applications and templates. The community features in particular are very nice and something that would be nice to eventually see in Visual Studio as well. The question is whether this is too little too late. Developers who have been clamoring for a simpler development environment on the .NET stack have mostly left for other simpler platforms like PHP or Python which are catering to the down and dirty developer. Microsoft will be hard pressed to win those folks-and other hardcore PHP developers-back. Regardless of how much you dress up a script engine fronted by the .NET Framework, it’s still the .NET Framework and all the complexity that drives it. While .NET is a fine solution in its breadth and features once you get a basic handle on the core features, the bar of entry to being productive with the .NET Framework is still pretty high. The MVC style helpers Microsoft provides are a good step in the right direction, but I suspect it’s not enough to shield new developers from having to delve much deeper into the Framework to get even basic applications built. Razor and its helpers is trying to make .NET more accessible but the reality is that in order to do useful stuff that goes beyond the handful of simple helpers you still are going to have to write some C# or VB or other .NET code. If the target is a hobby/amateur/non-programmer the learning curve isn’t made any easier by WebMatrix it’s just been shifted a tad bit further along in your development endeavor when you run out of canned components that are supplied either by Microsoft or the community. The database helpers are interesting and actually I’ve heard a lot of discussion from various developers who’ve been resisting .NET for a really long time perking up at the prospect of easier data access in .NET than the ridiculous amount of code it takes to do even simple data access with raw ADO.NET. It seems sad that such a simple concept and implementation should trigger this sort of response (especially since it’s practically trivial to create helpers like these or pick them up from countless libraries available), but there it is. It also shows that there are plenty of developers out there who are more interested in ‘getting stuff done’ easily than necessarily following the latest and greatest practices which are overkill for many development scenarios. Sometimes it seems that all of .NET is focused on the big life changing issues of development, rather than the bread and butter scenarios that many developers are interested in to get their work accomplished. And that in the end may be WebMatrix’s main raison d'être: To bring some focus back at Microsoft that simpler and more high level solutions are actually needed to appeal to the non-high end developers as well as providing the necessary tools for the high end developers who want to follow the latest and greatest trends. The current version of WebMatrix hits many sweet spots, but it also feels like it has a long way to go before it really can be a tool that a beginning developer or an accomplished developer can feel comfortable with. Although there are some really good ideas in the environment (like the gallery for downloading apps and components) which would be a great addition for Visual Studio as well, the rest of the development environment just feels like crippleware with required functionality missing especially debugging and Intellisense, but also general editor support. It’s not clear whether these are because the product is still in an early alpha release or whether it’s simply designed that way to be a really limited development environment. While simple can be good, nobody wants to feel left out when it comes to necessary tool support and WebMatrix just has that left out feeling to it. If anything WebMatrix’s technology pieces (which are really independent of the WebMatrix product) are what are interesting to developers in general. The compact IIS implementation is a nice improvement for development scenarios and SQL Compact 4.0 seems to address a lot of concerns that people have had and have complained about for some time with previous SQL Compact implementations. By far the most interesting and useful technology though seems to be the Razor view engine for its light weight implementation and it’s decoupling from the ASP.NET/HTTP pipeline to provide a standalone scripting/view engine that is pluggable. The first winner of this is going to be ASP.NET MVC which can now have a cleaner view model that isn’t inconsistent due to the baggage of non-implemented WebForms features that don’t work in MVC. But I expect that Razor will end up in many other applications as a scripting and code generation engine eventually. Visual Studio integration for Razor is currently missing, but is promised for a later release. The ASP.NET MVC team has already mentioned that Razor will eventually become the default MVC view engine, which will guarantee continued growth and development of this tool along those lines. And the Razor engine and support tools actually inherit many of the features that MVC pioneered, so there’s some synergy flowing both ways between Razor and MVC. As an existing ASP.NET developer who’s already familiar with Visual Studio and ASP.NET development, the WebMatrix IDE doesn’t give you anything that you want. The tools provided are minimal and provide nothing that you can’t get in Visual Studio today, except the minimal Razor syntax highlighting, so there’s little need to take a step back. With Visual Studio integration coming later there’s little reason to look at WebMatrix for tooling. It’s good to see that Microsoft is giving some thought about the ease of use of .NET as a platform For so many years, we’ve been piling on more and more new features without trying to take a step back and see how complicated the development/configuration/deployment process has become. Sometimes it’s good to take a step - or several steps - back and take another look and realize just how far we’ve come. WebMatrix is one of those reminders and one that likely will result in some positive changes on the platform as a whole. © Rick Strahl, West Wind Technologies, 2005-2010Posted in ASP.NET   IIS7  

    Read the article

  • I need some help with either my SQL or my PHP I do not know which...

    - by sico87
    Hello I am creating a CMS and some of the functionality of it that the images that are within the content are managable. I currently trying to display a table that shows the the content title and then the associated images, ideally I would like a layout similar to this, Content Title Image 1 Image 2 Image 3 Content Title 2 Image 1 Image 2 Content Title 3 Image 1 The SQL the returns the data is actually formed using Codeigniters Active Record class, function getAllContentImages() { $this->db->select('*'); $this->db->from('contentImagesTable'); $this->db->join('contentTable', 'contentTable.contentId = contentImagesTable.contentId'); $this->db->join('categoryTable', 'categoryTable.categoryId = contentTable.categoryId'); $query = $this->db->get(); return $query->result_array(); } The array that is returned is looks like this, I have cut the size down for readability. Array ( [0] => Array ( [contentImageId] => 25 [contentImageName] => green.png [contentImageType] => .png [contentImagePath] => /var/www/bangmarketing.bang/media/uploads/contentImages/2/green.png [isHeadlineImage] => 1 [contentImageDateUploaded] => 1265222654 [contentId] => 2 [dashboardUserId] => 0 [contentTitle] => sadsadsadassss [contentAbstract] => <p>Pllllleeeeeeeaaaaasssssseeeeee Work</p> [contentBody] => <p>Please work :-( please</p> [contentOnline] => 0 [contentAllowComments] => 0 [contentDateCreated] => 1265124038 [categoryId] => 1 [categoryTitle] => blogsss [categoryAbstract] => <p>asdsdsadasdsadfdsgdgdsgdsgssssssssssss</p> [categorySlug] => blog [categoryIsSpecial] => 0 [categoryOnline] => 1 [categoryDateCreated] => 1266588327 ) [1] => Array ( [contentImageId] => 28 [contentImageName] => yellow.png [contentImageType] => .png [contentImagePath] => /var/www/bangmarketing.bang/media/uploads/contentImages/7/yellow.png [isHeadlineImage] => 1 [contentImageDateUploaded] => 1265388055 [contentId] => 7 [dashboardUserId] => 0 [contentTitle] => Another Blog [contentAbstract] => <p>This is another blog and it is shit becuase this does not work</p> [contentBody] => <p>ioasfihfududfhdufhuishdfiudshfiudhsfiuhdsiufhusdhfuids</p> [contentOnline] => 1 [contentAllowComments] => 0 [contentDateCreated] => 1265388034 [categoryId] => 1 [categoryTitle] => blogsss [categoryAbstract] => <p>asdsdsadasdsadfdsgdgdsgdsgssssssssssss</p> [categorySlug] => blog [categoryIsSpecial] => 0 [categoryOnline] => 1 [categoryDateCreated] => 1266588327 ) [2] => Array ( [contentImageId] => 33 [contentImageName] => portaski.jpg [contentImageType] => .jpg [contentImagePath] => /var/www/bangmarketing.bang/media/uploads/contentImages/11/portaski.jpg [isHeadlineImage] => 1 [contentImageDateUploaded] => 1265714175 [contentId] => 11 [dashboardUserId] => 0 [contentTitle] => Portaski - new product and brand launch by Bang [contentAbstract] => <p>Bang's experience in new product development has helped launch PortaSki &ndash; the pocket-sized device which is set to revolutionise skiing.</p> [contentBody] => <p>After developing Portaski's brand identity and positioning, Bang re-designed the product and its packaging ahead of launch in late 2008.</p> <p>A media and PR strategy was devised and implemented using Bang's close relationship with two of the UK's most influential organisations in the Advertising and Media Buying industries. On-line advertising was supported with editorial reviews in the UK's leading broadsheets and tabloids, which combined with pin-point HTML direct mail to drive consumers to the new e-commerce site.</p> <p>Impressive month-on-month growth has been achieved since launch, and the direct marketing activity resulted in an unprecedented 2.71% of targets going on-line to purchase a PortaSki.</p> <p>For further information visit <a href="http://www.portaski.com" target="_blank">www.portaski.com</a></p> [contentOnline] => 1 [contentAllowComments] => 0 [contentDateCreated] => 1265718184 [categoryId] => 1 [categoryTitle] => blogsss [categoryAbstract] => <p>asdsdsadasdsadfdsgdgdsgdsgssssssssssss</p> [categorySlug] => blog [categoryIsSpecial] => 0 [categoryOnline] => 1 [categoryDateCreated] => 1266588327 ) [3] => Array ( [contentImageId] => 26 [contentImageName] => housingplus.jpg [contentImageType] => .jpg [contentImagePath] => /var/www/bangmarketing.bang/media/uploads/contentImages/5/housingplus.jpg [isHeadlineImage] => 1 [contentImageDateUploaded] => 1265284989 [contentId] => 5 [dashboardUserId] => 0 [contentTitle] => Bang launches Housing Plus [contentAbstract] => <p>Bang has launched Housing Plus, the new brand for the Central Borders Housing Group, along with new sub-brands Property Care and SSHA.</p> [contentBody] => <p>The Midlands based Group, with turnover in excess of &pound;21M, appointed Bang in 2008 following an open pitch of over 40 agencies. Bang's work began with an extensive marketing research strategy that challenged the Group's former positioning and brand structure.</p> <p>The research unveiled that the housing sector demanded a values-led Group. This led Bang to develop the brave &lsquo;Together for the Right Reasons' positioning for Housing Plus.</p> <p>Chris Garratt, Marketing Director at Bang explained "The housing sector has witnessed wholesale change in recent years. Much to tenant's dismay, many associations and Groups appear to be losing touch with their roots, we wanted to develop a Group for associations who place principles at the heart of their corporate strategy".</p> <p>The repositioned sub-brands also play an important role in the Group's revised brand by highlighting Housing Plus' willingness to embrace and nurture individual identities. Chris Garratt continued "By adopting a &lsquo;house of brands' hierarchy from the outset, Housing Plus has sent out a strong message to prospective strategic partners".</p> <p>Bang handled all aspects of work for the redevelopment of the three brands, including research, brand creation, naming, positioning, internal branding and communications, advertising, the brand launches, building the brands' on-line presence and the creation of a powerful brand film &ndash; which is already attracting significant interest from across the sector.</p> [contentOnline] => 1 [contentAllowComments] => 0 [contentDateCreated] => 1265285940 [categoryId] => 8 [categoryTitle] => News [categoryAbstract] => <p>The world at Bang Marketing moves fast, keep up to date w [categorySlug] => news [categoryIsSpecial] => 0 [categoryOnline] => 1 [categoryDateCreated] => 1265283717 ) I need a way that I can get all the content images associated with the same content title in one group and then display under the content title. Can anyone help?

    Read the article

  • Agile Development

    - by James Oloo Onyango
    Alot of literature has and is being written about agile developement and its surrounding philosophies. In my quest to find the best way to express the importance of agile methodologies, i have found Robert C. Martin's "A Satire Of Two Companies" to be both the most concise and thorough! Enjoy the read! Rufus Inc Project Kick Off Your name is Bob. The date is January 3, 2001, and your head still aches from the recent millennial revelry. You are sitting in a conference room with several managers and a group of your peers. You are a project team leader. Your boss is there, and he has brought along all of his team leaders. His boss called the meeting. "We have a new project to develop," says your boss's boss. Call him BB. The points in his hair are so long that they scrape the ceiling. Your boss's points are just starting to grow, but he eagerly awaits the day when he can leave Brylcream stains on the acoustic tiles. BB describes the essence of the new market they have identified and the product they want to develop to exploit this market. "We must have this new project up and working by fourth quarter October 1," BB demands. "Nothing is of higher priority, so we are cancelling your current project." The reaction in the room is stunned silence. Months of work are simply going to be thrown away. Slowly, a murmur of objection begins to circulate around the conference table.   His points give off an evil green glow as BB meets the eyes of everyone in the room. One by one, that insidious stare reduces each attendee to quivering lumps of protoplasm. It is clear that he will brook no discussion on this matter. Once silence has been restored, BB says, "We need to begin immediately. How long will it take you to do the analysis?" You raise your hand. Your boss tries to stop you, but his spitwad misses you and you are unaware of his efforts.   "Sir, we can't tell you how long the analysis will take until we have some requirements." "The requirements document won't be ready for 3 or 4 weeks," BB says, his points vibrating with frustration. "So, pretend that you have the requirements in front of you now. How long will you require for analysis?" No one breathes. Everyone looks around to see whether anyone has some idea. "If analysis goes beyond April 1, we have a problem. Can you finish the analysis by then?" Your boss visibly gathers his courage: "We'll find a way, sir!" His points grow 3 mm, and your headache increases by two Tylenol. "Good." BB smiles. "Now, how long will it take to do the design?" "Sir," you say. Your boss visibly pales. He is clearly worried that his 3 mms are at risk. "Without an analysis, it will not be possible to tell you how long design will take." BB's expression shifts beyond austere.   "PRETEND you have the analysis already!" he says, while fixing you with his vacant, beady little eyes. "How long will it take you to do the design?" Two Tylenol are not going to cut it. Your boss, in a desperate attempt to save his new growth, babbles: "Well, sir, with only six months left to complete the project, design had better take no longer than 3 months."   "I'm glad you agree, Smithers!" BB says, beaming. Your boss relaxes. He knows his points are secure. After a while, he starts lightly humming the Brylcream jingle. BB continues, "So, analysis will be complete by April 1, design will be complete by July 1, and that gives you 3 months to implement the project. This meeting is an example of how well our new consensus and empowerment policies are working. Now, get out there and start working. I'll expect to see TQM plans and QIT assignments on my desk by next week. Oh, and don't forget that your crossfunctional team meetings and reports will be needed for next month's quality audit." "Forget the Tylenol," you think to yourself as you return to your cubicle. "I need bourbon."   Visibly excited, your boss comes over to you and says, "Gosh, what a great meeting. I think we're really going to do some world shaking with this project." You nod in agreement, too disgusted to do anything else. "Oh," your boss continues, "I almost forgot." He hands you a 30-page document. "Remember that the SEI is coming to do an evaluation next week. This is the evaluation guide. You need to read through it, memorize it, and then shred it. It tells you how to answer any questions that the SEI auditors ask you. It also tells you what parts of the building you are allowed to take them to and what parts to avoid. We are determined to be a CMM level 3 organization by June!"   You and your peers start working on the analysis of the new project. This is difficult because you have no requirements. But from the 10-minute introduction given by BB on that fateful morning, you have some idea of what the product is supposed to do.   Corporate process demands that you begin by creating a use case document. You and your team begin enumerating use cases and drawing oval and stick diagrams. Philosophical debates break out among the team members. There is disagreement as to whether certain use cases should be connected with <<extends>> or <<includes>> relationships. Competing models are created, but nobody knows how to evaluate them. The debate continues, effectively paralyzing progress.   After a week, somebody finds the iceberg.com Web site, which recommends disposing entirely of <<extends>> and <<includes>> and replacing them with <<precedes>> and <<uses>>. The documents on this Web site, authored by Don Sengroiux, describes a method known as stalwart-analysis, which claims to be a step-by-step method for translating use cases into design diagrams. More competing use case models are created using this new scheme, but again, people can't agree on how to evaluate them. The thrashing continues. More and more, the use case meetings are driven by emotion rather than by reason. If it weren't for the fact that you don't have requirements, you'd be pretty upset by the lack of progress you are making. The requirements document arrives on February 15. And then again on February 20, 25, and every week thereafter. Each new version contradicts the previous one. Clearly, the marketing folks who are writing the requirements, empowered though they might be, are not finding consensus.   At the same time, several new competing use case templates have been proposed by the various team members. Each template presents its own particularly creative way of delaying progress. The debates rage on. On March 1, Prudence Putrigence, the process proctor, succeeds in integrating all the competing use case forms and templates into a single, all-encompassing form. Just the blank form is 15 pages long. She has managed to include every field that appeared on all the competing templates. She also presents a 159- page document describing how to fill out the use case form. All current use cases must be rewritten according to the new standard.   You marvel to yourself that it now requires 15 pages of fill-in-the-blank and essay questions to answer the question: What should the system do when the user presses Return? The corporate process (authored by L. E. Ott, famed author of "Holistic Analysis: A Progressive Dialectic for Software Engineers") insists that you discover all primary use cases, 87 percent of all secondary use cases, and 36.274 percent of all tertiary use cases before you can complete analysis and enter the design phase. You have no idea what a tertiary use case is. So in an attempt to meet this requirement, you try to get your use case document reviewed by the marketing department, which you hope will know what a tertiary use case is.   Unfortunately, the marketing folks are too busy with sales support to talk to you. Indeed, since the project started, you have not been able to get a single meeting with marketing, which has provided a never-ending stream of changing and contradictory requirements documents.   While one team has been spinning endlessly on the use case document, another team has been working out the domain model. Endless variations of UML documents are pouring out of this team. Every week, the model is reworked.   The team members can't decide whether to use <<interfaces>> or <<types>> in the model. A huge disagreement has been raging on the proper syntax and application of OCL. Others on the team just got back from a 5-day class on catabolism, and have been producing incredibly detailed and arcane diagrams that nobody else can fathom.   On March 27, with one week to go before analysis is to be complete, you have produced a sea of documents and diagrams but are no closer to a cogent analysis of the problem than you were on January 3. **** And then, a miracle happens.   **** On Saturday, April 1, you check your e-mail from home. You see a memo from your boss to BB. It states unequivocally that you are done with the analysis! You phone your boss and complain. "How could you have told BB that we were done with the analysis?" "Have you looked at a calendar lately?" he responds. "It's April 1!" The irony of that date does not escape you. "But we have so much more to think about. So much more to analyze! We haven't even decided whether to use <<extends>> or <<precedes>>!" "Where is your evidence that you are not done?" inquires your boss, impatiently. "Whaaa . . . ." But he cuts you off. "Analysis can go on forever; it has to be stopped at some point. And since this is the date it was scheduled to stop, it has been stopped. Now, on Monday, I want you to gather up all existing analysis materials and put them into a public folder. Release that folder to Prudence so that she can log it in the CM system by Monday afternoon. Then get busy and start designing."   As you hang up the phone, you begin to consider the benefits of keeping a bottle of bourbon in your bottom desk drawer. They threw a party to celebrate the on-time completion of the analysis phase. BB gave a colon-stirring speech on empowerment. And your boss, another 3 mm taller, congratulated his team on the incredible show of unity and teamwork. Finally, the CIO takes the stage to tell everyone that the SEI audit went very well and to thank everyone for studying and shredding the evaluation guides that were passed out. Level 3 now seems assured and will be awarded by June. (Scuttlebutt has it that managers at the level of BB and above are to receive significant bonuses once the SEI awards level 3.)   As the weeks flow by, you and your team work on the design of the system. Of course, you find that the analysis that the design is supposedly based on is flawedno, useless; no, worse than useless. But when you tell your boss that you need to go back and work some more on the analysis to shore up its weaker sections, he simply states, "The analysis phase is over. The only allowable activity is design. Now get back to it."   So, you and your team hack the design as best you can, unsure of whether the requirements have been properly analyzed. Of course, it really doesn't matter much, since the requirements document is still thrashing with weekly revisions, and the marketing department still refuses to meet with you.     The design is a nightmare. Your boss recently misread a book named The Finish Line in which the author, Mark DeThomaso, blithely suggested that design documents should be taken down to code-level detail. "If we are going to be working at that level of detail," you ask, "why don't we simply write the code instead?" "Because then you wouldn't be designing, of course. And the only allowable activity in the design phase is design!" "Besides," he continues, "we have just purchased a companywide license for Dandelion! This tool enables 'Round the Horn Engineering!' You are to transfer all design diagrams into this tool. It will automatically generate our code for us! It will also keep the design diagrams in sync with the code!" Your boss hands you a brightly colored shrinkwrapped box containing the Dandelion distribution. You accept it numbly and shuffle off to your cubicle. Twelve hours, eight crashes, one disk reformatting, and eight shots of 151 later, you finally have the tool installed on your server. You consider the week your team will lose while attending Dandelion training. Then you smile and think, "Any week I'm not here is a good week." Design diagram after design diagram is created by your team. Dandelion makes it very difficult to draw these diagrams. There are dozens and dozens of deeply nested dialog boxes with funny text fields and check boxes that must all be filled in correctly. And then there's the problem of moving classes between packages. At first, these diagram are driven from the use cases. But the requirements are changing so often that the use cases rapidly become meaningless. Debates rage about whether VISITOR or DECORATOR design patterns should be used. One developer refuses to use VISITOR in any form, claiming that it's not a properly object-oriented construct. Someone refuses to use multiple inheritance, since it is the spawn of the devil. Review meetings rapidly degenerate into debates about the meaning of object orientation, the definition of analysis versus design, or when to use aggregation versus association. Midway through the design cycle, the marketing folks announce that they have rethought the focus of the system. Their new requirements document is completely restructured. They have eliminated several major feature areas and replaced them with feature areas that they anticipate customer surveys will show to be more appropriate. You tell your boss that these changes mean that you need to reanalyze and redesign much of the system. But he says, "The analysis phase is system. But he says, "The analysis phase is over. The only allowable activity is design. Now get back to it."   You suggest that it might be better to create a simple prototype to show to the marketing folks and even some potential customers. But your boss says, "The analysis phase is over. The only allowable activity is design. Now get back to it." Hack, hack, hack, hack. You try to create some kind of a design document that might reflect the new requirements documents. However, the revolution of the requirements has not caused them to stop thrashing. Indeed, if anything, the wild oscillations of the requirements document have only increased in frequency and amplitude.   You slog your way through them.   On June 15, the Dandelion database gets corrupted. Apparently, the corruption has been progressive. Small errors in the DB accumulated over the months into bigger and bigger errors. Eventually, the CASE tool just stopped working. Of course, the slowly encroaching corruption is present on all the backups. Calls to the Dandelion technical support line go unanswered for several days. Finally, you receive a brief e-mail from Dandelion, informing you that this is a known problem and that the solution is to purchase the new version, which they promise will be ready some time next quarter, and then reenter all the diagrams by hand.   ****   Then, on July 1 another miracle happens! You are done with the design!   Rather than go to your boss and complain, you stock your middle desk drawer with some vodka.   **** They threw a party to celebrate the on-time completion of the design phase and their graduation to CMM level 3. This time, you find BB's speech so stirring that you have to use the restroom before it begins. New banners and plaques are all over your workplace. They show pictures of eagles and mountain climbers, and they talk about teamwork and empowerment. They read better after a few scotches. That reminds you that you need to clear out your file cabinet to make room for the brandy. You and your team begin to code. But you rapidly discover that the design is lacking in some significant areas. Actually, it's lacking any significance at all. You convene a design session in one of the conference rooms to try to work through some of the nastier problems. But your boss catches you at it and disbands the meeting, saying, "The design phase is over. The only allowable activity is coding. Now get back to it."   ****   The code generated by Dandelion is really hideous. It turns out that you and your team were using association and aggregation the wrong way, after all. All the generated code has to be edited to correct these flaws. Editing this code is extremely difficult because it has been instrumented with ugly comment blocks that have special syntax that Dandelion needs in order to keep the diagrams in sync with the code. If you accidentally alter one of these comments, the diagrams will be regenerated incorrectly. It turns out that "Round the Horn Engineering" requires an awful lot of effort. The more you try to keep the code compatible with Dandelion, the more errors Dandelion generates. In the end, you give up and decide to keep the diagrams up to date manually. A second later, you decide that there's no point in keeping the diagrams up to date at all. Besides, who has time?   Your boss hires a consultant to build tools to count the number of lines of code that are being produced. He puts a big thermometer graph on the wall with the number 1,000,000 on the top. Every day, he extends the red line to show how many lines have been added. Three days after the thermometer appears on the wall, your boss stops you in the hall. "That graph isn't growing quickly enough. We need to have a million lines done by October 1." "We aren't even sh-sh-sure that the proshect will require a m-million linezh," you blather. "We have to have a million lines done by October 1," your boss reiterates. His points have grown again, and the Grecian formula he uses on them creates an aura of authority and competence. "Are you sure your comment blocks are big enough?" Then, in a flash of managerial insight, he says, "I have it! I want you to institute a new policy among the engineers. No line of code is to be longer than 20 characters. Any such line must be split into two or more preferably more. All existing code needs to be reworked to this standard. That'll get our line count up!"   You decide not to tell him that this will require two unscheduled work months. You decide not to tell him anything at all. You decide that intravenous injections of pure ethanol are the only solution. You make the appropriate arrangements. Hack, hack, hack, and hack. You and your team madly code away. By August 1, your boss, frowning at the thermometer on the wall, institutes a mandatory 50-hour workweek.   Hack, hack, hack, and hack. By September 1st, the thermometer is at 1.2 million lines and your boss asks you to write a report describing why you exceeded the coding budget by 20 percent. He institutes mandatory Saturdays and demands that the project be brought back down to a million lines. You start a campaign of remerging lines. Hack, hack, hack, and hack. Tempers are flaring; people are quitting; QA is raining trouble reports down on you. Customers are demanding installation and user manuals; salespeople are demanding advance demonstrations for special customers; the requirements document is still thrashing, the marketing folks are complaining that the product isn't anything like they specified, and the liquor store won't accept your credit card anymore. Something has to give.    On September 15, BB calls a meeting. As he enters the room, his points are emitting clouds of steam. When he speaks, the bass overtones of his carefully manicured voice cause the pit of your stomach to roll over. "The QA manager has told me that this project has less than 50 percent of the required features implemented. He has also informed me that the system crashes all the time, yields wrong results, and is hideously slow. He has also complained that he cannot keep up with the continuous train of daily releases, each more buggy than the last!" He stops for a few seconds, visibly trying to compose himself. "The QA manager estimates that, at this rate of development, we won't be able to ship the product until December!" Actually, you think it's more like March, but you don't say anything. "December!" BB roars with such derision that people duck their heads as though he were pointing an assault rifle at them. "December is absolutely out of the question. Team leaders, I want new estimates on my desk in the morning. I am hereby mandating 65-hour work weeks until this project is complete. And it better be complete by November 1."   As he leaves the conference room, he is heard to mutter: "Empowermentbah!" * * * Your boss is bald; his points are mounted on BB's wall. The fluorescent lights reflecting off his pate momentarily dazzle you. "Do you have anything to drink?" he asks. Having just finished your last bottle of Boone's Farm, you pull a bottle of Thunderbird from your bookshelf and pour it into his coffee mug. "What's it going to take to get this project done? " he asks. "We need to freeze the requirements, analyze them, design them, and then implement them," you say callously. "By November 1?" your boss exclaims incredulously. "No way! Just get back to coding the damned thing." He storms out, scratching his vacant head.   A few days later, you find that your boss has been transferred to the corporate research division. Turnover has skyrocketed. Customers, informed at the last minute that their orders cannot be fulfilled on time, have begun to cancel their orders. Marketing is re-evaluating whether this product aligns with the overall goals of the company. Memos fly, heads roll, policies change, and things are, overall, pretty grim. Finally, by March, after far too many sixty-five hour weeks, a very shaky version of the software is ready. In the field, bug-discovery rates are high, and the technical support staff are at their wits' end, trying to cope with the complaints and demands of the irate customers. Nobody is happy.   In April, BB decides to buy his way out of the problem by licensing a product produced by Rupert Industries and redistributing it. The customers are mollified, the marketing folks are smug, and you are laid off.     Rupert Industries: Project Alpha   Your name is Robert. The date is January 3, 2001. The quiet hours spent with your family this holiday have left you refreshed and ready for work. You are sitting in a conference room with your team of professionals. The manager of the division called the meeting. "We have some ideas for a new project," says the division manager. Call him Russ. He is a high-strung British chap with more energy than a fusion reactor. He is ambitious and driven but understands the value of a team. Russ describes the essence of the new market opportunity the company has identified and introduces you to Jane, the marketing manager, who is responsible for defining the products that will address it. Addressing you, Jane says, "We'd like to start defining our first product offering as soon as possible. When can you and your team meet with me?" You reply, "We'll be done with the current iteration of our project this Friday. We can spare a few hours for you between now and then. After that, we'll take a few people from the team and dedicate them to you. We'll begin hiring their replacements and the new people for your team immediately." "Great," says Russ, "but I want you to understand that it is critical that we have something to exhibit at the trade show coming up this July. If we can't be there with something significant, we'll lose the opportunity."   "I understand," you reply. "I don't yet know what it is that you have in mind, but I'm sure we can have something by July. I just can't tell you what that something will be right now. In any case, you and Jane are going to have complete control over what we developers do, so you can rest assured that by July, you'll have the most important things that can be accomplished in that time ready to exhibit."   Russ nods in satisfaction. He knows how this works. Your team has always kept him advised and allowed him to steer their development. He has the utmost confidence that your team will work on the most important things first and will produce a high-quality product.   * * *   "So, Robert," says Jane at their first meeting, "How does your team feel about being split up?" "We'll miss working with each other," you answer, "but some of us were getting pretty tired of that last project and are looking forward to a change. So, what are you people cooking up?" Jane beams. "You know how much trouble our customers currently have . . ." And she spends a half hour or so describing the problem and possible solution. "OK, wait a second" you respond. "I need to be clear about this." And so you and Jane talk about how this system might work. Some of her ideas aren't fully formed. You suggest possible solutions. She likes some of them. You continue discussing.   During the discussion, as each new topic is addressed, Jane writes user story cards. Each card represents something that the new system has to do. The cards accumulate on the table and are spread out in front of you. Both you and Jane point at them, pick them up, and make notes on them as you discuss the stories. The cards are powerful mnemonic devices that you can use to represent complex ideas that are barely formed.   At the end of the meeting, you say, "OK, I've got a general idea of what you want. I'm going to talk to the team about it. I imagine they'll want to run some experiments with various database structures and presentation formats. Next time we meet, it'll be as a group, and we'll start identifying the most important features of the system."   A week later, your nascent team meets with Jane. They spread the existing user story cards out on the table and begin to get into some of the details of the system. The meeting is very dynamic. Jane presents the stories in the order of their importance. There is much discussion about each one. The developers are concerned about keeping the stories small enough to estimate and test. So they continually ask Jane to split one story into several smaller stories. Jane is concerned that each story have a clear business value and priority, so as she splits them, she makes sure that this stays true.   The stories accumulate on the table. Jane writes them, but the developers make notes on them as needed. Nobody tries to capture everything that is said; the cards are not meant to capture everything but are simply reminders of the conversation.   As the developers become more comfortable with the stories, they begin writing estimates on them. These estimates are crude and budgetary, but they give Jane an idea of what the story will cost.   At the end of the meeting, it is clear that many more stories could be discussed. It is also clear that the most important stories have been addressed and that they represent several months worth of work. Jane closes the meeting by taking the cards with her and promising to have a proposal for the first release in the morning.   * * *   The next morning, you reconvene the meeting. Jane chooses five cards and places them on the table. "According to your estimates, these cards represent about one perfect team-week's worth of work. The last iteration of the previous project managed to get one perfect team-week done in 3 real weeks. If we can get these five stories done in 3 weeks, we'll be able to demonstrate them to Russ. That will make him feel very comfortable about our progress." Jane is pushing it. The sheepish look on her face lets you know that she knows it too. You reply, "Jane, this is a new team, working on a new project. It's a bit presumptuous to expect that our velocity will be the same as the previous team's. However, I met with the team yesterday afternoon, and we all agreed that our initial velocity should, in fact, be set to one perfectweek for every 3 real-weeks. So you've lucked out on this one." "Just remember," you continue, "that the story estimates and the story velocity are very tentative at this point. We'll learn more when we plan the iteration and even more when we implement it."   Jane looks over her glasses at you as if to say "Who's the boss around here, anyway?" and then smiles and says, "Yeah, don't worry. I know the drill by now."Jane then puts 15 more cards on the table. She says, "If we can get all these cards done by the end of March, we can turn the system over to our beta test customers. And we'll get good feedback from them."   You reply, "OK, so we've got our first iteration defined, and we have the stories for the next three iterations after that. These four iterations will make our first release."   "So," says Jane, can you really do these five stories in the next 3 weeks?" "I don't know for sure, Jane," you reply. "Let's break them down into tasks and see what we get."   So Jane, you, and your team spend the next several hours taking each of the five stories that Jane chose for the first iteration and breaking them down into small tasks. The developers quickly realize that some of the tasks can be shared between stories and that other tasks have commonalities that can probably be taken advantage of. It is clear that potential designs are popping into the developers' heads. From time to time, they form little discussion knots and scribble UML diagrams on some cards.   Soon, the whiteboard is filled with the tasks that, once completed, will implement the five stories for this iteration. You start the sign-up process by saying, "OK, let's sign up for these tasks." "I'll take the initial database generation." Says Pete. "That's what I did on the last project, and this doesn't look very different. I estimate it at two of my perfect workdays." "OK, well, then, I'll take the login screen," says Joe. "Aw, darn," says Elaine, the junior member of the team, "I've never done a GUI, and kinda wanted to try that one."   "Ah, the impatience of youth," Joe says sagely, with a wink in your direction. "You can assist me with it, young Jedi." To Jane: "I think it'll take me about three of my perfect workdays."   One by one, the developers sign up for tasks and estimate them in terms of their own perfect workdays. Both you and Jane know that it is best to let the developers volunteer for tasks than to assign the tasks to them. You also know full well that you daren't challenge any of the developers' estimates. You know these people, and you trust them. You know that they are going to do the very best they can.   The developers know that they can't sign up for more perfect workdays than they finished in the last iteration they worked on. Once each developer has filled his or her schedule for the iteration, they stop signing up for tasks.   Eventually, all the developers have stopped signing up for tasks. But, of course, tasks are still left on the board.   "I was worried that that might happen," you say, "OK, there's only one thing to do, Jane. We've got too much to do in this iteration. What stories or tasks can we remove?" Jane sighs. She knows that this is the only option. Working overtime at the beginning of a project is insane, and projects where she's tried it have not fared well.   So Jane starts to remove the least-important functionality. "Well, we really don't need the login screen just yet. We can simply start the system in the logged-in state." "Rats!" cries Elaine. "I really wanted to do that." "Patience, grasshopper." says Joe. "Those who wait for the bees to leave the hive will not have lips too swollen to relish the honey." Elaine looks confused. Everyone looks confused. "So . . .," Jane continues, "I think we can also do away with . . ." And so, bit by bit, the list of tasks shrinks. Developers who lose a task sign up for one of the remaining ones.   The negotiation is not painless. Several times, Jane exhibits obvious frustration and impatience. Once, when tensions are especially high, Elaine volunteers, "I'll work extra hard to make up some of the missing time." You are about to correct her when, fortunately, Joe looks her in the eye and says, "When once you proceed down the dark path, forever will it dominate your destiny."   In the end, an iteration acceptable to Jane is reached. It's not what Jane wanted. Indeed, it is significantly less. But it's something the team feels that can be achieved in the next 3 weeks.   And, after all, it still addresses the most important things that Jane wanted in the iteration. "So, Jane," you say when things had quieted down a bit, "when can we expect acceptance tests from you?" Jane sighs. This is the other side of the coin. For every story the development team implements,   Jane must supply a suite of acceptance tests that prove that it works. And the team needs these long before the end of the iteration, since they will certainly point out differences in the way Jane and the developers imagine the system's behaviour.   "I'll get you some example test scripts today," Jane promises. "I'll add to them every day after that. You'll have the entire suite by the middle of the iteration."   * * *   The iteration begins on Monday morning with a flurry of Class, Responsibilities, Collaborators sessions. By midmorning, all the developers have assembled into pairs and are rapidly coding away. "And now, my young apprentice," Joe says to Elaine, "you shall learn the mysteries of test-first design!"   "Wow, that sounds pretty rad," Elaine replies. "How do you do it?" Joe beams. It's clear that he has been anticipating this moment. "OK, what does the code do right now?" "Huh?" replied Elaine, "It doesn't do anything at all; there is no code."   "So, consider our task; can you think of something the code should do?" "Sure," Elaine said with youthful assurance, "First, it should connect to the database." "And thereupon, what must needs be required to connecteth the database?" "You sure talk weird," laughed Elaine. "I think we'd have to get the database object from some registry and call the Connect() method. "Ah, astute young wizard. Thou perceives correctly that we requireth an object within which we can cacheth the database object." "Is 'cacheth' really a word?" "It is when I say it! So, what test can we write that we know the database registry should pass?" Elaine sighs. She knows she'll just have to play along. "We should be able to create a database object and pass it to the registry in a Store() method. And then we should be able to pull it out of the registry with a Get() method and make sure it's the same object." "Oh, well said, my prepubescent sprite!" "Hay!" "So, now, let's write a test function that proves your case." "But shouldn't we write the database object and registry object first?" "Ah, you've much to learn, my young impatient one. Just write the test first." "But it won't even compile!" "Are you sure? What if it did?" "Uh . . ." "Just write the test, Elaine. Trust me." And so Joe, Elaine, and all the other developers began to code their tasks, one test case at a time. The room in which they worked was abuzz with the conversations between the pairs. The murmur was punctuated by an occasional high five when a pair managed to finish a task or a difficult test case.   As development proceeded, the developers changed partners once or twice a day. Each developer got to see what all the others were doing, and so knowledge of the code spread generally throughout the team.   Whenever a pair finished something significant whether a whole task or simply an important part of a task they integrated what they had with the rest of the system. Thus, the code base grew daily, and integration difficulties were minimized.   The developers communicated with Jane on a daily basis. They'd go to her whenever they had a question about the functionality of the system or the interpretation of an acceptance test case.   Jane, good as her word, supplied the team with a steady stream of acceptance test scripts. The team read these carefully and thereby gained a much better understanding of what Jane expected the system to do. By the beginning of the second week, there was enough functionality to demonstrate to Jane. She watched eagerly as the demonstration passed test case after test case. "This is really cool," Jane said as the demonstration finally ended. "But this doesn't seem like one-third of the tasks. Is your velocity slower than anticipated?"   You grimace. You'd been waiting for a good time to mention this to Jane but now she was forcing the issue. "Yes, unfortunately, we are going more slowly than we had expected. The new application server we are using is turning out to be a pain to configure. Also, it takes forever to reboot, and we have to reboot it whenever we make even the slightest change to its configuration."   Jane eyes you with suspicion. The stress of last Monday's negotiations had still not entirely dissipated. She says, "And what does this mean to our schedule? We can't slip it again, we just can't. Russ will have a fit! He'll haul us all into the woodshed and ream us some new ones."   You look Jane right in the eyes. There's no pleasant way to give someone news like this. So you just blurt out, "Look, if things keep going like they're going, we're not going to be done with everything by next Friday. Now it's possible that we'll figure out a way to go faster. But, frankly, I wouldn't depend on that. You should start thinking about one or two tasks that could be removed from the iteration without ruining the demonstration for Russ. Come hell or high water, we are going to give that demonstration on Friday, and I don't think you want us to choose which tasks to omit."   "Aw forchrisakes!" Jane barely manages to stifle yelling that last word as she stalks away, shaking her head. Not for the first time, you say to yourself, "Nobody ever promised me project management would be easy." You are pretty sure it won't be the last time, either.   Actually, things went a bit better than you had hoped. The team did, in fact, have to drop one task from the iteration, but Jane had chosen wisely, and the demonstration for Russ went without a hitch. Russ was not impressed with the progress, but neither was he dismayed. He simply said, "This is pretty good. But remember, we have to be able to demonstrate this system at the trade show in July, and at this rate, it doesn't look like you'll have all that much to show." Jane, whose attitude had improved dramatically with the completion of the iteration, responded to Russ by saying, "Russ, this team is working hard, and well. When July comes around, I am confident that we'll have something significant to demonstrate. It won't be everything, and some of it may be smoke and mirrors, but we'll have something."   Painful though the last iteration was, it had calibrated your velocity numbers. The next iteration went much better. Not because your team got more done than in the last iteration but simply because the team didn't have to remove any tasks or stories in the middle of the iteration.   By the start of the fourth iteration, a natural rhythm has been established. Jane, you, and the team know exactly what to expect from one another. The team is running hard, but the pace is sustainable. You are confident that the team can keep up this pace for a year or more.   The number of surprises in the schedule diminishes to near zero; however, the number of surprises in the requirements does not. Jane and Russ frequently look over the growing system and make recommendations or changes to the existing functionality. But all parties realize that these changes take time and must be scheduled. So the changes do not cause anyone's expectations to be violated. In March, there is a major demonstration of the system to the board of directors. The system is very limited and is not yet in a form good enough to take to the trade show, but progress is steady, and the board is reasonably impressed.   The second release goes even more smoothly than the first. By now, the team has figured out a way to automate Jane's acceptance test scripts. The team has also refactored the design of the system to the point that it is really easy to add new features and change old ones. The second release was done by the end of June and was taken to the trade show. It had less in it than Jane and Russ would have liked, but it did demonstrate the most important features of the system. Although customers at the trade show noticed that certain features were missing, they were very impressed overall. You, Russ, and Jane all returned from the trade show with smiles on your faces. You all felt as though this project was a winner.   Indeed, many months later, you are contacted by Rufus Inc. That company had been working on a system like this for its internal operations. Rufus has canceled the development of that system after a death-march project and is negotiating to license your technology for its environment.   Indeed, things are looking up!

    Read the article

< Previous Page | 24 25 26 27 28