Search Results

Search found 59278 results on 2372 pages for 'time estimation'.

Page 33/2372 | < Previous Page | 29 30 31 32 33 34 35 36 37 38 39 40  | Next Page >

  • Ubuntu one changes 'Date modified' to time and date of sync

    - by Philippe
    I'm wondering why ubuntu one changes the date of the synced files. Instead of leaving the actual date and time of modification it updates the time and date to the sync time. So, e.g., if I change and save a file today at july 26 2 pm and I go home and sync my home-pc with u1 tomorrow at 10 the 'Date modified' of that file will reflect the syncdate which might be July 27, 10am. I don't like that behavior and I don't understand if this is a bug or if that is actually intended?

    Read the article

  • Time tracking and payment registration architecture

    - by egis
    ?itle might be a little bit incorrect. :) Anyway, I'm building a software where employees input time they worked per day (work hours) and employer "pays" for this time. "Payment" is done outside this system, so employer just "confirms" (checkbox or something like this) which work hours are paid. So the question is - what is the best way (both UI and data storage wise) to implement this? At the moment I have this idea: Employee selects week and manually (with some Javascript helpers, like "fill the same time for all days") inputs work hours in every day of the week. Employer confirms payment the same way employee inputs data (selects week, confirms each day). Data is saved in DB as unix timestamp (one day per table row). Problem is 14 inputs (7 days * ("hours from" + "hours to" input), yet this approach seems kinda easy to implement. Maybe I'm overlooking something and this can be done differently and better? Maybe someone has any example of already working software?

    Read the article

  • Increasing speed of circle over time as linear with Box2d

    - by Whispered
    Assume that there is a circle and it can be moved by using keyboard arrows.Is required that increasing speed over time like increasing car speed. For example; max speed is 25 and time to reach max speed shall be 5 sec. Over 5 sec the speed will reach to max speed. Does Box2d handle that situation?. I tried setting linear valocity but it seems to make the circle have constant speed instead of increased speed over time. Thank You! Note: I'm using Box2DWeb Javascript port of Box2D.

    Read the article

  • New Time Zone Patch DST V18 is available

    - by Mike Dietrich
    Sorry for not updating the blog more often at the moment - but more updates will come soon as I play around with Oracle Restart and single instance databases in ASM with Oracle 11.2. Just on the side there's a new time zone patch to DST V18 available since May 2012. You can download it via PATCH download from MOS with the patch number: 13417321 What do you think? Will Lufthansa operate a faster jet the other night? Will the jet stream be more powerful? Or a better type of fuel? Or is it just the travel portal which hasn't applied the correct time zone patches to catch DST change that night in the US whereas it happens two weeks later in Europe? Guess ... And please see the readme about how to apply the patch and our slides about why time zone patching may be important even in your environment RDBMS bug: Bug 13417321: DST 18 : HALF YEARLY DST PATCHES, MAY 2012 OJVM Bug 14112098 - dst changes for dstv18 (tzdata2012c) - need ojvm fix

    Read the article

  • Business Case for investing time developing Stubs and BizUnit Tests

    - by charlie.mott
    I was recently in a position where I had to justify why effort should be spent developing Stubbed Integration Tests for BizTalk solutions. These tests are usually developed using the BizUnit framework. I assumed that most seasoned BizTalk developers would consider this best practice. Even though Microsoft suggest use of BizUnit on MSDN, I've not found a single site listing the justifications for investing time writing stubs and BizUnit tests. Stubs Stubs should be developed to isolate your development team from external dependencies. This is described by Michael Stephenson here. Failing to do this can result in the following problems: In contract-first scenarios, the external system interface will have been defined.  But the interface may not have been setup or even developed yet for the BizTalk developers to work with. By the time you open the target location to see the data BizTalk has sent, it may have been swept away. If you are relying on the UI of the target system to see the data BizTalk has sent, what do you do if it fails to arrive? It may take time for the data to be processed or it may be scheduled to be processed later. Learning how to use the source\target systems and investigations into where things go wrong in these systems will slow down the BizTalk development effort. By the time the data is visible in a UI it may have undergone further transformations. In larger development teams working together, do you all use the same source and target instances. How do you know which data was created by whose tests? How do you know which event log error message are whose?  Another developer may have “cleaned up” your data. It is harder to write BizUnit tests that clean up the data\logs after each test run. What if your B2B partners' source or target system cannot support the sort of testing you want to do. They may not even have a development or test instance that you can work with. Their single test instance may be used by the SIT\UAT teams. There may be licencing costs of setting up an instances of the external system. The stubs I like to use are generic stubs that can accept\return any message type.  Usually I need to create one per protocol. They should be driven by BizUnit steps to: validates the data received; and select a response messages (or error response). Once built, they can be re-used for many integration tests and from project to project. I’m not saying that developers should never test against a real instance.  Every so often, you still need to connect to real developer or test instances of the source and target endpoints\services. The interface developers may ask you to send them some data to see if everything still works.  Or you might want some messages sent to BizTalk to get confidence that everything still works beyond BizTalk. Tests Automated “Stubbed Integration Tests” are usually built using the BizUnit framework. These facilitate testing of the entire integration process from source stub to target stub. It will ensure that all of the BizTalk components are configured together correctly to meet all the requirements. More fine grained unit testing of individual BizTalk components is still encouraged.  But BizUnit provides much the easiest way to test some components types (e.g. Orchestrations). Using BizUnit with the Behaviour Driven Development approach described by Mike Stephenson delivers the following benefits: source: http://biztalkbddsample.codeplex.com – Video 1. Requirements can be easily defined using Given/When/Then Requirements are close to the code so easier to manage as features and scenarios Requirements are defined in domain language The feature files can be used as part of the documentation The documentation is accurate to the build of code and can be published with a release The scenarios are effective to document the scenarios and are not over excessive The scenarios are maintained with the code There’s an abstraction between the intention and implementation of tests making them easier to understand The requirements drive the testing These same tests can also be used to drive load testing as described here. If you don't do this ... If you don't follow the above “Stubbed Integration Tests” approach, the developer will need to manually trigger the tests. This has the following risks: Developers are unlikely to check all the scenarios each time and all the expected conditions each time. After the developer leaves, these manual test steps may be lost. What test scenarios are there?  What test messages did they use for each scenario? There is no mechanism to prove adequate test coverage. A test team may attempt to automate integration test scenarios in a test environment through the triggering of tests from a source system UI. If this is a replacement for BizUnit tests, then this carries the following risks: It moves the tests downstream, so problems will be found later in the process. Testers may not check all the expected conditions within the BizTalk infrastructure such as: event logs, suspended messages, etc. These automated tests may also get in the way of manual tests run on these environments.

    Read the article

  • Balancing full time work and personal coding projects.

    - by pllee
    I am nearing the end of developing the major pieces of my website that I have been working on in my spare time for the last 3 months. My goal is to get it released by the end of next month and hopefully start making some money on it. Unfortunately the next step will be to write a lot of specific data handling and ui code that I can see becoming very tedious and boring. When I was first started the project I was able to find time for working on it easily, it was interesting and writing the back-end was new. Once I got to the start of writing stuff that I know and do at work (ui), it seemed harder and harder to make myself work on the project, sometimes the last thing I want to do when I get home from work is code again. Anyone in the same situation? Any tips on how to find time and effort for side projects without burning out? Any tips on staying on the right track?

    Read the article

  • Finding "spare time" in a day from within a list of events

    - by MFB
    I have a list of events which is always sorted chronologically. The start time is always followed by the end time. Times are strings formatted as 'HHmmss'. // list of events var events = [ '010000', // start '013000', // end... '053000', '060000', '161500', '184500'] // desired output var spares = [ '000000', // start '010000', // end... '013000', '053000', '060000', '161500', '184500', '235959'] How can I programmatically create a new list of "spare time" from 000000 to 235959? PS I'm trying to do this in Javascript, but any conceptual answer or pseudo code would be helpful too.

    Read the article

  • Google I/O 2010 - Writing real-time games for Android redux

    Google I/O 2010 - Writing real-time games for Android redux Google I/O 2010 - Writing real-time games for Android redux Android 201 Chris Pruett This session is a crash course in Android game development: everything you need to know to get started writing 2D and 3D games, as well as tips, tricks, and benchmarks to help your code reach optimal performance. In addition, we'll discuss hot topics related to game development, including hardware differences across devices, using C++ to write Android games, and the traits of the most popular games on Market. For all I/O 2010 sessions, please go to code.google.com From: GoogleDevelopers Views: 10 0 ratings Time: 58:57 More in Science & Technology

    Read the article

  • Avoiding lag when rendering Texture2D for first time

    - by Emir Lima
    I have found a similar question here, but it is about playing sounds. I am using 2048 x 2048 textures for sprite sheets and every time I call spriteBatch.Draw using a sheet for the first time in game execution, causes a considerable lag. The lag doesn't appears for the next times. Someone has faced this problem before? What can I do to overcome this? Update: I inserted a code in the end of content load routine that draws EVERY Texture2D that is loaded into ContentManager before follow to the game screen. This works well. None lag occurs when different textures are rendered over the time, EXCEPT if the IsFullScreen are changed. Apparently, changing this property makes the textures loaded in the GPU gone. Is that correct?

    Read the article

  • First frame has a much longer delta time than other frames

    - by Kipras
    I had a problem where my AI moved extreme at the first frame and then normal after that. I then figured out it was my delta. It's about 0.016 seconds (60 fps), but the first frame was about 19000 seconds, which is obviously impossible. Does anybody know what might be happening? Also the delta later on likes to oscillate from 0.01 to 0.03, which is, again, crazy. long time = Sys.getTime() * 1000 / Sys.getTimerResolution(); float delta = (time - lastFrame) / 1000f; lastFrame = time; return delta; That's the delta code.

    Read the article

  • Optimization of time-varying parameters

    - by brama
    I need to find an optimal set of "n" parameter values that minimize an objective function (a 2-hr simulation of a system). I have looked at genetic algorithm and simulated annealing methods, but was wondering if there are any better algorithms and guidance on their merits and limitations. With the above optimization methods I can find the optimal parameter values that hold true for the entire simulation duration. Incase, I want to find the optimal "time varying" parameter values (parameter values change with time during the 2-hr simulation), are there any methods/ideas other than making each time varying parameter value a variable to optimize? Any thoughts?

    Read the article

  • AS3 Calculating Delta Time In Seconds

    - by user1133079
    Here is how I've been trying to implement delta time based on different internet resources. var startTime:Number = getTimer(); game.Update(deltaTime); deltaTime = Number(getTimer() - startTime) * 0.001; My issue with this is it doesn't seem to be giving me accurate timing. The main update shows the frame time at 0.001 and when reinitializing the level it goes to 0.002. I'm using dt else where for a timer and later on time based physics so I would like it to work as expected. I must be missing something silly.

    Read the article

  • How to get the Time Difference in C# .net

    - by Aamir Hasan
    A DateTime instance stores both date and time information. The DateTime class can be found in the System namespace.In order to retrieve the current system time, we can use the static property Now of the DateTime class.In this Example i have shown, how to calculate the difference between two DateTime objects using C# syntax. DateTime startTime; DateTime endTime;            startTime = Convert.ToDateTime("12:12 AM");            endTime = Convert.ToDateTime("1:12 AM");            var timeDifference = new TimeSpan(endTime.Ticks - startTime.Ticks);Response.Write("Time difference in hours is " + timeDifference.Hours);Link:http://msdn.microsoft.com/en-us/library/8kb3ddd4.aspx

    Read the article

  • What is the effect of creating unit tests during development on time to develop as well as time spent in maintenance activities?

    - by jgauffin
    I'm a consultant and I am going to introduce unit tests to all developers at my client site. My goal is to ensure that all new applications should have unit tests for all classes created. The client has a problem with high maintenance costs from fixing bugs in their existing applications. Their applications have a life span from between 5-15 years in which they continuously add new features. I'm quite confident that they will benefit greatly from starting with unit tests. I'm interested in the effect of unit tests on the time and cost of development: How much time will writing unit tests as part of the development process add? How much time will be saved in maintenance activities (testing and debugging) by having good unit tests?

    Read the article

  • Google Analytics and Whos.amung.us in realtime visitors, why such an enormous discrepancy?

    - by jacouh
    Since years I use in a site both Google Analytics and Whos.amung.us, both Google analytics and whos.amung.us javascripts are inserted in the same pages in the tracked part of the site. In real-time visitors, why such an enormous discrepancy ? for example at the moment, Google analytics gives me 9 visitors, whos.amung.us indicates 59, a ratio of 6 times? Why whos.amung.us is 6 times optimistic than Google Analytics in terms of the realtime visitors? Google whos.amung.us My question is: whos.amung.us does not detect robots while Google does? GA ignores visitors from some countries, not whos.amung.us? Some robots/bots execute whos.amung.us javascript for tracking? While no robots/bots can execute the tracking javascript provided by Google Analytics? To facilitate your analysis, I copy JS code used below: Google analytics: <script type="text/javascript"> var _gaq = _gaq || []; _gaq.push(['_setAccount', 'MyGaAccountNo']); _gaq.push(['_trackPageview']); (function() { var ga = document.createElement('script'); ga.type = 'text/javascript'; ga.async = true; ga.src = ('https:' == document.location.protocol ? 'https://ssl' : 'http://www') + '.google-analytics.com/ga.js'; var s = document.getElementsByTagName('script')[0]; s.parentNode.insertBefore(ga, s); })(); </script> Whos.amung.us: <script>var _wau = _wau || []; _wau.push(["tab", "MyWAUAccountNo", "c6x", "right-upper"]);(function() { var s=document.createElement("script"); s.async=true; s.src="http://widgets.amung.us/tab.js";document.getElementsByTagName("head")[0].appendChild(s);})();</script> I've aleady signaled this to WAU staff some time ago, NR, I've not done this to Google as they don't handle this kind of feedback. Thank you for your explanations.

    Read the article

  • How to visualize timer functionality in sequence diagram?

    - by truthseeker
    I am developing software for communication with external device through serial port. To better understand the new functionality I am trying to display it in sequence diagram. Flow of events is as follows. I send to the device command to reset it. This is asynchronous operation so there is some delay between request and response (typically 100 ms). There can be case when the answer never comes (for example device is not connected to the specified port or is currently turned off). For this purpose I create a timer with period twice the maximum answer time. In my case it is 2 * 125 ms = 250 ms. If the answer comes in predefined time interval, I destroy already running timer. If the answer doesnt come in predefined interval, timer initiates some action. After this action we can destroy it. How to effectively model this situation in sequence diagram? Addendum 1: Based on advices made by scarfridge i drew following UML diagram. Comment by Ozair is also helpful for simplifying the diagram even more.

    Read the article

  • How do I dig myself out of this DEEP hole? [closed]

    - by user74847
    I may be a bit bias in the way i word this but any opinions and suggestions are welcome. I should start by saying i have a MSc in CS and a degree in new media +6 years expereince and im probably around a middleweight developer. I started a web development company with my friend from uni a year ago, there was a 4 month gap in the middle where i went miles away work on a big project. Ive since returned and picked up where we left off. A year on though i find im still staying up til 5am and getting up at 9 sometimes 2-3 days without sleep. While i was away i was working 9-5 and struggling to keep up with doing stuff for my clients 8 hours ahead, after work, so things stagnated. We currently have about 12 active projects, with one other part time developer and a full time freelancer who is dealing with one of our major projects. I am solely responsible for concurrently developing 2 big sites similar to gumtree in functionality, at the same time as about 5-6+ small WordPress based 5-10page sites. a lot of the content isnt in yet or the client is delaying so i chop and change project every other day which does my head in. Is it reasonable to expect myself to remember the intricate details of each project when i come back to it a week later? and remember the details of a task which hasnt been written down? my business partner seems to think so. or am i just forgetful? Im particularly bad at estimating timescales which doesnt help, added to that a lot of the technologies im am using are new to me (a magento site took weeks to theme rather than days and was full of bugs, even after 1000's of google searches and hours reading forums) im still trying to learn and find the best CMS for us to use and getting my head around the likes of Bootstrap and jquery, Cpanel / Linux (we just got a blank vps for me to set up with no experience) even installing an SSL certificate caused everyone's mail clients to go down which was more stress for me to sort out. I find the pressure of the workload and timescales and trying to learn this stuff so fast is beginning to turn me against my career path. The fact that i never seem to get anything done really winds up my business partner and iv come to associate him with the stress and pain of the whole situation especially when I get berated or a look that says "oh you retard" when I forget something. Even today i spent hours learning how a particular themeforest theme worked with wordpress and how i could twist it to work for our partiuclar needs, on the surface had done no work, that triggered a 30 minute tirade of anger and stress and questioning what i had done from my business partner. had i taken too long to work on that? shoudl i have done it in 2 hours instead of 6? i told him i would take 2 hours. i was wrong. I feel like im running myself into the ground. My sleeping pattern has got so bad that when im working im half asleep and making mistakes, my eyes are constantly purple underneath, i literally fall asleep at my desk, its affecting my social life too, ive not slept more than lightly for the last year and grind through impossible code puzzles in my half sleep wich keeps me awake, when im already exhausted. plus the work is rushed and buggy when it does get done so drags on into the next project. I also procrastinate quite badly, pacing the livingroom, looking out the window when Im alone for three days straight in the flat and start to get cabin fever which means i do even less work and the negative feedback loop continues. I get told im the only one with the problem when i say that i cant work from home any more, and examples of other freelancers get brought up. an office wouldnt bring any extra cash in to the company but im convinced having that moving more than 2 meters away from my bed to go to "work" would get me working, at the moment i feel guilty like i should be working 24-7. It is important that we do all this work to raise enough cash to get our business to the next level but every month still feels like a struggle to pay the rent (there is about £20K coming in by Jan) and i have to borrow money from friends often to buy food or get a taxi to a meeting, so it is vital the money keeps coming in. (im also 20 mins late for nearly all meetings but thats a different issue) have you experienced anything similar? how can i deal with the issues ive raised? is it realistic to develop 10 sites at once? how can i improve my relationship with my business partner? do you struggle to work at home? how do you deal with that? i think if i dont get my life on track by feb i will seriously consider giving it all up, but that seems like such a waste. any ideas!!? i need help! Thanks.

    Read the article

  • Slide 2d Vector to destination over a period of time

    - by SchautDollar
    I am making a library of GUI controls for games I make with XNA. I am currently developing the library as I make a game so I can test the features and find errors/bugs and hopefully smash them right away. My current issue is on a slide feature I want to implement for my base class that all controls inherit. My goal is to get the control to slide to a specified point over a specified amount of time. Here is the #region containing the code #region Slide private bool sliding; private Vector2 endPoint; private float slideTimeLeft; private float speed; private bool wasEnabled; private Vector2 slideDirection; private float slideDistance; public void Slide(Vector2 startPoint, Vector2 endPoint, float slideTime) { this.location = startPoint; Slide(endPoint,slideTime); } public void Slide(Vector2 endPoint, float slideTime) { this.wasEnabled = this.enabled; this.enabled = false; this.sliding = true; Vector2 tempLength = endPoint - this.location; this.slideDistance = tempLength.Length(); //Was this.slideDistance = (float)Math.Sqrt(tempLength.LengthSquared()); this.speed = slideTime / this.slideDistance; this.endPoint = endPoint; this.slideTimeLeft = slideTime; } private void UpdateSlide(GameTime gameTime) { if (this.sliding) { this.slideTimeLeft -= gameTime.ElapsedGameTime.Milliseconds; if (this.slideTimeLeft >= 0 ) { if ((this.endPoint-this.location).Length() != 0){//Was if (this.endPoint.LengthSquared() > 0 || this.location.LengthSquared() > 0) { this.slideDirection = Vector2.Normalize(this.endPoint - this.location); } this.location += this.slideDirection * speed * gameTime.ElapsedGameTime.Milliseconds;//This is where I believe the issue is, but I'm not sure. It seems right to me... (Even though it doesn't work) } else { this.enabled = this.wasEnabled; this.location = this.endPoint;//After time, the controls position will get set to be the endpoint. this.sliding = false; } } } #endregion this.location is the location of the control elsewhere defined in the class. I have looked at this blog as a huge reference and have googled around quite and have looked on many forums but can't find anything that shows how to implement it. Please and Thanks for your time! EDIT: I have switched this line "this.location += this.slideDirection * speed * gameTime.ElapsedGameTime.Milliseconds;" several times to see what it does. My issue is getting the control to smoothly move to the end location. It moves after the time has expired, but It doesn't move other then that except flash in my face. EDIT2: I have used the first slide method with 3 parameters and it works except it doesn't do it in a period of time and once it gets to its destination, it starts moving randomly towards the previous location and the end location.

    Read the article

  • How to get short month names in Joda Time?

    - by Mr Morgan
    Hello Does anyone know if there's a method in Joda Time or Java itself which takes either an int or a String as an argument, e.g. 4 or "4" and gives the name of the month back in short format, i.e. JAN for January? I suppose long month names can be truncated and converted to upper case. Thanks Mr Morgan.

    Read the article

  • Is this the correct way to convert a UTC datetime string into localtime?

    - by Steve
    Is this the correct way to convert a UTC string into local time allowing for daylight savings? It looks ok to me but you never know :) import time UTC_STRING = "2010-03-25 02:00:00" stamp = time.mktime(time.strptime(UTC_STRING,"%Y-%m-%d %H:%M:%S")) stamp -= time.timezone now = time.localtime() if now[8] == 1: stamp += 60*60 elif now[8] == -1: stamp -= 60*60 print 'UTC: ', time.gmtime(stamp) print 'Local: ', time.localtime(stamp) --- Results from New Zealand (GMT+12 dst=1) --- UTC: (2010, 3, 25, 2, 0, 0, 3, 84, 0) Local: (2010, 3, 25, 15, 0, 0, 3, 84, 1)

    Read the article

  • How do you determine an acceptable response time for DB requests?

    - by qiq
    According to this discussion of Google App Engine on Hacker News, A DB (read) request takes over 100ms on the datastore. That's insane and unusable for about 90% of applications. How do you determine what is an acceptable response time for a DB read request? I have been using App Engine without noticing any issues with DB responsiveness. But, on the other hand, I'm not sure I would even know what to look for in that regard :)

    Read the article

< Previous Page | 29 30 31 32 33 34 35 36 37 38 39 40  | Next Page >