Search Results

Search found 11541 results on 462 pages for 'personal projects'.

Page 34/462 | < Previous Page | 30 31 32 33 34 35 36 37 38 39 40 41  | Next Page >

  • Subversion same revision for tagging or committing multiple projects

    - by cubanacan
    How to make tags for multiple projects within one revision? For example, if it needs to tag with the same name: svn copy svn://localhost/BigProject/Project1/trunk svn://localhost/BigProject/Project1/tags/1.0.0 --message "1.0.0" svn copy svn://localhost/BigProject/Project2/trunk svn://localhost/BigProject/Project2/tags/1.0.0 --message "1.0.0" ... svn copy svn://localhost/BigProject/ProjectX/trunk svn://localhost/BigProject/ProjectX/tags/1.0.0 --message "1.0.0" But that snippet makes X revisions. So, how to make just one revision or how to integrate all in one? Another question is, how to commit similar modifications within one revision? TIA

    Read the article

  • Multiple svn projects into one git repository?

    - by trondgzi
    Hi, I have started to use git-svn for some of my work to be able to do local commits. This works great for projects that use standard svn layout. Recently I started working on a Java project that is split into multiple connected modules (20-25), and each module have its own root folder in the same svn repo with its own trunk/branches/tags. svnrepo/ module-1 trunk branches tags module-N trunk branches tags I have cloned each and every module with git svn clone -s /path/to/svnrepo/module[1-N]. The "problem" is that when I want to do git svn rebase on all modules i have to do it N times. I have tried to do git svn clone /path/to/svnrepo/ do avoid doing the rebase operation N times, but that leaves me with a directory layout that is the same as in the svn repo. Is there a way that I can track all the trunks of all modules in one git repo? So that I get a directory layout like this within my git repository: module-1 module-2 module-N

    Read the article

  • Analyze VS2010 C# projects and report files on disk not part of the projects?

    - by Lasse V. Karlsen
    I discovered earlier tonight that files and folders I have removed from my C# projects are apparently still on disk, even though my Visual Studio Mercurial plugin seems to do a good job of deleting them when I delete them in Visual Studio. It must have hickuped when it came to these files. So I wondered... Does anyone have a script or similar, or know of something, that will look at my .csproj files and report extra files and folders on my disk that isn't part of the project files? I just want to clean up my repository contents.

    Read the article

  • Approaches to a week long camp programming course (tips & projects)

    - by Good Person
    I will be teaching a week long programming course to kids between the ages of 11-18. Most of the kids have no programming experience. I'm looking for two things 1) General tips for teaching a camp class (how to make it fun when explaining the difference between int and float) 2) Interesting projects that the kids will be able to complete by the end of the week. Unfortunately the language I'll be required to use is either c++ or Java which means that I'll need to spend more time on itty bitty details than I'd like in a week long course. I feel more competent in c++ than in Java. However if someone can show me that Java is much easier to learn I'll probably teach that instead. My initial idea is to try something like "a game a day" with games like hangman, tic-tac-toe, guess-a-number, wheel-of-fortune, etc. I'll try and update the question text as answers come in to offer more details While there are other questions about teaching programming around I'm looking for advice and tasks that are useful for specifically a week long camp

    Read the article

  • Visual Studio swapping code between projects?!?!?!?!??!

    - by Tom
    Are there any known issues with visual studio and code being swapped between projects? I had a project running in VS2008 and when i went back to it, the code from another project had been swapped in the Program.cs class. I havent made any mistakes, im not talking about some code- i mean the whole project had been swapped out. Its as if the .proj files or .soln files had been swapped from their project folders??? EDIT Ive restarted laptop, opened the code again and its still showing the wrong code BUT when i execute it, its the right code?!?!?!

    Read the article

  • Knowledge mining using Hadoop.

    - by Anurag
    Hello there, I want to do a project Hadoop and map reduce and present it as my graduation project. To this, I've given some thought,searched over the internet and came up with the idea of implementing some basic knowledge mining algorithms say on a social websites like Facebook or may stckoverflow, Quora etc and draw some statistical graphs, comparisons frequency distributions and other sort of important values.For searching purpose would it be wise to use Apache Solr ? I want know If such thing is feasible using the above mentioned tools, if so how should I build up on this little idea? Where can I learn about knowledge mining algorithms which are easy to implement using java and map reduce techniques? In case this is a wrong idea please suggest what else can otherwise be done on using Hadoop and other related sub-projects? Thank you

    Read the article

  • Commonly use Utility methods in projects

    - by Newbie
    In many projects, we come across various utility methods, e.g. Email validation Convert from dd/mm/yyyy to mm/dd/yyyy or other date formats I would like to know as what are the varoius common utility method that we genrally use? I know that some methods are project specific but many will be common. I searched in net to get a list of as much as possible but none I found to be very informative. Could you please help? Well I am more interested in the method behaviour and not in their implementation. If I can get the method names and what it does e.g. ConvertMMDDYYYY to ConvertDDMMYYYY it will server my purpose. Thanks

    Read the article

  • Android Java Eclipse Intent with 2 Projects

    - by user3793685
    Good day! I have 2 Projects in my Eclipse. MainActivity1 and MainActivity2 are the names of the activities. The MainActivity2 is connected to the MainActivity1 via Project in the properties of the MainActivity1. So far, I can call the package of the MainActivity2 from the MainActivity1. Now, below are my problem: I have a button in MainActivity1. What I want to do is after I click on the button in the MainActivity1, it runs the MainActivity2 project and some variables will be passed on to the MainActivity2. I've been searching in google for a while now and I couldn't get the right keyword for it. I've checked some of the questions here in StackOverflow but I'm unable to locate the problem similar to mine with calling and running the MainActivity2 class from the MainActivity1.java I'm a noob in Android Java but have knowledge in other OOP. Any tips will be a great help. Thanks

    Read the article

  • Need personal advice on how to get out of a company..

    - by SOfan
    Hi, I am an SO user since past 6 months and this is the first time I am turning to SO for personal help. I have asked technical questions before with my real ID. I am stuck inside a service based IT company for the past one year and haven't been able to decide if to leave it, when to leave it and how to leave it. I had taken 2 weeks LWP on medical reason roughly at end of 1 year and then soon after reporting, I applied for 2 months more LWP (on medical/personal ground) with the intention of working on my health,take up a hobby class to ward off depression,pessimism, to have some fun in life, and to look for a job which I really would be excited about - that interests me and which matches with my strength. My leave starts from this Monday. So in any case, I had hard set in mind that I will leave the company after I join them back hopefully with some job offer already in hand (after figuring out what I want do). Neither I can stand the past project,past colleagues,company, HR, pathetically low salary. But if I really listen to my heart, I don't want to have to go back to that office after my sabbatical and again have to see those people. I will have to resign it after my sabbatical ends. Then HR people perhaps wont like it, may even accuse me on face or behind back that primary purpose of my leave must have been to hunt for a better job and I lied about medical and person reasons. Also, if they get nasty and force me to serve 2 months notice period. There is no way I see myself after sabbatical resuming in old project or starting new work. It will be a pain. Since they have already approved 2 months leave and stuff, ideally if they want, they should be just able to relieve me right on the next day after I join back. But, I don't know if they want to get nasty, will they mention about my 2 months sabbatical leave in my experience letter or more scary, the term medical/personal reason. I have hard earned my experience here, have worked against my will, mostly it has been painful and slogged like anything, because I realize the importance of work experience in IT industry. I don't have greed to have those 2 months included extra in my experience letter, but I don't want to mess up with my experience letter in a way which makes my next employer ask question, get suspicious, or be wary if I have any medical reason going on. Being an emotional,moody person or somebody who can't be in an environment, once my mind and heart starts hating it. I think it perhaps is best, if I resign on Monday itself telling them (in polite manner) something that look I took sabbatical for some reason but I don't want to resume working in the company after my sabbatical ends. So please accept my resignation. Now tell me what you want to do about my leave request, my notice period and when you are willing to relieve me. What should I write and how? Some background: I am working in an IT company in India.I am overqualified in the company. It is grossly underpaying me. My education qualifications far exceed anyone's in the whole company being a CS undergrad as well as a CS grad. I joined this company after finishing the grad. I had self-doubts about my skills and interest as a programmer. I like doing research oriented work, though didn't have any particular success during grad. My life here has been very hectic. The project containing many many sub-projects has kept me on my toes and I have never really liked the work. I have been playing against my strength. Also the company strict internet usage policy (you can't read gmails, can't browse any non-work related sites not even news). When working for a client, from the machine we can't even check company related emails.For this one has to go to kiosk like 5 machines in a small room etc. Most of the times those machines are not available, so it was not unusual to keep making rounds to these kiosk machines to check company emails, browse company related emails etc.So it was not so easy to keep in touch with company related basic affairs for a not particular careful person. Things like this which are new to me, make me feel restricted. I am an undecisive person with a sense of failure, self-doubt, not meeting up unrealistic expectation. Somewhere at back of mind, I envy my classmates who make a smooth transition from company to company without causing any gap in their resume. I on other hand have gaps in resume. I get tired after working in a place for sometime. problem with colleagues in general. I am not particular great with people, have few friends, not known for a fun nature, rather serious, scholar. I am not a typical conventional female. I think females are usually more disciplined. But I am not so. I reach office late (though after informing manager). I don't want to blame them entirely, because from my past, it is not unusual for me to get undecisive on things. Also I had doubts about my ability as researched and to succeed there. of building a relationship in a group, to have something to talk about, newspaper. I get cut-off from people. peer pressure. I make blunders in coding, lose patience. Consciously or unconsciously I feel contempt for people here, work here, environment here. I have doubts that either I go to a place which does innovation, does research oriented work, product biggies, have great motivated people, have competent people passionate about products they are building. But then I also doubt my ability to survive there. I have identified that an idea job for me would be 4 days a week, a high salary job. When among people in company/team, I can't think much. I need some time at home to read good authentic books written in good style on what work I am doing.So that I am comfortable with my understanding of work. I get into pressure easily under deadline and need 5th day to cool myself off. I took for 2 weeks leave, because each day was hell for me. May be the depression phase of bipolar is on and also partially it could be that being a work centered person, who derives happiness,self-esteem from work, haven't been enjoying work and have been working for the sole person of proving stability, and ability to stick, against all odds, and facing what challenges I see, bonding with people, identifying opportunities to learn in given task etc.have been averaging one day LWP in 1 week or 10 days. or may be because of my nature,ADD,not being able to switch context,out of touch with news, don't have a circle of friends with who I enjoy. less knowledge in general to talk about, just some technical stuff.anyway, so due to emotional reason, some practical reason etc, I wanted to be very sure before leaving. So my leave starts from Monday and I should feel happy about it. I have taken the leave to for a few purposes - to take care of my health by regular yoga/exercise (with project on, I just can't do anything regular), reassess myself to see what I want to try next which work I might like, look for next job, take up a hobby which I like say singing. I am not clear on my career,job aspiration. I have tried my hands on research. During this year appraisal yesterday, I even had some conflict with my last manager. In meeting with me one on one, he would say all nice things about me, but in feedback to new manager, he hasn't given any excellent feedback. It is all only good. I am angry at this old Manager. Also new manager also scolded me as I didn't agree to his appraisal and waited to hear myself from old Manager. He kind of scolded me for wasting his time. Am I being unethical somewhere? I am always very conscious of if I am cheating anywhere. What advice I am seeking? How to resign and what to write in resignation letter

    Read the article

  • How do you persuade users to abandon their personal folders?

    - by thing2k
    Towards the end of last year we started using Mimecast services, in particular their cloud base e-mail archiving. Since then we’ve been rolling out the Mimecast Services for Outlook (MSO) Add-in. We’ve informed the users that we will be give them training in the next few Months, and we do not require them to use it, but my boss stated that we are getting rid of Personal Folders (pst files), by putting them into Mimecast. Unsurprisingly this did cause something of a backlash. Though really who likes change. I know the IT reasons for getting rid of Personal Folders (inefficient, unreliable, single access, etc), but from an average user’s perspective, unless they have had one fail on them, they see them as simple and only way to archive e-mail when their 200Mb mailbox is full. So what can I say to the users, to get them to understand why Personal Folders are not the best solution?

    Read the article

  • outlook express 2007: remove personal folders from mail folders.

    - by ufk
    Hiya. I installed outlook express 2007 and i configured it for my e-mail account. it seems that i cannot remove the personal folders and i cannot configure the gmail Mail file to be as default. (it's translated from hebrew so i hope i got the menu words correct) when i go to tools - manage accounts - data files i see 2 files, one for personal folders and the other for my gmail. the personal folder is the default one and i can't remove it and i can't set my gmail mail file to be the default. how can i resolve the issue? thanks!

    Read the article

  • Small projects using the cathedral model: does open-source lower security?

    - by Anto
    We know of Linus' law: With enough eyeballs all bugs are shallow In general, people seem to say that open-source software is more secure because of that very thing, but... There are many small OSS projects with just 1 or 2 developers (the cathedral model, as described by ESR). For these projects, does releasing the source-code actually lower the security? For projects like the Linux kernel there are thousands of developers and security vulnerabilities are quite likely going to be found, but when just some few people look through the source code, while allowing crackers (black hat hackers) to see the source as well, is the security lowered instead of increased? I know that the security advantage closed-source software has over OSS is security through obscurity, which isn't good (at all), but it could help to some degree, at least by giving those few devs some more time (security through obscurity doesn't help with the if but with the when). EDIT: The question isn't whether OSS is more secure than non-OSS software but if the advantages for crackers are greater than the advantages for the developers who want to prevent security vulnerabilities from being exploited.

    Read the article

  • Why do large IT projects tend to fail or have big cost/schedule overruns?

    - by Pratik
    I always read about large scale transformation or integration project that are total or almost total disaster. Even if they somehow manage to succeed the cost and schedule blow out is enormous. What is the real reason behind large projects being more prone to failure. Can agile be used in these sort of projects or traditional approach is still the best. One example from Australia is the Queensland Payroll project where they changed test success criteria to deliver the project. See some more failed projects in this SO question Have you got any personal experience to share?

    Read the article

  • Is it possible to get a job in a high-demand company without having hobby projects?

    - by Rachel
    I was curious if the recruitment team at high-demand companies such as Google takes a lack of hobby projects into consideration when evaluating candidates. I'm a straight 40 hour/week programmer, who is lucky to spend an hour or two a month outside of work on anything programming related. I love hanging out on SO/SE during my breaks at work, and love answering questions, but after work I leave the programming world and go back to my life. I already understand that you don't need hobby projects to be a good programmer, but does this lack of hobby projects affect my chances getting a job at a company that always has a long list of candidates trying to get in?

    Read the article

  • Is it normal for programmer to work on multiple projects simultaneously.

    - by gasan
    On a current job I have 2 projects to work on. First is very huge system and the second one is smaller but it also big (first project is being developed for 12 years, second for 4 years). At first I was working only on first project and was trying to get used to it. Then I was moved to second project and tried there, so my knowledge about first project became shady. Now I have to work on both projects at the same time. It's very hard for me because despite they both use java, they use different frameworks and the amount of code and business-logic to understand is very big so I really can't hold both that projects in my head. Is it normal and I should get used to it, although my expertise became very squashy, what won't happen if I would work only on a single project? Or should I raise a concern or maybe change employer?

    Read the article

  • how to contribute the same source code to two separate open-source projects?

    - by Jason S
    Let's say there are two similar open source projects A and B, both licensed under the Apache Software License 2.0. I would like to contribute an improvement to both projects (because I don't know which one is administered better, and I would like to see my improvement show up in both). Is there a way I can contribute this improvement to both projects in a simple way? (One obvious approach is to start an open source project C licensed under Apache 2.0, but that's a headache for various reasons; I don't want to maintain a project myself)

    Read the article

  • How are crossplatform/multiple-OS C++ projects planned in terms of code and tools?

    - by Nav
    I want to create a project in C++ that can work in Windows, Linux and Embedded Linux. How are projects created when they have to work across many OS'es? Is it first created on one OS and then the code slowly modified to be ported to another OS? Eg: to me, the Linux version of Firefox appears to be created as a Windows project and a separate Linux project with a different code base, since Firefox behaves a bit different in Windows and Linux. Although the source code download is surprisingly a single link. If QT is used for UI, Boost threads for threading, Build Bot for CI and NetBeans/Eclipse/QT Creator for an IDE, would a person be able to minimise the amount of code re-write required to get the project onto another OS? Is this the right way to do it, or are such projects meant to be created as two entirely separate projects for two separate OS'es?

    Read the article

  • Which online/hosted bug tracking tool do you use for your own work and projects?

    - by blueberryfields
    I've accumulated a lot of side projects over the years, which I slowly improve on over time. Whenever I return to one, I take some time reading over text files that include design, recent bugs, next features, etc... that I should be working on - it's not pretty. I'm looking to switch to something more formal. Ideally, this would be a full featured, online, bug tracking system, which allows for free or nearly free bug tracking for my own projects. Also, ideally this would be doable in a private manner - I don't really want everyone to see my side projects and what a mess I've made of some of them.

    Read the article

  • Why do some open source projects do not allow to report issues in a public issue tracker?

    - by linquize
    Why do some open source projects do not allow to report issues in a public issue tracker? Those projects requires the issues to be reported via email, and the issues may be forwarded to people in mailing list. Users may repeatedly report the same issue if there is no public issue tracker, as they have no easy way to know what have been reported before. The project team members need to spend extra time answering those repeated issues. Some projects do have a public issue tracker, but the issues are still reported through email and they are posted only by the project team only after filtering. It does not allow anyone to report directly in issue tracker. (example: SVN) Such arrangement is not transparent nor open, which I think it violates the philosophy of open source. And it is outdated.

    Read the article

  • Why do some open-source projects NOT have a public issue tracker?

    - by linquize
    Why do some open source projects not allow to report issues in a public issue tracker? Those projects require the issues to be reported via email, and the issues may be forwarded to people in a mailing list. Users may repeatedly report the same issue if there is no public issue tracker, as they have no easy way to know what has been reported before. The project team members need to spend extra time answering those repeated issues. Some projects do have a public issue tracker but the issues are still reported through email and they are posted by the project team only after filtering. It does not allow anyone to report directly in issue tracker (example: SVN). Such arrangement is not transparent nor open, which I think violates the philosophy of open source. And it is outdated.

    Read the article

  • How do you stay motivated for hobby projects? [closed]

    - by aubreyrhodes
    I started seriously programming as a hobbiest, student and then intern about 4 years ago and I've always done small projects on the side as a learning exercise. Schools over now though, and I spend my days at work as a software developer. I would still love to do projects on the side to learn about areas in computer science that I'm not exposed to at work, but I've noticed that after 8 hours of starring at an IDE it's far to tempting to veg out. Any time I do get up the gumption to work on something for a few hours lately it's gotten left by the wayside. Anyone have any advice for sticking with side projects when you spend most of your day coding?

    Read the article

  • Monday at Oracle OpenWorld 2012 - Must See Session: “Using the Right Tools, Techniques, and Technologies for Integration Projects”

    - by Lionel Dubreuil
    Don’t miss this “CON8669 - Using the Right Tools, Techniques, and Technologies for Integration Projects“ session with Timothy Hall - Sr. Director, Oracle: Date: Monday, Oct 1, Time: 3:15 PM - 4:15 PM Location: Moscone South - 308 Every integration project brings its own unique set of challenges. There are many tools and techniques to choose from. How do you ensure that you have a means of consistently and repeatedly making decisions about which tools, techniques, and technologies are used? In working with many customers around the globe, Oracle has developed a set of criteria to help evaluate a variety of common integration questions. This session explores these criteria and how they have been further organized into decision trees that offer a repeatable means for ensuring that project teams are given the same guidance from project to project. Using these techniques, the presentation shows how you can reduce risk and speed productivity for your projects Objectives for this session are to: Discuss common questions that arise at the start of integration projects Review various decision criteria and approaches for getting to a consistent set of answers Explore how these techniques can be used to reduce risk and speed productivity

    Read the article

  • Monday at Oracle OpenWorld 2012 - Must See Session: “Using the Right Tools, Techniques, and Technologies for Integration Projects”

    - by Lionel Dubreuil
    Don’t miss this “CON8669 - Using the Right Tools, Techniques, and Technologies for Integration Projects“ session with Timothy Hall - Sr. Director, Oracle: Date: Monday, Oct 1, Time: 3:15 PM - 4:15 PM Location: Moscone South - 308 Every integration project brings its own unique set of challenges. There are many tools and techniques to choose from. How do you ensure that you have a means of consistently and repeatedly making decisions about which tools, techniques, and technologies are used? In working with many customers around the globe, Oracle has developed a set of criteria to help evaluate a variety of common integration questions. This session explores these criteria and how they have been further organized into decision trees that offer a repeatable means for ensuring that project teams are given the same guidance from project to project. Using these techniques, the presentation shows how you can reduce risk and speed productivity for your projects Objectives for this session are to: Discuss common questions that arise at the start of integration projects Review various decision criteria and approaches for getting to a consistent set of answers Explore how these techniques can be used to reduce risk and speed productivity

    Read the article

  • GIT repository layout for server with multiple projects

    - by Paul Alexander
    One of the things I like about the way I have Subversion set up is that I can have a single main repository with multiple projects. When I want to work on a project I can check out just that project. Like this \main \ProductA \ProductB \Shared then svn checkout http://.../main/ProductA As a new user to git I want to explore a bit of best practice in the field before committing to a specific workflow. From what I've read so far, git stores everything in a single .git folder at the root of the project tree. So I could do one of two things. Set up a separate project for each Product. Set up a single massive project and store products in sub folders. There are dependencies between the products, so the single massive project seems appropriate. We'll be using a server where all the developers can share their code. I've already got this working over SSH & HTTP and that part I love. However, the repositories in SVN are already many GB in size so dragging around the entire repository on each machine seems like a bad idea - especially since we're billed for excessive network bandwidth. I'd imagine that the Linux kernel project repositories are equally large so there must be a proper way of handling this with Git but I just haven't figured it out yet. Are there any guidelines or best practices for working with very large multi-project repositories?

    Read the article

< Previous Page | 30 31 32 33 34 35 36 37 38 39 40 41  | Next Page >