Search Results

Search found 11015 results on 441 pages for 'explain plan'.

Page 36/441 | < Previous Page | 32 33 34 35 36 37 38 39 40 41 42 43  | Next Page >

  • how to remap Ctrl to Escape if pressed and released on its own

    - by psvm
    I want to remap Control, so that: A. If it is pressed and released with no other key, it acts as Escape. B. If it is pressed & held together with another key, it acts as Control (no change in behavior in this case). I'm aware of How do I remap certain keys?, so I suspect it may be done with xmodmap. But that answer does not explain how to map the modifier keys. I looked into the examples and grammar sections of the xmodmap manpage, but they do not explain that. The answer in Remapping Caps Lock to Control and Escape (not the usual way) mention that it is not possible to do that to CapsLock, since it is a Lock key, but I hope this may be possible to do it with Control which is a mod key. A solution with something different than xmodmap will also be accepted. (I'm running Xmonad in Ubuntu 12.04, so perhaps there is a way to set this up in xmonad.hs?)

    Read the article

  • Confused about modifying the sprint backlog during a sprint

    - by Maltiriel
    I've been reading a lot about scrum lately, and I've found what seem to me to be conflicting information about whether or not it's ok to change the sprint backlog during a sprint. The Wikipedia article on scrum says it's not ok, and various other articles say this as well. Also my Software Development professor taught the same thing during an overview of scrum. However, I read Scrum and XP from the Trenches and that describes a section for unplanned items on the taskboard. So then I looked up the Scrum Guide and it says that during the sprint "No changes are made that would affect the Sprint Goal" and in the discussion of the Sprint Goal "If the work turns out to be different than the Development Team expected, then they collaborate with the Product Owner to negotiate the scope of Sprint Backlog within the Sprint." It goes on to say in the discussion of the Sprint Backlog: The Sprint Backlog is a plan with enough detail that changes in progress can be understood in the Daily Scrum. The Development Team modifies Sprint Backlog throughout the Sprint, and the Sprint Backlog emerges during the Sprint. This emergence occurs as the Development Team works through the plan and learns more about the work needed to achieve the Sprint Goal. As new work is required, the Development Team adds it to the Sprint Backlog. As work is performed or completed, the estimated remaining work is updated. When elements of the plan are deemed unnecessary, they are removed. Only the Development Team can change its Sprint Backlog during a Sprint. The Sprint Backlog is a highly visible, real-time picture of the work that the Development Team plans to accomplish during the Sprint, and it belongs solely to the Development Team. So at this point I'm altogether confused. Thinking about it, it makes more sense to me to take the second approach. The individual, specific items in the backlog don't seem to me to be the most important thing, but rather the sprint goal, so not changing the sprint goal but being able to change the backlog makes sense. For instance if both the product owner and the team thought they were on the same page about a story, but as the sprint progressed they figured out there was a misunderstanding, it seems like it makes sense to change the tasks that make up that story accordingly. Or if there was some story or task that was forgotten about, but is required to reach the sprint goal, I would think it would be best to add the story or task to the backlog during the sprint. However, there are a lot of people who seem quite adamant that any change to the sprint backlog is not ok. Am I misunderstanding that position somehow? Are those folks defining the sprint backlog differently somehow? My understanding of the sprint backlog is that it consists of both the stories and the tasks they're broken down into. Anyway I would really appreciate input on this issue. I'm trying to figure out both what the idealistic scrum approach is to changing the sprint backlog during a sprint, and whether people who use scrum successfully for development allow changing the sprint backlog during a sprint.

    Read the article

  • Try the Oracle Database Appliance Manager Configurator - For Fun!

    - by pwstephe-Oracle
    Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 If you would like to get a first hand glimpse of how easy it is to configure an ODA, even if you don’t have access to one, it’s possible to download the Appliance Manager Configurator from the Oracle Technology Network, and run it standalone on your PC or Linux/Unix  workstation. The configurator is packaged in a zip file that contains the complete Java environment to run standalone. Once the package is downloaded and unzipped it’s simply a matter of launching it using the config command or shell depending on your runtime environment. Oracle Appliance Manager Configurator is a Java-based tool that enables you to input your deployment plan and validate your network settings before an actual deployment, or you can just preview and experiment with it. Simply download and run the configurator on a local client system which can be a Windows, Linux, or UNIX system. (For Windows launch the batch file config.bat for Linux/Unix environments, run  ./ config.sh). You will be presented with the very same dialogs and options used to configure a production ODA but on your workstation. At the end of a configurator session, you may save your deployment plan in a configuration file. If you were actually ready to deploy, you could copy this configuration file to a real ODA where the online Oracle Appliance Manager Configurator would use the contents to deploy your plan in production. You may also print the file’s content and use the printout as a checklist for setting up your production external network configuration. Be sure to use the actual production network addresses you intend to use it as this will only work correctly if your client system is connected to same network that will be used for the ODA. (This step is not necessary if you are just previewing the Configurator). This is a great way to get an introductory look at the simple and intuitive Database Appliance configuration interface and the steps to configure a system. /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;}

    Read the article

  • iOS: game with facebook challenges

    - by nazz_areno
    I created a game for iPad and I want to challenge my facebook friends. I follow the iOS tutorial in "facebook dev docs", with the "Smash game", but it doesn't explain how to challenge a friend directly to a game. I will explain with an example: I want to start a new match and I want challenge a friend on facebook. Then I send him a request to install the app and when I detect that its app is installed I send him a request to play vs me. Then, when I finish the match I sent him my result and my friend do the same thing. But if I and my friend don't finish the match it is not possible to send another challenge. This scenario is not explained by facebook sdk. Is it necessary to use another instrument to do this situation?

    Read the article

  • And if I ask the job interviewer for reasons to join the company?

    - by Oscar
    In job interviews I am frequently asked if I know the company, explain why do I think I would be the best choice for this company, etc and I have never liked this kinds of questions. Using your experiences in job interviewing, what do you think it would happen if I ask the interviewer to explain me why he think the company is the best company for me and why I should accept their answer? Do you think it would be a good think or bad thing to do? Edit: the idea of the question would not be to "challenge" the interviewer. The idea of the question would be to see what he thinks about the company, what values he thinks are given importance inside the company and what are the strong points of the company.

    Read the article

  • MySQL Workbench 6.2.1 BETA has been released

    - by user12602715
    The MySQL Workbench team is announcing availability of the first beta release of its upcoming major product update, MySQL  Workbench 6.2. MySQL Workbench 6.2 focuses on support for innovations released in MySQL 5.6 and MySQL 5.7 DMR (Development Release) as well as MySQL Fabric 1.5, with features such as: A new spatial data viewer, allowing graphical views of result sets containing GEOMETRY data and taking advantage of the new GIS capabilities in MySQL 5.7. Support for new MySQL 5.7.4 SQL syntax and configuration options. Metadata Locks View shows the locks connections are blocked or waiting on. MySQL Fabric cluster connectivity - Browsing, view status, and connect to any MySQL instance in a Fabric Cluster. MS Access migration Wizard - easily move to MySQL Databases. Other significant usability improvements were made, aiming to raise productivity for advanced and new users: Direct shortcut buttons to commonly used features in the schema tree. Improved results handling. Columns have better auto-sizing and their widths are saved. Fonts can also be customized. Results "pinned" to persist viewing data. A convenient Run SQL Script command to directly execute SQL scripts, without loading them first. Database Modeling has been updated to allow changes to the formatting of note objects and attached SQL scripts can now be included in forward engineering and synchronization scripts. Integrated Visual Explain within the result set panel. Visual Explain drill down for large to very large explain plans. Shared SQL snippets in the SQL Editor, allowing multiple users to share SQL code by storing it within a MySQL instance. And much more. The list of provided binaries was updated and MySQL Workbench binaries now available for: Windows 7 or newer Mac OS X Lion or newer Ubuntu 12.04 LTS and Ubuntu 14.04 Fedora 20 Oracle Linux 6.5 Oracle Linux 7 Sources for building in other Linux distributions For the full list of changes in this revision, visit http://dev.mysql.com/doc/relnotes/workbench/en/changes-6-2.html For discussion, join the MySQL Workbench Forums: http://forums.mysql.com/index.php?151 Download MySQL Workbench 6.2.1 now, for Windows, Mac OS X 10.7+, Oracle Linux 6 and 7, Fedora 20, Ubuntu 12.04 and Ubuntu 14.04 or sources, from: http://dev.mysql.com/downloads/tools/workbench/ On behalf of the MySQL Workbench and the MySQL/ORACLE RE Team.

    Read the article

< Previous Page | 32 33 34 35 36 37 38 39 40 41 42 43  | Next Page >