Search Results

Search found 1250 results on 50 pages for 'torment march'.

Page 38/50 | < Previous Page | 34 35 36 37 38 39 40 41 42 43 44 45  | Next Page >

  • Problem passing json into jquery graph(flot)

    - by Adam McMahon
    I trying to retrieve some json to pass into a flot graph. I know that json is right because I hard coded it to check, but I'm pretty sure that I'm not passing right because It's not showing up. Here's the javascript: var total = $.ajax({ type: "POST", async: false, url: "../api/?key=xxx&api=report&crud=return_months&format=json" }).responseText; //var total = $.evalJSON(total); var plot = $.plot($("#placeholder"),total); here's the json: [ { data: [[1,12], [2,43], [3,10], [4,17], ], label: "E-File"}, { data: [[1,25], [2,35], [3,3], [4,5], ], label: "Bank Products" }, { data: [[1,41], [2,87], [3,30], [4,29], ], label: "All Returns" } ], {series: {lines: { show: true },points: { show: true }}, grid: { hoverable: true, clickable: true }, yaxis: { min: 0, max: 100 }, xaxis: { ticks: [[1,"January"],[2,"February"],[3,"March"],[4,"April"],[5,"May"],[6,"June"],[7,"July"],[8,"August"],[9,"September"],[10,"October"],[11,"November"],[12,"December"]] }}

    Read the article

  • ICC vs GCC - Optimization and CPU architecture

    - by Rayne
    Hi all, I'm interested in knowing how GCC differs from Intel's ICC in terms of the optimization levels and catering to specific processor architecture. I'm using GCC 4.1.2 20070626 and ICC v11.1 for Linux. How does ICC's optimization levels (O1 to O3) differ from GCC, if they differ at all? The ICC is able to cater specifically to different architectures (IA-32, intel64 and IA-64). I've read that GCC has the -march compiler option which I think is similar, but I can't find a list of the options to use. I'm using Intel Xeon X5570, which is 64-bit. Are there any other GCC compiler options I could use that would cater my applications for 64-bit Intel CPUs? Thank you. Regards, Rayne

    Read the article

  • Is it possible to Embed Gecko or Webkit in a Windows Form just like a WebView?

    - by Martín Marconcini
    Hi, I'd love to know if there is such thing as a Gecko.NET ;) I mean, just like we can embed a WebView and that is an "instance" of IE7 inside any Windows Forms application (and tell it to "navigateto (fancy_url);", I'd love to use FireFox or WebKit. Anybody tried this? UPDATE: Please bear in mind that although it is possible to embed gecko using the mentioned controls, it is still impossible to print while using gecko. UPDATE March 2010: It’s still not possible to print natively using GeckoFX, however a couple of methods exist that may be enough, depending upon what you’re trying to do. See: http://geckofx.org/viewtopic.php?id=796 for more information.

    Read the article

  • A rails migration that specifies the distance between two months..?

    - by Trip
    I would like to make two drop downs. a start time, and an end time. Specifically, I only need months. I would like to, for example, choose January, and then March, and then have the database read that it is the these two months plus February. Is there any out of the box migration that could work? I'm guessing.. script/generate migration AddMonthsToClass beginDate:datetime #through endDate:datetime I apologize ahead of time if my question sounds retarded! Sorry! :D

    Read the article

  • iPad application submission with iPhone SDK beta 5 rejected

    - by FredM
    I try to send an specific iPad Application to iTunes connect before March 27 and as Apple says: "Only iPad apps compiled with iPhone SDK 3.2 beta 5 will be accepted for this initial review." So I compiled my application with iPhone SDK 3.2 beta 5 with a distribution provisioning profile. But when I upload my application on iTunes Connect, I have the following error: "The binary you uploaded was invalid. A pre-release beta version of the SDK was used to build the application" For sure, it's the beta 5 ! Have you got an idea? Thank you in advance. Fred

    Read the article

  • What calendar appears to count days since december 28, 1800?

    - by Sander Marechal
    Hello, I have been tasked to read in some data from some weird old system. The system contains many dates but they are all oddly formatted. They are integer numbers ranging from approximately 55,000 to 80,000. I know two dates for certain: 58,112 equals February 2, 1960 61,439 equals March 16, 1969 It appears to me that those integer numbers are the number of days elapsed since December 28, 1800. But I think that's a very strange date to start a calendar on. There is probably going something on with leap years and what-not that is doing to bite me in the ass later on. Does anyone recognise this calendar? Can anyone tell me what the proper way is to convert those integers to human readable dates? Thanks in advance!

    Read the article

  • Is Microformat's date-value-pattern fully accessible?

    - by Stephen
    Has there been an announcement (outside microformats.org) that the value-class-pattern is fully accessible? e.g. given <abbr class="value" title="2008-06-24">this Tuesday</abbr>, will a screen reader say "24 June 2008" or will it say "2008 dash 6 dash 24"? History Microformats came along, and were great, except that dates etc were stored in abbr tags: <abbr class="dtstart" title="20070312T1700-06"> March 12, 2007 at 5 PM, Central Standard Time </abbr>` This lead to screen readers doing ridiculous things as noted in hAccessibility. Now that microformats.org have released the value-class-pattern it's a lot better. But I'm left unable to find a declaration from WaSP (or another accessibility source not directly tied to microformats) that declaratively states that they are now accessible to screen readers etc.

    Read the article

  • JQuery UI Datepicker date format issue with initial value

    - by Mithun
    I need to set the initial date for the date picker to 03/20/2010 in mm-dd-yyyyy format. I have done this <input id='datepicker' type='text' value='20/03/2010' /> But my problem is on clicking the field date picker populates with today's date as highlighed and no date selected, and up on selecting date value But when i change my input field like one below <input id='datepicker' type='text' value='03/20/2010' /> Date picker is populating March 20 as selected date and current date highlighted. But all in 'mm-dd-yyyy' format! I want show all dates in 'dd-mm-yyyy' format. How can I solve this?

    Read the article

  • How could the year 2010 be mistaken as a leap year? [closed]

    - by Templar
    According to news reports such as this one, older Playstation 3 game consoles incorrectly considered the year 2010 to be a leap year. The problem persisted through most of the Monday, March 1, which older PlayStations thought was Feb. 29, 2010, a date that doesn't exist. The standard leap year formula states that a leap year is any year that is divisible by 4, but not by 100, except if divisible by 400. The year 2010 doesn't fit any of those criteria. Any idea what programming error would have caused this?

    Read the article

  • How do you convert date taken from a bash script to milliseconds in a Java program?

    - by Matt Pascoe
    I am writing a piece of code in Java that needs to take a time sent from a bash script and parse the time to milliseconds. When I check the millisecond conversion on the date everything is correct except for the month I have sent which is January instead of March. Here is the variable I create in the bash script, which later in the script I pass to the Java program: TIME=`date +%m%d%Y_%H:%M:%S` Here is the Java code which parses the time to milliseconds: String dt = "${scriptstart}"; java.text.SimpleDateFormat scriptStart = new java.text.SimpleDateFormat("MMDDyyyy_HH:mm:ss"); long start = scriptStart.parse(dt).getTime(); The goal of this statement is to find the elapsed time between the start of the script and the current system time. To troubleshoot this I printed out the two: System Time = 1269898069496 (converted = Mon Mar 29 2010 16:27:49 GMT-0500 (Central Daylight Time)) Script Start = 03292010_16:27:45 Script Start in Milli = 1264804065000 (Converted = Fri Jan 29 2010 16:27:45 GMT-0600 (Central Standard Time))

    Read the article

  • D-Day Calendar has wrong dates when importing from google calendar?

    - by chobo2
    Hi I am using D-Day calendar and I am not sure but I got a weird problem. I basically have this for my code iCalendar iCal = iCalendar.LoadFromStream(file.InputStream); foreach (Event evt in iCal.Events) { DateTime start = evt.DTStart.Date; DateTime end = evt.DTEnd.Date; // loop through it and get values. } Yet when I import a calendar from google calendar the end date is messed up on some of the stuff I am importing. Like for instance I have this Title: should not show When: Sun, March 21(all day). Yet when I import it in. I says the start date is the 21st yet the end date is the 22nd when it should be the 21st. Not sure what is going on. I am not really sure what other info I can give you guys.

    Read the article

  • help, php calendar links

    - by Ray
    Below is a partial table row that will create a line row of 3 columns. Two columns in each side is links, left is previous year and right is next year links. Center is links for january thru december. When you click a month links, the calendar will show that month you've clicked in the current year the calendar is on. For example, the calendar will open current month and year by default...March 2010. If you clicked previous year (2009), it will display current month (March) of last year (2009)...and then if you click Jun, the calendar will display June of whatever the year the calendar is currently on, which is June of 2009. my question is, what can i do to following code to do such thing. $Calendar.= "</tr><tr><td>"."<a "."href=\"".$_SERVER["PHP_SELF"]."?year=" . $LastYear["year"] ."\"> $LastY </a></td>\n"; $Calendar.= "<td colspan=\"5\">"."<a "."href=\"".$_SERVER["PHP_SELF"]."?year=".$ThisYear["year"]."&month=" . $MonthArray[0] ."\">Jan.</a> | "."<a "."href=\"".$_SERVER["PHP_SELF"]."?year=".$ThisYear["year"]."&month=" . $MonthArray[1] ."\">Feb.</a> | "."<a "."href=\"".$_SERVER["PHP_SELF"]."?year=".$ThisYear["year"]."&month=" . $MonthArray[2] ."\">Mar.</a> | "."<a "."href=\"".$_SERVER["PHP_SELF"]."?year=".$ThisYear["year"]."&month=" . $MonthArray[3] ."\">Apr.</a> | "."<a "."href=\"".$_SERVER["PHP_SELF"]."?year=".$ThisYear["year"]."&month=" . $MonthArray[4] ."\">May</a> | "."<a "."href=\"".$_SERVER["PHP_SELF"]."?year=".$ThisYear["year"]."&month=" . $MonthArray[5] ."\">Jun.</a> | "."<a "."href=\"".$_SERVER["PHP_SELF"]."?year=".$ThisYear["year"]."&month=" . $MonthArray[6] ."\">Jul.</a> | "."<a "."href=\"".$_SERVER["PHP_SELF"]."?year=".$ThisYear["year"]."&month=" . $MonthArray[7] ."\">Aug.</a> | "."<a "."href=\"".$_SERVER["PHP_SELF"]."?year=".$ThisYear["year"]."&month=" . $MonthArray[8] ."\">Sep.</a> | "."<a "."href=\"".$_SERVER["PHP_SELF"]."?year=".$ThisYear["year"]."&month=" . $MonthArray[9] ."\">Oct.</a> | "."<a "."href=\"".$_SERVER["PHP_SELF"]."?year=".$ThisYear["year"]."&month=" . $MonthArray[10] ."\">Nov.</a> | "."<a "."href=\"".$_SERVER["PHP_SELF"]."?year=".$ThisYear["year"]."&month=" . $MonthArray[11] ."\">Dec.</a> </td>"; $Calendar.= "<td>"."<a "."href=\"".$_SERVER["PHP_SELF"]."?year=" . $NextYear["year"] ."\"> $NextY </a></td>\n"; Thanks in advance.

    Read the article

  • MYSQL Select and group by date

    - by Gil
    I'm not sure how create a right query to get the result I'm looking for. What I have is 2 tables. first has ID, Name columns and second has date and adminID, which is referenced from table 1 column ID. Now, what I want to get is basically number of times each admin loged in per day during the month. From structure like this one I want to get per day and month data so result would be similar to 1, 2, 2 march total 5 for admin 4. ID | Date ------------------ 4 | 2010/03/01 4 | 2010/03/04 4 | 2010/03/04 4 | 2010/03/05 4 | 2010/03/05

    Read the article

  • Nagios - Custom Report Generation

    - by Naveen
    Hi, I want to generate a custom report in "Nagios-3.2.0". I have defined the work-hours in "timeperiods.cfg" as follows: 'workhours' timeperiod definition define timeperiod { timeperiod_name 0800-2000 alias full time monday 08:00-20:00 tuesday 08:00-20:00 wednesday 08:00-20:00 thursday 08:00-20:00 friday 08:00-20:00 saturday 08:00-20:00 } Now, if I replace "saturday" with "2010-03-27" or "march 27" as shown below: 'workhours' timeperiod definition define timeperiod { timeperiod_name 0800-2000 alias full time monday 08:00-20:00 tuesday 08:00-20:00 wednesday 08:00-20:00 thursday 08:00-20:00 friday 08:00-20:00 2010-03-27 08:00-20:00 } Nagios is not generating report for the given date (2010-03-27). How can I modify "timeperiods.cfg" so that I can generate reports for the given dates ?

    Read the article

  • PHP and Javascript Webservice

    - by ajithperuva
    By using javascript am trying to cal a webservice.That service return response as follows.. <envelope> <date_time> Test', callbackTest Wednesday, March 31, 2010 2:28:55 AM </date_time> </envelope> I am using firefox as browser to execute the application.Thats why after creating the object of XMLHttpRequest try to read as follows _xmlDoc.responseXML.getElementsByTagName('date_time')[0].firstChild.nodeValue; But it is showing output like undefined.please help me to solve this problem.What is actual problem ?

    Read the article

  • Working with NSCalendar -- getting the next first tuesday of a month

    - by Bjorn S.
    Hi all, This is a bit odd, but is it possible to use an NSCalendar (or any component, for that matter) to figure out what the date of the next "first tuesday of the month" would be? For example, today is Thursday March 25, 2010. The next "first tuesday of the month" would be on April 6. Likewise, if I were looking for the next "first tuesday of the month" on April 1, it would still be on April 6. How would you do this? Thanks very much!!!!!

    Read the article

  • Wordpress is ignoring Unicode Chars in URL

    - by Ankur Gupta
    Hi, I am using wordpress with this type of permalink: /%year%/%monthnum%/%postname%/ if I use this type of url: example.com/2010/03/????? it treats this url like this example.com/2010/03/ (By ignoring unicode chars) and displays March 2010 archive list. if I use english url: example.com/2010/03/technology then it works perfectly. This problem occurs even on tags page: for example example.com/tag/??????? is treated like example.com/tag/ and displays 404 page. Why wordpress is ignoring unicode chars? If I use default querystring structure then it works perfectly even with unicode characters. Server Info: IIS7 Win2008 Server (Url rewriting enabled) Wordpress 2.9.2

    Read the article

  • mod_wsgi | linux installation error

    - by MMRUser
    I'm getting the following error when I try to install mod_wsgi ./configure checking for apxs2... no checking for apxs... /usr/sbin/apxs checking Apache version... 2.2.3 configure: creating ./config.status config.status: creating Makefile make /usr/sbin/apxs -c -I/usr/local/include/python2.6 -DNDEBUG mod_wsgi.c -L/usr/local/lib -L/usr/local/lib/python2.6/config -lpython2.6 -lpthread -ldl -lutil -lm /apr-1/build/libtool --silent --mode=compile gcc -prefer-pic -O2 -g -pipe -Wall -Wp,-D_FORTIFY_SOURCE=2 -fexceptions -fstack-protector --param=ssp-buffer-size=4 -m32 -march=i386 -mtune=generic -fasynchronous-unwind-tables -fno-strict-aliasing -DLINUX=2 -D_REENTRANT -D_GNU_SOURCE -D_LARGEFILE64_SOURCE -pthread -I/usr/include/httpd -I/usr/include/apr-1 -I/usr/include/apr-1 -I/usr/local/include/python2.6 -DNDEBUG -c -o mod_wsgi.lo mod_wsgi.c && touch mod_wsgi.slo sh: /apr-1/build/libtool: No such file or directory apxs:Error: Command failed with rc=8323072 . make: *** [mod_wsgi.la] Error 1 libtool is installed on my system.. mod_wsgi 3.2 *Apache 2.2* *Python 2.6*

    Read the article

  • number of days in a period that fall within another period

    - by thomas
    I have 2 independent but contiguous date ranges. The first range is the start and end date for a project. Lets say start = 3/21/10 and end = 5/16/10. The second range is a month boundary (say 3/1/10 to 3/31/10, 4/1/10 to 4/30/10, etc.) I need to figure out how many days in each month fall into the first range. The answer to my example above is March = 10, April = 30, May = 16. I am trying to figure out an excel formula or VBA function that will give me this value. Any thoughts on an algorithm for this? I feel it should be rather easy but I can't seem to figure it out. I have a formula which will return TRUE/FALSE if ANY part of the month range is within the project start/end but not the number of days. That function is below. return month_start <= project_end And month_end >= project_start

    Read the article

  • Display continuous dates in Pivot Chart

    - by Douglas
    I have a set of data in a pivot table with date times and events. I've made a pivot chart with this data, and grouped the data by day and year, then display a count of events for each day. So, my horizontal axis goes from 19 March 2007 to 11 May 2010, and my vertical axis is numeric, going from zero to 140. For some days, I have zero events. These days don't seem to be shown on the horizontal axis, so 2008 is narrower than 2009. How do I display a count of zero for days with no events? I'd like my horizontal axis to be continuous, so that it does not miss any days, and every month ends up taking up the same amount of horizontal space. (This question is similar to the unanswered question here, but I'd rather not generate a table of all the days in the last x number of years just to get a smooth plot!)

    Read the article

  • Regex Searching in Emacs

    - by Inaimathi
    I'm trying to write some Elisp code to format a bunch of legacy files. The idea is that if a file contains a section like "<meta name=\"keywords\" content=\"\\(.*?\\)\" />", then I want to insert a section that contains existing keywords. If that section is not found, I want to insert my own default keywords into the same section. I've got the following function: (defun get-keywords () (re-search-forward "<meta name=\"keywords\" content=\"\\(.*?\\)\" />") (goto-char 0) ;The section I'm inserting will be at the beginning of the file (or (march-string 1) "Rubber duckies and cute ponies")) ;;or whatever the default keywords are When the function fails to find its target, it returns Search failed: "[regex here]" and prevents the rest of evaluation. Is there a way to have it return the default string, and ignore the error?

    Read the article

  • How can I get to the value of my WPF UserControl DependencyProperty from UI Automation Framework?

    - by Surfbutler
    Hi, I'm having trouble getting access to my WPF UserControl DependencyProperty values through the UI Automation Framework. I've used James McCaffreys article in MSDN as a starting point (Automating IO Tests in WPF Applications, MSDN March 2009), but I can only see properties etc in standard controls such as buttons. I'm assuming there's some Automation interface I have to implement on my UserControl, but what and how? I can already see my control fine e.g. in UISpy, but I can't see the dependency properties within it. Here's what my usercontrol looks like currently in UISpy: AutomationElement General Accessibility AccessKey: "" AcceleratorKey: "" IsKeyboardFocusable: "False" LabeledBy: "(null)" HelpText: "Switches 48v Phantom Power On/Off (for Mic inputs only)." State IsEnabled: "True" HasKeyboardFocus: "False" Identification ClassName: "" ControlType: "ControlType.Custom" Culture: "(null)" AutomationId: "V48SwL" LocalizedControlType: "custom" Name: "" ProcessId: "5684 (VirtualSix)" RuntimeId: "7 5684 40026340" IsPassword: "False" IsControlElement: "True" IsContentElement: "True" Visibility BoundingRectangle: "(140, 457, 31, 20)" ClickablePoint: "155,467" IsOffscreen: "False" ControlPatterns

    Read the article

  • Excel 2003 - ADDRESS() function issues

    - by hairdresser-101
    I finally thought I had found a way to acutally use excel productively but the code that I followed does not appear to work. I'm thinking that the code is very limited and can't do what I want but I thought I'd ask to confirm - maybe it is my function that is the problem. I want to calculate the sum of a row of values for the previous month based on how many days we are into this month (i.e. It is the 20th of April so I want to sum the first 20 days of March to compare against.) =SUM(G4:ADDRESS(ROW(),7+$BR$3,4)) I basically want to SUM(G4:AA4) and have used the address function to return the cell reference AA4 by taking G4 and adding 20 to the column count. ADDRESS(ROW(),7+$BR$3,4) This successfully returns AA7 as expected HOWEVER, when I try to use the returning value in the SUM() function it throws an error... Am I not able to use this reference in my calculation?

    Read the article

  • Simple neon optimization in Android

    - by Peter
    In my Android application, I use a bunch of open source libraries such as libyuv, libvpx, libcrypto, libssl, etc. Some of them come with Android.mk. For others, I hand-crafted Android.mk. The code is built only for arm for now. Here is my Application.mk: APP_ABI := armeabi-v7a APP_OPTIM := release APP_STL := gnustl_static APP_CPPFLAGS := -frtti I am looking for way to generate binaries that are optimized for neon. Browsing the net, I found the following setting that someone is using in his Android.mk: LOCAL_CFLAGS += -mfloat-abi=softfp -mfpu=neon -march=armv7 I wonder if I simply put this setting in Application.mk, will it automatically get applied across all the libraries? A step before each library is built is the following: include $(CLEAR_VARS) Is it better to include LOCAL_CFLAGS directive after this line (instead of including it in Application.mk)? Finally, why doesn't ndk-build automatically optimize for neon when it sees armabi in Application.mk? Regards.

    Read the article

  • Complicated parsing in python

    - by Quazi Farhan
    I have a weird parsing problem with python. I need to parse the following text. Here I need only the section between(not including) "pre" tag and column of numbers (starting with 205 4 164). I have several pages in this format. <html> <pre> A Short Study of Notation Efficiency CACM August, 1960 Smith Jr., H. J. CA600802 JB March 20, 1978 9:02 PM 205 4 164 210 4 164 214 4 164 642 4 164 1 5 164 </pre> </html>

    Read the article

< Previous Page | 34 35 36 37 38 39 40 41 42 43 44 45  | Next Page >