Search Results

Search found 59785 results on 2392 pages for 'time synchronization'.

Page 39/2392 | < Previous Page | 35 36 37 38 39 40 41 42 43 44 45 46  | Next Page >

  • Is there a server distro with the capability of syncing live data to multiple machines?

    - by Adam Hart
    Scenario: I have a main server that is used for pagebuilding/storing master data, and is accessed by a few clients on site. This company also has multiple branches with their own server that that connect to locally, but need to work with all the same data, and have it synchronized across all servers in real (or close) time. Is there a way/specific server OS that can sync live data across all of these servers? These servers would also need to be able to: Configure AFP, FTP, CIFS, SMB Continue to host their web server and database server in a Microsoft environment, but move the file server off to commodity hardware Just wondering if this is even possible.

    Read the article

  • Do you know of an online back up & sync solution for Windows that actually works?

    - by Hermann
    I've been looking for some time for a program that backups your data to the cloud and is also able to sync 2 or more computers. By syncing I mean, if I change something on one computer that it should also apply the same change on another computer. I've tried two solutions so far which looked good initially but ultimately failed because they were buggy or simply don't work, or both. Syncplicity has messed up my file structure several times and they don't fix fix bugs that are literally over a year old. I then switched to SpiderOak which looked promising but ultimately had the same problems. Messed up my file structure several times, sometimes sync simply doesn't work, it's extremely inefficient and they keep pushing out releases were they say they fixed the sync bugs I reported but they did't. Does anyone of you know of an online sync solution that actually works?

    Read the article

  • How to reliably synchronise file servers between London and Shanghai?

    - by Andy S
    We have two offices, one in London and one in Shanghai, each needing to be able to access the same set of files. This means we need a solid, speedy means of synchronising a set of folders between servers at either office. They're likely to be Windows servers, but we could look at Linux boxes if the software side makes more sense on *nix. We've considered Rsync, Unison, Gluster, and a few other options, but none of them seem capable of reliably keeping the servers in sync between such distant office locations. Each office is on DSL connectivity over the open internet, so encryption is also a factor. Does anyone have any hints for getting the servers synchronising in as close to real time as possible, without dying constantly? Andy

    Read the article

  • Same album repeatedly updates when syncing iTunes with iPhone

    - by Unsliced
    I have many many albums and tracks purchased via the iTunes store both through iTunes directly and via the iPhone. They all synchronise properly and are on iTunes eventually (i.e. if purcashed originally on the iPhone). There's one album, though, purchased via the iTunes app in June this year. Virtually every time I sync the iPhone it says "updating files" and this album gets updated. The rest of the sync goes just fine, new tracks added, listened to podcasts are removed, playlists are updated (notwithstanding that smart playlists' orderings are now utterly broken) fine - but this album is always getting updated. In finder I've looked at the permissions and nothing seems unusual. FWIW, I'm on Mac OS X 10.5.8, iPhone 3.1.2, iTunes 9.02. Anyone with any ideas? It's not a fundamental problem, but it does means that each sync takes an extra 30-60 seconds, which is annoying!

    Read the article

  • How to sync passwords one-way between windows domains without trust relationship?

    - by Franco C.
    We're migrating from Windows 2003 to 2008 SBS. We will run concurrently for a short period of time. I cannot establish a trust relationship between Server 2003 & Server 2008 SBS and I would like to know if there is a way to sync the passwords between 2003-2008? For example, I would like to dump the pre-encrypted passswords to a file in 2003 and then use this to update the passwords for the correspoding usernames in 2008 SBS. Is this possible? I have no need to ever see the clear text version of the passwords. I see one commercial product, but it hardly seems worth it given the temporary nature of my project... Thanks, Franco

    Read the article

  • rsync server side limit bandwidth/connection

    - by c2h2
    In a VOIP application, I have upto 3000 clients rsync audio files from there linux server in a daily, server is placed at a data center (10Mbps in/out bound), the server works as a VOIP sip server running FreeSWITCH (low ping latency should be ensured.) Therefore I would like to have server side control of rsync which controls: Limit total outbound bandwidth. Limit total number of connections. (Reject clients while at max number of connection and let it retry after a specific time frame.) OPTIONAL: list/kill individual connections. Normally I would use ssh + rsync + pem_keys with some extra options, but above requirements are not feasible by simple command lines. Can anyone point me some direction. or show some scripts/tools? I would also probably integrate them and release on github. Thanks!

    Read the article

  • Service or software to auto-sync one server to another so they are identical?

    - by Ryan
    We have a main node in a DC data center and want to setup a back-up node in Seattle. The back-up node will only be used if the DC node goes down and we switch it over while DC node is repaired. The question is, what kind of services out there allow me to sync the data, I suppose we want to do it fairly frequently so if something goes down there isn't much loss in data between the time of failure and the last back-up/sync. Is there any common solution for this? It's Windows Server 2003 running Parallels Virtuozzo.

    Read the article

  • Syncing 1TB+ to a iSCSI device, software needed

    - by mojah
    Hi, I need to sync a local disk to a iSCSI mount on Windows (server 2003), and I'm struggling to find software that's capable of doing so in a reasonable timeframe. Notes on the current 1TB disk: - 800GB currently in use - Contains a folder with several hundred thousand subfolders, which in turn have several thousand files, ... So I'm trying to find a piece of software that can handle such large filelists, and give me a good timeframe on when this will be copied. I've tried DeltaCopy (the rSync GUI client for Windows), but it's intolerably slow and doesn't provide me with a good estimate time remaining. DeltaCopy: http://www.aboutmyip.com/AboutMyXApp/DeltaCopy.jsp Does anyone know alternative software for Windows, that would do this well?

    Read the article

  • Google Analytics and Whos.amung.us in realtime visitors, why such an enormous discrepancy?

    - by jacouh
    Since years I use in a site both Google Analytics and Whos.amung.us, both Google analytics and whos.amung.us javascripts are inserted in the same pages in the tracked part of the site. In real-time visitors, why such an enormous discrepancy ? for example at the moment, Google analytics gives me 9 visitors, whos.amung.us indicates 59, a ratio of 6 times? Why whos.amung.us is 6 times optimistic than Google Analytics in terms of the realtime visitors? Google whos.amung.us My question is: whos.amung.us does not detect robots while Google does? GA ignores visitors from some countries, not whos.amung.us? Some robots/bots execute whos.amung.us javascript for tracking? While no robots/bots can execute the tracking javascript provided by Google Analytics? To facilitate your analysis, I copy JS code used below: Google analytics: <script type="text/javascript"> var _gaq = _gaq || []; _gaq.push(['_setAccount', 'MyGaAccountNo']); _gaq.push(['_trackPageview']); (function() { var ga = document.createElement('script'); ga.type = 'text/javascript'; ga.async = true; ga.src = ('https:' == document.location.protocol ? 'https://ssl' : 'http://www') + '.google-analytics.com/ga.js'; var s = document.getElementsByTagName('script')[0]; s.parentNode.insertBefore(ga, s); })(); </script> Whos.amung.us: <script>var _wau = _wau || []; _wau.push(["tab", "MyWAUAccountNo", "c6x", "right-upper"]);(function() { var s=document.createElement("script"); s.async=true; s.src="http://widgets.amung.us/tab.js";document.getElementsByTagName("head")[0].appendChild(s);})();</script> I've aleady signaled this to WAU staff some time ago, NR, I've not done this to Google as they don't handle this kind of feedback. Thank you for your explanations.

    Read the article

  • How to visualize timer functionality in sequence diagram?

    - by truthseeker
    I am developing software for communication with external device through serial port. To better understand the new functionality I am trying to display it in sequence diagram. Flow of events is as follows. I send to the device command to reset it. This is asynchronous operation so there is some delay between request and response (typically 100 ms). There can be case when the answer never comes (for example device is not connected to the specified port or is currently turned off). For this purpose I create a timer with period twice the maximum answer time. In my case it is 2 * 125 ms = 250 ms. If the answer comes in predefined time interval, I destroy already running timer. If the answer doesnt come in predefined interval, timer initiates some action. After this action we can destroy it. How to effectively model this situation in sequence diagram? Addendum 1: Based on advices made by scarfridge i drew following UML diagram. Comment by Ozair is also helpful for simplifying the diagram even more.

    Read the article

  • Am I programming too slow?

    - by Jonn
    I've only been a year in the industry and I've had some problems making estimates for specific tasks. Before you close this, yes, I've already read this: http://programmers.stackexchange.com/questions/648/how-to-respond-when-you-are-asked-for-an-estimate and that's about the same problem I'm having. But I'm looking for a more specific gauge of experiences, something quantifiable or probably other programmer's average performances which I should aim for and base my estimates. The answers range from weeks, and I was looking more for an answer on the level of a task assigned for a day or so. (Note that this doesn't include submitting for QA or documentations, just the actual development time from writing tests if I used TDD, to making the page, before having it submitted to testing) My current rate right now is as follows (on ASP.NET webforms): Right now, I'm able to develop a simple data entry page with a grid listing (no complex logic, just Creating and Reading) on an already built architecture, given one full day's (8 hours) time. Adding complex functionality, and Update and Delete pages add another full day to the task. If I have to start the page from scratch (no solution, no existing website) it takes me another full day. (Not always) but if I encounter something new or haven't done yet it takes me another full day. Whenever I make an estimate that's longer than the expected I feel that others think that I'm lagging a lot behind everyone else. I'm just concerned as there have been expectations that when it's just one page it should take me no more than a full day. Yes, there definitely is more room for improvement. There always is. I have a lot to learn. But I would like to know if my current rate is way too slow, just average, or average for someone no longer than a year in the industry.

    Read the article

  • Assuming "clean code/architecture" is there a difference in "effort" between PHP or Java/J2EE web application development?

    - by PhD
    A client asked us to estimate effort when selecting PHP as the implementation language for his next web-based application. We spent about a week exploring PHP, prototyping, testing etc., We are quite new to this language - may have hacked around it in the past but, let's go with PHP-noobs but application development experts (for the lack of a better, less flattering word :) It seems, that if we write, clean maintainable code, follow separation of concerns, enterprise architecture patters (DAOs etc.) the 'effort' in creating an object-oriented PHP based web-application seems to be the same for a Java based one. Here's our equation for estimating the effort (development/delivery time): ConstructionEffort = f(analysis, design, coding, testing, review, deployment) We were specifically comparing effort estimates in creating an enterprise application with the following: PHP + CakePHP/CodeIgniter (should we have considered others?) Java + Spring + Restlet It's an end-to-end application: Client: Javascript/jQuery + HTML/CSS Middle tier/Business Logic - (Still evaluating PHP/Java) Database: MySQL The effort estimates of the 1st and 3rd tier are constant and relatively independent of the middle tier's technology. At a high level with an initial breakdown into user stories of the requested features as well as a high-level SWAG on the sheer number of classes/SLOC that would be required for PHP doesn't seem to differ by much from what is required of the same in Java. Is this correct? We are basing our initial estimates on the initial prototyping/coding we've done with PHP - we are currently disregarding fluency with the language as a factor, since that'll be an initial hurdle and not a long term impediment IMHO (we also have sufficient time to become quite fluent with PHP). I'm interested in knowing the programmers' perspective with respect to effort when creating similar applications with either of the languages to justify choosing one over the other. Are we missing something here? It seems we are going against popular belief of PHP being quicker to market (or we being very fluent with Java have our vision clouded). It doesn't seem to have any coding/programming effort saving from what we/ve played around with.

    Read the article

  • Calculation of Milestones/Task list

    - by sugar
    My project manager assigned me a task to estimate the development time for an iPad application. Lets assume that I gave estimation of 15 working days. He thought that the number of days where too many and client needed the changes to the application urgently (as in most of cases). So, he told me: "I am going to assign two developer including you and as per my understandings and experience it won't take more than seven working days." Clarifications I was given the task of estimating development time for an individual. How could I be sure that 2 developers are going to finish it within 7 days? (I am new to team & I hardly know the others abilities) Questions Why do most of project managers / team leaders have understandings like: If one developer requires N days, Then two developers would require N/2 days, Do they think something like developer = s/w production machines? Should a team member (developer, not team lead or any higher post) estimate other developers work? I didn't deny anything in the meeting and didn't said, but what should be the appropriate answer to convince them that N/2 formula that they follow is not correct?

    Read the article

  • How do I dig myself out of this DEEP hole? [closed]

    - by user74847
    I may be a bit bias in the way i word this but any opinions and suggestions are welcome. I should start by saying i have a MSc in CS and a degree in new media +6 years expereince and im probably around a middleweight developer. I started a web development company with my friend from uni a year ago, there was a 4 month gap in the middle where i went miles away work on a big project. Ive since returned and picked up where we left off. A year on though i find im still staying up til 5am and getting up at 9 sometimes 2-3 days without sleep. While i was away i was working 9-5 and struggling to keep up with doing stuff for my clients 8 hours ahead, after work, so things stagnated. We currently have about 12 active projects, with one other part time developer and a full time freelancer who is dealing with one of our major projects. I am solely responsible for concurrently developing 2 big sites similar to gumtree in functionality, at the same time as about 5-6+ small WordPress based 5-10page sites. a lot of the content isnt in yet or the client is delaying so i chop and change project every other day which does my head in. Is it reasonable to expect myself to remember the intricate details of each project when i come back to it a week later? and remember the details of a task which hasnt been written down? my business partner seems to think so. or am i just forgetful? Im particularly bad at estimating timescales which doesnt help, added to that a lot of the technologies im am using are new to me (a magento site took weeks to theme rather than days and was full of bugs, even after 1000's of google searches and hours reading forums) im still trying to learn and find the best CMS for us to use and getting my head around the likes of Bootstrap and jquery, Cpanel / Linux (we just got a blank vps for me to set up with no experience) even installing an SSL certificate caused everyone's mail clients to go down which was more stress for me to sort out. I find the pressure of the workload and timescales and trying to learn this stuff so fast is beginning to turn me against my career path. The fact that i never seem to get anything done really winds up my business partner and iv come to associate him with the stress and pain of the whole situation especially when I get berated or a look that says "oh you retard" when I forget something. Even today i spent hours learning how a particular themeforest theme worked with wordpress and how i could twist it to work for our partiuclar needs, on the surface had done no work, that triggered a 30 minute tirade of anger and stress and questioning what i had done from my business partner. had i taken too long to work on that? shoudl i have done it in 2 hours instead of 6? i told him i would take 2 hours. i was wrong. I feel like im running myself into the ground. My sleeping pattern has got so bad that when im working im half asleep and making mistakes, my eyes are constantly purple underneath, i literally fall asleep at my desk, its affecting my social life too, ive not slept more than lightly for the last year and grind through impossible code puzzles in my half sleep wich keeps me awake, when im already exhausted. plus the work is rushed and buggy when it does get done so drags on into the next project. I also procrastinate quite badly, pacing the livingroom, looking out the window when Im alone for three days straight in the flat and start to get cabin fever which means i do even less work and the negative feedback loop continues. I get told im the only one with the problem when i say that i cant work from home any more, and examples of other freelancers get brought up. an office wouldnt bring any extra cash in to the company but im convinced having that moving more than 2 meters away from my bed to go to "work" would get me working, at the moment i feel guilty like i should be working 24-7. It is important that we do all this work to raise enough cash to get our business to the next level but every month still feels like a struggle to pay the rent (there is about £20K coming in by Jan) and i have to borrow money from friends often to buy food or get a taxi to a meeting, so it is vital the money keeps coming in. (im also 20 mins late for nearly all meetings but thats a different issue) have you experienced anything similar? how can i deal with the issues ive raised? is it realistic to develop 10 sites at once? how can i improve my relationship with my business partner? do you struggle to work at home? how do you deal with that? i think if i dont get my life on track by feb i will seriously consider giving it all up, but that seems like such a waste. any ideas!!? i need help! Thanks.

    Read the article

  • Slide 2d Vector to destination over a period of time

    - by SchautDollar
    I am making a library of GUI controls for games I make with XNA. I am currently developing the library as I make a game so I can test the features and find errors/bugs and hopefully smash them right away. My current issue is on a slide feature I want to implement for my base class that all controls inherit. My goal is to get the control to slide to a specified point over a specified amount of time. Here is the #region containing the code #region Slide private bool sliding; private Vector2 endPoint; private float slideTimeLeft; private float speed; private bool wasEnabled; private Vector2 slideDirection; private float slideDistance; public void Slide(Vector2 startPoint, Vector2 endPoint, float slideTime) { this.location = startPoint; Slide(endPoint,slideTime); } public void Slide(Vector2 endPoint, float slideTime) { this.wasEnabled = this.enabled; this.enabled = false; this.sliding = true; Vector2 tempLength = endPoint - this.location; this.slideDistance = tempLength.Length(); //Was this.slideDistance = (float)Math.Sqrt(tempLength.LengthSquared()); this.speed = slideTime / this.slideDistance; this.endPoint = endPoint; this.slideTimeLeft = slideTime; } private void UpdateSlide(GameTime gameTime) { if (this.sliding) { this.slideTimeLeft -= gameTime.ElapsedGameTime.Milliseconds; if (this.slideTimeLeft >= 0 ) { if ((this.endPoint-this.location).Length() != 0){//Was if (this.endPoint.LengthSquared() > 0 || this.location.LengthSquared() > 0) { this.slideDirection = Vector2.Normalize(this.endPoint - this.location); } this.location += this.slideDirection * speed * gameTime.ElapsedGameTime.Milliseconds;//This is where I believe the issue is, but I'm not sure. It seems right to me... (Even though it doesn't work) } else { this.enabled = this.wasEnabled; this.location = this.endPoint;//After time, the controls position will get set to be the endpoint. this.sliding = false; } } } #endregion this.location is the location of the control elsewhere defined in the class. I have looked at this blog as a huge reference and have googled around quite and have looked on many forums but can't find anything that shows how to implement it. Please and Thanks for your time! EDIT: I have switched this line "this.location += this.slideDirection * speed * gameTime.ElapsedGameTime.Milliseconds;" several times to see what it does. My issue is getting the control to smoothly move to the end location. It moves after the time has expired, but It doesn't move other then that except flash in my face. EDIT2: I have used the first slide method with 3 parameters and it works except it doesn't do it in a period of time and once it gets to its destination, it starts moving randomly towards the previous location and the end location.

    Read the article

  • How to get short month names in Joda Time?

    - by Mr Morgan
    Hello Does anyone know if there's a method in Joda Time or Java itself which takes either an int or a String as an argument, e.g. 4 or "4" and gives the name of the month back in short format, i.e. JAN for January? I suppose long month names can be truncated and converted to upper case. Thanks Mr Morgan.

    Read the article

  • Is this the correct way to convert a UTC datetime string into localtime?

    - by Steve
    Is this the correct way to convert a UTC string into local time allowing for daylight savings? It looks ok to me but you never know :) import time UTC_STRING = "2010-03-25 02:00:00" stamp = time.mktime(time.strptime(UTC_STRING,"%Y-%m-%d %H:%M:%S")) stamp -= time.timezone now = time.localtime() if now[8] == 1: stamp += 60*60 elif now[8] == -1: stamp -= 60*60 print 'UTC: ', time.gmtime(stamp) print 'Local: ', time.localtime(stamp) --- Results from New Zealand (GMT+12 dst=1) --- UTC: (2010, 3, 25, 2, 0, 0, 3, 84, 0) Local: (2010, 3, 25, 15, 0, 0, 3, 84, 1)

    Read the article

  • How do you determine an acceptable response time for DB requests?

    - by qiq
    According to this discussion of Google App Engine on Hacker News, A DB (read) request takes over 100ms on the datastore. That's insane and unusable for about 90% of applications. How do you determine what is an acceptable response time for a DB read request? I have been using App Engine without noticing any issues with DB responsiveness. But, on the other hand, I'm not sure I would even know what to look for in that regard :)

    Read the article

  • How do you determine an acceptable response time for App Engine DB requests?

    - by qiq
    According to this discussion of Google App Engine on Hacker News, A DB (read) request takes over 100ms on the datastore. That's insane and unusable for about 90% of applications. How do you determine what is an acceptable response time for a DB read request? I have been using App Engine without noticing any issues with DB responsiveness. But, on the other hand, I'm not sure I would even know what to look for in that regard :)

    Read the article

  • Subroutine to apply Daylight Bias to display time in local DST?

    - by vfclists
    UK is currently 1 hour ahead of UTC due to Daylight Savings Time. When I check the Daylight Bias value from GetTimeZoneInformation it is currently -60. Does that mean that translating UTC to DST means DST = UTC + -1 * DaylightBias, ie negate and add? I thought in this case for instance adding Daylight Bias to UTC is the correct operation, hence requiring DaylightBias to be 60 rather than -60.

    Read the article

< Previous Page | 35 36 37 38 39 40 41 42 43 44 45 46  | Next Page >