Search Results

Search found 39047 results on 1562 pages for 'process control'.

Page 42/1562 | < Previous Page | 38 39 40 41 42 43 44 45 46 47 48 49  | Next Page >

  • What if a large number of objects are passed to my SwingWorker.process() method?

    - by Trejkaz
    I just found an interesting situation. Suppose you have some SwingWorker (I've made this one vaguely reminiscent of my own): public class AddressTreeBuildingWorker extends SwingWorker<Void, NodePair> { private DefaultTreeModel model; public AddressTreeBuildingWorker(DefaultTreeModel model) { } @Override protected Void doInBackground() { // Omitted; performs variable processing to build a tree of address nodes. } @Override protected void process(List<NodePair> chunks) { for (NodePair pair : chunks) { // Actually the real thing inserts in order. model.insertNodeInto(parent, child, parent.getChildCount()); } } private static class NodePair { private final DefaultMutableTreeNode parent; private final DefaultMutableTreeNode child; private NodePair(DefaultMutableTreeNode parent, DefaultMutableTreeNode child) { this.parent = parent; this.child = child; } } } If the work done in the background is significant then things work well - process() is called with relatively small lists of objects and everything is happy. Problem is, if the work done in the background is suddenly insignificant for whatever reason, process() receives a huge list of objects (I have seen 1,000,000, for instance) and by the time you process each object, you have spent 20 seconds on the Event Dispatch Thread, exactly what SwingWorker was designed to avoid. In case it isn't clear, both of these occur on the same SwingWorker class for me - it depends on the input data, and the type of processing the caller wanted. Is there a proper way to handle this? Obviously I can intentionally delay or yield the background processing thread so that a smaller number might arrive each time, but this doesn't feel like the right solution to me.

    Read the article

  • Is a control's OnInit called even when attaching it during parent's OnPreRender?

    - by Xerion
    My original understanding was that the asp.net page lifecycle is run once for all pages and controls under normal circumstances. When I attached a control during a container's OnPreRender, I encountered a situation where the control's OnInit was not called. OK, I considered that a bug in my code and fixed as such, by attaching the control earlier. But just today, I encountered a situation where OnInit for a control seems to be called after the normal OnInit has been done for everyone else. See stack below. It seems that during the page's PreRender, the control's OnInit is called as it is being dynamically added. So I just want to confirm exactly what ASP.NET's behavior is? Does it actually keep track of the stage of each control's lifecycle, and upon adding a new control, it will run from the very beginning? [HttpException (0x80004005): The control collection cannot be modified during DataBind, Init, Load, PreRender or Unload phases.] System.Web.UI.ControlCollection.Add(Control child) +8678663 MyCompany.Web.Controls.SetStartPageWrapper.Initialize() MyCompany.Web.Controls.SetStartPageWrapper.OnInit(EventArgs e) System.Web.UI.Control.InitRecursive(Control namingContainer) +333 System.Web.UI.Control.InitRecursive(Control namingContainer) +210 System.Web.UI.Control.AddedControl(Control control, Int32 index) +198 System.Web.UI.ControlCollection.Add(Control child) +80 MyCompany.Web.Controls.PageHeader.OnPreRender(EventArgs e) in System.Web.UI.Control.PreRenderRecursiveInternal() +80 System.Web.UI.Control.PreRenderRecursiveInternal() +171 System.Web.UI.Control.PreRenderRecursiveInternal() +171 System.Web.UI.Page.ProcessRequestMain(Boolean includeStagesBeforeAsyncPoint, Boolean includeStagesAfterAsyncPoint) +842

    Read the article

  • Creating independent process!

    - by Neha
    I am trying to create a process from a service in C++. This new process is creating as a child process. I want to create an independent process and not a child process... I am using CreateProcess function for the same. Since the new process i create is a child process when i try to kill process tree at the service level it is killing the child process too... I dont want this to happen. I want the new process created to run independent of the service. Please advice on the same.. Thanks.. Code STARTUPINFO si; PROCESS_INFORMATION pi; ZeroMemory( &si, sizeof(si) ); si.cb = sizeof(si); // Start the child process. ZeroMemory( &pi, sizeof(pi) ); si.dwFlags = STARTF_USESHOWWINDOW; if(bRunOnWinLogonDesktop) { if(csDesktopName.empty()) si.lpDesktop = _T("winsta0\\default"); else _tcscpy(si.lpDesktop, csDesktopName.c_str()); } if(bHide) si.wShowWindow = SW_HIDE; /* maybe even SW_HIDE */ else si.wShowWindow = SW_SHOW; /* maybe even SW_HIDE */ TCHAR szCmdLine[512]; _tcscpy(szCmdLine, csCmdLine.c_str()); if( !CreateProcess( NULL, szCmdLine, NULL, NULL, FALSE, CREATE_NEW_PROCESS_GROUP, NULL, NULL, &si, &pi ) )

    Read the article

  • Assembla is no longer free, is there a good alternative?!

    - by pabloide86
    http://blog.assembla.com/assemblablog/tabid/12618/bid/6986/Release-2-0-restricting-free-plans-giving-back-with-features-and-pric I'm very disappointed about this... I use Assembla for my personal projects(commercial) and now I have to move everything to another place! There are some questions about different free hosting... I extracted some of the sites that offers free hosting for projects: http://www.svnhostingcomparison.com/ http://www.codespaces.com/ If you know about others like assembla please post it! Cheers from Argentina!

    Read the article

  • Android - How to decide wether to run a Service in a separate Process?

    - by pableu
    I am working on an Android application that collects sensor data over the course of multiple hours. For that, we have a Service that collects the Sensor Data (e.g. Acceleration, GPS, ..), does some processing and stores them remotely on a server. Currently, this Service runs in a separate process (using android:service=":background" in the manifest). This complicates the communication between the Activities and the Service, but my predecessors created the Application this way because they thought that separating the Service from the Activities would make it more stable. I would like some more factual reasons for the effort of running a separate process. What are the advantages? Does it really run more stable? Is the Service less likely to be killed by the OS (to free up resources) if it's in a separate process? Our Application uses startForeground() and friends to minimize the chance of getting killed by the OS. The Android docs are not very specific about this, the mostly state that it depends on the Application's purpose ;-) TL;DR What are objective reasons to put a long-running Service in a separate process (in Android)?

    Read the article

  • SQL Server devs–what source control system do you use, if any? (answer and maybe win free stuff)

    - by jamiet
    Recently I noticed a tweet from notable SQL Server author and community dude-at-large Steve Jones in which he asked how many SQL Server developers were putting their SQL Server source code (i.e. DDL) under source control (I’m paraphrasing because I can’t remember the exact tweet and Twitter’s search functionality is useless). The question surprised me slightly as I thought a more pertinent question would be “how many SQL Server developers are not using source control?” because I have been doing just that for many years now and I simply assumed that use of source control is a given in this day and age. Then I started thinking about it. “Perhaps I’m wrong” I pondered, “perhaps the SQL Server folks that do use source control in their day-to-day jobs are in the minority”. So, dear reader, I’m interested to know a little bit more about your use of source control. Are you putting your SQL Server code into a source control system? If so, what source control server software (e.g. TFS, Git, SVN, Mercurial, SourceSafe, Perforce) are you using? What source control client software are you using (e.g. TFS Team Explorer, Tortoise, Red Gate SQL Source Control, Red Gate SQL Connect, Git Bash, etc…)? Why did you make those particular software choices? Any interesting anecdotes to share in regard to your use of source control and SQL Server? To encourage you to contribute I have five pairs of licenses for Red Gate SQL Source Control and Red Gate SQL Connect to give away to what I consider to be the five best replies (“best” is totally subjective of course but this is my blog so my decision is final ), if you want to be considered don’t forget to leave contact details; email address, Twitter handle or similar will do. To start you off and to perhaps get the brain cells whirring, here are my answers to the questions above: Are you putting your SQL Server code into a source control system? As I think I’ve already said…yes. Always. If so, what source control server software (e.g. TFS, Git, SVN, Mercurial, SourceSafe, Perforce) are you using? I move around a lot between many clients so it changes on a fairly regular basis; my current client uses Team Foundation Server (aka TFS) and as part of a separate project is trialing the use of Team Foundation Service. I have used SVN extensively in the past which I am a fan of (I generally prefer it to TFS) and am trying to get my head around Git by using it for ObjectStorageHelper. What source control client software are you using (e.g. TFS Team Explorer, Tortoise, Red Gate SQL Source Control, Red Gate SQL Connect, Git Bash, etc…)? On my current project, Team Explorer. In the past I have used Tortoise to connect to SVN. Why did you make those particular software choices? I generally use whatever the client uses and given that I work with SQL Server I find that the majority of my clients use TFS, I guess simply because they are Microsoft development shops. Any interesting anecdotes to share in regard to your use of source control and SQL Server? Not an anecdote as such but I am going to share some frustrations about TFS. In many ways TFS is a great product because it integrates many separate functions (source control, work item tracking, build agents) into one whole and I’m firmly of the opinion that that is a good thing if for no reason other than being able to associate your check-ins with a work-item. However, like many people there are aspects to TFS source control that annoy me day-in, day-out. Chief among them has to be the fact that it uses a file’s read-only property to determine if a file should be checked-out or not and, if it determines that it should, it will happily do that check-out on your behalf without you even asking it to. I didn’t realise how ridiculous this was until I first used SVN about three years ago – with SVN you make any changes you wish and then use your source control client to determine which files have changed and thus be checked-in; the notion of “check-out” doesn’t even exist. That sounds like a small thing but you don’t realise how liberating it is until you actually start working that way. Hoping to hear some more anecdotes and opinions in the comments. Remember….free software is up for grabs! @jamiet 

    Read the article

  • The Java Community Process: What's Broken and How to Fix It

    - by Tori Wieldt
    In a panel discussion today at TheServerSide Java Symposium, Patrick Curran, Head of the Java Community Process, James Gosling, and ?Reza Rahman, member, Java EE 6 and EJB 3.1 expert groups, discussed the state of the JCP. Moderated by Cameron McKenzie, Editor of TheServerSide.com, they discussed what's wrong with JCP and ways to fix it.What's wrong with the JCP? Reza Rahman was quite supportive of the JCP. "I work as a consultant, and it's much better than getting a decision made a large company," Reza commented. He gave the JCP "Five stars" and explained that as an individual, he was able to have an impact on things that mattered to him. Cameron asked, "Now all these JCP problems came after Oracle acquired Sun, right?" To which the crowd had a good laugh, and the panel all agreed many of the JCP problems existed under Sun. How is the JCP handled differently under Oracle than Sun? "Pretty similar," said James. Oracle "tends more towards practicality" said Reza. "I'm glad to see things moving again, we've got several new JSRs filed," Patrick commented.How to Fix It?They all agreed greater transparency is a top issue. Without it, people assume sinister behavior whether it's there or not. Patrick said that currently spec leads are "encouraged" to be transparent, and the JCP office is planning to submit JSRs to change the JCP process so transparency is mandated, both for mailing lists and issue tracking. Shining a light on problems is the best way to fix them.Reza said the biggest problem is lack of a participation from the community. If more people are involved, a lot of the problems go away. "Developers are too non-chalant, they should realize what happens in the JCP has an direct impact on their career and they need to get involved." Reza commented.Got Involved!During Q&A, someone asked how a developer could get involved. They answered: Pick a JSR you are interested in and follow it. To start, you could read an article about the JSR and comment on the article (expert group members do read the comments). Or read the spec, discuss it with others and post a blog about it. Read the Expert Group proceedings. Join the JCP (free for individuals). Open source projects have code that you can download and play with, download it and provide feedback. Patrick mentioned that the JCP really wants more participation. "One way we are working on it is that we are encouraging JUGs to join the JCP as a group, and that makes all members of the JUG JCP members," Patrick said.They commented that most spec leads are desperate for feedback. "And, please get involved BEFORE the spec is finalized!" James declared. Someone from the audience said it's hard to put valuable time into something before it's baked. Patrick explained that Post Final Draft (PFD) is the time in the JCP process when the spec is mature enough to review but before the spec is finalized. The panel agreed the worst thing that could happen is that most people in the Java community just complain about the JCP without getting involved. Developer Sumit Goyal, conference attendee, thought it was a healthy discussion. "I got insights into how JSRs are worked on and finalized," he said.Key LinksThe Java Community Process Website  http://jcp.org/en/home/indexArticle: A Conversation with JCP Chair Patrick Curran Oracle Technology Network http://www.oracle.com/technetwork/java/index.htmlTheServerSide Java Symposium  http://javasymposium.techtarget.com/

    Read the article

  • Detecting Process Shutdown/Startup Events through ActivationAgents

    - by Ramkumar Menon
    @10g - This post is motivated by one of my close friends and colleague - who wanted to proactively know when a BPEL process shuts down/re-activates. This typically happens when you have a BPEL Process that has an inbound polling adapter, when the adapter loses connectivity to the source system. Or whatever causes it. One valuable suggestion came in from one of my colleagues - he suggested I write my own ActivationAgent to do the job. Well, it really worked. Here is a sample ActivationAgent that you can use. There are few methods you need to override from BaseActivationAgent, and you are on your way to receiving notifications/what not, whenever the shutdown/startup events occur. In the example below, I am retrieving the emailAddress property [that is specified in your bpel.xml activationAgent section] and use that to send out an email notification on the activation agent initialization. You could choose to do different things. But bottomline is that you can use the below-mentioned API to access the very same properties that you specify in the bpel.xml. package com.adapter.custom.activation; import com.collaxa.cube.activation.BaseActivationAgent; import com.collaxa.cube.engine.ICubeContext; import com.oracle.bpel.client.BPELProcessId; import java.util.Date; import java.util.Properties; public class LifecycleManagerActivationAgent extends BaseActivationAgent { public BPELProcessId getBPELProcessId() { return super.getBPELProcessId(); } private void handleInit() throws Exception { //Write initialization code here System.err.println("Entered initialization code...."); //e.g. String emailAddress = getActivationAgentDescriptor().getPropertyValue(emailAddress); //send an email sendEmail(emailAddress); } private void handleLoad() throws Exception { //Write load code here System.err.println("Entered load code...."); } private void handleUnload() throws Exception { //Write unload code here System.err.println("Entered unload code...."); } private void handleUninit() throws Exception { //Write uninitialization code here System.err.println("Entered uninitialization code...."); } public void init(ICubeContext icubecontext) throws Exception { super.init(icubecontext); System.err.println("Initializing LifecycleManager Activation Agent ....."); handleInit(); } public void unload(ICubeContext icubecontext) throws Exception { super.unload(icubecontext); System.err.println("Unloading LifecycleManager Activation Agent ....."); handleUnload(); } public void uninit(ICubeContext icubecontext) throws Exception{ super.uninit(icubecontext); System.err.println("Uninitializing LifecycleManager Activation Agent ....."); handleUninit(); } public String getName() { return "Lifecyclemanageractivationagent"; } public void onStateChanged(int i, ICubeContext iCubeContext) { } public void onLifeCycleChanged(int i, ICubeContext iCubeContext) { } public void onUndeployed(ICubeContext iCubeContext) { } public void onServerShutdown() { } } Once you compile this code, generate a jar file and ensure you add it to the server startup classpath. The library is ready for use after the server restarts. To use this activationAgent, add an additional activationAgent entry in the bpel.xml for the BPEL Process that you wish to monitor. After you deploy the process, the ActivationAgent object will be called back whenever the events mentioned in the overridden methods are raised. [init(), load(), unload(), uninit()]. Subsequently, your custom code is executed. Sample bpel.xml illustrating activationAgent definition and property definition. <?xml version="1.0" encoding="UTF-8"? <BPELSuitcase timestamp="1291943469921" revision="1.0" <BPELProcess wsdlPort="{http://xmlns.oracle.com/BPELTest}BPELTestPort" src="BPELTest.bpel" wsdlService="{http://xmlns.oracle.com/BPELTest}BPELTest" id="BPELTest" <partnerLinkBindings <partnerLinkBinding name="client" <property name="wsdlLocation"BPELTest.wsdl</property </partnerLinkBinding <partnerLinkBinding name="test" <property name="wsdlLocation"test.wsdl</property </partnerLinkBinding </partnerLinkBindings <activationAgents <activationAgent className="oracle.tip.adapter.fw.agent.jca.JCAActivationAgent" partnerLink="test" <property name="portType"Read_ptt</property </activationAgent <activationAgent className="com.oracle.bpel.activation.LifecycleManagerActivationAgent" partnerLink="test" <property name="emailAddress"[email protected]</property </activationAgent </activationAgents </BPELProcess </BPELSuitcase em

    Read the article

  • IIS not starting: The process cannot access the file because it is being used by another process

    - by Rick Strahl
    Ok, apparently a few people knew about this issue, but it is new to me and has caused me nearly an hour to track down today. What happened is that I’ve been working all day doing some final pre-deployment testing of several tools on my local dev machine. In the process I’ve been starting and stopping several IIS 7 Web sites. At some point I was done and just wanted to start my Default Web Site again and found this  little gem of an error message popping up: The process cannot access the file because it is being used by another process. (Exception from HRESULT: 0x80070020) A lot of headless running around ensued after this, trying to figure out why IIS wouldn’t start. Oddly some sites started right up, others didn’t. I killed INetInfo, all worker processes, tried IISReset a million times and even rebooted – all to no avail. What gives? Skype, you evil Bastard! As it turns out the culprit is – drum roll please - Skype!  What, you may ask, does Skype have to do with IIS and Web Requests? It looks like recent versions of Skype have an option to run over Port 80 and 443 to allow running over corporate firewalls. Which is actually a nice feature that lets Skype work just about anywhere. What’s not so cool is that IIS fails to start up when another application is already using the same port that a Web site is mapped to. In the case of my dev site that’d be port 80 and Skype was hogging it. To fix this issue you can stop Skype from using port 80 and 443 which quickly fixes the problem. Or stop Skype. Duh! To permanently fix the problem in Skype find the option on the Options | Connection tab and uncheck the Use port 80/443 option: Oddly I haven’t run into this problem even though my setup hasn’t changed in quite some time. It appears that it’s bad startup timing that causes this problem to occur. Whatever the circumstance was, Skype somehow ended up starting before IIS.  If Skype is started after IIS has started it will automatically opt for other ports and not use port 80 and so there’s no problem. It’s easy to demonstrate this behavior if you’re looking for it: Stop IIS Stop Skype Start Skype and make a test call Start IIS And voila your error is ready for you! This really shouldn’t be a problem except that it would be really nice if IIS could give a more helpful error message when it can fire up a site because a port is blocked. “The process cannot access a file” is really not a very helpful error message in this scenario… I/O port / file ah what the heck it’s all the same to Windows. Right! I’ve run into this situation quite a bit with other, albeit more obvious applications like running Apache on the local machine for testing and then trying to run an IIS application. Same situation,  although it’s been a while – pre IIS 7 and I think previous versions of IIS actually gave more useful error messages for port blockages and that would be helpful. On the way to figuring this out I ran into some pretty humorous forum posts though with people ragging on why the hell you would be running IIS. Or Skype. The misinformed paranoia police out in full force so to say :-). It’ll be nice to start running IIS Express once Visual Studio 2010 SP1 gets released. Anyway, no surprise that Skype didn’t jump out at me as the culprit right away and I was left fumbling for a while until the Internet came to the rescue. I’m not the first to have found this for sure – I posted a message on Twitter and dozens of people replied they’d run into this before as well. Seems worth mentioning again though – since I’m sure to forget that this happened in a year from now when I hit that same error. Maybe I’ll even find this blog post to remind me…© Rick Strahl, West Wind Technologies, 2005-2011Posted in IIS7  Windows  

    Read the article

  • Daemon process exiting when shell closes

    - by Pace
    I have a script which starts a daemon process and then sleeps for 20 seconds. If I run the script on SLES11 SP1 or RHEL6 then after the script exits the process is still running. If I run the script on SLES11 SP3 or RHEL6.3 then after the script exits the process is no longer running. The process continues to run for the entire 20 second sleep and is killed when the process exits. The script is run via expect so the script's entire shell exits with the process. Obviously if this wasn't a daemon it was starting I wouldn't be surprised. Also, I suspect the problem isn't the OS version as much as it is the difference in the way we've setup the newer servers (no idea what those differences are though, the older servers were set up years ago). During the 20 seconds the process runs if I do a ps I get the following: root 4699 1 0 15:14 pts/2 00:00:00 sudo -u openmq /opt/PacketPortal/openmq/default/bin/imqbrokerd -bgnd -autorestart -silent -port 7676 -Dimq.service.activelist=admin,ssljms -D openmq 4701 4699 0 15:14 pts/2 00:00:00 /bin/sh /opt/PacketPortal/openmq/default/bin/imqbrokerd -bgnd -autorestart -silent -port 7676 -Dimq.service.activelist=admin,ssljms -Dimq.ssl The fact that the parent process of 4699 is 1 seems to suggest to me that the process has been correctly daemonized. However, after the expect script exits both 4699 and 4701 are killed. What could be causing this? UPDATE I've printed the same output on the servers that work. During the 20 second sleep I get: openmq 18652 1 0 15:44 pts/1 00:00:00 /bin/sh /opt/PacketPortal/openmq/default/bin/imqbrokerd -bgnd -autorestart -silent -port 7676 -Dimq.service.activelist=admin,ssljms -Dimq.ssljms.tls.port=7680 openmq 18686 18652 8 15:44 pts/1 00:00:02 /usr/java/latest/bin/java -cp /opt/PacketPortal/openmq/default/bin/../lib/imqbroker.jar:/opt/PacketPortal/openmq/default/bin/../lib/imqutil.jar:/opt/PacketPortal/ope After the 20 second sleep I get: openmq 18652 1 0 15:44 ? 00:00:00 /bin/sh /opt/PacketPortal/openmq/default/bin/imqbrokerd -bgnd -autorestart -silent -port 7676 -Dimq.service.activelist=admin,ssljms -Dimq.ssljms.tls.port=7680 openmq 18686 18652 5 15:44 ? 00:00:02 /usr/java/latest/bin/java -cp /opt/PacketPortal/openmq/default/bin/../lib/imqbroker.jar:/opt/PacketPortal/openmq/default/bin/../lib/imqutil.jar:/opt/PacketPortal/ope After the script exits it disconnects the controlling terminal. I wonder why it doesn't do that on the newer servers. UPDATE Here is the section of the script that actually launches OpenMQ. The -bgnd flag is what is supposed to daemonize it. sudo -u openmq $IMQ_HOME/bin/$EXECUTABLE -bgnd $BROKER_OPTIONS $ARGS > /dev/null 2>&1 &

    Read the article

  • unable to kill process / logout on windows server 2003

    - by vitalik
    My own console .net application stuck in a "ghost" stage. It just shows a window that i can't close. It doesn't show up as a process in the task manager. when i try to "find windows process" using Process Explorer (from sysinternals) it says there is no process that owns that window or something like that. The problem is that it doesn't allow me to logout or reboot the server (remotely) because logoff process keeps waiting on that window to close. shutdown /r /f also is stuck waiting for it. I can probably have somebody go an reboot the server but i'd like to know if there is a way to close that process, close that session or force logout remotely. This is windows server 2003, but i had the same issue on XP just a few days ago.

    Read the article

  • How to find the process(es) which are hogging the machine

    - by Aaron Digulla
    Scenario: All of a sudden, my computer feels sluggish. Mouse moves but windows take ages to open, etc. uptime says the load is 7.69 and raising. What is the fastest way to find out which process(es) are the cause of the load? Now, "top" and similar tools isn't the answer because they either show CPU or memory usage but not both at the same time. What I need is the single command which I might be able to type as it happens - something that will figure out any of System is trying to swap 8GB of RAM to disk because process X ... or process X seeks all over the disk or process X uses 400% CPU" So what I'm looking for is iostat, htop/atop and similar tools run into one with an output like this: 1235 cp - Disk trashing 87 chrome - Uses 2&nbsp;GB of RAM 137 nfs_bench - Uses 95% of the network bandwidth I don't want a tool that gives me some numbers which I can analyze but a tool that tells me exactly which process causes the current load. Assume that the user in front of the keyboard barely knows how to write "process", but the user is quickly overwhelmed when it comes to "resident size", "virtual memory" or "process life cycle". My argument goes like this: A user notices a problem. There can be thousands of reasons ... well, almost :-) The user wants to know the source of the problem. The current solutions give me lots of numbers, and I need to know what these numbers mean. What I'm looking for is a meta tool. 99% of the data is irrelevant to the problem. So what the tool should do is look for processes which hog some resource and list only those along with "this process needs a lot of CPU, this produces many IRQs, this process allocates a lot of RAM (and it's still growing)". This will be a relatively short list. It will be much more simple for someone new to this to locate the culprit from this list than from the output of, say, htop which gives me about 5000 numbers but requires me to fold multi-threaded processes myself (I have 50 lines which say VIRT 2750M but only 16 GB of RAM - the machine ought to swap itself to death but of course, this is a misinterpretation of the data that can happen quickly).

    Read the article

  • Oracle Coherence, Split-Brain and Recovery Protocols In Detail

    - by Ricardo Ferreira
    This article provides a high level conceptual overview of Split-Brain scenarios in distributed systems. It will focus on a specific example of cluster communication failure and recovery in Oracle Coherence. This includes a discussion on the witness protocol (used to remove failed cluster members) and the panic protocol (used to resolve Split-Brain scenarios). Note that the removal of cluster members does not necessarily indicate a Split-Brain condition. Oracle Coherence does not (and cannot) detect a Split-Brain as it occurs, the condition is only detected when cluster members that previously lost contact with each other regain contact. Cluster Topology and Configuration In order to create an good didactic for the article, let's assume a cluster topology and configuration. In this example we have a six member cluster, consisting of one JVM on each physical machine. The member IDs are as follows: Member ID  IP Address  1  10.149.155.76  2  10.149.155.77  3  10.149.155.236  4  10.149.155.75  5  10.149.155.79  6  10.149.155.78 Members 1, 2, and 3 are connected to a switch, and members 4, 5, and 6 are connected to a second switch. There is a link between the two switches, which provides network connectivity between all of the machines. Member 1 is the first member to join this cluster, thus making it the senior member. Member 6 is the last member to join this cluster. Here is a log snippet from Member 6 showing the complete member set: 2010-02-26 15:27:57.390/3.062 Oracle Coherence GE 3.5.3/465p2 <Info> (thread=main, member=6): Started DefaultCacheServer... SafeCluster: Name=cluster:0xDDEB Group{Address=224.3.5.3, Port=35465, TTL=4} MasterMemberSet ( ThisMember=Member(Id=6, Timestamp=2010-02-26 15:27:58.635, Address=10.149.155.78:8088, MachineId=1102, Location=process:228, Role=CoherenceServer) OldestMember=Member(Id=1, Timestamp=2010-02-26 15:27:06.931, Address=10.149.155.76:8088, MachineId=1100, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:511, Role=CoherenceServer) ActualMemberSet=MemberSet(Size=6, BitSetCount=2 Member(Id=1, Timestamp=2010-02-26 15:27:06.931, Address=10.149.155.76:8088, MachineId=1100, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:511, Role=CoherenceServer) Member(Id=2, Timestamp=2010-02-26 15:27:17.847, Address=10.149.155.77:8088, MachineId=1101, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:296, Role=CoherenceServer) Member(Id=3, Timestamp=2010-02-26 15:27:24.892, Address=10.149.155.236:8088, MachineId=1260, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:32459, Role=CoherenceServer) Member(Id=4, Timestamp=2010-02-26 15:27:39.574, Address=10.149.155.75:8088, MachineId=1099, Location=process:800, Role=CoherenceServer) Member(Id=5, Timestamp=2010-02-26 15:27:49.095, Address=10.149.155.79:8088, MachineId=1103, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:3229, Role=CoherenceServer) Member(Id=6, Timestamp=2010-02-26 15:27:58.635, Address=10.149.155.78:8088, MachineId=1102, Location=process:228, Role=CoherenceServer) ) RecycleMillis=120000 RecycleSet=MemberSet(Size=0, BitSetCount=0 ) ) At approximately 15:30, the connection between the two switches is severed: Thirty seconds later (the default packet timeout in development mode) the logs indicate communication failures across the cluster. In this example, the communication failure was caused by a network failure. In a production setting, this type of communication failure can have many root causes, including (but not limited to) network failures, excessive GC, high CPU utilization, swapping/virtual memory, and exceeding maximum network bandwidth. In addition, this type of failure is not necessarily indicative of a split brain. Any communication failure will be logged in this fashion. Member 2 logs a communication failure with Member 5: 2010-02-26 15:30:32.638/196.928 Oracle Coherence GE 3.5.3/465p2 <Warning> (thread=PacketPublisher, member=2): Timeout while delivering a packet; requesting the departure confirmation for Member(Id=5, Timestamp=2010-02-26 15:27:49.095, Address=10.149.155.79:8088, MachineId=1103, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:3229, Role=CoherenceServer) by MemberSet(Size=2, BitSetCount=2 Member(Id=1, Timestamp=2010-02-26 15:27:06.931, Address=10.149.155.76:8088, MachineId=1100, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:511, Role=CoherenceServer) Member(Id=4, Timestamp=2010-02-26 15:27:39.574, Address=10.149.155.75:8088, MachineId=1099, Location=process:800, Role=CoherenceServer) ) The Coherence clustering protocol (TCMP) is a reliable transport mechanism built on UDP. In order for the protocol to be reliable, it requires an acknowledgement (ACK) for each packet delivered. If a packet fails to be acknowledged within the configured timeout period, the Coherence cluster member will log a packet timeout (as seen in the log message above). When this occurs, the cluster member will consult with other members to determine who is at fault for the communication failure. If the witness members agree that the suspect member is at fault, the suspect is removed from the cluster. If the witnesses unanimously disagree, the accuser is removed. This process is known as the witness protocol. Since Member 2 cannot communicate with Member 5, it selects two witnesses (Members 1 and 4) to determine if the communication issue is with Member 5 or with itself (Member 2). However, Member 4 is on the switch that is no longer accessible by Members 1, 2 and 3; thus a packet timeout for member 4 is recorded as well: 2010-02-26 15:30:35.648/199.938 Oracle Coherence GE 3.5.3/465p2 <Warning> (thread=PacketPublisher, member=2): Timeout while delivering a packet; requesting the departure confirmation for Member(Id=4, Timestamp=2010-02-26 15:27:39.574, Address=10.149.155.75:8088, MachineId=1099, Location=process:800, Role=CoherenceServer) by MemberSet(Size=2, BitSetCount=2 Member(Id=1, Timestamp=2010-02-26 15:27:06.931, Address=10.149.155.76:8088, MachineId=1100, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:511, Role=CoherenceServer) Member(Id=6, Timestamp=2010-02-26 15:27:58.635, Address=10.149.155.78:8088, MachineId=1102, Location=process:228, Role=CoherenceServer) ) Member 1 has the ability to confirm the departure of member 4, however Member 6 cannot as it is also inaccessible. At the same time, Member 3 sends a request to remove Member 6, which is followed by a report from Member 3 indicating that Member 6 has departed the cluster: 2010-02-26 15:30:35.706/199.996 Oracle Coherence GE 3.5.3/465p2 <D5> (thread=Cluster, member=2): MemberLeft request for Member 6 received from Member(Id=3, Timestamp=2010-02-26 15:27:24.892, Address=10.149.155.236:8088, MachineId=1260, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:32459, Role=CoherenceServer) 2010-02-26 15:30:35.709/199.999 Oracle Coherence GE 3.5.3/465p2 <D5> (thread=Cluster, member=2): MemberLeft notification for Member 6 received from Member(Id=3, Timestamp=2010-02-26 15:27:24.892, Address=10.149.155.236:8088, MachineId=1260, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:32459, Role=CoherenceServer) The log for Member 3 determines how Member 6 departed the cluster: 2010-02-26 15:30:35.161/191.694 Oracle Coherence GE 3.5.3/465p2 <Warning> (thread=PacketPublisher, member=3): Timeout while delivering a packet; requesting the departure confirmation for Member(Id=6, Timestamp=2010-02-26 15:27:58.635, Address=10.149.155.78:8088, MachineId=1102, Location=process:228, Role=CoherenceServer) by MemberSet(Size=2, BitSetCount=2 Member(Id=1, Timestamp=2010-02-26 15:27:06.931, Address=10.149.155.76:8088, MachineId=1100, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:511, Role=CoherenceServer) Member(Id=2, Timestamp=2010-02-26 15:27:17.847, Address=10.149.155.77:8088, MachineId=1101, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:296, Role=CoherenceServer) ) 2010-02-26 15:30:35.165/191.698 Oracle Coherence GE 3.5.3/465p2 <Info> (thread=Cluster, member=3): Member departure confirmed by MemberSet(Size=2, BitSetCount=2 Member(Id=1, Timestamp=2010-02-26 15:27:06.931, Address=10.149.155.76:8088, MachineId=1100, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:511, Role=CoherenceServer) Member(Id=2, Timestamp=2010-02-26 15:27:17.847, Address=10.149.155.77:8088, MachineId=1101, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:296, Role=CoherenceServer) ); removing Member(Id=6, Timestamp=2010-02-26 15:27:58.635, Address=10.149.155.78:8088, MachineId=1102, Location=process:228, Role=CoherenceServer) In this case, Member 3 happened to select two witnesses that it still had connectivity with (Members 1 and 2) thus resulting in a simple decision to remove Member 6. Given the departure of Member 6, Member 2 is left with a single witness to confirm the departure of Member 4: 2010-02-26 15:30:35.713/200.003 Oracle Coherence GE 3.5.3/465p2 <Info> (thread=Cluster, member=2): Member departure confirmed by MemberSet(Size=1, BitSetCount=2 Member(Id=1, Timestamp=2010-02-26 15:27:06.931, Address=10.149.155.76:8088, MachineId=1100, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:511, Role=CoherenceServer) ); removing Member(Id=4, Timestamp=2010-02-26 15:27:39.574, Address=10.149.155.75:8088, MachineId=1099, Location=process:800, Role=CoherenceServer) In the meantime, Member 4 logs a missing heartbeat from the senior member. This message is also logged on Members 5 and 6. 2010-02-26 15:30:07.906/150.453 Oracle Coherence GE 3.5.3/465p2 <Info> (thread=PacketListenerN, member=4): Scheduled senior member heartbeat is overdue; rejoining multicast group. Next, Member 4 logs a TcpRing failure with Member 2, thus resulting in the termination of Member 2: 2010-02-26 15:30:21.421/163.968 Oracle Coherence GE 3.5.3/465p2 <D4> (thread=Cluster, member=4): TcpRing: Number of socket exceptions exceeded maximum; last was "java.net.SocketTimeoutException: connect timed out"; removing the member: 2 For quick process termination detection, Oracle Coherence utilizes a feature called TcpRing which is a sparse collection of TCP/IP-based connections between different members in the cluster. Each member in the cluster is connected to at least one other member, which (if at all possible) is running on a different physical box. This connection is not used for any data transfer, only heartbeat communications are sent once a second per each link. If a certain number of exceptions are thrown while trying to re-establish a connection, the member throwing the exceptions is removed from the cluster. Member 5 logs a packet timeout with Member 3 and cites witnesses Members 4 and 6: 2010-02-26 15:30:29.791/165.037 Oracle Coherence GE 3.5.3/465p2 <Warning> (thread=PacketPublisher, member=5): Timeout while delivering a packet; requesting the departure confirmation for Member(Id=3, Timestamp=2010-02-26 15:27:24.892, Address=10.149.155.236:8088, MachineId=1260, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:32459, Role=CoherenceServer) by MemberSet(Size=2, BitSetCount=2 Member(Id=4, Timestamp=2010-02-26 15:27:39.574, Address=10.149.155.75:8088, MachineId=1099, Location=process:800, Role=CoherenceServer) Member(Id=6, Timestamp=2010-02-26 15:27:58.635, Address=10.149.155.78:8088, MachineId=1102, Location=process:228, Role=CoherenceServer) ) 2010-02-26 15:30:29.798/165.044 Oracle Coherence GE 3.5.3/465p2 <Info> (thread=Cluster, member=5): Member departure confirmed by MemberSet(Size=2, BitSetCount=2 Member(Id=4, Timestamp=2010-02-26 15:27:39.574, Address=10.149.155.75:8088, MachineId=1099, Location=process:800, Role=CoherenceServer) Member(Id=6, Timestamp=2010-02-26 15:27:58.635, Address=10.149.155.78:8088, MachineId=1102, Location=process:228, Role=CoherenceServer) ); removing Member(Id=3, Timestamp=2010-02-26 15:27:24.892, Address=10.149.155.236:8088, MachineId=1260, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:32459, Role=CoherenceServer) Eventually we are left with two distinct clusters consisting of Members 1, 2, 3 and Members 4, 5, 6, respectively. In the latter cluster, Member 4 is promoted to senior member. The connection between the two switches is restored at 15:33. Upon the restoration of the connection, the cluster members immediately receive cluster heartbeats from the two senior members. In the case of Members 1, 2, and 3, the following is logged: 2010-02-26 15:33:14.970/369.066 Oracle Coherence GE 3.5.3/465p2 <Warning> (thread=Cluster, member=1): The member formerly known as Member(Id=4, Timestamp=2010-02-26 15:30:35.341, Address=10.149.155.75:8088, MachineId=1099, Location=process:800, Role=CoherenceServer) has been forcefully evicted from the cluster, but continues to emit a cluster heartbeat; henceforth, the member will be shunned and its messages will be ignored. Likewise for Members 4, 5, and 6: 2010-02-26 15:33:14.343/336.890 Oracle Coherence GE 3.5.3/465p2 <Warning> (thread=Cluster, member=4): The member formerly known as Member(Id=1, Timestamp=2010-02-26 15:30:31.64, Address=10.149.155.76:8088, MachineId=1100, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:511, Role=CoherenceServer) has been forcefully evicted from the cluster, but continues to emit a cluster heartbeat; henceforth, the member will be shunned and its messages will be ignored. This message indicates that a senior heartbeat is being received from members that were previously removed from the cluster, in other words, something that should not be possible. For this reason, the recipients of these messages will initially ignore them. After several iterations of these messages, the existence of multiple clusters is acknowledged, thus triggering the panic protocol to reconcile this situation. When the presence of more than one cluster (i.e. Split-Brain) is detected by a Coherence member, the panic protocol is invoked in order to resolve the conflicting clusters and consolidate into a single cluster. The protocol consists of the removal of smaller clusters until there is one cluster remaining. In the case of equal size clusters, the one with the older Senior Member will survive. Member 1, being the oldest member, initiates the protocol: 2010-02-26 15:33:45.970/400.066 Oracle Coherence GE 3.5.3/465p2 <Warning> (thread=Cluster, member=1): An existence of a cluster island with senior Member(Id=4, Timestamp=2010-02-26 15:27:39.574, Address=10.149.155.75:8088, MachineId=1099, Location=process:800, Role=CoherenceServer) containing 3 nodes have been detected. Since this Member(Id=1, Timestamp=2010-02-26 15:27:06.931, Address=10.149.155.76:8088, MachineId=1100, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:511, Role=CoherenceServer) is the senior of an older cluster island, the panic protocol is being activated to stop the other island's senior and all junior nodes that belong to it. Member 3 receives the panic: 2010-02-26 15:33:45.803/382.336 Oracle Coherence GE 3.5.3/465p2 <Error> (thread=Cluster, member=3): Received panic from senior Member(Id=1, Timestamp=2010-02-26 15:27:06.931, Address=10.149.155.76:8088, MachineId=1100, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:511, Role=CoherenceServer) caused by Member(Id=4, Timestamp=2010-02-26 15:27:39.574, Address=10.149.155.75:8088, MachineId=1099, Location=process:800, Role=CoherenceServer) Member 4, the senior member of the younger cluster, receives the kill message from Member 3: 2010-02-26 15:33:44.921/367.468 Oracle Coherence GE 3.5.3/465p2 <Error> (thread=Cluster, member=4): Received a Kill message from a valid Member(Id=3, Timestamp=2010-02-26 15:27:24.892, Address=10.149.155.236:8088, MachineId=1260, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:32459, Role=CoherenceServer); stopping cluster service. In turn, Member 4 requests the departure of its junior members 5 and 6: 2010-02-26 15:33:44.921/367.468 Oracle Coherence GE 3.5.3/465p2 <Error> (thread=Cluster, member=4): Received a Kill message from a valid Member(Id=3, Timestamp=2010-02-26 15:27:24.892, Address=10.149.155.236:8088, MachineId=1260, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:32459, Role=CoherenceServer); stopping cluster service. 2010-02-26 15:33:43.343/349.015 Oracle Coherence GE 3.5.3/465p2 <Error> (thread=Cluster, member=6): Received a Kill message from a valid Member(Id=4, Timestamp=2010-02-26 15:27:39.574, Address=10.149.155.75:8088, MachineId=1099, Location=process:800, Role=CoherenceServer); stopping cluster service. Once Members 4, 5, and 6 restart, they rejoin the original cluster with senior member 1. The log below is from Member 4. Note that it receives a different member id when it rejoins the cluster. 2010-02-26 15:33:44.921/367.468 Oracle Coherence GE 3.5.3/465p2 <Error> (thread=Cluster, member=4): Received a Kill message from a valid Member(Id=3, Timestamp=2010-02-26 15:27:24.892, Address=10.149.155.236:8088, MachineId=1260, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:32459, Role=CoherenceServer); stopping cluster service. 2010-02-26 15:33:46.921/369.468 Oracle Coherence GE 3.5.3/465p2 <D5> (thread=Cluster, member=4): Service Cluster left the cluster 2010-02-26 15:33:47.046/369.593 Oracle Coherence GE 3.5.3/465p2 <D5> (thread=Invocation:InvocationService, member=4): Service InvocationService left the cluster 2010-02-26 15:33:47.046/369.593 Oracle Coherence GE 3.5.3/465p2 <D5> (thread=OptimisticCache, member=4): Service OptimisticCache left the cluster 2010-02-26 15:33:47.046/369.593 Oracle Coherence GE 3.5.3/465p2 <D5> (thread=ReplicatedCache, member=4): Service ReplicatedCache left the cluster 2010-02-26 15:33:47.046/369.593 Oracle Coherence GE 3.5.3/465p2 <D5> (thread=DistributedCache, member=4): Service DistributedCache left the cluster 2010-02-26 15:33:47.046/369.593 Oracle Coherence GE 3.5.3/465p2 <D5> (thread=Invocation:Management, member=4): Service Management left the cluster 2010-02-26 15:33:47.046/369.593 Oracle Coherence GE 3.5.3/465p2 <D5> (thread=Cluster, member=4): Member 6 left service Management with senior member 5 2010-02-26 15:33:47.046/369.593 Oracle Coherence GE 3.5.3/465p2 <D5> (thread=Cluster, member=4): Member 6 left service DistributedCache with senior member 5 2010-02-26 15:33:47.046/369.593 Oracle Coherence GE 3.5.3/465p2 <D5> (thread=Cluster, member=4): Member 6 left service ReplicatedCache with senior member 5 2010-02-26 15:33:47.046/369.593 Oracle Coherence GE 3.5.3/465p2 <D5> (thread=Cluster, member=4): Member 6 left service OptimisticCache with senior member 5 2010-02-26 15:33:47.046/369.593 Oracle Coherence GE 3.5.3/465p2 <D5> (thread=Cluster, member=4): Member 6 left service InvocationService with senior member 5 2010-02-26 15:33:47.046/369.593 Oracle Coherence GE 3.5.3/465p2 <D5> (thread=Cluster, member=4): Member(Id=6, Timestamp=2010-02-26 15:33:47.046, Address=10.149.155.78:8088, MachineId=1102, Location=process:228, Role=CoherenceServer) left Cluster with senior member 4 2010-02-26 15:33:49.218/371.765 Oracle Coherence GE 3.5.3/465p2 <Info> (thread=main, member=n/a): Restarting cluster 2010-02-26 15:33:49.421/371.968 Oracle Coherence GE 3.5.3/465p2 <D5> (thread=Cluster, member=n/a): Service Cluster joined the cluster with senior service member n/a 2010-02-26 15:33:49.625/372.172 Oracle Coherence GE 3.5.3/465p2 <Info> (thread=Cluster, member=n/a): This Member(Id=5, Timestamp=2010-02-26 15:33:50.499, Address=10.149.155.75:8088, MachineId=1099, Location=process:800, Role=CoherenceServer, Edition=Grid Edition, Mode=Development, CpuCount=2, SocketCount=1) joined cluster "cluster:0xDDEB" with senior Member(Id=1, Timestamp=2010-02-26 15:27:06.931, Address=10.149.155.76:8088, MachineId=1100, Location=site:usdhcp.oraclecorp.com,machine:dhcp-burlington6-4fl-east-10-149,process:511, Role=CoherenceServer, Edition=Grid Edition, Mode=Development, CpuCount=2, SocketCount=2) Cool isn't it?

    Read the article

  • AIA Release 3.1 verfügbar

    - by Hans Viehmann
    Nachdem das Foundation Pack 11g inzwischen eine Weile auf dem Markt ist, wurden jetzt auch die darauf aufsetzenden Process Integration Packs (PIPs) freigegeben. In diesem Zuge wurden neben den bestehenden 16 PIPs auch drei neue Integrationen vorgestellt:Oracle Design-to-Release Integration Pack for Agile Product Lifecycle Management for Process and Oracle Process ManufacturingOracle Clinical Trial Payments Integration Pack for Siebel ClinicalOracle Serialization and Tracking Integration Pack for Oracle Pedigree and Serialization Manager and Oracle E-Business SuiteLetztere sind speziell für den Healthcare/Life Sciences Markt gedacht.Zur Freigabe gibt es nicht nur eine entsprechende Pressemeldung (hier), sondern auch einen öffentlichen Launch-Webcast am 23. Februar unter dem Titel "Tackling the Challenges of Application Integration". Leider ist er mehr für amerikanische Zuhörer gedacht und findet um 10:00h PDT statt. Wer aber sein abendliches Fernsehprogramm eintauschen möchte, findet hier die nötigen Details und die Möglichkeit zur Registrierung.

    Read the article

  • Networking Client Server Packet logic (How they communicate)

    - by Trixmix
    I want to know what is the logic behind server client communication through packets for a real time game. for example the server sends x packets then the client receives x packets and processes them.. Basically what is the process to keep the client and server in sync and able to receive and send packets. more in depth example of what I want to know: client step 1 wait for a packet step 2 read x packets step 3 process x packets step 4 send x packets and so on... I need to know the very basic outline of the communication. Big questions are: 1) do I send and read packets all at one time? i.e for loop though the incoming packets array list and read them all or one every server loop or what... 2) what order should I do things i.e first receive then read then process then send etc.. 3) what I asked above a step by step of what the server / client should do.. Thanks!

    Read the article

  • PASS: The Budget Process

    - by Bill Graziano
    Every fiscal year PASS creates a detailed budget.  This helps us set priorities and communicate to our members what we’re going to do in the upcoming year.  You can review the current budget on the PASS Governance page.  That page currently requires you to login but I’m talking with HQ to see if there are any legal issues with opening that up. The Accounting Team The PASS accounting team is two people.  The Executive Vice-President of Finance (“EVP”) and the PASS Accounting Manager.  Sandy Cherry is the accounting manager and works at PASS HQ.  Sandy has been with PASS since we switched management companies in 2007.  Throughout this document when I talk about any actual work related to the budget that’s all Sandy :)  She’s the glue that gets us through this process.  Last year we went through 32 iterations of the budget before the Board approved so it’s a pretty busy time for her us – well, mostly her. Fiscal Year The PASS fiscal year runs from July 1st through June 30th the following year.  Right now we’re in fiscal year 2011.  Our 2010 Summit actually occurred in FY2011.  We switched to this schedule from a calendar year in 2006.  Our goal was to have the Summit occur early in our fiscal year.  That gives us the rest of the year to handle any significant financial impact from the Summit.  If registrations are down we can reduce spending.  If registrations are up we can decide how much to increase our reserves and how much to spend.  Keep in mind that the Summit is budgeted to generate 82% of our revenue this year.  How it performs has a significant impact on our financials.  The other benefit of this fiscal year is that it matches the Microsoft fiscal year.  We sign an annual sponsorship agreement with Microsoft and it’s very helpful that our fiscal years match. This year our budget process will probably start in earnest in March or April.  I’d like to be done in early June so we can publish before July 1st.  I was late publishing it this year and I’m trying not to repeat that. Our Budget Our actual budget is an Excel spreadsheet with 36 sheets.  We remove some of those when we publish it since they include salary information.  The budget is broken up into various portfolios or departments.  We have 20 portfolios.  They include chapters, marketing, virtual chapters, marketing, etc.  Ideally each portfolio is assigned to a Board member.  Each portfolio also typically has a staff person assigned to it.  Portfolios that aren’t assigned to a Board member are monitored by HQ and the ExecVP-Finance (me).  These are typically smaller portfolios such as deferred membership or Summit futures.  (More on those in a later post.)  All portfolios are reviewed by all Board members during the budget approval process, when interim financials are released internally and at year-end. The Process Our first step is to budget revenues.  The Board determines a target attendee number.  We have formulas based on historical performance that convert that to an overall attendee revenue number.  Other revenue projections (such as vendor sponsorships) come from different parts of the organization.  I hope to have another post with more details on how we project revenues. The next step is to budget expenses.  Board members fill out a sample spreadsheet with their budget for the year.  They can add line items and notes describing what the amounts are for.  Each Board portfolio typically has from 10 to 30 line items.  Any new initiatives they want to pursue needs to be budgeted.  The Summit operations budget is managed by HQ.  It includes the cost for food, electrical, internet, etc.  Most of these come from our estimate of attendees and our contract with the convention center.  During this process the Board can ask for more or less to be spent on various line items.  For example, if we weren’t happy with the Internet at the last Summit we can ask them to look into different options and/or increasing the budget.  HQ will also make adjustments to these numbers based on what they see at the events and the feedback we receive on the surveys. After we have all the initial estimates we start reviewing the entire budget.  It is sent out to the Board and we can see what each portfolio requested and what the overall profit and loss number is.  We usually start with too much in expenses and need to cut.  In years past the Board started haggling over these numbers as a group.  This past year they decided I should take a first cut and present them with a reasonable budget and a list of what I changed.  That worked well and I think we’ll continue to do that in the future. We go through a number of iterations on the budget.  If I remember correctly, we went through 32 iterations before we passed the budget.  At each iteration various revenue and expense numbers can change.  Keep in mind that the PASS budget has 200+ line items spread over 20 portfolios.  Many of these depend on other numbers.  For example, if we decide increase the projected attendees that cascades through our budget.  At each iteration we list what changed and the impact.  Ideally these discussions will take place at a face-to-face Board meeting.  Many of them also take place over the phone.  Board members explain any increase they are asking for while performing due diligence on other budget requests.  Eventually a budget emerges and is passed. Publishing After the budget is passed we create a version without the formulas and salaries for posting on the web site.  Sandy also creates some charts to help our members understand the budget.  The EVP writes a nice little letter describing some of the changes from last year’s budget.  You can see my letter and our budget on the PASS Governance page. And then, eight months later, we start all over again.

    Read the article

  • Should I put my output files in source control?

    - by sebastiaan
    I've been asked to put every single file in my project under source control, including the database file (not the schema, the complete file). This seems wrong to me, but I can't explain it. Every resource I find about source control tells me not to put generated output files in a source control system. And I understand, it's not "source" files. However, I've been presented with the following reasoning: Who cares? We have plenty of bandwidth. I don't mind having to resolve a conflict each time I get the latest revision, it's just one click It's so much more convenient than having to think about good ignore files Also, if I have to add an external DLL file in the bin folder now, I can't forget to put it in source control, as the bin folder is not being ignored now. The simple solution for the last bullet-point is to add the file in a libraries folder and reference it from the project. Please explain if and why putting generated output files under source control is wrong.

    Read the article

  • What is the worst source control you have used? [closed]

    - by David Liddle
    There are many discussions about what people's favourite source control is (subversion, mercurial ...). But what source control systems have you used that you certainly wouldn't recommend? And more beneficial, how would you go about promoting change in the business to a new source control system? A few years ago I developed using a source control system called Synergy. There were two Synergy experts in the company that constantly had to help the developers do check-ins/outs and merges were especially difficult. What would be your steps of migrating to a better source control. Would you host everything internally or pay for services such as github?

    Read the article

  • What happens to other users if the .NET worker process crashes?

    - by Jason Slocomb
    My knowledge of how processes are handled by the ASP.Net worker process is woefully inadequate. I'm hoping some of the experts out there can fill me in. If I crash the worker process with a System.OutOfMemoryException, what would the user experience be for other users who were being served by the same process? Would they get a blank screen? 503 error? I'm going to attempt to test this scenario with some other folks in our lab, but I thought I would float this out there. I will update with our results.

    Read the article

  • How Does One Make Scala Control Abstraction in Repeat Until?

    - by peter_pilgrim
    Hi I am Peter Pilgrim. I watched Martin Odersky create a control abstraction in Scala. However I can not yet seem to repeat it inside IntelliJ IDEA 9. Is it the IDE? package demo class Control { def repeatLoop ( body: = Unit ) = new Until( body ) class Until( body: = Unit ) { def until( cond: = Boolean ) { body; val value: Boolean = cond; println("value="+value) if ( value ) repeatLoop(body).until(cond) // if (cond) until(cond) } } def doTest2(): Unit = { var y: Int = 1 println("testing ... repeatUntil() control structure") repeatLoop { println("found y="+y) y = y + 1 } { until ( y < 10 ) } } } The error message reads: Information:Compilation completed with 1 error and 0 warnings Information:1 error Information:0 warnings C:\Users\Peter\IdeaProjects\HelloWord\src\demo\Control.scala Error:Error:line (57)error: Control.this.repeatLoop({ scala.this.Predef.println("found y=".+(y)); y = y.+(1) }) of type Control.this.Until does not take parameters repeatLoop { In the curried function the body can be thought to return an expression (the value of y+1) however the declaration body parameter of repeatUntil clearly says this can be ignored or not? What does the error mean?

    Read the article

  • MSCC: Purpose and benefits of Version Control Systems (VCS)

    Unfortunately, there was no monthly meetup during May. Which means that it was even more important and interesting to go forward with a great topic for this month. Earlier this year I already spoke to Nayar Joolfoo about doing a presentation on version control systems (VCS), and he gladly agreed since then. It was just about finding the right date for the action. Furthermore, it was also a great coincidence that Avinash Meetoo announced on social media networks that Knowledge 7 is about to have a new training on "Effective git" - which correlates to a book title Avinash is currently working on - all the best with your approach on this and reach out to our MSCC craftsmen for recessions. Once again a big Thank you to Orange Ebene Accelerator on providing the venue for us, and the MSCC members involved on securing the time slot for our event. Unfortunately, it's kind of tough to get an early confirmation for our meetups these days. I'll keep you posted on that one as there are some interesting and exciting options coming up soon. Okay, let's talk about the meeting and version control systems again. As usual, I'm going to put my first impression of the meetup: "Absolutely great topic, questions and discussions on version control systems, like git or VSO. I was also highly pleased by the number of first timers and female IT geeks. Hopefully, we will be able to keep this trend for future get-togethers." And I really have to emphasise the amount of fresh blood coming to our gathering. Also, during the initial phase it was surprising to see that exactly those first-timers, most of them students at various campuses here on the island, had absolutely no idea about version control systems. More about further down... Reactions of other attendees If I counted correctly, we had a total of 17 attendees this month, and I'd like to give you feedback from some of them: "Inspiring. Helped me understand more about GIT." -- Sean on event comments "Joined the meetup today with literally no idea what is a version control system. I have several reasons why I should be starting to use VCS as from NOW in my projects. Thanks Nayar, Jochen and other participants :)" -- Yudish on event comments "Was present today and I'm very satisfied.I was not aware if there was a such tool like git available. Thanks to those who contributed for this meetup.It was great. Learned a lot from this meetup!!" -- Leonardo on event comments "Seriously, I can see how it’s going to ease my task and help me save time. Gone are the issues with files backups.  And since I’ll be doing my dissertation this year, using Git would help me a lot for my backups and I’m grateful to Nayar for the great explanation." -- Swan-Iyah on MSCC meetup : Version Controls Hopefully, I'll be able to get some other sources - personal blogs preferred - on our meeting. Geeks, thank you so much for those encouraging comments. It's really great to experience that we, all members of the MSCC, are doing the right thing to get more IT information out, and to help each other to improve and evolve in our professional careers. Our agenda of the day Honestly, we had a bumpy start... First, I was battling a little bit with the movable room divider in order to maximize the space. I mean, we had 24 RSVPs and usually there might additional people coming along. Then, for what ever reason, we were facing power outages - actually twice in short periods. Not too good for the projector after all, but hey it went smooth for the rest of the time being. And last but not least... our first speaker Nayar got stuck somewhere on the road. ;-) Anyway, not a real show-stopper and we used the time until Nayar's arrival to introduce ourselves a little bit. It is always important for me to get to know the "newbies" a little bit, and as a result we had lots of students of university - first year, second year and recent graduates - among them. Surprisingly, none of them was ever in contact with version control systems at all. I mean, this is a shocking discovery! Similar to the ability of touch-typing I'd say that being able to use (and master) any kind of version control system is compulsory in any job in the IT industry. Seriously, I'm wondering what is being taught during the classes on the campus. All of them have to work on semester assessments or final projects, even in small teams of 2-4 people. That's the perfect occasion to get started with VCS. Already in this phase, we had great input from more experienced VCS users, like Sean, Avinash and myself. git - a modern approach to VCS - Nayar What a tour! Nayar gave us the full round of git from start to finish, even touching some more advanced techniques. First, he started to explain about the importance of version control systems as an essential tool for software developers, even working alone on a project, and the ability to have a kind of "time machine" that allows you to inspect and revert to a previous version of source code at any time. Then he showed how easy it is to install git on an Ubuntu based system but also mentioned that git is literally available for any operating system, like Windows, Mac OS X and of course other Linux distributions. Next, he showed us how to set the initial configuration values of user name and email address which simplifies the daily usage of the git client while working with your repositories. Then he initialised and added a new repository for some local development of a blogging software. All commands were done using the command line interface (CLI) so that they can be repeated on any system as reference. The syntax and the procedure is always the same, and Nayar clearly mentioned this to the attendees. Now, having a git repository in place it was about time to work on some "important" changes on the blogging software - just for the sake of demonstrating the ease of use and power of git. One interesting question came very early: "How many commands do we have to learn? It looks quite difficult at the moment" - Well, rest assured that during daily development circles you will need less than 10 git commands on a regular base: git add, commit, push, pull, checkout, and merge And Nayar demo'd all of them. Much to the delight of everyone he also showed gitk which is the git repository browser. It's an UI tool to display changes in a repository or a selected set of commits. This includes visualizing the commit graph, showing information related to each commit, and the files in the trees of each revision. Using gitk to display and browse information of a local git repository And last but not least, we took advantage of the internet connectivity and reached out to various online portals offering git hosting for free. Nayar showed us how to push the local repository into a remote system on github. Showing the web-based git browser and history handling, and then also explained and demo'd on how to connect to existing online repositories in order to get access to either your own source code or other people's open source projects. Next to github, we also spoke about bitbucket and gitlab as potential online platforms for your projects. Have a look at the conditions and details about their free service packages and what you can get additionally as a paying customer. Usually, you already get a lot of services for up to five users for free but there might be other important aspects that might have an impact on your decision. Anyways, moving git-based repositories between systems is a piece of cake, and changing online platforms is possible at any stage of your development. Visual Studio Online (VSO) - Jochen Well, Nayar literally covered all elements of working with git during his session, including the use of external online platforms. So, what would be the advantage of talking about Visual Studio Online (VSO)? First of all, VSO is "just another" online platform for hosting and managing git repositories on remote systems, equivalent to github, bitbucket, or any other web site. At the moment (of writing), Microsoft also provides a free package of up to five users / developers on a git repository but there is more in that package. Of course, it is related to software development on the Windows systems and the bonds are tightened towards the use of Visual Studio but out of experience you are absolutely not restricted to that. Connecting a Linux or Mac OS X machine with a git client or an integrated development environment (IDE) like Eclipse or Xcode works as smooth as expected. So, why should one opt in for VSO? Well, one of the main aspects that I would like to mention here is that VSO integrates the Application Life Cycle Methodology (ALM) of Microsoft in their platform. Meaning that you get agile project management with Backlogs, Sprints, Burn-down charts as well as the ability to track tasks, bug reports and work items next to collaborative team chats. It's the whole package of agile development you'll get. And, something I mentioned briefly during the begin of our meeting, VSO gives you the possibility of an automated continuous integrated (CI) process which builds and can run tests of your source code after each commit of changes. Having a proper CI strategy is also part of the Clean Code Developer practices - on Level Green actually -, and not only simplifies your life as a software developer but also reduces the sources of potential errors. Seamless integration and automated deployment between Microsoft Azure Web Sites and git repository But my favourite feature is the seamless continuous deployment to Microsoft Azure. Especially, while working on web projects it's absolutely astounishing that as soon as you commit your chances it just takes a couple of seconds until your modifications are deployed and available on your Azure-hosted web sites. Upcoming Events and networking Due to the adjusted times, everybody was kind of hungry and we didn't follow up on networking or upcoming events - very unfortunate to my opinion and this will have an impact on future planning of our meetups. Because I rather would like to see more conversations during and at the end of our meetings than everyone just packing their laptops, bags and accessories and rush off to grab some food. I was hoping to get some information regarding this year's Code Challenge - supposedly to be organised during July? Maybe someone could leave a comment on that - but I couldn't get any updates. Well, I'll keep digging... In case that you would like to get more into git and how to use it effectively, please check out Knowledge 7's upcoming course on "Effective git". Thanks Avinash for your vital input into today's conversation and I'm looking forward to get a grip on your book title very soon. My resume of the day Do not work in IT without any kind of version control system! Seriously, without a VCS in place you're doing it wrong. It's like driving a car without seat belts attached or riding your bike without safety helmet. You don't do that! End of discussion. ;-) Nowadays, having access to free (as in cost) tools to install on your machine and numerous online platforms to host your source code for free for up to five users it's a no-brainer to get yourself familiar with VCS. Today's sessions gave a good overview on how to start using git and how to connect to various remote services like github or VSO.

    Read the article

  • Something to add to your library...

    - by werner.de.gruyter
    There is a new book in town: The Grid Control Handbook. Featuring an in-depth discussion of what Grid Control is and what Grid Control can do for your IT environment. It starts right at the beginning, and guides you through the all steps of a typical deployment: From the planning phase, to installing, to the strengthening of the environment and finally (most importantly) the maintenance and daily-use of the product. And there are quite a few tips, tricks, workshops and best practices along the way to help you with some very practical day-to-day challenges. For all those using Grid Control, something definitely worth checking out!

    Read the article

  • Case Management Patterns with Oracle Unified Business Process Management Suite

    - by Ajay Khanna
    Contributed by Heidi Buelow, Oracle Product Management Case Management was a hot topic all week at Oracle OpenWorld so I was excited to share our current features and upcoming plans at the session Thursday morning on Case Management Patterns with Oracle Unified Business Process Management Suite.  My colleague, Ravi Rangaswamy, the Case Management Development Manager, and I, Heidi Buelow, the Case Management Product Manager, discussed case management use case patterns with an interested audience.  We also talked about the current BPM Suite offering for Case Managment and showed a demo of our upcoming release where Case Management becomes a first class component in a BPM composite application. Case Management use case patterns cover a wide range of horizontal applications such as Accounts Payable, Dispute Resolution, Call Center, Employee OnBoarding, and many vertical applications in domains and industries such as Public Sector services, Insurance claims, and Healthcare.  Really, it is any use case where the resolution of a request may require a knowledge worker making decisions using experienced judgement in the current situation.  This allows for expidited care and customer satisfaction, both being highly valued for consumer loyalty, regulatory compliance, and efficient resolution. Today, BPM Suite provides the tools for creating Case Management applications using BPMN 2.0, Business Rules, and rich BAM and Case Analytics.  The Process Composer provides the agility to change rules and processes by the business users.  The case manager and case workers have the flexibilty they need.  With integrated content management and the concept of a BPM Process Spaces instance (case) space, the current release enables case management use case applications. In the next release, Case Management becomes a first class component. By this, we mean, Case is a separate component in the composite.  We are adding case attributes such as milestones, case events, case stakeholders, and more, providing a rich toolset for the use cases that require a flexible Case Management approach.  Activites become available according to the conditions that you specify and information can be protected by permissions indicated.  In BPM Studio, you design a Case and associate all of the attributes and activities that are needed, yet, at runtime you have the flexibility to add and change these as needed. We enjoyed sharing Case Management and it was well received by the audience.  The presentation is available online and we have viewlets of the demo that will be available at release time.

    Read the article

< Previous Page | 38 39 40 41 42 43 44 45 46 47 48 49  | Next Page >