Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 441/1407 | < Previous Page | 437 438 439 440 441 442 443 444 445 446 447 448  | Next Page >

  • whereis command [closed]

    - by madalina
    I have installed xfig on my computer(MacOSX) but in order to complete the instalation I need a make install inside the source directory of xfig. I used the command whereis xfig in order to find the path of the source of xfig (as I cannot find it otherwise) but when I type this command I get no answer as i.e: hcp249:~ madalinahodorog$ whereis xfig hcp249:~ madalinahodorog$ why dont I get some answer? how can I find the path to the source of xfig? thank you in advance, madalina

    Read the article

  • protection points in survivable mutlicast network

    - by wantobegeek
    I am working on a project on survivable multicasting.I want to propose a hybrid scheme(protection and restoration) for that purpose.Can anyone help me with an approach to decide protection points in a multicast tree??(The protection points will be those points upto which there will be an alternate path from the multicast source(protection) and from protection point to the multicast destination the path will be dynamically restored.).Pls suggest an approach to find the protection points.I found an approach name caterpillar tree which assigns the nodes on the spine of caterpillar tree as protection points.Is there any other such approach..?

    Read the article

  • Instance variables vs. class variables in Python

    - by deamon
    I have Python classes, of which I need only one instance at runtime, so it would be sufficient to have the attributes only once per class and not per instance. If there would be more than one instance (what won't happen), all instance should have the same configuration. I wonder which of the following options would be better or more "idiomatic" Python. Class variables: MyController(Controller): path = "something/" childs = [AController, BController] def action(request): pass Instance ariables: MyController(Controller): def __init__(self): self.path = "something/" self.childs = [AController, BController] def action(self, request): pass

    Read the article

  • Getting file updates in folders with no permission.

    - by Wesley
    I've been working on a program to monitor a network folder to find out which spreadsheets our company uses are the most popular. I'm using the FileSystemWatcher class in C# to do the monitoring. I've noticed I'm getting updates to files that are in folders that my user does not have permission to browse. I understand that my software is subscribing to a list of updates done by other system software and not actually browsing those files itself, but is this functionality intentional or is it a bug?

    Read the article

  • PowerShell locking File....

    - by Ben
    I am trying to do something very simple in powershell Reading the contents of a file Manipulation some string Saving the modified test back to the file function Replace { $file = Get-Content C:\Path\File.cs $file | foreach {$_ -replace "document.getElementById", "$"} |out-file -filepath C:\Path\File.cs } I have tried Set-Content as well. I always get unautorized exception. I can see the $file has the file content, error is coming while writing the file. Any help is appreciated. Ben

    Read the article

  • count of paths from A[a,b] to A[c,d] without duplicating?

    - by Sorush Rabiee
    I write a sokoban solver for fun and practice, it uses a simple algorithm (something like BFS). now i want to estimate its running time ( O and omega). but i need to know how to calculate count of paths from a vertex to another in a network. each path from a to b is a sequence of edges with no circuit. for example this is a correct path: http://www.imgplace.com/viewimg143/4789/501k.png but this is not: http://www.imgplace.com/viewimg143/6140/202.png

    Read the article

  • How do I display a dynamically resized image in Kohana without saving it?

    - by Ygam
    I have an image path string stored in a database It goes like: img/uploads/imagename.jpg I have a controller: $this->image = new Image($wines->image) //this is assuming that I have a wines table with the image property $this->image->resize(60, 250, Image::AUTO) echo $this->image->render(); //the problem is nothing is rendered //Is there a better way of doing this? the image path that I am passing at the Image object //instantiation is the result of a query

    Read the article

  • C# Create Values in Registry Local Machine

    - by Shahmir Javaid
    This is not working for me: public bool createRegistry() { if (!registryExists()) { Microsoft.Win32.Registry.LocalMachine.CreateSubKey("Software\\xelo\\"); Microsoft.Win32.Registry.LocalMachine.OpenSubKey("Software\\xelo").SetValue("hostname", (string)hostname, Microsoft.Win32.RegistryValueKind.String); return true; } else { return updateRegistry(); } } The exception error is to do with Not Authorized to do this. Any Help would be apreaciated Exeption: System.UnauthorizedAccessException | "Cannot write to the registry key"

    Read the article

  • How to remove music/videos DRM protection and convert to Mobile Devices such as iPod, iPhone, PSP, Z

    - by tonywesley
    The music/video files you purchased from online music stores like iTunes, Yahoo Music or Wal-Mart are under DRM protection. So you can't convert them to the formats supported by your own mobile devices such as Nokia phone, Creative Zen palyer, iPod, PSP, Walkman, Zune… You also can't share your purchased music/videos with your friends. The following step by step tutorial is dedicated to instructing music lovers to how to convert your DRM protected music/videos to mobile devices. Method 1: If you only want to remove DRM protection from your protected music, this method will not spend your money. Step 1: Burn your protected music files to CD-R/RW disc to make an audio CD Step 2: Find a free CD Ripper software to convert the audio CD track back to MP3, WAV, WMA, M4A, AAC, RA… Method 2: This guide will show you how to crack drm from protected wmv, wma, m4p, m4v, m4a, aac files and convert to unprotected WMV, MP4, MP3, WMA or any video and audio formats you like, such as AVI, MP4, Flv, MPEG, MOV, 3GP, m4a, aac, wmv, ogg, wav... I have been using Media Converter software, it is the quickest and easiest solution to remove drm from WMV, M4V, M4P, WMA, M4A, AAC, M4B, AA files by quick recording. It gets audio and video stream at the bottom of operating system, so the output quality is lossless and the conversion speed is fast . The process is as follows. Step 1: Download and install the software Step 2: Run the software and click "Add…" button to load WMA or M4A, M4B, AAC, WMV, M4P, M4V, ASF files Step 3: Choose output formats. If you want to convert protected audio files, please select "Convert audio to" list; If you want to convert protected video files, please select "Convert video to" list. Step 4: You can click "Settings" button to custom preference for output files. Click "Settings" button bellow "Convert audio to" list for protected audio files Click "Settings" button bellow "Convert video to" list for protected video files Step 5: Start remove DRM and convert your DRM protected music and videos by click on "Start" button. What is DRM? DRM, which is most commonly found in movies and music files, doesn't mean just basic copy-protection of video, audio and ebooks, but it basically means full protection for digital content, ranging from delivery to end user's ways to use the content. We can remove the Drm from video and audio files legally by quick recording.

    Read the article

  • HPUX setacl leaves uid behind

    - by Woot4Moo
    I have a shell script that I execute after uninstalling a web application. The script is meant to clean up permissions that were needed during the execution of the application. find /opt/path -exec setacl -d user:myUser{} ';' After this executes and the acl is removed I am left with an acl that looks as follows user:101:--- /opt/path How can I properly call setacl to remove the user without leaving behind a uid?

    Read the article

  • Inno setup, How do I check for an app and set install directory based on it?

    - by JustSmith
    I'm installing an extension to an application and it needs to be copied into the same directory. I want the setup script to look to see if the app is installed by checking for it's register key and getting its installed directory and set the install path that is shown to this path. My questions are: Can I check a registry key with the installer before they user gets to the directory selection screen? If I can how to I change the text in that box?

    Read the article

  • SortDescription with custom attached property

    - by Krimson
    Hi, In Xaml I can set a custom attached property using local:TestClass.TestProperty="1" An I can bind to a custom attached property using {Binding Path=(Namespace:[OwnerType].[PropertyName])} {Binding Path=(local:TestClass.TestProperty)} But how do I specify the namespace when I need to use a custom attached property in a SortDescription? I can bind to an attached property using new SortDescription("(Grid.Row)", ListSortDirection.Descending) but here I can't set a namespace anywhere... Best Regards, Jesper

    Read the article

  • how to Send Parameter????

    - by rajesh
    Hi. I have problem that how can i can send image path to the function........ myn code is........ Cricket i want to send my image path in the function addElement along with id..... Please somebody help.....

    Read the article

  • how to Send Parameter????

    - by rajesh
    Hi. I have problem that how can i can send image path to the function........ myn code is........ <a href="#" onclick="addElement(this.id);" id="cricket" tabindex="1">Cricket</a> i want to send my image path in the function addElement along with id..... Please somebody help.....

    Read the article

  • Wallet Underflow? [closed]

    - by David T. McKee
    I am a software engineer who would love to "disconnect" from the "company store" so-to-speak. This concept of Stack-Overflow is great...so, because I know that software engineers need coffee and food, how do you monetize this? Just wondering.

    Read the article

  • Converting PDF to PostScript with GhostScript

    - by Joel Martinez
    I installed ghostscript and updated the appropriate path variables ... however, I'm getting an error when I try to execute this command: C:\PROGRA~1\gs\gs8.64\lib>pdf2ps mydocument.pdf mydocument.ps Access is denied. Unable to open command line file _.at Is this the right command? did I miss some configuration or path setting? Otherwise, is there a sane method of doing this conversion? Thanks!

    Read the article

  • How to wrap images into a Excel Add-in 2003

    - by nimo
    hi, I'm having a excel add-in with several menu items. Each menu item embedded with a image. I'm loading picture to menu item using LoadPicture function where I gave the absolute path to image location. In order to make the add-in distributable I need to provide a relative path. Appropriate anyone can suggest me how to do this. Thank you

    Read the article

  • Page Redirect when session end in ASP.Net MVC

    - by Kaung Sitt Thu
    I would like to do redirect to login when current session end and that config must be working at any View and Controller. ///My current code in Global.asax protected void Session_End(object sender, EventArgs e) { Session.Abandon(); //GetPath() is getting currently path // eg. http://localhost/mymvcproject Response.Redirect(PATH.GetPath() + "User/LogOn"); }

    Read the article

  • How do I use django settings in my logging.ini file?

    - by slypete
    I have a BASE_DIR setting in my settings.py file: BASE_DIR = os.path.dirname(os.path.abspath(__file__)) I need to use this variable in my logging.ini file to setup my file handler paths. The initialization of logging happens in the same file, the settings.py file, below my BASE_DIR variable: LOG_INIT_DONE=False if not LOG_INIT_DONE: logging.config.fileConfig(LOGGING_INI) LOG_INIT_DONE=True Thanks, Pete

    Read the article

  • view handler design pattern

    - by Mark Roberts
    I'm trying to figure out the origin of the view handler design pattern in software engineering. Many of the design patterns in software engineering were inspired by things which pre-date computers, and I was wondering if anybody had any insights on the origin of this particular pattern.

    Read the article

  • How can I tell [G]vim where to look for python26.dll?

    - by Ariel
    I have a version of Vim compiled with python 2.6 support enabled (from here). however vim cannot find the python26.dll. :version confirms +python/dyn :version and gvim.exe confirms DYNAMIC_PYTHON_DLL="python26.dll" echo PATH confirms python26.dll is in the search path. (both c:\windows\system32, and C:\python26) What could I be missing? Did I skip something silly?

    Read the article

  • open corel draw file into photoshop

    - by air
    i have one coral draw file and i don't have coral draw software with me. is this possible to open that file in PSD or convert into PSD or image format. i search on internet but didn't find any free software or plug in. Thanks

    Read the article

< Previous Page | 437 438 439 440 441 442 443 444 445 446 447 448  | Next Page >