Search Results

Search found 22918 results on 917 pages for 'microsoft word'.

Page 47/917 | < Previous Page | 43 44 45 46 47 48 49 50 51 52 53 54  | Next Page >

  • How to get back to having OPEN IN SINGLE INSTANCE" as default for Excel 2007?

    - by rweeks
    In June Mikhail asked the same question but the answer was how to do the opposite (make multiple instances the default). I am trying to get to an answer to Mikhail's question which I rephrase as :- I have same problem with 64 byte Windows 7 and Excel 2007. Excel always used to open in a single instance n o matter how/where I opened the sheets. Because of this I could always copy and paste, etc with full formatting, formulas, etc. Suddenly, Excel switched to opening everything in fresh, separate, multiple instances and destroyed the basic cut and paste options. Wasn't the original question how to go back to everything in a single instance ? I have been searching for the answer to that question (rather than the opposite) Richard

    Read the article

  • Pivot Table Does Not Refresh Source

    - by AME
    Typically, when selecting a data source for a pivot table in Excel 2013, it is possible to refresh the table by selecting "refresh table" or "refresh all". This triggers an update in the Pivot Table based on changes in the underlying data source. However, I am running into a case where this functionality does not prompt a refresh of the pivot table. What might be causing the pivot table in Excel 2013 to remain static when selecting "refresh data"?

    Read the article

  • How can I sort my data while keeping paired rows together?

    - by Joe Lee Frank
    How can I pair two rows on a spreadsheet, so that for each data entry I can sort the matrix but the pair of rows moves as a single list of data, retaining the structure of the two rows? For example: Original entry A1,1 B1,1 C1,1 D1,1 A1,2 B1,2 C1,2 D1,2 A2,1 B2,1 C2,1 D2,1 A2,2 B2,2 C2,2 D2,2 Sorted reverse order A2,1 B2,1 C2,1 D2,1 A2,2 B2,2 C2,2 D2,2 A1,1 B1,1 C1,1 D1,1 A1,2 B1,2 C1,2 D1,2

    Read the article

  • Adding value of cell X only if cell Y is blank

    - by Graeme Hutchison
    I have a list with three columns A, B, and C. The first two columns are complete (A and B), while the third (C) has many blanked fields. What I want to do is replace all the blank fields in Column C with the same value form cell A in the same row. The List contains over 2000 records, of which 65% have a blank Column C value, so I would like to use a formula/function. Below is an example of what I have and what I want to do (on a much smaller scale)

    Read the article

  • Excel - Referring to a certain cell based off of data in another

    - by Ethan Brouwer
    I have a spreadsheet where there is one table with the headings: Coordinate, Lat, Long Another with headings Triangle, Coordinate 1, Coordinate 2, Coordinate 3, Area What this is for, is taking the triangles formed by the specified three coordinates' area based off of Girard's theorem, as they are all spherical triangles. I need to take the specific latitude and longitude values from the first table based on the coordinate numbers underneath the three coordinate headings in the second table. I hope this makes sense. Here are pictures detailing what the two tables look like: Table 1 Table 2 Thanks in advance. And I really do hope this makes sense.

    Read the article

  • Use Excel Color Scale Formatting with Text

    - by stumpylog
    I use Excel sheets to track the status of tasks through a set of discrete statuses. I'd like to be able to format these automatically, with the start being red, the end being green and progressing through the combination colors in the middle. Status1 (Red) Status2 (More Red than Green) Status3 (More Green than Red) Status4 (Green) The "Color Scales" option under Conditional Formatting seems like it could be made to work, but it wants numbers. So, my question, can it be done? Using conditional formatting or other formulas to achieve the desired affect?

    Read the article

  • Is there a way to modify the default size of a new side note in OneNote 2010?

    - by user1202747
    I am a fan of OneNote, but there is one aspect of it that makes it less useful than it could be. When I make a new side note (i.e. by clicking the OneNote icon in the system tray or pressing WindowsKey + N), the size of the window of the resulting note that opens is far too large. It probably takes up 20% of my reasonably high-res screen by default. I have to click and drag to resize it, and that's a waste of my time. So, I have a two part question: Is there a way of modifying some settings somewhere (perhaps in the registry?) so that the default window size of a new side note is smaller than the default? I would prefer something more in line with the size of a new "sticky" note in OS X. If not, does anyone know of a fast way to shrink the size of a window using the keyboard? I'd appreciate any advice that anyone can give. Thanks.

    Read the article

  • Strange traceroute to msdn.microsoft.com

    - by Jasper
    The problem is I could not view any msdn.microsoft.com/* site and the main site itself on my Ubuntu box on Google Chrome browser. Error is: Error 101 (net::ERR_CONNECTION_RESET): The connection was reset. When I run traceout I get different result: Here is simple one: traceroute msdn.microsoft.com traceroute to msdn.microsoft.com (65.55.11.235), 30 hops max, 60 byte packets 1 10.0.0.138 (10.0.0.138) 0.121 ms 0.131 ms 0.128 ms 2 192.168.0.1 (192.168.0.1) 1.730 ms 1.724 ms 2.024 ms 3 bzq-179-37-1.static.bezeqint.net (212.179.37.1) 18.314 ms 19.277 ms 20.694 ms 4 bzq-218-227-250.red.bezeqint.net (81.218.227.250) 22.806 ms 23.651 ms 24.820 ms 5 bzq-179-75-198.static.bezeqint.net (212.179.75.198) 26.650 ms 27.533 ms 28.791 ms 6 * * * 7 bzq-179-124-122.static.bezeqint.net (212.179.124.122) 76.032 ms 72.968 ms 74.660 ms 8 igblmdistc7504.uk.msft.net (195.66.224.140) 75.708 ms 76.797 ms 78.257 ms 9 ge-5-1-0-0.lts-64cb-1a.ntwk.msn.net (207.46.42.227) 80.125 ms 81.336 ms 82.671 ms 10 ge-7-0-0-0.nyc-64cb-1a.ntwk.msn.net (207.46.47.20) 179.232 ms so-7-1-0-0.ash-64cb-1b.ntwk.msn.net (213.199.144.158) 162.508 ms 163.223 ms 11 xe-0-0-1-0.co1-96c-1b.ntwk.msn.net (207.46.45.29) 227.964 ms ge-7-0-0-0.co1-64c-1b.ntwk.msn.net (207.46.40.90) 228.226 ms xe-0-0-1-0.co1-96c-1b.ntwk.msn.net (207.46.45.29) 212.781 ms 12 10.22.8.54 (10.22.8.54) 215.046 ms xe-5-2-0-0.co1-96c-1a.ntwk.msn.net (207.46.40.167) 214.825 ms 10.22.8.58 (10.22.8.58) 213.251 ms 13 10.22.8.62 (10.22.8.62) 212.745 ms 213.827 ms 10.22.8.50 (10.22.8.50) 215.655 ms 14 10.22.8.62 (10.22.8.62) 211.665 ms !X 10.22.8.50 (10.22.8.50) 214.491 ms !X 10.22.8.54 (10.22.8.54) 218.471 ms !X Line 1,2 : It's me Line from 3-7: It's my Internet provider Line 8 and on: I think I hit MS servers WTF line 12-14 ????? 10.22.8.x ???? then I run this traceroute: sudo traceroute -T msdn.microsoft.com traceroute to msdn.microsoft.com (65.55.11.235), 30 hops max, 60 byte packets 1 10.0.0.138 (10.0.0.138) 0.109 ms 0.127 ms * 2 * * * 3 * * * 4 * * * 5 * * * 6 * 65.55.11.235 (65.55.11.235) 16.019 ms 17.364 ms So I hit MSDN web site already at 6 hop ! WTF ??? This is host -a msdn.microsoft.com from me: host -a msdn.microsoft.com Trying "msdn.microsoft.com" ;; ->>HEADER<<- opcode: QUERY, status: NOERROR, id: 19522 ;; flags: qr rd ra; QUERY: 1, ANSWER: 2, AUTHORITY: 0, ADDITIONAL: 0 ;; QUESTION SECTION: ;msdn.microsoft.com. IN ANY ;; ANSWER SECTION: msdn.microsoft.com. 3274 IN CNAME msdn.microsoft.akadns.net. msdn.microsoft.akadns.net. 600 IN A 65.55.11.235 Received 91 bytes from 127.0.0.1#53 in 108 ms Could someone help me understand and fix it ??

    Read the article

  • Way to update / refresh / reschedule project plan after adding a vacation / changing calendar

    - by CodeCanvas
    I had created a project plan using MS-Project 2010 (not server). I had set the task schedule mode to "Auto Scheduled" and entered the necessary tasks. Since it is a single person project I also added one person to the Resource of the file and assigned that resource to all the tasks and leveled the project. After the plan was put in and tasks were leveled I figured the calendar was not correctly set (in UAE the weekend is Friday and Saturday instead of Saturday and Sunday). So, I updated the default calendar (Standard) of the project by going to Project-Change Working Time-Work Weeks and changed them as needed. But after doing this, the tasks are still scheduled over Friday and Saturday even though I have marked them as nonworking days in the standard calendar. I tried the following for the tasks to refresh, but I was not successful: Updated all tasks to use the "Standard" calendar in the project Selected option so that tasks do not ignore resource calendars Added a constraint "As Soon As Possible" Executed "Level All" Any help on solving this issue would be much appreciated, thanks in advance.

    Read the article

  • How to put Powerpoint viewer full screen on secondary display?

    - by Andrew Grimm
    Using Powerpoint viewer (2010), I want to show a Powerpoint show on my secondary display, i.e. the projector, not on my laptop screen. However, Powerpoint viewer always does full screen presentations on the primary display, even if I move the Powerpoint viewer program to the secondary display. Powerpoint and multiple monitors shows how to configure which display a Powerpoint presentation is shown on for the full version of Powerpoint. But how do I do this for Powerpoint viewer? One workaround is to clone monitors rather than having separate monitors displaying different things, but I'm still wondering if there's a better way.

    Read the article

  • How do I keep Conditional Formatting formulas and ranges from automatically changing?

    - by Iszi
    I've found that Conditional Formatting formulas and ranges will automatically adjust when you copy, delete, or move data around in a spreadsheet. While this is a nice idea, it tends to break things for me in some rather weird ways. To avoid this, I tried writing rules that applied to the entire spreadsheet and keyed off of column headers to highlight the data I wanted to check. Example: =AND(A$1="Check This Column For Blanks),ISBLANK(A1)) applied to =$1:$1048576 However, even with the rule explicitly applied to the entire sheet, it was still automatically adjusting (and breaking in weird ways by doing so) as I worked in the sheet. How can I avoid this?

    Read the article

  • Tie stock quote value to cell in Excel 2011 Mac

    - by vedantchandra
    I've been working on a mock stock portfolio in Excel, and I've been looking for ways to automatically update the data, eg. stock price and P/E ratio. I have tried using a web query to MSN Money, but that just brings up the whole stock quote across multiple cells, I want data to be updated in individual cells only. The only web query solution I can think of is if someone hosted a website where each value in the stock quote was saved on a different HTML file. I could then WebQuery to that file for each cell requiring that value. However, no website offers this. So in essence, is there any tool on Excel 2011 Mac that will let me pull individual values from a stock quote and assign them to a single cell?

    Read the article

  • Remove Excel data link in Visio Drawing

    - by Ddono25
    I am creating a server topology for one of our SharePoint farms and thought it would be easy to just link the Excel spreadsheet with our server information to the Visio drawing to auto-populate some things. It didn't work out that well, but the drawing is finished without it now. I cannot remove the link between the Excel spreadsheet and the Visio diagram. Whenever the drawing is opened the linked excel server list opens in a pane at the very bottom of the window. How would I eliminate the data link? Or just the spreadsheet from view when being opened?

    Read the article

  • PowerPoint avoid animation completion on click & advance slide or start new one

    - by ScottS
    Scenario I have PowerPoint 2010 On the "Transitions" tab the "Advance Slide On Mouse Click" check box is checked. I have a long, slow, timed, non-repeating animation working in the background of the slide. I click to advance the slide before the animation is finished, but ... Instead of advancing the slide, the animation moves to the completed state ... Forcing a second click to actually advance the slide. Additionally If I have other animations on the slide that are initiated by a click, the long animation also advances to a finished state before starting the new animation. Desired Behavior On click, I want the slide to advance or the next on-click animation to start whether the long animation is done or not, and without having that long animation first "complete" itself. In the case of another animation, I simply want the long animation to continue, while also doing the new animation. Ultimate Question Is there a way to either: Set an option somewhere to not have that animation complete on click and simply "continue" to animate with the start of a new animation or to advance the slide (as the case may be)? Create a VBA script that will produce the desired behavior for the long animation?

    Read the article

  • Create a form as a worksheet in Excel that adds records to another worksheet

    - by Holden Fenner
    I am trying to create a form in Excel for vehicle requests. What I want to happen is to create one worksheet that is a recreation of the current paper form, but have a clickable button that will enter all the data for the vehicle request as a record on a second worksheet. Conversely, if you know the record number, I want the form to auto-flll the information from that record number. I have the second part figured out, that should be a simple HLOOKUP, but I don't know how to generate the clickable button. Will I need to use scripting for this, or is there an pre-built way of doing this? (As an aside, I know there are other and better ways of accomplishing database work, but the nature of my work makes Excel the best choice)

    Read the article

  • How to require a cell input if another cell has a value

    - by Connor
    I'm trying to edit the VBA for one of my workbooks so that If there is a value in column A, then a value for column C is required or else the file won't save, but i'm having some trouble with this. I can get excel to check a cell for any input and require it have input, but I need it to check if a different cell has an input before requiring input. This is because not all of the lines in my spreadsheet will be used all of the time, but some people forget to put very important pieces of information in the spreadsheet which throws some of our balances off. An SKU is entered on the sheet when we switch to a new one, and I want the program to make sure there is an amount of product in a given cell every time a new SKU is entered onto the sheet. Thanks.

    Read the article

  • OneNote can't connect to SkyDrive in Windows 8.1

    - by Greg
    Since I installed windows 8.1 I can't open my OneNote notebooks stored on skydrive with the 2013 Office OneNote app. When I click in the office app to open from skydrive it gives back: "We can't get your notebooks right now. Please try again later." I can open them without trouble in the modern UI onenote app, but I can't open password protected pages there. Also if I try to open it from a browser the error message follows: "We couldn't open that location. It might not exist or you might not have permission to open it." Neither can I create new notebooks on skydrive with the office app. "...The specified location is not available. -You do not have permissions to modify the specified location..." Can it be fixed somehow? Or can I at least save a notebook to my hard drive without opening it in office? The backup file got deleted with the win 8.1 installation.

    Read the article

  • Use a Trendline Formula to Get Values for Any Given X with Excel

    - by kirkouimet
    Is there an easy way to apply the trend line formula from a chart to any given X value in Excel? For example, I want to get the Y value for a given X = $2,006.00. I've already taken the formula and retyped it out be: =-0.000000000008*X^3 - 0.00000001*X^2 + 0.0003*X - 0.0029 I am continually making adjustments to the trend line by adding more data, and don't want to retype out the formula every time.

    Read the article

  • VBA + Polymorphism: Override worksheet functions from 3rd party

    - by phi
    my company makes extensive use of a data provider using a (closed source) VBA plugin. In principal, every query follows follows a certain structure: Fill one cell with a formula, where arguments to the formula specify the query the range of that formula is extended (not an arrray formula!) and cells below/right are filled with data For this to work, however, a user has to have a terminal program installed on the machine, as well as a com-plugin referenced in VBA/Excel. My Problem These Excelsheets are used and extended by multiple users, and not all of them have access to the data provider. While they can open the sheet, it will recalculate and the data will be gone. However, frequent recalculation is required. I would like every user to be able to use the sheets, without executing a very specific set of formulas. Attempts remove the reference on those computers where I do not have terminal access. This generates a NAME error i the cell containing the query (acceptable), but this query overrides parts of the data (not acceptable) If you allow the program to refresh, all data will be gone after a failed query Replace all formulas with the plain-text result in the respective cells (press a button and loop over every cell...). Obviously destroys any refresh-capabilities the querys offer for all subsequent users, so pretty bad, too. A theoretical idea, and I'm not sure how to implement it: Replace the functions offered by the plugin with something that will be called either first (and relay the query through to the original function, if thats available) or instead of the original function (by only deploying the solution on non-terminal machines), which just returns the original value. More specifically, if my query function is used like this: =GETALLDATA(Startdate, Enddate, Stockticker, etc) I would like to transparently swap the function behind the call. Do you see any hope, or am I lost? I appreciate your help. PS: Of course I'm talking about Bloomberg... Some additional points to clarify issues raise by Frank: The formula in the sheets may not be changed. This is mission-critical software, and its way too complex for any sane person to try and touch it. Only excel and VBA may be used (which is the reason for the previous point...) It would be sufficient to prevent execution of these few specific formulas/functions on a specific machine for all excel sheets to come This looks more and more like a problem for stackoverflow ;-)

    Read the article

  • Dynamically reference a Named Table Column via cell content in Excel

    - by rcphq
    How do I reference an Excel Table column dynamically in Excel 2007? ie: i wanna reference a named column of a named table and what table it is will vary with the value of a cell. I have a Table in Excel (Let's call it Table1). I want to reference one of its columns (Let's call it column1) dynamically from a value in another cell (A1) so that I can achieve the following result: When I change A1, the formula that counts Table1[DynamicallyReferencedColumnName] gets updated to the new reference. I tried using =Count(Table1[INDIRECT("$A$1")]) but Excel says the formula contains an error. Example: A1 = names then the formula would equal Count(Table1[names]). A1 = lastname then the formula would equal Count(Table1[lastname]).

    Read the article

  • How do I stop Outlook from stealing mailto protocol from Gmail?

    - by AngryHacker
    In Chrome, when I click on a mailto: link, I'd like to be taken to my Gmail's Compose window. So I downloaded ChromeMailer and it works relatively well. However, after using Outlook 2010, the default for the mailto reverts to Outlook. I went into Outlook's Options, clicked Default Programs... and was greeted with this: As you can see, the checkbox is grayed out and I can't do anything to changed it. Clicking Select All checkbox does nothing either. How do I stop Outlook from stealing the mailto protocol handler?

    Read the article

  • How to change or remove all traces of original author name in Excel 2010 document

    - by Adam Ryczkowski
    At our company we need to deploy one Excel Workbook in that way that nobody would see it is made by us by looking at the Office metadata. What fields do we need to look for? I know, that the document has track of original writer and the last save author. But is it all? I guess there might be some hidden properties, that might give our company name. Where to look for such fields? Is there any good editor available, or will explorer's property page give enough power? I use Excel 2010

    Read the article

  • View another persons calendar details in Outlook 2010

    - by SqlRyan
    I know how to view somebody else's calendar - there are 100 walk-throughs like this one on Google. However, this feature has changed in Outlook 2010, and you no longer get prompted for rights to view another person's calendar, and Outlook just displays their "Free/Busy" information, which doesn't help me. I'd like to request permissions to view the details of their appointments, but I can't find any place to request permissions on their calendar - Outlook 2010 just gives me "Free/Busy" rights and then appears to have no option to request additional rights. Can anybody point me in the right direction?

    Read the article

  • Desktop notifcations for IMAP subfolders in Outlook 2013

    - by hplieninger
    I use Outlook 2013 and an IMAP account for my mails. I have configured several filters (rules) directly in the webmail application of my provider in order to deliver certain mails, e.g., from my boss, into certain folders other then the "inbox". Note that I did not define any rules in Outlook itself and I also do not want to do so (because I want these mails being delivered into the folders not only in Outlook but also on other devices). The problem is that that I receive desktop notifications only for incoming mails in the main folder ("Inbox") but not for mails in any of the other folders.

    Read the article

< Previous Page | 43 44 45 46 47 48 49 50 51 52 53 54  | Next Page >