Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 512/1407 | < Previous Page | 508 509 510 511 512 513 514 515 516 517 518 519  | Next Page >

  • Sharing a symlinked (`mklink /d`) directory via SMB?

    - by Alois Mahdal
    I have a Windows 7 amd64 box where one directory is shared: local path is d:\drop\ remote path is \\aloism\drop from SMB point of view, Everyone has Read and Write permission ACLs for the folder are set so that all authenticated users have read and write permissions:NT AUTHORITY\Authenticated Users:(OI)(CI)C (which is inherited to all levels below) Now I create a symbolic link within the structure of the directory: D:\drop>mklink /d tools2 tools symbolic link created for tools2 <<===>> tools The problem is that I can't access this new directory from any of the remote machines (a Windows 7 box and a Windows XP box—both behave the same way): C:\>dir \\aloism\drop\tools2\ Volume in drive \\aloism\drop is droot Volume Serial Number is FA73-1897 Directory of \\aloism\drop\tools2 File Not Found How can I make it work? Possibly also for files?

    Read the article

  • Setting a mapped drive in Virtual hosts causes apache to not start

    - by darksoulsong
    I´m trying to set a virtual host on my windows 7 machine. The folder I want to point to is located on a centOS machine and the folder path is Z:\Websites\Online\MyClient\Site. But something strange happens when I set the document root like this: DocumentRoot "Z:\Websites\Online\MyClient\Site" Apache do not restarts after that. When I take a look at the log, there is an error pointing to that line, where I added the path to the folder: Syntax error on line 48 of C:/Program Files/Zend/Apache2/conf/extra/httpd-vhosts.conf: DocumentRoot must be a directory. There must be a way to make it work like this, by setting an Apache Installation on a machine and pointing it to a folder located on another computer, right? My hosts file is set like this: 172.17.10.1\Data\Websites\Online\MyClient\Site MyClient.local ANY HELP would be VERY appreciated.

    Read the article

  • vbs - 800A0401 - Expected End of Statement

    - by user93200
    The bat has >>%vbs% echo oShellLink.IconLocation = "%1, 0"to produce oShellLink.IconLocation = ""C:\WINDOWS\NOTEPAD.exe", 0"` where %1 is a quoted path However, unless I remove the quotes from path like here: oShellLink.IconLocation = "C:\WINDOWS\NOTEPAD.exe, 0" I get the titular error. What do you suggest? (Note that %1 is always supplied with quotes) Also, I'm not very familiar with vbscript, why does it require no quotes next to each other? ... Still not clear why vbscript can't interpret this assignment, but found a fix: %~1 - Expands %1 and removes any surrounding quotation marks ("").

    Read the article

  • Windows 7 very slow after restart, but fine after complete shutdown?

    - by lkm
    I have a Dell pc running Windows 7 with the Intel i3 processor. Whenever I restart the computer, the os crawls. For example, I move the mouse and then I see it move on the screen 10 seconds later... Everything runs slowly. This happens only on a restart (it's fine when I turn it on after it has been shut down). Any ideas what is causing this (I haven't installed any new software since buying it). Does it sound like a hardware or software issue?

    Read the article

  • sticky bit on NFS file system

    - by Kris_R
    I have a system where to the main server (homes, nfs, ntp, queue...) can log-in only root – all the other users use front-end host with NFS-mounted home directories (RW) and all other software directories (read-only). My problem is, that time to time, if root or normal user with sudo makes some administrative works on front-end some homes of normal users getting sticky bits (drwsr-sr-x). If it happens usually the user can't log-in (as long as permission for his home are not changed to drwxr-xr-x). The last time I saw it after compiling some new software (normal user configure;make) and installation from the same directory as root (su and make install or direct as normal user sudo make install). Can somebody explain me why it happens and what should I do to get rid of this problem? p.s. I'm using CentOS 5.7

    Read the article

  • Smart Auto-completion in SVN (and other programs!)

    - by Jimmy
    When I type "svn add path/to/somefile..." and tab to autocomplete, the system should ONLY complete files/directories that are NOT under currently under SVN control. Likewise, when I commit, remove or resolve files, the tab completion should only complete files that are relevant to what I'm doing. This is especially important in SVN where I can waste thousands of keystrokes typing long path and file names, but it of applies to other programs. I know bash has a bash_completion file that can be used to programatically alter this behaviour but I've not found a decent example of SVN completion which actually completes file names rather than SVN command names. My question is: Does anyone have such a setup? Does anyone use a different shell or tool that does something similar? Has anyone given this any thought?

    Read the article

  • Future of desktop applications on Windows 8

    - by Vibhore Tanwer
    There are a lot of threads discussing existence of WPF/Silverlight/HTML5 on Windows 8, I just need to clarify the picture about desktop applications only, I have following queries to the experts What are the technologies available for developing desktop applications on Windows 8? What are the technologies I can use for creating rich multimedia applications. Currently I have an application with DirectX 9 and WPF. If I am to develop something like that for Windows 8 then what options are available to me, and what are the pros and cons of these. Is it a good idea to continue with the same DirectX 9 code on Windows 8 as well? What is the best option equivalent to DirectX, Is it XNA or is it DirectX 11 or something else? Performance an extensibility are critical points to me. All suggestions are welcome. Thanks in Advance.

    Read the article

  • In Ubuntu Linux, how do I list packages installed from the “universe” repository?

    - by Nate
    On an Ubuntu 10.04 LTS server, I want to list installed packages and see what repository they come from. It’s easy to list installed packages, but it does not include the name of the repository (such as “main” or “universe”). And this information isn’t in /var/lib/dpkg/status, so dpkg-query doesn’t show it either. I want to get a list of “unsupported” software—that is, software that doesn’t come from the “main” repository, and for which Ubuntu does not guarantee security updates. Note: This is a server. It does not have X, GNOME or KDE installed.

    Read the article

  • Boot screen appears to be asking a question but garbled

    - by mark kaylor
    I'm running 12.04 Precise Pangolin, Kernel 3.2.0-32 w/ GNOME 3.4.2 I perused the prior questions/answers and did not find exactly the same problem, I am concerned that AUTOFSCK, Grub or some other critical event that needs some attention ? Any idea on how to get my video clean during boot? Once I get past the boot screen the video driver/card, etc is performing beautifully ! Here is a photo of the boot screen; nVidia GeForce CARD INFORMATION (lspci -vvv) 01:00.0 VGA compatible controller: NVIDIA Corporation G72 [GeForce 7300 LE] (rev a1) (prog-if 00 [VGA controller]) Subsystem: Gateway 2000 Device 3a07 Control: I/O+ Mem+ BusMaster+ SpecCycle- MemWINV- VGASnoop- ParErr- Stepping- SERR- FastB2B- DisINTx- Status: Cap+ 66MHz- UDF- FastB2B- ParErr- DEVSEL=fast TAbort- SERR- [disabled] Capabilities: Kernel driver in use: nvidia Kernel modules: nvidia_173, nouveau, nvidiafb Thanks for your help/advice.

    Read the article

  • monitor internet bandwidth on LAN

    - by Dimal Chandrasiri
    I'm on a office network and there are around 12 PCs that are connected to a switch and then to a Prolink Router. Now the Internet connection is very slow and I'm the one who manage all the computers. I want to monitor bandwidth usage of each computer on the LAN. how can I achieve this using my computer. I cannot install any software on the client computers other than mine. I tried wireshark but, it only shows my network usage so there is no use with the data I get from it. Is there any specific software that I can use within my PC to get the bandwidth details of other computers. I'm on a windows 7 x64bit PC with admin privileges. Thank you.

    Read the article

  • What security changes are necessary when connecting DSL modem directly to PC instead of router?

    - by Mike B
    Windows XP I have a user with a single PC that was connected to the internet via a standard home router. The router is now having hardware-related issues and to save money, they're considering connecting the PC directly to the DSL modem since they don't need to share the internet connection or need wireless functionality. If they decide to do that, I'm concerned that this will introduce additional security concerns. Is the Windows Firewall sufficient and Microsoft Security Essentials sufficient for protecting a computer directly connected to a DSL Modem? Or is other security software needed here? Ideally, I'd like to avoid having third-party firewall software constantly bringing up alerts and asking them to approve everything. Also, just to clarify, their use cases are just internet browsing and email.

    Read the article

  • Moving soon, fiancee has new job: how to transition?

    - by Anonymous
    I've found myself in a sort of conundrum lately and I figured Stack Overflow would be the place to ask this question. I normally post under my personal account here, but I'm writing in anonymously this time so as to make sure my co-workers don't find out too early that I'll be leaving them behind in a few months. My fiancee just landed a great software development job at a very large, stable company. She'll be starting after she graduates and just after we get married (May to June-ish). Her compensation and benefits package will be more than enough to take care of both of us, so I agreed to step down from my current position so we could move to a larger city with more opportunities. I'll probably take a few weeks off to decompress, but I don't want to stay unemployed very long. Since there will be less pressure on me to bring home a second income though, we're not as adverse to risk as we normally would be. I'm currently debating whether to eventually seek employment at a small company, a larger company, do contract work, or do something else entirely. I haven't been in the software development business long (2-3 years plus some small personal projects), but I've seen what things can be like at a startup (my first job) and at a more established, mid-sized business (my current job). Most importantly what I'm looking for out of a new employment opportunity is challenge and variety. Does this situation describe anyone on SO? If so, what did you do/what are you doing? How is it working out for you? Programming is a pleasure as well as a career skill for me, so I want to make sure it stays that way. Thanks to all in advance for any responses.

    Read the article

  • Handling Backups for Rapid Resilience

    The backup and restore system in SQL Server hasn't changed a great deal over the years despite a huge growth in the typical size of databases. When disaster strikes, and an important service is taken offline while a restore is performed, there is often time to reflect on whether it might be possible to design databases for a more rapid recovery of the most critical parts of a database application. Uncover the flexibility of custom metricsKeep up to date from anywhere with SQL Monitor, and monitor the most important data for your servers and applications. Download a free trial.

    Read the article

  • How can I install a scanner by IP?

    - by user54266
    I'm trying to install a scanner by IP the same way you would install a printer by IP. I don't want to install the horrible HP Solution Center software but I don't know how to install a network scanner without the software. I'm having a hard time googling this because when I search for things like "install network scanner" or "install scanner by IP" all the results are for things like Angry IP Scanner which is clearly different than what I'm trying to get. Thanks in advance. This is for Windows Vista, but Windows 7 instructions will do.

    Read the article

  • Help me diagnose Windows 7 pc issue

    - by lkm
    I have a dell pc running windows 7 with the intel i3 processor. Whenever I restart the computer, the os crawls. For example, I move the mouse and then I see it move on the screen 10 seconds later...everything runs slowly. This happens only on a restart (its fine when I turn it on after it has been shut down). Any ideas what is causing this (I haven't installed any new software since buying it). Does it sound like a hardware or software issue? Thanks

    Read the article

  • If an entity is composed, is it still a god object?

    - by Telastyn
    I am working on a system to configure hardware. Unfortunately, there is tons of variety in the hardware, which means there's a wide variety of capabilities and configurations depending on what specific hardware the software connects to. To deal with this, we're using a Component Based Entity design where the "hardware" class itself is a very thin container for components that are composed at runtime based on what capabilities/configuration are available. This works great, and the design itself has worked well elsewhere (particularly in games). The problem is that all this software does is configure the hardware. As such, almost all of the code is a component of the hardware instance. While the consumer only ever works against the strongly typed interfaces for the components, it could be argued that the class that represents an instance of the hardware is a God Object. If you want to do anything to/with the hardware, you query an interface and work with it. So, even if the components of an object are modular and decoupled well, is their container a God Object and the downsides associated with the anti-pattern?

    Read the article

  • Multiple Monitors on One Screen

    - by Hulihan Applications
    Does anyone know of any software/hardware configuration that will allow you to preview/view the contents multiple monitors on one monitor? Let's pretend: I have two monitors hooked up to one pc, Monitor A and Monitor B. The monitors are not near each other. I'd like to be able to preview/see what's displaying on Monitor B on Monitor A I haven't been able to find much about this, but I imagine it may not currently be possible to access/emulate video output going out of a video port in software. However, wouldn't it be possible to capture display data generated by the OS kernel or data getting passed down to the display adapter driver?

    Read the article

  • Does (should?) changing the URI scheme name change the semantics?

    - by Doug
    If we take: http://example.com/foo is it fair to say that: ftp://example.com/foo .. points to the same resource, just using a different mechanism for resolving it (and of course possibly a different representation, but perhaps not)? This came to light in a discussion we were having surrounding some internal tooling with Git. We have to process some Git repositories, and they come to use as "git@{authority}/{path}" , however the library we're using to interface with them doesn't support the git protocol. I suggested that we should make the service robust in of that it tries to use HTTP or SSH, in essence, discovering what protocols/schemes are supported for resolving the repository at {path} under each {authority}. This was met with some criticism: "We don't know if that's the same repository". My response was: "It had better be!" Looking at RFC 3986, I see this excerpt: URI "resolution" is the process of determining an access mechanism and the appropriate parameters necessary to dereference a URI; this resolution may require several iterations. To use that access mechanism to perform an action on the URI's resource is to "dereference" the URI. Which makes me think that the resolution process is permitted to try different protocols, because: Although many URI schemes are named after protocols, this does not imply that use of these URIs will result in access to the resource via the named protocol. The only concern I have, I guess, is that I only see reference to the notion of changing protocols when it comes to traversing relationships: it is possible for a single set of hypertext documents to be simultaneously accessible and traversable via each of the "file", "http", and "ftp" schemes if the documents refer to each other with relative references. I'm inclined to think I'm wrong in my initial beliefs, because the Normalization and Comparison section of said RFC doesn't mention any way of treating two URIs as equivalent if they use different schemes. It seems like schemes named/based on IP protocols ought to have this notion, at least?

    Read the article

  • What do you consider standard job perks? [closed]

    - by reseter
    What does a company need to offer you (apart from a fat pay cheque) for you to work for them? I am aware of this question, which is from an employer's perspective. I am interested in your views as employees. To get the discussion started, here is a list off the top of my head (not in any particular order): High-end computer with a huge screen or two. The best software tool money can buy as per Joel's test). That isn't too much to ask given many of the best tools are free (think git). Flexibility is a bonus- if a particular platform/ piece of software is not absolutely required, I would like to pick my OS and IDE. A quality chair Quiet workspace. Open plan is fine as long as there are meeting rooms so that there is no constant chatter going on around me. Spacious workspace. I would rather have more than three inches between my mouse and the person next to me's keyboard. Food and drink at work. Many companies these days have fruit baskets, biscuits, etc available to their employees, some even offer free lunch. Education. If my employer wants my skills to stay up-to-date, they should at the very least understand I need time to learn. If they want to pay for my books and conference registration fees, I am more than happy to accept. Other options include organizing internal knowledge exchange days or inviting speakers from outside. Flexible hours/ option to work from home is a bonus

    Read the article

  • Good free way to clone a hard drive or a partition and send the image over the network (through FTP, Windows file sharing, "anything")?

    - by Deleted
    What I ideally would like is a free software solution which can: Boot from a CD/DVD/USB-stick and Clone a complete hard drive or a partition and Send the resulting image file over the network through Windows file sharing (SMB, I could use SAMBA on my server to receive the image) or through FTP or through SFTP or through SCP It should work with Linux and Windows file-systems (where specific file system support is necessary) Is there anything good out there like this? I know Wikipedia lists a lot of cloning software. But I'm looking for a personal recommendation which you have used yourself, as I find it more credible (I'll see from the upvotes if the answer is liked by a lot of visitors).

    Read the article

  • Need help configuring NAT

    - by QuinnFTW
    First of all, the router I am using is a Cisco WRVS4400N. My company runs a software which handles the MySQL database of all of their products. The software now has an e-commerce module, so I have to set up a secure tunnel from our network to the server that will be hosting our e-commerce site so that when the database is updated, the site will also be updated. The technician completeing the job said there is an IP conflict, and has asked me to NAT 192.168.0.0/24 to 192.168.115.0/24. I am not really sure how to do this, and they want to charge $150 an hour to do it for me. Can anyone help?

    Read the article

  • (core dumped) ${TOMCAT_START}?

    - by Farticle Pilter
    I am running COMSOL (a scientific software) as a server, to which MATLAB is connected to. After a while, COMSOL aborted with the following error message. [s@beads ~]$ comsol server -comsolinifile $HOME/comsolini/comsolbatch.ini Error occurred during initialization of VM Could not reserve enough space for object heap Could not create the Java virtual machine. [s@beads ~]$ comsol server -comsolinifile $HOME/comsolini/comsolserver.ini COMSOL 4.4 (Build: 150) started listening on port 2036 Use the console command 'close' to exit the program A client with username 's' has logged on to the server from 'beads.myuniversity.edu' using port 2036. /software/linux/x86_64/comsol-4.4/bin/comsol: line 1436: 32757 Aborted (core dumped) ${TOMCAT_START} What might be the cause of this (core dumped) ${TOMCAT_START}? How may I fix it?

    Read the article

  • Migrating Split Access Database from one domain to another (not working, details in Q)

    - by Expo_Rob
    Some background: I'm a programmer, not a network administrator, who has been asked to migrate some accounting software (Integrated Office Accounting version 3.2) from an existing domain (OLD_NETWORK) to a new domain (NEW_NETWORK). No-body at the office knows how it works under the hood. It is a split Access 2000 database with the back-end shared and on a file server (which is also the DC) using mapped drives. The DC is NT Server 4 SP 6. The new server is server 2003. The two networks are running independently (ie: two computers on each desk). I have been able to get new computers set up on NEW_NETWORK and working with the IOA software just perfectly but for one problem: The company here uses other entirely separate databases which access the tables IOA maintains (specifically the 'customers' table) via links. To switch between these systems, you press F11 then File-Open the appropriate database and away you go (this is necessary to maintain the permissions that the IOA system uses to protect the customers table). The entire database is Access 2000, the links go to other Access databases, SQL-Server is not involved in any way, nor is a migration to SQL server likely. If I can't migrate anything over, everything will stay as it is, and the NEW_NETWORK computers will not be used. The problem: When I try and update these seperate databases (I shall call one "BANK_ACCOUNT", but the name does not matter), it says "this recordset cannot be updated". It also will sometimes not pull information out of the 'customers' table (ie: date_entered) when looking at a report of everyone who opened a bank account on a certain day (ie: today). I have tried: Giving 'everyone' full control via. shared directory permissions Giving 'everyone' full control on a file system level Checking the permissions within Access (everyone has full read/write on all tables) Copying the entire server contents from one file server to another (ie: xcopy everything) Copying the entire local client files from one computer to another, putting them in the exact same position in the file system, with the same permissons (or full control to 'everyone'). Running as an Administrator Taking one of the NEW_NETWORK computers, having it join OLD_NETWORK and run the software (direct copy from a working system with identical drive mappings), this did not work Weeping openly My Question: Is there anything else I can try? (sorry for this being so long)

    Read the article

  • Long term system health monitor

    - by user30336
    As an experienced user, I sometimes notice that things are not going well with my computer. For example, my backup drive recently started cycling up and down, so I guessed it was probably dying, and replaced it. I detected this with my ears. Windows did not seem to notice or care. There ought to be software that monitors overall system health by keeping track of things like this, so that unusual events or increasing error rates will not be shrugged off. Among other things: disk errors that are recovered, corrupt network packets (at above the baseline expected rate) and crashes of trusted programs are early warnings. Is there any software that tries to use this kind of monitoring to warn of impending trouble?

    Read the article

< Previous Page | 508 509 510 511 512 513 514 515 516 517 518 519  | Next Page >