Search Results

Search found 4174 results on 167 pages for 'tasks'.

Page 6/167 | < Previous Page | 2 3 4 5 6 7 8 9 10 11 12 13  | Next Page >

  • Sparxsystems Enterprise Architect and issuses/tasks tracking system?

    - by peperg
    We (developement team 4 upto 7 people) use Sparxsystems EA for requirement analysis, modeling etc. Do you know any well-working methods to use EA and some task/issue tracking system like Redmine/Mantis/Trac ? The problem is not to duplicate functionality (there are issues/tasks/changes in Redmine and EA) but to have some user friendly interface (preffered web) to manage tasks and issues. By user-friendly I mean "my tasks" page add effort / time tracking easy "add issue" by everyone (simple bug tracking system) mail notifications

    Read the article

  • Running Cron Tasks on Heroku

    - by viatropos
    I've seen that Heroku charges $15/mo to run Delayed Job, and $3/mo to run cron tasks daily. Is it possible to skip that entirely and run my own cron tasks manually? Or are they somehow figuring out that I'm running cron tasks?

    Read the article

  • chaining array of tasks with continuation

    - by Andrei Cristof
    I have a Task structure that is a little bit complex(for me at least). The structure is: (where T = Task) T1, T2, T3... Tn. There's an array (a list of files), and the T's represent tasks created for each file. Each T has always two subtasks that it must complete or fail: Tn.1, Tn.2 - download and install. For each download (Tn.1) there are always two subtasks to try, download from two paths(Tn.1.1, Tn.1.2). Execution would be: First, download file: Tn1.1. If Tn.1.1 fails, then Tn.1.2 executes. If either from download tasks returns OK - execute Tn.2. If Tn.2 executed or failed - go to next Tn. I figured the first thing to do, was to write all this structure with jagged arrays: private void CreateTasks() { //main array Task<int>[][][] mainTask = new Task<int>[_queuedApps.Count][][]; for (int i = 0; i < mainTask.Length; i++) { Task<int>[][] arr = GenerateOperationTasks(); mainTask[i] = arr; } } private Task<int>[][] GenerateOperationTasks() { //two download tasks Task<int>[] downloadTasks = new Task<int>[2]; downloadTasks[0] = new Task<int>(() => { return 0; }); downloadTasks[1] = new Task<int>(() => { return 0; }); //one installation task Task<int>[] installTask = new Task<int>[1] { new Task<int>(() => { return 0; }) }; //operations Task is jagged - keeps tasks above Task<int>[][] operationTasks = new Task<int>[2][]; operationTasks[0] = downloadTasks; operationTasks[1] = installTask; return operationTasks; } So now I got my mainTask array of tasks, containing nicely ordered tasks just as described above. However after reading the docs on ContinuationTasks, I realise this does not help me since I must call e.g. Task.ContinueWith(Task2). I'm stumped about doing this on my mainTask array. I can't write mainTask[0].ContinueWith(mainTask[1]) because I dont know the size of the array. If I could somehow reference the next task in the array (but without knowing its index), but cant figure out how. Any ideas? Thank you very much for your help. Regards,

    Read the article

  • Java Executor: Small tasks or big ones?

    - by Arash Shahkar
    Consider one big task which could be broken into hundreds of small, independently-runnable tasks. To be more specific, each small task is to send a light network request and decide upon the answer received from the server. These small tasks are not expected to take longer than a second, and involve a few servers in total. I have in mind two approaches to implement this using the Executor framework, and I want to know which one's better and why. Create a few, say 5 to 10 tasks each involving doing a bunch of send and receives. Create a single task (Callable or Runnable) for each send & receive and schedule all of them (hundreds) to be run by the executor. I'm sorry if my question shows that I'm lazy to test these and see for myself what's better (at least performance-wise). My question, while looking after an answer to this specific case, has a more general aspect. In situations like these when you want to use an executor to do all the scheduling and other stuff, is it better to create lots of small tasks or to group those into a less number of bigger tasks?

    Read the article

  • where can I find the rake tasks delivered with rails

    - by ash34
    I am looking for tasks like tmp:clear or db:migrate. Where can I find the code for these tasks. I remember seeing them before but don't recollect where. Also, is there a way I can set some global variables in a .rake file that can be accessed by all tasks in that file without passing them as arguments to each task. thanks, ash

    Read the article

  • Set scheduled task last result to 0x0 manually

    - by Rogier
    Every night a task runs that checks if any scheduled task has a Last Result is not equal to 0x0. If a scheduled tasks has an error like 0x1, then automatically an e-mail is sent to me. As some tasks are running only weekly, and sometimes an error occurs which results in not equal to 0x0, every night an e-mail is sent with the error message, as the Last Result column still shows the last result of 0x1. But I would like to set the Last Result column to 0x0 manually if I solved a problem, so I won't get every night an e-mail with the error message. So is it possible to set the scheduled tasks Last Result to 0x0 manually (or by a script)? @harrymc. See located script underneath that is sending the e-mail. I can easily add a criteria to ignore result 0x1 (or another code), however this is not the solution as most of the times this result is a real error and has to be e-mailed. set [email protected] set SMTPServer=SMTPserver set PathToScript=c:\scripts set [email protected] for /F "delims=" %%a in ('schtasks /query /v /fo:list ^| findstr /i "Taskname Result"') do call :Sub %%a goto :eof :Sub set Line=%* set BOL=%Line:~0,4% set MOL=%Line:~38% if /i %BOL%==Task ( set name=%MOL% goto :eof ) set result=%MOL% echo Task Name=%name%, Task Result=%result% if not %result%==0 ( echo Task %name% failed with result %result% > %PathToScript%\taskcheckerlog.txt bmail %PathToScript%\taskcheckerlog.txt -t %YourEmailAddress% -a "Warning! Failed %name% Scheduled Task on %computername%" -s %SMTPServer% -f %FromAddress% -b "Task %name% failed with result %result% on CorVu scheduler %computername%" )

    Read the article

  • Celery daemon as a Ubuntu service does not consume tasks while running from terminal does

    - by Guy
    On Ubuntu 11.10, I have to issue python tasks from django using celery. I'm currently testing on the same machine but eventually the celery worker should run on a remote machine. django uses the following settings: BROKER_HOST = "127.0.0.1" BROKER_PORT = 5672 BROKER_VHOST = "/my_vhost" BROKER_USER = "celery" BROKER_PASSWORD = "celery" I can also see my task queued in http://localhost:55672/#/queues the celery daemon uses the following configuration (celeryconfig.py): BROKER_HOST = "127.0.0.1" BROKER_PORT = 5672 BROKER_USER = "celery" BROKER_PASSWORD = "celery" BROKER_VHOST = "/my_vhost" CELERY_RESULT_BACKEND = "amqp" import os import sys sys.path.append(os.getcwd()) CELERY_IMPORTS = ("tasks", ) running celeryd -l info works well and now I want to run it as a service. I've followed the instructions from http://ask.github.com/celery/cookbook/daemonizing.html and now I'm trying to run it using: sudo /etc/init.d/celeryd start But the message is not being consumed, no error in the celery log either. /etc/default/celeryd CELERYD_NODES="w1" CELERYD_CHDIR="/path/to/django/project" CELERYD_OPTS="--time-limit=300 --concurrency=1" CELERY_CONFIG_MODULE="celeryconfig" # %n will be replaced with the nodename. CELERYD_LOG_FILE="/var/log/celery/%n.log" CELERYD_PID_FILE="/var/run/celery/%n.pid" # Workers should run as an unprivileged user. CELERYD_USER="celery" CELERYD_GROUP="celery" I've also created user celery in Ubuntu not sure if its necessary. Any help will be appreciated, Thanks, Guy

    Read the article

  • Any task-control algorithms programming practices?

    - by NumberFour
    Hi, I was just wondering if there's any field which concerns the task-control programming (or at least that's the way I call it). For a better explanation of task-control consider the following scenario: An application (master-thread) waits for a command - which might be a particular action or a set of actions the application should perform. When a command is received the master-thread creates a task (= spawns an independent thread which actually does the action) and adds a record in it's task-list - thus keeping track of the time of execution, thread handle, task priority...etc. The master-thread awaits for any other incoming commands while taking care of all the tasks - e.g: kills tasks running too long, prioritizes tasks with higher priorities, kills a task on a request of another task, limits the number of currently running tasks, allows task scheduling, cleans finished tasks (threads) and so on. The model is pretty similar to what we can see in OS dealing with running processes. Are there any good practices programming such task-models or is there some theoretical work done in this field? Maybe my question is too generalized, but at least I wanted to know whether there are any experiences working on such models or if there's a better approach. Thanks for any answers.

    Read the article

  • ERROR 0x8007007A when trying to schedule a task

    - by Paul Hollingsworth
    I am getting the error "The data area passed to a system call is too small. (Exception from HRESULT: 0x8007007A)" when trying to create a scheduled task on a particular windows machine. The problem description is identical to that described in this Microsoft KB article I followed their steps to resolve: Stopped the task scheduler service (right-clicked "Task Scheduler" in the Services window from Control Panel and selected "Stop"). Restarted the task scheduler service Waited 15 minutes tried to schedule the task. But the error is persisting. To give more context of how we are creating these scheduled tasks, they are actually generated automatically from a configuration script (we run the script each time we wish to make a change). Each time this happens, it deletes all of the existing tasks and creates new ones. I don't know what else to try.... but surely there is some way to "reset" the task scheduler... How can I stop this error from happening.

    Read the article

  • ERROR 0x8007007A when trying to schedule a task

    - by Paul Hollingsworth
    I am getting the error "The data area passed to a system call is too small. (Exception from HRESULT: 0x8007007A)" when trying to create a scheduled task on a particular windows machine. The problem description is identical to that described in this Microsoft KB article I followed their steps to resolve: Stopped the task scheduler service (right-clicked "Task Scheduler" in the Services window from Control Panel and selected "Stop"). Restarted the task scheduler service Waited 15 minutes tried to schedule the task. But the error is persisting. To give more context of how we are creating these scheduled tasks, they are actually generated automatically from a configuration script (we run the script each time we wish to make a change). Each time this happens, it deletes all of the existing tasks and creates new ones. I don't know what else to try.... but surely there is some way to "reset" the task scheduler... How can I stop this error from happening.

    Read the article

  • How to find out the reason why a scheduled task hang?

    - by Graviton
    I have scheduled quite a number of tasks in my Windows 7, doing a variety of cron jobs on my machines. I am perfectly sure that these tasks, when run on their own, won't hang. But the problem is that, when I run them daily, over the course of several days and weeks and months, occasionally some of them will hang. So I am forced to kill the hanged task and rerun it--- and now it can run successfully! I want to fix this problem once and for all, and for that, I need to know why a scheduled task will hang, even when I run it separately, it won't. Anyway for me to find out the reason?

    Read the article

  • System architecture: simple approach for setting up background tasks behind a web application -- wil

    - by Tim Molendijk
    I have a Django web application and I have some tasks that should operate (or actually: be initiated) on the background. The application is deployed as follows: apache2-mpm-worker; mod_wsgi in daemon mode (1 process, 15 threads). The background tasks have the following characteristics: they need to operate in a regular interval (every 5 minutes or so); they require the application context (i.e. the application packages need to be available in memory); they do not need any input other than database access, in order to perform some not-so-heavy tasks such as sending out e-mail and updating the state of the database. Now I was thinking that the most simple approach to this problem would be simply to piggyback on the existing application process (as spawned by mod_wsgi). By implementing the task as part of the application and providing an HTTP interface for it, I would prevent the overhead of another process that is holding all of the application into memory. A simple cronjob can be setup that sends a request to this HTTP interface every 5 minutes and that would be it. Since the application process provides 15 threads and the tasks are quite lightweight and only running every 5 minutes, I figure they would not be hindering the performance of the web application's user-facing operations. Yet... I have done some online research and I have seen nobody advocating this approach. Many articles suggest a significantly more complex approach based on a full-blown messaging component (such as Celery, which uses RabbitMQ). Although that's sexy, it sounds like overkill to me. Some articles suggest setting up a cronjob that executes a script which performs the tasks. But that doesn't feel very attractive either, as it results in creating a new process that loads the entire application into memory, performs some tiny task, and destroys the process again. And this is repeated every 5 minutes. Does not sound like an elegant solution. So, I'm looking for some feedback on my suggested approach as described in the paragraph before the preceeding paragraph. Is my reasoning correct? Am I overlooking (potential) problems? What about my assumption that application's performance will not be impeded?

    Read the article

  • Linux Newbie: SSH or VNC for linux admin tasks

    - by Dirk
    Longtime Windows user, looking to get my feet wet with Linux. Since Windows makes comparatively little use of the command line, I'm naturally more comfortable with GUI tools for remote server administration tasks. However, before i rush out and install a VNC server on my Linux box, I want to get a sense of how many of Linux's various packages actually offer GUI front end. If not many, then it's probably not worth the effort.

    Read the article

  • Microsoft exchange/outlook "tasks" in linux/evolution ??

    - by criss
    Hi all Ive tried receiving Microsoft outlook/exchange tasks (like meetings and duties) with "evolution"(evolution) without any success... Have anyone succeed with evolution or other linux program?? This is the only thing stopping me to say good by to microsft windows... Best Regards and thanks for the great Site !!

    Read the article

  • taskkill - end tasks with window titles ending with a specific string

    - by DBZ_A
    I need to write a batch program to end all MS office communicator tasks with window titles (usually ending with pattern "- Conversation" . I tried taskkill /FI "WINDOWTITLE eq *Conversation" /IM communicator.exe but the wildcard pattern starting with a '*' does not seem to work. Gives the folowing error ERROR: The search filter cannot be recognized. any suggestions for a workaround would be greatly appreciated!

    Read the article

  • Windows Server 2008 R2 Customer Experience Tasks

    - by ulrichb
    Can I disable the CEIP and Application Experience Tasks in the task scheduler without hesitation? I'm talkin about: \Microsoft\Windows\Application Experience: "AitAgent" and "ProgramDataUpdater" \Microsoft\Windows\Autochk: "Proxy" \Microsoft\Windows\Customer Experience Improvement Program: "Consolidator", "KernelCeipTask" and "UsbCeip" \Microsoft\Windows\Customer Experience Improvement Program\Server: "ServerCeipAssistant", "ServerRoleCollector" and "ServerRoleUsageCollector"

    Read the article

  • SQL Server maintenance tasks cannot run after changing computer name

    - by Gatura
    I am having a problem performing maintenance tasks on Microsoft SQL Server 2008 after changing my server name from the original random name given during installation to the one I prefer This is the error am getting Could not obtain Information about Windows NT group/users 'WIN-4N4A9TLBGJJ\Administrator', error code 0x534 Is there a way I can fix this problem without having to delete the account and recreating it again?

    Read the article

  • How do I account for changed or forgotten tasks in an estimate?

    - by Andrew
    To handle task-level estimates and time reporting, I have been using (roughly) the technique that Steve McConnell describes in Chapter 10 of Software Estimation. Specifically, when the time comes for me to create task-level estimates (right before coding begins on a project), I determine the tasks at a fairly granular level so that, whenever possible, I have no tasks with a single-point, 50%-confidence estimate greater than four hours. That way, the task estimation process helps with constructing the software while helping me not to forget tasks during estimation. I come up with a range of hours possible for each task also, and using the statistical calculations that McConnell describes along with my historical accuracy data, I can generate estimates at other confidence levels when desired. I feel like this method has been working fairly well for me. We are required to put tasks and their estimates into TFS for tracking, so I use the estimates at the percentage of confidence I am told to use. I am unsure, however, what to do when I do forget a task, or I end up needing to do work that does not neatly fall within one of the tasks I estimated. Of course, trying to avoid this situation is best, but how do I account for forgotten/changed tasks? I want to have the best historical data I can to help me with future estimates, but right now, I basically am just calculating whether I made the 50%-confidence estimate and whether I made it inside the ranged estimate. I'll be happy to clarify what I'm asking if needed -- let me know what is unclear.

    Read the article

  • Are functional programming languages good for practical tasks?

    - by Clueless
    It seems to me from my experimenting with Haskell, Erlang and Scheme that functional programming languages are a fantastic way to answer scientific questions. For example, taking a small set of data and performing some extensive analysis on it to return a significant answer. It's great for working through some tough Project Euler questions or trying out the Google Code Jam in an original way. At the same time it seems that by their very nature, they are more suited to finding analytical solutions than actually performing practical tasks. I noticed this most strongly in Haskell, where everything is evaluated lazily and your whole program boils down to one giant analytical solution for some given data that you either hard-code into the program or tack on messily through Haskell's limited IO capabilities. Basically, the tasks I would call 'practical' such as Aceept a request, find and process requested data, and return it formatted as needed seem to translate much more directly into procedural languages. The most luck I have had finding a functional language that works like this is Factor, which I would liken to a reverse-polish-notation version of Python. So I am just curious whether I have missed something in these languages or I am just way off the ball in how I ask this question. Does anyone have examples of functional languages that are great at performing practical tasks or practical tasks that are best performed by functional languages?

    Read the article

  • Celery / Django Single Tasks being run multiple times

    - by felix001
    I'm facing an issue where I'm placing a task into the queue and it is being run multiple times. From the celery logs I can see that the same worker is running the task ... [2014-06-06 15:12:20,731: INFO/MainProcess] Received task: input.tasks.add_queue [2014-06-06 15:12:20,750: INFO/Worker-2] starting runner.. [2014-06-06 15:12:20,759: INFO/Worker-2] collection started [2014-06-06 15:13:32,828: INFO/Worker-2] collection complete [2014-06-06 15:13:32,836: INFO/Worker-2] generation of steps complete [2014-06-06 15:13:32,836: INFO/Worker-2] update created [2014-06-06 15:13:33,655: INFO/Worker-2] email sent [2014-06-06 15:13:33,656: INFO/Worker-2] update created [2014-06-06 15:13:34,420: INFO/Worker-2] email sent [2014-06-06 15:13:34,421: INFO/Worker-2] FINISH - Success However when I view the actual logs of the application it is showing 5-6 log lines for each step (??). Im using Django 1.6 with RabbitMQ. The method for placing into the queue is via placing a delay on a function. This function (task decorator is added( then calls a class which is run. Has anyone any idea on the best way to troubleshoot this ? Edit : As requested heres the code, views.py In my view im sending my data to the queue via ... from input.tasks import add_queue_project add_queue_project.delay(data) tasks.py from celery.decorators import task @task() def add_queue_project(data): """ run project """ logger = logging_setup(app="project") logger.info("starting project runner..") f = project_runner(data) f.main() class project_runner(): """ main project runner """ def __init__(self,data): self.data = data self.logger = logging_setup(app="project") def self.main(self): .... Code settings.py THIRD_PARTY_APPS = ( 'south', # Database migration helpers: 'crispy_forms', # Form layouts 'rest_framework', 'djcelery', ) import djcelery djcelery.setup_loader() BROKER_HOST = "127.0.0.1" BROKER_PORT = 5672 # default RabbitMQ listening port BROKER_USER = "test" BROKER_PASSWORD = "test" BROKER_VHOST = "test" CELERY_BACKEND = "amqp" # telling Celery to report the results back to RabbitMQ CELERY_RESULT_DBURI = "" CELERY_IMPORTS = ("input.tasks", ) celeryd The line im running is to start celery, python2.7 manage.py celeryd -l info Thanks,

    Read the article

  • Passing Parameters to Child Tasks from a Parent Task in Rake

    - by Haseeb Khan
    I am new to the world of Rake and currently writing a Rake Script which consists of various tasks depending on the arguments passed to it on runtime. From some Tutorials over the web, I figured out how to pass parameters to the Script as well how to make a task which is dependent on other subtasks. For reference, I have mentioned a sample below: task :parent, [:parent_argument1, :parent_argument2, :parent_argument3] => [:child1, :child2] do # Perform Parent Task Functionalities end task :child1, [:child1_argument1, :child1_argument2] do |t, args| # Perform Child1 Task Functionalities end task :child2, [:child2_argument1, :child2_argument2] do |t, args| # Perform Child2 Task Functionalities end Following is what I want to achieve: I want to pass the arguments passed to the parent task to the child tasks. Is it allowed? Is there a way I can make the child tasks as private so they can't be called independently? Thanks in advance.

    Read the article

  • Sending Tasks using an offline Outlook

    - by ASV
    Hi All, I've a scenario wherein I need to send/assign tasks from my browser UI to the concerned. This should happen with Outlook being offline (or for that matter outlook not even configured on the terminal) so that the user can be accessing a workflow from any terminal (using his/her AD credentials) and if required should have the ability to send a task to the concerned without having to return to his own terminal to be able to do so. I envision that the user's credentials should be used to look up the AD for his/her email ID and send a task using the same from anywhere in the intranet. Using Outlook object library I have been able to assign/send tasks, but with the Outlook being fired up and not otherwise. Redemption does the sync of contacts while Outlook is offline but not tasks. Kindly help if anybody has had a chance to do something similar. Thanks in advance.

    Read the article

  • Windows Workflows - While Activity for creating multiple tasks not working

    - by Georgil Mathew
    I am using a while activity for creating multiple tasks for a workflow. The code is executed fine and the task is created when the loop runs only once. But when the loop runs twice or more, only one task is getting created. Also the WF status shows as Error Occured. All I want to do here is create multiple tasks (no of tasks depends on an entered column value) for the same user. Is it posible to use 'while' in this scenario? Or is there any other way to go ahead? NB: I am using state machine workflow.

    Read the article

< Previous Page | 2 3 4 5 6 7 8 9 10 11 12 13  | Next Page >