Search Results

Search found 10751 results on 431 pages for 'day cq'.

Page 64/431 | < Previous Page | 60 61 62 63 64 65 66 67 68 69 70 71  | Next Page >

  • Math with Timestamp

    - by Knut Vatsendvik
    table.sql { border-width: 1px; border-spacing: 2px; border-style: dashed; border-color: #0023ff; border-collapse: separate; background-color: white; } table.sql th { border-width: 1px; padding: 1px; border-style: none; border-color: gray; background-color: white; -moz-border-radius: 0px 0px 0px 0px; } table.sql td { border-width: 1px; padding: 3px; border-style: none; border-color: gray; background-color: white; -moz-border-radius: 0px 0px 0px 0px; } .sql-keyword { color: #0000cd; background-color: inherit; } .sql-result { color: #458b74; background-color: inherit; } Got this little SQL quiz from a colleague.  How to add or subtract exactly 1 second from a Timestamp?  Sounded simple enough at first blink, but was a bit trickier than expected. If the data type had been a Date, we knew that we could add or subtract days, minutes or seconds using + or – sysdate + 1 to add one day sysdate - (1 / 24) to subtract one hour sysdate + (1 / 86400) to add one second Would the same arithmetic work with Timestamp as with Date? Let’s test it out with the following query SELECT   systimestamp , systimestamp + (1 / 86400) FROM dual; ---------- 03.05.2010 22.11.50,240887 +02:00 03.05.2010 The first result line shows us the system time down to fractions of seconds. The second result line shows the result as Date (as used for date calculation) meaning now that the granularity is reduced down to a second.   By using the PL/SQL dump() function, we can confirm this with the following query SELECT   dump(systimestamp) , dump(systimestamp + (1 / 86400)) FROM dual; ---------- Typ=188 Len=20: 218,7,5,4,8,53,9,0,200,46,89,20,2,0,5,0,0,0,0,0 Typ=13 Len=8: 218,7,5,4,10,53,10,0 Where typ=13 is a runtime representation for Date. So how can we increase the precision to include fractions of second? After investigating it a bit, we found out that the interval data type INTERVAL DAY TO SECOND could be used with the result of addition or subtraction being a Timestamp. Let’s try again our first query again, now using the interval data type. SELECT systimestamp,    systimestamp + INTERVAL '0 00:00:01.0' DAY TO SECOND(1) FROM dual; ---------- 03.05.2010 22.58.32,723659000 +02:00 03.05.2010 22.58.33,723659000 +02:00 Yes, it worked! To finish the story, here is one example showing how to specify an interval of 2 days, 6 hours, 30 minutes, 4 seconds and 111 thousands of a second. INTERVAL ‘2 6:30:4.111’ DAY TO SECOND(3)

    Read the article

  • ArchBeat Link-o-Rama Top 10 - September 16-22, 2012

    - by Bob Rhubart
    The Top 10 most popular items shared on the OTN ArchBeat Facebook Page for the week of September 16-22, 2012. The Real Architects of LA: OTN Architect Day in Los Angeles - Oct 25No gossip. No drama. No hair pulling. Just a full day of technical sessions and peer interaction focused on using Oracle technologies in today's cloud and SOA architectures. The event is free, but seating is limited, so register now. Thursday October 25, 2012. 8:00 a.m. – 5:00 p.m. Sofitel Los Angeles, 8555 Beverly Boulevard, Los Angeles, CA 90048. OIM-OAM-OAAM integration using TAP – Request Flow you must understand!! | Atul KumarAtul Kumar's post addresses "key points and request flow that you must understand" when integrating three Oracle Identity Management product Oracle Identity Management, Oracle Access Management, and Oracle Adaptive Access Manager. Cloud, automation drive new growth in SOA governance market | ZDNet "SOA governance tools and processes learned over the past decade are now underpinning cloud projects as they scale across enterprises," reports Joe McKendrick. But there remains a lack of understanding about SOA Governance. DevOps Basics: Track Down High CPU Thread with ps, top and the new JDK7 jcmd Tool | Frank Munz "The approach is very generic and works for WebLogic, Glassfish or any other Java application," say Frank Munz. "UNIX commands in the example are run on CentOS, so they will work without changes for Oracle Enterprise Linux or RedHat. Creating the thread dump at the end of the video is done with the jcmd tool from JDK7." Frank has captured the process in the posted video. Oracle OpenWorld 2012 Hands-on Lab: "Leading Your Everyday Application Integration Projects with Enterprise SOA" Yet another session to squeeze into your already-jammed Oracle OpenWorld schedule. This hands-on lab focuses on how "Oracle Enterprise Repository, Oracle Application Integration Architecture (AIA) Foundation Pack, and Oracle SOA Suite work together to help you drive your enterprisewide integration projects." Loving VirtualBox 4.2… | The ORACLE-BASE Blog Is it wrong for a man to love a technology? Oracle ACE Director Tim Hall has several very good reasons for his feelings… ADF Create and CreateInsert Operations for ADF Table | Andrejus Baranovskis Oracle ACE Director Andrejus Baranovskis answers the question, "What operation is best to use to insert a new row into an ADF table, Create or CreateInsert?" Fault Handling Slides and Q&A | Ronald van Luttikhuizen Oracle ACE Director Ronald van Luttikhuizen shares the slides and a Q&A transcript from a presentation he and fellow ACE Director Guido Schmutz gave at the recent Oracle OpenWorld and JavaOne preview event organized by AMIS Technology. Why IT is a profession in 'flux' | ZDNet I usuallly don't post two items from the same person in one day, but this post from ZDNet blogger Joe McKendrick deals with some critical issues affecting those in IT. As McKendrick puts it: "IT professionals are under considerable pressure to deliver more value to the business, versus being good at coding and testing and deploying and integrating." Running RichFaces on WebLogic 12c | Markus Eisele "With all the JMS magic and the different provider checks in the showcase this has become some kind of a challenge to simply build and deploy it," says Oracle ACE Director Markus Eisele. His detailed post will help you to meet that challenge. Thought for the Day "Less is more." — Ludwig Mies van der Rohe (March 27, 1886 – August 17, 1969) Source: BrainyQuote.com

    Read the article

  • ArchBeat Link-o-Rama for 2012-08-30

    - by Bob Rhubart
    Next Generation Mobile Clients for Oracle Applications & the role of Oracle Fusion Middleware | Manish Palaparthy Manish Palaparthy examines some of Oracle's mobile applications, and takes a look at the underlying technology. Master Data Management: A Foundation for Big Data Analysis | Manouj Tahiliani "Businesses that have embraced MDM to get a single, enriched and unified view of Master data by resolving semantic discrepancies and augmenting the explicit master data information from within the enterprise with implicit data from outside the enterprise like social profiles will have a leg up in embracing Big Data solutions. This is especially true for large and medium-sized businesses in industries like Retail, Communications, Financial Services, etc that would find it very challenging to get comprehensive analytical coverage and derive long-term success without resolving the limitations of the heterogeneous topology that leads to disparate, fragmented and incomplete master data." — Manouj Tahiliani Architect Day: Boston - Agenda Update Here's the latest updated information on the session schedule and content for Oracle Technology Network Architect Day in Boston, MA on September 12, 2012. Registration is open, but seating is limited. OTN Architect Day: Boston is being held on Wednesday September 12, 2012, 8:00 a.m. – 5:00 p.m., at the Boston Marriott Burlington, One Burlington Mall Road, Burlington, MA 01803. Integrating Coherence & Java EE 6 Applications using ActiveCache | Ricardo Ferreira The seamless integration between Oracle Coherence and Oracle WebLogic Server "provides a comprehensive environment to develop applications without the complexity of extra Java code to manage cache as a dependency," explains Ricardo Ferreira, "since Oracle provides a DI (Dependency Injection) mechanism for Coherence, the same DI mechanism available in standard Java EE applications. This feature is called ActiveCache." Ricardo shows you how to configure ActiveCache in WebLogic and your Java EE application. Cloud Infrastructure has a new standard from the DMTF "Unlike a de facto standard where typically one vendor has change control over the interface, and everyone else has to reverse engineer the inner workings of it, [Cloud Infrastructure Management Interface (CIMI)] is a de jure standard that is under change control of a standards body. One reason the standard took two years to create is that we factored in use cases, requirements and contributed APIs from multiple vendors. These vendors have products shipping today and as a result CIMI has a strong foundation in real world experience." Oracle GoldenGate 11g Release Launch Webcast- September 12 The new release of Oracle GoldenGate 11g is now available for major databases and platforms. Register for this webcast and live Q&A with product experts to learn about the solution's new features. September 12, 2012. 8:00am AM and 10:00AM PT. Speakers: Doug Reid (Director, Product Management, Oracle GoldenGate), Irem Radzik (Director, Product Marketing, Oracle Data Integration Products) Thought for the Day "[When] asking skilled architects…what they do when confronted with highly complex problems… [they] would most likely answer, 'Just use Common Sense.' [A] better expression than 'common sense' is 'contextual sense'—a knowledge of what is reasonable within a given context. Practicing architects through eduction, experience and examples accumulate a considerable body of contextual sense by the time they're entrusted with solving a system-level problem…" — Eberhardt Rechtin (January 16, 1926 – April 14, 2006) Source: SoftwareQuotes.com

    Read the article

  • Iterative and Incremental Principle Series 4: Iteration Planning – (a.k.a What should I do today?)

    - by llowitz
    Welcome back to the fourth of a five part series on applying the Iteration and Incremental principle.  During the last segment, we discussed how the Implementation Plan includes the number of the iterations for a project, but not the specifics about what will occur during each iteration.  Today, we will explore Iteration Planning and discuss how and when to plan your iterations. As mentioned yesterday, OUM prescribes initially planning your project approach at a high level by creating an Implementation Plan.  As the project moves through the lifecycle, the plan is progressively refined.  Specifically, the details of each iteration is planned prior to the iteration start. The Iteration Plan starts by identifying the iteration goal.  An example of an iteration goal during the OUM Elaboration Phase may be to complete the RD.140.2 Create Requirements Specification for a specific set of requirements.  Another project may determine that their iteration goal is to focus on a smaller set of requirements, but to complete both the RD.140.2 Create Requirements Specification and the AN.100.1 Prepare Analysis Specification.  In an OUM project, the Iteration Plan needs to identify both the iteration goal – how far along the implementation lifecycle you plan to be, and the scope of work for the iteration.  Since each iteration typically ranges from 2 weeks to 6 weeks, it is important to identify a scope of work that is achievable, yet challenging, given the iteration goal and timeframe.  OUM provides specific guidelines and techniques to help prioritize the scope of work based on criteria such as risk, complexity, customer priority and dependency.  In OUM, this prioritization helps focus early iterations on the high risk, architecturally significant items helping to mitigate overall project risk.  Central to the prioritization is the MoSCoW (Must Have, Should Have, Could Have, and Won’t Have) list.   The result of the MoSCoW prioritization is an Iteration Group.  This is a scope of work to be worked on as a group during one or more iterations.  As I mentioned during yesterday’s blog, it is pointless to plan my daily exercise in advance since several factors, including the weather, influence what exercise I perform each day.  Therefore, every morning I perform Iteration Planning.   My “Iteration Plan” includes the type of exercise for the day (run, bike, elliptical), whether I will exercise outside or at the gym, and how many interval sets I plan to complete.    I use several factors to prioritize the type of exercise that I perform each day.  Since running outside is my highest priority, I try to complete it early in the week to minimize the risk of not meeting my overall goal of doing it twice each week.  Regardless of the specific exercise I select, I follow the guidelines in my Implementation Plan by applying the 6-minute interval sets.  Just as in OUM, the iteration goal should be in context of the overall Implementation Plan, and the iteration goal should move the project closer to achieving the phase milestone goals. Having an Implementation Plan details the strategy of what I plan to do and keeps me on track, while the Iteration Plan affords me the flexibility to juggle what I do each day based on external influences thus maximizing my overall success. Tomorrow I’ll conclude the series on applying the Iterative and Incremental approach by discussing how to manage the iteration duration and highlighting some benefits of applying this principle.

    Read the article

  • How to recover after embarrassing yourself and your company?

    - by gaearon
    I work in an outsourcing company in Russia, and one of our clients is a financial company located in USA. For the last six months I have been working on several projects for this particular company, and as I was being assigned a larger project, I was invited to work onsite in USA in order to understand and learn the new system. Things didn't work out as well as I hoped because the environment was messy after original developers, and I had to spent quite some time to understand the quirks. However we managed to do the release several days ago, and it looks like everything's going pretty smooth. From technical perspective, my client seems to be happy with me. My solutions seem to work, and I always try to add some spark of creativity to what I do. However I'm very disorganized in a certain sense, as I believe many of you fellas are. Let me note that my current job is my first job ever, and I was lucky enough to get a job with flexible schedule, meaning I can come in and out of the office whenever I want as long as I have 40 hours a week filled. Sometimes I want to hang out with friends in the evening, and days after that I like to have a good sleep in the morning—this is why flexible schedule (or lack of one) is ideal fit for me. [I just realized this paragraph looks too serious, I should've decorated it with some UNICORNS!] Of course, after coming to the USA, things changed. This is not some software company with special treatment for the nerdy ones. Here you have to get up at 7:30 AM to get to the office by 9 AM and then sit through till 5 PM. Personally, I hate waking up in the morning, not to say my productivity begins to climb no sooner than at 5 o'clock, i.e. I'm very slow until I have to go, which is ironic. Sometimes I even stay for more than 8 hours just to finish my current stuff without interruptions. Anyway, I could deal with that. After all, they are paying for my trip, who am I to complain? They need me to be in their working hours to be able to discuss stuff. It makes perfect sense that fixed schedule doesn't make any sense for me. But it does makes sense that it does make sense for my client. And I am here for client, therefore sense is transferred. Awww, you got it. I was asked several times to come exactly at 9 AM but out of laziness and arrogance I didn't take these requests seriously enough. This paid off in the end—on my last day I woke up 10 minutes before final status meeting with business owner, having overslept previous day as well. Of course this made several people mad, including my client, as I ignored his direct request to come in time for two days in the row, including my final day. Of course, I didn't do it deliberately but certainly I could've ensured that I have at least two alarms to wake me up, et cetera...I didn't do that. He also emailed my boss, calling my behavior ridiculous and embarrassing for my company and saying “he's not happy with my professionalism at all”. My boss told me that “the system must work both in and out” and suggested me to stay till late night this day working in a berserker mode, fixing as many issues as possible, and sending a status email to my client. So I did, but I didn't receive the response yet. These are my questions to the great programmers community: Did you have situations where your ignorance and personal non-technical faults created problems for your company? Were you able to make up for your fault and stay in a good relationship with your client or boss? How? How would you act if you were in my situation?

    Read the article

  • What is the difference between Workcenters, Dashboards, and the Interaction Hub?

    - by Matthew Haavisto
    Oracle Open World has just concluded.  Over the course of the conference, we presented several sessions covering different aspects of the PeopleSoft user experience, including Workcenters, Dashboards, and the PeopleSoft Interaction Hub (formerly known as the PeopleSoft Applications Portal).  Although we've produced collateral on these features and covered them in sessions, it became apparent at the conference that customers still have many questions about the these products, including how they are licensed, how they are installed, what their various purposes are, and how they can be used together synergistically. Let's Start with Licensing and Installation As you may know, we've extended the restricted use license (RUL) for the Interaction Hub.  This grants customers with PeopleTools 8.52 licenses the right to install the Interaction Hub for free for use as specified in the Tools license notes.  Note that this means customers receive a restricted use license for the Interaction Hub that doesn't cost them an additional license fee, but it is a separate product, not part of PeopleTools or PeopleSoft applications, and is a separate installation.  This means customers must provide the infrastructure to install and run the Hub, just like any other application.  The benefits of using the Hub to unify your PeopleSoft user experience can be great.  PeopleSoft applications have not yet delivered instances of the Hub with their products, though they may in the future. Workcenters and Dashboards, on the other hand, are frameworks provided by PeopleTools.  No other license is required, and no additional installation of a separate product is needed (apart from PeopleTools and PeopleSoft applications).  PeopleSoft applications are delivering instances of the workcenters and dashboards with their products.  Some are available now, and more are coming in future releases.  These delivered workcenter and dashboard instances require no additional licenses, and no additional installations beyond Tools and the applications that provide them.  In addition, the workcenter and dashboard frameworks provided by PeopleTools can be used by customers to build their own workcenters and dashboards, and it's quite easy and simple to do so. What are Their Differences?  What Purposes do they Serve? Workcenters, Dashboards and the Interaction Hub appear somewhat similar.  They all contain pagelets, and have some visual characteristics in common.  However, their strengths and purposes are very different, and they were designed to provide different benefits to your PeopleSoft ecosystem. Workcenters and Dashboards have the following characteristics: Designed for specific roles Focus on the daily tasks of those roles Help to streamline the work performed most often Personal view of my work world Makes navigation and search easier and quicker, particularly for transactions and decision support Reports and data needed for day-to-day work Personalizable, but minimal Delivered by PS Apps, but can be altered by customer for their requirements Customers can create their own Workcenters can be used for guided processes  The Interaction Hub is designed to aggregate content from multiple applications, and is is used to unify the user experience of those applications.  It offers a rich, web site-based user experience, and is often used to provide access to infrequently performed activities like benefits enrollment, payroll inquiries, life event changes, onboarding, and so on. Full-featured and robust Centrally administered Pushed to large audience Broad info like Company News Infrequent activities like benefits, not day-to-day tasks Self-service, access to employer info Central launch point for other activities and can navigate to workcenters and dashboards Deployed by customers or consultants, instances not delivered by PeopleSoft (at this time) Content management Unified PS application navigation Although these products are quite different and serve different purposes in your PeopleSoft environment, they can be used together to provide a richer, more efficient and engaging user experience for your all your user communities.

    Read the article

  • WebCenter Customer Spotlight: Hyundai Motor Company

    - by me
    Author: Peter Reiser - Social Business Evangelist, Oracle WebCenter  Solution SummaryHyundai Motor Company is one of the world’s fastest-growing car manufacturers, ranked as the fifth-largest in 2011. The company also operates the world’s largest integrated automobile manufacturing facility in Ulsan, Republic of Korea, which can produce 1.6 million units per year. They  undertook a project to improve business efficiency and reinforce data security by centralizing the company’s sales, financial, and car manufacturing documents into a single repository. Hyundai Motor Company chose Oracle Exalogic, Oracle Exadata, Oracle WebLogic Sever, and Oracle WebCenter Content 11g, as they provided better performance, stability, storage, and scalability than their competitors.  Hyundai Motor Company cut the overall time spent each day on document-related work by around 85%, saved more than US$1 million in paper and printing costs, laid the foundation for a smart work environment, and supported their future growth in the competitive car industry. Company OverviewHyundai Motor Company is one of the world’s fastest-growing car manufacturers, ranked as the fifth-largest in 2011. The company also operates the world’s largest integrated automobile manufacturing facility in Ulsan, Republic of Korea, which can produce 1.6 million units per year. The company strives to enhance its brand image and market recognition by continuously improving the quality and design of its cars. Business Challenges To maximize the company’s growth potential, Hyundai Motor Company undertook a project to improve business efficiency and reinforce data security by centralizing the company’s sales, financial, and car manufacturing documents into a single repository. Specifically, they wanted to: Introduce a smart work environment to improve staff productivity and efficiency, and take advantage of rapid company growth due to new, enhanced car designs Replace a legacy document system managed by individual staff to improve collaboration, the visibility of corporate documents, and sharing of work-related files between employees Improve the security and storage of documents containing corporate intellectual property, and prevent intellectual property loss when staff leaves the company Eliminate delays when downloading files from the central server to a PC Build a large, single document repository to more efficiently manage and share data between 30,000 staff at the company’s headquarters Establish a scalable system that can be extended to Hyundai offices around the world Solution DeployedAfter conducting a large-scale benchmark test, Hyundai Motor Company chose Oracle Exalogic, Oracle Exadata, Oracle WebLogic Sever, and Oracle WebCenter Content 11g, as they provided better performance, stability, storage, and scalability than their competitors. Business Results Lowered the overall time spent each day on all document-related work by approximately 85%—from 4.5 hours to around 42 minutes on an average day Saved more than US$1 million per year in printer, paper, and toner costs, and laid the foundation for a completely paperless environment Reduced staff’s time spent requesting and receiving documents about car sales or designs from supervisors by 50%, by storing and managing all documents across the corporation in a single repository Cut the time required to draft new-car manufacturing, sales, and design documents by 20%, by allowing employees to reference high-quality data, such as marketing strategy and product planning documents already in the system Enhanced staff productivity at company headquarters by 9% by reducing the document-related tasks of 30,000 administrative and research and development staff Ensured the system could scale to hold 3 petabytes of car sales, manufacturing, and design data by 2013 and be deployed at branches worldwide We chose Oracle Exalogic, Oracle Exadata, and Oracle WebCenter Content to support our new document-centralization system over their competitors as Oracle offers stable storage for petabytes of data and high processing speeds. We have cut the overall time spent each day on document-related work by around 85%, saved more than US$1 million in paper and printing costs, laid the foundation for a smart work environment, and supported our future growth in the competitive car industry. Kang Tae-jin, Manager, General Affairs Team, Hyundai Motor Company Additional Information Hyundai Motor Company Customer Snapshot Oracle WebCenter Content

    Read the article

  • Some PowerShell goodness

    - by KyleBurns
    Ever work somewhere where processes dump files into folders to maintain an archive?  Me too and Windows Explorer hates it.  Very often I find myself needing to organize these files into subfolders so that I can go after files without locking up Windows Explorer and my answer used to be to write a program in something like C# to do the job.  These programs will typically enumerate the files in a folder and move each file to a subdirectory named based on a datestamp.  The last such program I wrote had to use lower-level Win32 API calls to perform the enumeration because it appears the standard .Net calls make use of the same method of enumerating the directories that Windows Explorer chokes on when dealing with a large number of entries in a particular directory, so a simple task was accomplished with a lot of code. Of course, this little utility was just something I used to make my life easier and "not a production app", so it was in my local source folder and not source control when my hard drive died.  So... I was getting ready to re-create it and thought it might be a good idea to play with PowerShell a bit - something I had been wanting to do but had not yet met a requirement to make me do it.  The resulting script was amazingly succinct and even building the flexibility for parameterization and adding line breaks for readability was only about 25 lines long.  Here's the code with discussion following: param(     [Parameter(         Mandatory = $false,         Position = 0,         HelpMessage = "Root of the folders or share to archive.  Be sure to end with appropriate path separator"     )]     [String] $folderRoot="\\fileServer\pathToFolderWithLotsOfFiles\",       [Parameter(         Mandatory = $false,         Position = 1     )]     [int] $days = 1 ) dir $folderRoot|?{(!($_.PsIsContainer)) -and ((get-date) - $_.lastwritetime).totaldays -gt $days }|%{     [string]$year=$([string]$_.lastwritetime.year)     [string]$month=$_.lastwritetime.month     [string]$day=$_.lastwritetime.day     $dir=$folderRoot+$year+"\"+$month+"\"+$day     if(!(test-path $dir)){         new-item -type container $dir     }     Write-output $_     move-item $_.fullname $dir } The script starts by declaring two parameters.  The first parameter holds the path to the folder that I am going to be sorting into subdirectories.  The path separator is intended to be included in this argument because I didn't want to mess with determining whether this was local or UNC and picking the right separator in code, but this could be easily improved upon using Path.Combine since PowerShell has access to the full framework libraries.  The second parameter holds a minimum age in days for files to be removed from the root folder.  The script then pipes the dir command through a query to include only files (by excluding containers) and of those, only entries that meet the age requirement based on the last modified datestamp.  For each of those, the datestamp is used to construct a folder name in the format YYYY\MM\DD (if you're in an environment where even a day's worth of files need further divided, you could make this more granular) and the folder is created if it does not yet exist.  Finally, the file is moved into the directory. One of the things that was really cool about using PowerShell for this task is that the new-item command is smart enough to create the entire subdirectory structure with a single call.  In previous code that I have written to do this kind of thing, I would have to test the entire tree leading down to the subfolder I want, leading to a lot of branching code that detracted from being able to quickly look at the code and understand the job it performs. Overall, I have to say I'm really pleased with what has been done making PowerShell powerful and useful.

    Read the article

  • Spotlight on an office – Utrecht

    - by Maria Sandu
    Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin-top:0cm; mso-para-margin-right:0cm; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-family:"Calibri","sans-serif"; mso-ascii- mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi- mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} This time in our monthly topic, we have our spotlight on the brand new Oracle office in Utrecht, the Netherlands. About 35km south-east of Schiphol Airport and centrally located in the Netherlands, Oracle moved into the Facet building in March 2011. Facet is much more than an office building, it creates a work environment that relates to the ‘No Limits’ philosophy Oracle has in the Netherlands. “No Limits” means the building belongs to everyone. You choose the best place to work, based on the activities of that moment. To point this out, we currently have 1050 people working for Oracle Netherlands, and 623 workplaces. There is virtually no limit to where you can sit in our shiny new offices; we no longer have 'zoning', where departments own specific areas in the building, Even the Managing Director of Oracle Netherlands, does not have an office and he chooses a different working place every day. So make sure you are prepared when he is sitting next to you one day! If nobody has a fixed workplace, then you would think that finding a colleague could be tricky. Oracle uses CU (‘SeeYou’) which makes all of us easier to locate. Upon entering the building you receive a text stating where the greatest concentration of your buddies is sitting. Our internal messaging service also proves to be very valuable finding your colleagues. The heart of our building is the great RestOrant, with a very busy coffee bar. It offers an informal place for people to meet and is busy all day, not just at lunch time! The O-Bar in the atrium on the ground floor is also a very popular place to meet and drink tea or coffee and gives a breathtaking introduction to the office to any of our first time visitors. For a few minutes of relaxation during the working day, there are table tennis facilities and a Wii room on every floor! So if you are interested in joining Oracle in this Netherlands or anywhere else in EMEA, please have a look at http://campus.oracle.com for all of our latest vacancies and internships.

    Read the article

  • Where are my date ranges in Analytics coming from?

    - by Jeffrey McDaniel
    In the P6 Reporting Database there are two main tables to consider when viewing time - W_DAY_D and W_Calendar_FS.  W_DAY_D is populated internally during the ETL process and will provide a row for every day in the given time range. Each row will contain aspects of that day such as calendar year, month, week, quarter, etc. to allow it to be used in the time element when creating requests in Analytics to group data into these time granularities. W_Calendar_FS is used for calculations such as spreads, but is also based on the same set date range. The min and max day_dt (W_DAY_D) and daydate (W_Calendar_FS) will be related to the date range defined, which is a start date and a rolling interval plus a certain range. Generally start date plus 3 years.  In P6 Reporting Database 2.0 this date range was defined in the Configuration utility.  As of P6 Reporting Database 3.0, with the introduction of the Extended Schema this date range is set in the P6 web application. The Extended Schema uses this date range to calculate the data for near real time reporting in P6.  This same date range is validated and used for the P6 Reporting Database.  The rolling date range means if today is April 1, 2010 and the rolling interval is set to three years, the min date will be 1/1/2010 and the max date will be 4/1/2013.  1/1/2010 will be the min date because we always back fill to the beginning of the year. On April 2nd, the Extended schema services are run and the date range is adjusted there to move the max date forward to 4/2/2013.  When the ETL process is run the Reporting Database will pick up this change and also adjust the max date on the W_DAY_D and W_Calendar_FS. There are scenarios where date ranges affecting areas like resource limit may not be adjusted until a change occurs to cause a recalculation, but based on general system usage these dates in these tables will progress forward with the rolling intervals. Choosing a large date range can have an effect on the ETL process for the P6 Reporting Database. The extract portion of the process will pull spread data over into the STAR. The date range defines how long activity and resource assignment spread data is spread out in these tables. If an activity lasts 5 days it will have 5 days of spread data. If a project lasts 5 years, and the date range is 3 years the spread data after that 3 year date range will be bucketed into the last day in the date range. For the overall project and even the activity level you will still see the correct total values.  You just would not be able to see the daily spread 5 years from now. This is an important question when choosing your date range, do you really need to see spread data down to the day 5 years in the future?  Generally this amount of granularity years in the future is not needed. Remember all those values 5, 10, 15, 20 years in the future are still available to report on they would be in more of a summary format on the activity or project.  The data is always there, the level of granularity is the decision.

    Read the article

  • Calling WCF service with parameter using jQuery

    - by Remi Despres-Smyth
    I'm trying to call a WCF web service hosted by IIS using jQuery. I can call it fine without any parameters, and I can also call it fine with a GET request that includes my parameter, but as soon as I try to send in the request via POST, the call is failing. The web service is currently nothing but: [OperationContract, WebInvoke] public ValidationResultSummary TestValidateOn( object day) { return null; } I've set the parameter to object, to make sure the issue isn't something with type coercion. With a breakpoint in the web service, I know the call without parameters as well as the GET call with param succeeds; in the latter the expected value is sent up. Calling code looks like: $.ajax({ // type: "GET", // url: "../Shared/Services/DomainServices.svc/TestValidateOn?day='12/Jan/2010'", type: "POST", url: "../Shared/Services/DomainServices.svc/TestValidateOn", // data: "{ }", --This works if object type param, calls with null data: "{'day': " + selectedDate + "}", // This fails miserably // data: "{'day': '" + selectedDate + "'}", --This also fails miserably contentType: "application/json; charset=utf-8", dataType: "json", success: function(data) { displayResults(data.d); }, error: function(xmlHttpReq, status, errThrown) { displayError(xmlHttpReq, status, errThrown); } }); The POST call never reaches my breakpoint, and on the client, error 500 - "Internal Server Error" - is returned. Any help would be appreciated.

    Read the article

  • Date format in SQLite - iphone - How ?

    - by sagar
    I know that - SQLite doesn't support Day name & month name. I have gone through this question. I have created two custom functions for it. My custom function for Converting Day name from day number ( %w day of week 0-6 with sunday==0 ) +(NSString*)dayNameStringFromDayNo:(NSString*)dayNo{ return ([dayNo isEqualToString:@"0"])?@"Sunday": ( ([dayNo isEqualToString:@"1"])?@"Monday": ( ([dayNo isEqualToString:@"2"])?@"Tuesday": ( ([dayNo isEqualToString:@"3"])?@"Wednesday": ( ([dayNo isEqualToString:@"4"])?@"Thursday": ( ([dayNo isEqualToString:@"5"])?@"Friday": @"Saturday" ) ) ) ) ); } My custom method for getting month name from month no string ( %m month: 01-12 ) +(NSString*)monthNameFromNumber:(NSString*)no{ return ([no isEqualToString:@"01"])?@"January": ( ([no isEqualToString:@"02"])?@"February": ( ([no isEqualToString:@"03"])?@"March": ( ([no isEqualToString:@"04"])?@"April": ( ([no isEqualToString:@"05"])?@"May": ( ([no isEqualToString:@"06"])?@"June": ( ([no isEqualToString:@"07"])?@"July": ( ([no isEqualToString:@"08"])?@"August": ( ([no isEqualToString:@"09"])?@"September": ( ([no isEqualToString:@"10"])?@"October": ( ([no isEqualToString:@"11"])?@"November":@"Decemeber" ) ) ) ) ) ) ) ) ) ); } But what about date following format. Sat 6th February How to get this kind of output ? Do I have to again create a custom function for it ? Thanks in advance for sharing your knowledge. Sagar.

    Read the article

  • How can I 'transpose' my data using SQL and remove duplicates at the same time?

    - by Remnant
    I have the following data structure in my database: LastName FirstName CourseName John Day Pricing John Day Marketing John Day Finance Lisa Smith Marketing Lisa Smith Finance etc... The data shows employess within a business and which courses they have shown a preference to attend. The number of courses per employee will vary (i.e. as above, John has 3 courses and Lisa 2). I need to take this data from the database and pass it to a webpage view (asp.net mvc). I would like the data that comes out of my database to match the view as much as possible and want to transform the data using SQl so that it looks like the following: LastName FirstName Course1 Course2 Course3 John Day Pricing Marketing Finance Lisa Smith Marketing Finance Any thoughts on how this may be achieved? Note: one of the reasons I am trying this approach is that the original data structure does not easily lend itself to be iterated over using the typical mvc syntax: <% foreach (var item in Model.courseData) { %> Because of the duplication of names in the orignal data I would end up with lots of conditionals in my View which I would like to avoid. I have tried transforming the data using c# in my ViewModel but have found it tough going and feel that I could lighten the workload by leveraging SQL before I return the data. Thanks.

    Read the article

  • Prevent empty tooltips at a wpf datagrid

    - by TheCalendarProgrammer
    I am working on a calendar program, which consists mainly of a WPF DataGrid. As there is not always enough space to display all the entries of a day (which is a DataGridCell), a tooltip with all the entries of the day shell appear at mouse over. This works so far with the code snippet shown below. And now the (little) problem: If there are no entries for a day, no tooltip shell pop up. With the code below an empty tooltip pops up. <DataGridTemplateColumn x:Name="Entry" IsReadOnly="True"> <DataGridTemplateColumn.CellTemplate> <DataTemplate> <Grid> <TextBlock Text="{Binding EntryText}" Foreground="{Binding EntryForeground}" FontWeight="{Binding EntryFontWeight}"> </TextBlock> <TextBlock Text="{Binding RightAlignedText}" Foreground="Gray" Background="Transparent"> <TextBlock.ToolTip> <TextBlock Text="{Binding AllEntriesText}"/> </TextBlock.ToolTip> </TextBlock> </Grid> </DataTemplate> </DataGridTemplateColumn.CellTemplate> </DataGridTemplateColumn> The Databinding is made via myCalDataGrid.Itemssource = _listOfDays; in code behind, where a 'Day' is the view model for a single calendar row.

    Read the article

  • Display real time years, months, weeks and days between 2 days in JavaScript

    - by alex
    This is what I've coded it up, and it appears to work. window.onload = function() { var currentSpan = document.getElementById('current'); var minute = 60000, hour = minute * 60, day = hour * 24, week = day * 7, month = week * 4, year = day * 365; var start = new Date(2009, 6, 1); setInterval(function() { var now = new Date(); var difference = now - start; var years = Math.floor(difference / year), months = Math.floor((difference - (years * year)) / month), weeks = Math.floor((difference - (months * month + years * year)) / week), days = Math.floor((difference - (weeks * week + months * month + years * year)) / day); currentSpan.innerHTML = 'Since has passed: ' + years + ' years, ' + months + ' months, ' + weeks + ' weeks and ' + days + ' days'; }, 500); }; This seems to update my span fine, and all the numbers look correct. However, the code looks quite ugly. Do I really need to set up faux constants like that, and then do all that math to calculate what I want? It's been a while since I've worked with the Date object. Is this the best way to do this?

    Read the article

  • how to make Regular expression into non-greedy ?

    - by Rueta
    Hi everyone! I have made a Work with JQ. My Work is a string width a special character block begin and end of string. I want take the text in that special characters, i used regular expression for find in string, but how to make JQ find multi result when have two special character or more. My html here; <div id="container"> <div id="textcontainer"> Cu?c chi?n pháp lý gi?a [|co th?|nghi?m|] th? tru?ng [|test2|dây là test l?n 2|] ch?ng khoán [|M?|day la nuoc my|] và ngân hàng d?u tu quy?n l?c nh?t Ph? Wall m?i ch? b?t d?u. </div> </div> and my JQ $(document).ready(function() { var takedata = $("#textcontainer").text(); var test = 'abcd adddb'; var filterdata = takedata.match(/(\[.+\])/); alert(filterdata); //end write js }); my result is: [|co th?|nghi?m|] th? tru?ng [|test2|dây là test l?n 2|] ch?ng khoán [|M?|day la nuoc my|] . but this is'nt the result i want :(. How to get [text] for times 1 and [demo] for times 2 ?. pls help me !. thankyou :)

    Read the article

  • Getting unpredictable data into a tabular format

    - by Acorn
    The situation: Each page I scrape has <input> elements with a title= and a value= I don't know what is going to be on the page. I want to have all my collected data in a single table at the end, with a column for each title. So basically, I need each row of data to line up with all the others, and if a row doesn't have a certain element, then it should be blank (but there must be something there to keep the alignment). eg. First page has: {animal: cat, colour: blue, fruit: lemon, day: monday} Second page has: {animal: fish, colour: green, day: saturday} Third page has: {animal: dog, number: 10, colour: yellow, fruit: mango, day: tuesday} Then my resulting table should be: animal | number | colour | fruit | day cat | none | blue | lemon | monday fish | none | green | none | saturday dog | 10 | yellow | mango | tuesday Although it would be good to keep the order of the title value pairs, which I know dictionaries wont do. So basically, I need to generate columns from all the titles (kept in order but somehow merged together) What would be the best way of going about this without knowing all the possible titles and explicitly specifying an order for the values to be put in?

    Read the article

  • MS Query returns data inside itself but does not export it to Excel

    - by kappa
    Hi, I'm having a strange problem with Excel and MS Query: I'm using MS Query to run a T-SQL query against a Microsoft SQL Server 2000 and return the results to Excel. To do this, I open Excel, go to Data - Import external data - New database query, select my data source, paste the SQL script in MS Query and click File - Return data to Microsoft Office Excel, leaving all the query options to their defaults. This works fine for many other Excel files, but this time although MS Query shows the correct data when I paste the SQL script, after returning to Excel all I get is the query name in the upper left cell, with no data returned. I fear the cause could be the SQL script, as it contains some advanced functions like union all, UDFs and variables. Here's the script: declare @date smalldatetime set @date = dateadd(day, datediff(day, 0, getdate()), 0) select [date], sum([hours]) as [hours] from ( select [date], [hours] from [server].[dbo].[udf] (84, '2010-01-01', @date) union all select [date], [hours] from [server].[dbo].[udf] (89, '2010-01-01', @date) union all select [date], [hours] from [server].[dbo].[udf] (93, '2010-01-01', @date) ) as [a] group by [date] order by [date] asc I can't get rid of the UDF as inside them are done advanced groupings involving cursors and temporary tables, nor I can remove the variable as the UDF won't accept dateadd(day, datediff(day, 0, getdate()), 0) as parameter. Any ideas? Thanks in advance, Andrea.

    Read the article

  • Javascript array of dates - not iterating properly (jquery ui datepicker)

    - by PaulB
    Hi I have some code which builds an array of date ranges. I then call a function, passing it a date, and compare that date with dates in the array. I'm doing it this way because the dates are stored in a cms, and I'm manipulating the JqueryUI datepicker. Unfortunately my code only checks the first date range in the array - and I can't figure out why! I think it's probably something simple (/stupid!) - if anyone can shed some light on it I'd be extremely grateful! The code is below - the june-september range works fine, the december to jan is totally ignored... <script type="text/javascript" language="javascript"> var ps1 = new Date(2010, 06-1, 18); var pe1 = new Date(2010, 09-1, 03); var ps2 = new Date(2010, 12-1, 20); var pe2 = new Date(2011, 01-1, 02); var peakStart = new Array(ps1,ps2); var peakEnd = new Array(pe1,pe2); function checkDay(date) { var day = date.getDay(); for (var i=0; i<peakStart.length; i++) { if ((date > peakStart[i]) && (date < peakEnd[i])) { return [(day == 5), '']; } else { return [(day == 1 || day == 5), '']; } } } </script>

    Read the article

  • stored procedure issue, has to do with my where clause and if statement

    - by MyHeadHurts
    right now my stored procedure is returning 2 different result sets one for @booked and the other for @booked1 if you look closely my query is doing the same thing for each @booked and @booked but one is for a user selected year and the other for the current year. I don't want two different result sets, i want to join the selected year and the current year side by side by SDESCR(which is a column that they have in common) another hurdle i am facing is i am use @mode to decide whether the user wants netsales, sales... so on. I know i need sometype of join but, it isnt working because i have a where statement that says where dyyyy= @yeartoget which won't allow the current year data to work ALTER PROCEDURE [dbo].[test1] @mode varchar(20), @YearToGet int AS SET NOCOUNT ON Declare @Booked Int Set @Booked = CONVERT(int,DateAdd(year, @YearToGet - Year(getdate() + 1), DateAdd(day, DateDiff(day, 1, getdate()), 1) ) ) Declare @Booked1 Int Set @Booked1 = CONVERT(int,DateAdd(year, (year( getdate() )) - Year(getdate() + 1), DateAdd(day, DateDiff(day, 1, getdate()), 1) ) ) If @mode = 'Sales' Select Division, SDESCR, DYYYY, Sum(Case When Booked <= @Booked Then NetAmount End) ASofNetSales, SUM(NetAmount) AS YENetSales, Sum(Case When Booked <= @Booked Then PARTY End) AS ASofPAX, SUM(PARTY) AS YEPAX From dbo.B101BookingsDetails Where DYYYY = @YearToGet Group By SDESCR, DYYYY, Division Order By Division, SDESCR, DYYYY else if @mode = 'netsales' Select Division, SDESCR, DYYYY, Sum(Case When Booked <= @Booked Then NetAmount End) ASofNetSales, SUM(NetAmount) AS YENetSales, Sum(Case When Booked <= @Booked Then PARTY End) AS ASofPAX, SUM(PARTY) AS YEPAX From dbo.B101BookingsDetails Where DYYYY = @YearToGet Group By SDESCR, DYYYY, Division Order By Division, SDESCR, DYYYY If @mode = 'Sales' Select Division, SDESCR, DYYYY, Sum(Case When Booked <= @Booked1 Then NetAmount End) currentNetSales, Sum(Case When Booked <= @Booked1 Then PARTY End) AS currentPAX From dbo.B101BookingsDetails Where DYYYY = (year( getdate() )) Group By SDESCR, DYYYY, Division Order By Division, SDESCR, DYYYY else if @mode = 'netsales' Select Division, SDESCR, DYYYY, Sum(Case When Booked <= @Booked1 Then NetAmount End) currentNetSales, Sum(Case When Booked <= @Booked1 Then PARTY End) AS currentPAX From dbo.B101BookingsDetails Where DYYYY = (year( getdate() )) Group By SDESCR, DYYYY, Division Order By Division, SDESCR, DYYYY Else if @mode = 'Inssales' Select Division, SDESCR, DYYYY, Sum(Case When Booked <= @Booked1 Then InsAmount End) currentInsSales, Sum(Case When Booked <= @Booked1 Then PARTY End) AS currentPAX From dbo.B101BookingsDetails Where DYYYY = (year( getdate() )) Group By SDESCR, DYYYY, Division Order By Division, SDESCR, DYYYY

    Read the article

  • Optimizing T-SQL where an array would be nice

    - by Polatrite
    Alright, first you'll need to grab a barf bag. I've been tasked with optimizing several old stored procedures in our database. This SP does the following: 1) cursor loops through a series of "buildings" 2) cursor loops through a week, Sunday-Saturday 3) has a huge set of IF blocks that are responsible for counting how many Objects of what Types are present in a given building Essentially what you'll see in this code block is that, if there are 5 objects of type #2, it will increment @Type_2_Objects_5 by 1. IF @Number_Type_1_Objects = 0 BEGIN SET @Type_1_Objects_0 = @Type_1_Objects_0 + 1 END IF @Number_Type_1_Objects = 1 BEGIN SET @Type_1_Objects_1 = @Type_1_Objects_1 + 1 END IF @Number_Type_1_Objects = 2 BEGIN SET @Type_1_Objects_2 = @Type_1_Objects_2 + 1 END IF @Number_Type_1_Objects = 3 BEGIN SET @Type_1_Objects_3 = @Type_1_Objects_3 + 1 END [... Objects_4 through Objects_20 for Type_1] IF @Number_Type_2_Objects = 0 BEGIN SET @Type_2_Objects_0 = @Type_2_Objects_0 + 1 END IF @Number_Type_2_Objects = 1 BEGIN SET @Type_2_Objects_1 = @Type_2_Objects_1 + 1 END IF @Number_Type_2_Objects = 2 BEGIN SET @Type_2_Objects_2 = @Type_2_Objects_2 + 1 END IF @Number_Type_2_Objects = 3 BEGIN SET @Type_2_Objects_3 = @Type_2_Objects_3 + 1 END [... Objects_4 through Objects_20 for Type_2] In addition to being extremely hacky (and limited to a quantity of 20 objects), it seems like a terrible way of handling this. In a traditional language, this could easily be solved with a 2-dimensional array... objects[type][quantity] += 1; I'm a T-SQL novice, but since writing stored procedures often uses a lot of temporary tables (which could essentially be a 2-dimensional array) I was wondering if someone could illuminate a better way of handling a situation like this with two dynamic pieces of data to store. Requested in comments: The columns are simply Number_Type_1_Objects, Number_Type_2_Objects, Number_Type_3_Objects, Number_Type_4_Objects, Number_Type_5_Objects, and CurrentDateTime. Each row in the table represents 5 minutes. The expected output is to figure out what percentage of time a given quantity of objects is present throughout each day. Sunday - Object Type 1 0 objects - 69 rows, 5:45, 34.85% 1 object - 85 rows, 7:05, 42.93% 2 objects - 44 rows, 3:40, 22.22% On Sunday, there were 0 objects of type 1 for 34.85% of the day. There was 1 object for 42.93% of the day, and 2 objects for 22.22% of the day. Repeat for each object type.

    Read the article

  • Why is this Java Calendar comparison bad?

    - by joe7pak
    Hello folks. I'm having an inexplicable problem with the Java Calendar class when I'm trying to compare to dates. I'm trying to compare to Calendars and determine if their difference is than 1 day, and do things bases on that difference or not. But it doesn't work. If I do this with the two dates: String currDate = aCurrentUTCCalendar.getTime().toString(); String localDate = aLocalCalendar.getTime().toString(); I get these results: currDate = "Thu Jan 06 05:58:00 MST 2010" localDate = "Tue Jan 05 00:02:00 MST 2010" This is correct. But if I do this: long curr = aCurrentUTCCalendar.getTime().getTime(); long local = aLocalCalendar.getTime().getTime(); I get these results: ( in milliseconds since the epoch ) curr = -125566110120000 local = 1262674920000 Since there is only about a 30 hour different between the two, the magnitudes are vastly different, not to mention that annoying negative sign. This causes problems if I do this: long day = 60 * 60 * 24 * 1000; // 86400000 millis, one day if( local - curr > day ) { // do something } What's wrong? Why are the getTime().toString() calls correct, but the getTime().getTime() calls are vastly different? I'm using jdk 1.6_06 on WinXP. I can't upgrade the JDK for various reasons.

    Read the article

  • MySQL nested CASE error I need help with?

    - by AK
    What I am trying to do here is: IF the records in table todo as identified in $done have a value in the column recurinterval then THEN reset date_scheduled column ELSE just set status_id column to 6 for those records. This is the error I get from mysql_error() ... You have an error in your SQL syntax; check the manual that corresponds to your MySQL server version for the right syntax to use near 'CASE recurinterval != 0 AND recurinterval IS NOT NULL THEN SET date_sche' at line 2 How can I make this statement work? UPDATE todo CASE recurinterval != 0 AND recurinterval IS NOT NULL THEN SET date_scheduled = CASE recurunit WHEN 'DAY' THEN DATE_ADD(date_scheduled, INTERVAL recurinterval DAY) WHEN 'WEEK' THEN DATE_ADD(date_scheduled, INTERVAL recurinterval WEEK) WHEN 'MONTH' THEN DATE_ADD(date_scheduled, INTERVAL recurinterval MONTH) WHEN 'YEAR' THEN DATE_ADD(date_scheduled, INTERVAL recurinterval YEAR) END WHERE todo_id IN ($done) ELSE SET status_id = 6 WHERE todo_id IN ($done) END The following mySQL statement worked just fine before I revised like above. UPDATE todo SET date_scheduled = CASE recurunit WHEN 'DAY' THEN DATE_ADD(date_scheduled, INTERVAL recurinterval DAY) WHEN 'WEEK' THEN DATE_ADD(date_scheduled, INTERVAL recurinterval WEEK) WHEN 'MONTH' THEN DATE_ADD(date_scheduled, INTERVAL recurinterval MONTH) WHEN 'YEAR' THEN DATE_ADD(date_scheduled, INTERVAL recurinterval YEAR) END WHERE todo_id IN ($done) AND recurinterval != 0 AND recurinterval IS NOT NULL

    Read the article

  • MySql Check if NOW() falls within a weekday/time range

    - by Niall
    I have a table as follows: CREATE TABLE `zonetimes` ( `id` int(11) unsigned NOT NULL AUTO_INCREMENT, `zone_id` int(10) unsigned NOT NULL, `active_from_day` tinyint(1) unsigned NOT NULL DEFAULT '2', `active_to_day` tinyint(1) unsigned NOT NULL DEFAULT '2', `active_from` time NOT NULL, `active_to` time NOT NULL PRIMARY KEY (`id`) ) ENGINE=MyISAM ; So, a user could add a time entry starting on a particular day and time and ending on a particular day and time, eg: Between Monday 08:00 and Friday 18:00 or Between Thursday 15:00 and Tuesday 15:00 (Note the crossover at the end of the week). I need to query this data and determine if a zone is currently active (NOW(), DAYOFWEEK() etc)... This is turning out to be quite tricky. If I didn't have overlaps, eg: from 'Wednesday 8pm to Tuesday 4am' or from 'Thursday 4pm to Tuesday 4pm' this would be easy with BETWEEN. Also, need to allow a user to add for the entire week, eg: Monday 8am - Monday 8am (This should be easy enough, eg: where (active_from_day=active_to_day AND active_from=active_to) OR .. Any ideas? Note: I found a similar question here Timespan - Check for weekday and time of day in mysql but it didn't get an answer. One of the suggestions was to store each day as a separate row. I would much rather store one time span for multiple days though.

    Read the article

  • Cakephp cache only caching one file per action

    - by Jamesz
    Hi, I have a songs controller. Within the songs controller i have a 'view' action which get's passed an id, eg /songs/view/1 /songs/view/5 /songs/view/500 When a user visits /songs/view/1, the file is cached correctly and saved as 'songs_view_1.php' Now for the problem, when a user hit's a different song, eg /songs/view/2, the 'songs_view_1.php' is deleted and '/songs/view/2.php' is in it's place. The cahced files will stay there for a day if I don't visit a different url, and visiting a different action will not affect any other action's cached file. I've tried replacing my 'cake' folder (from 1.2 to 1.2.6), but that didn't do anything. I get no error messages at all and nothing in the logs. Here's my code, I've tried umpteen variations all ending up with the same problem. var $helpers = array('Cache'); var $cacheAction = array( 'view/' => '+1 day' ); Any ideas? EDIT: After some more testing, this code var $cacheAction = array( 'view/1' => "1 day", 'view/2' => "1 day" ); will cache 'view/1' or 'view/2', but delete the previous page as before. If I visit '/view/3' it will delete the cached page from before... sigh EDIT: Having the same issue on another server with same code...

    Read the article

< Previous Page | 60 61 62 63 64 65 66 67 68 69 70 71  | Next Page >