Search Results

Search found 39047 results on 1562 pages for 'process control'.

Page 641/1562 | < Previous Page | 637 638 639 640 641 642 643 644 645 646 647 648  | Next Page >

  • Move on and look elsewhere, or confront the boss?

    - by Meister
    Background: I have my Associates in Applied Science (Comp/Info Tech) with a strong focus in programming, and I'm taking University classes to get my Bachelors. I was recently hired at a local company to be a Software Engineer I on a team of about 8, and I've been told they're looking to hire more. This is my first job, and I was offered what I feel to be an extremely generous starting salary ($30/hr essentially + benefits and yearly bonus). What got me hired was my passion for programming and a strong set of personal projects. Problem: I had no prior experience when I interviewed, so I didn't know exactly what to ask them about the company when I was hired. I've spotted a number of warning signs and annoyances since then, such as: Four developers when I started, with everyone talking about "Ben" or "Ryan" leaving. One engineer hired thirty days before me, one hired two weeks after me. Most of the department has been hiring a large number of people since I started. Extremely limited internet access. I understand the idea from an IT point of view, but not only is Facebook blocked, but so it Youtube, Twitter, and Pandora. I've also figured out that they block all access to non-DNS websites (http://xxx.xxx.xxx.xxx/) and strangely enough Miranda-IM. Low cubicles. Which is fine because I like my immediate coworkers, but they put the developers with the customer service, customer training, and QA department in a huge open room. Noise, noise, noise, and people stop to chitchat all day long. Headphones only go so far. Several emails have been sent out by my boss since I started telling us programmers to not talk about non-work-related-things like Video Games at our cubicles, despite us only spending maybe five minutes every few hours doing so. Further digging tells me that this is because someone keeps complaining that the programmers are "slacking off". People are looking over my shoulder all day. I was in the Freenode webchat to get help with a programming issue, and within minutes I had an email from my boss (to all the developers) telling us that we should NOT be connected to any outside chat servers at work. Version control system from 2005 that we must access with IE and keep the Java 1.4 JRE installed to be able to use. I accidentally updated to Java 6 one day and spent the next two days fighting with my PC to undo this "problem". No source control, no comments on anything, no standards, no code review, no unit testing, no common sense. I literally found a problem in how they handle string resource translations that stems from the simple fact that they don't trim excess white spaces, leading to developers doing: getResource("Date: ") instead of: getResource("Date") + ": ", and I was told to just add the excess white spaces back to the database instead of dealing with the issue directly. Some of these things I'd like to try to understand, but I like having IRC open to talk in a few different rooms during the day and keep in touch with friends/family over IM. They don't break my concentration (not NEARLY as much as the lady from QA stopping by to talk about her son), but because people are looking over my shoulder all day as they walk by they complain when they see something that's not "programmer-looking work". I've been told by my boss and QA that I do good, fast work. I should be judged on my work output and quality, not what I have up on my screen for the five seconds you're walking by So, my question is, even though I'm just barely at my 90 days: How do you decide to move on from a job and looking elsewhere, or when you should start working with your boss to resolve these issues? Is it even possible to get the boss to work with me in many of these things? This is the only place I heard back from even though I sent out several resume's a day for several months, and this place does pay well for putting up with their many flaws, but I'm just starting to get so miserable working here already. Should I just put up with it?

    Read the article

  • Identity in .NET 4.5&ndash;Part 2: Claims Transformation in ASP.NET (Beta 1)

    - by Your DisplayName here!
    In my last post I described how every identity in .NET 4.5 is now claims-based. If you are coming from WIF you might think, great – how do I transform those claims? Sidebar: What is claims transformation? One of the most essential features of WIF (and .NET 4.5) is the ability to transform credentials (or tokens) to claims. During that process the “low level” token details are turned into claims. An example would be a Windows token – it contains things like the name of the user and to which groups he belongs to. That information will be surfaced as claims of type Name and GroupSid. Forms users will be represented as a Name claim (all the other claims that WIF provided for FormsIdentity are gone in 4.5). The issue here is, that your applications typically don’t care about those low level details, but rather about “what’s the purchase limit of alice”. The process of turning the low level claims into application specific ones is called claims transformation. In pre-claims times this would have been done by a combination of Forms Authentication extensibility, role manager and maybe ASP.NET profile. With claims transformation all your identity gathering code is in one place (and the outcome can be cached in a single place as opposed to multiple ones). The structural class to do claims transformation is called ClaimsAuthenticationManager. This class has two purposes – first looking at the incoming (low level) principal and making sure all required information about the user is present. This is your first chance to reject a request. And second – modeling identity information in a way it is relevant for the application (see also here). This class gets called (when present) during the pipeline when using WS-Federation. But not when using the standard .NET principals. I am not sure why – maybe because it is beta 1. Anyhow, a number of people asked me about it, and the following is a little HTTP module that brings that feature back in 4.5. public class ClaimsTransformationHttpModule : IHttpModule {     public void Dispose()     { }     public void Init(HttpApplication context)     {         context.PostAuthenticateRequest += Context_PostAuthenticateRequest;     }     void Context_PostAuthenticateRequest(object sender, EventArgs e)     {         var context = ((HttpApplication)sender).Context;         // no need to call transformation if session already exists         if (FederatedAuthentication.SessionAuthenticationModule != null &&             FederatedAuthentication.SessionAuthenticationModule.ContainsSessionTokenCookie(context.Request.Cookies))         {             return;         }         var transformer = FederatedAuthentication.FederationConfiguration.IdentityConfiguration.ClaimsAuthenticationManager;         if (transformer != null)         {             var transformedPrincipal = transformer.Authenticate(context.Request.RawUrl, context.User as ClaimsPrincipal);             context.User = transformedPrincipal;             Thread.CurrentPrincipal = transformedPrincipal;         }     } } HTH

    Read the article

  • How do you update live web sites with code changes?

    - by Aaron Anodide
    I know this is a very basic question. If someone could humor me and tell me how they would handle this, I'd be greatful. I decided to post this because I am about to install SynchToy to remedy the issue below, and I feel a bit unprofessional using a "Toy" but I can't think of a better way. Many times I find when I am in this situation, I am missing some painfully obvious way to do things - this comes from being the only developer in the company. ASP.NET web application developed on my computer at work Solution has 2 projects: Website (files) WebsiteLib (C#/dll) Using a Git repository Deployed on a GoGrid 2008R2 web server Deployment: Make code changes. Push to Git. Remote desktop to server. Pull from Git. Overwrite the live files by dragging/dropping with windows explorer. In Step 5 I delete all the files from the website root.. this can't be a good thing to do. That's why I am about to install SynchToy... UPDATE: THANKS for all the useful responses. I can't pick which one to mark answer - between using a web deployment - it looks like I have several useful suggesitons: Web Project = whole site packaged into a single DLL - downside for me I can't push simple updates - being a lone developer in a company of 50, this remains something that is simpler at times. Pulling straight from SCM into web root of site - i originally didn't do this out of fear that my SCM hidden directory might end up being exposed, but the answers here helped me get over that (although i still don't like having one more thing to worry about forgetting to make sure is still true over time) Using a web farm, and systematically deploying to nodes - this is the ideal solution for zero downtime, which is actually something I care about since the site is essentially a real time revenue source for my company - i might have a hard time convincing them to double the cost of the servers though. -- finally, the re-enforcement of the basic principal that there needs to be a single click deployment for the site OR ELSE THERE SOMETHING WRONG is probably the most useful thing I got out of the answers. UPDATE 2: I thought I come back to this and update with the actual solution that's been in place for many months now and is working perfectly (for my single web server solution). The process I use is: Make code changes Push to Git Remote desktop to server Pull from Git Run the following batch script: cd C:\Users\Administrator %systemroot%\system32\inetsrv\appcmd.exe stop site "/site.name:Default Web Site" robocopy Documents\code\da\1\work\Tree\LendingTreeWebSite1 c:\inetpub\wwwroot /E /XF connectionsconfig Web.config %systemroot%\system32\inetsrv\appcmd.exe start site "/site.name:Default Web Site" As you can see this brings the site down, uses robocopy to intelligently copy the files that have changed then brings the site back up. It typically runs in less than 2 seconds. Since peak traffic on this site is about 2 requests per second, missing 4 requests per site update is acceptable. Sine I've gotten more proficient with Git I've found that the first four steps above being a "manual process" is also acceptable, although I'm sure I could roll the whole thing into a single click if I wanted to. The documentation for AppCmd.exe is here. The documentation for Robocopy is here.

    Read the article

  • Access denied error while mounting a shared folder?

    - by SSH
    I am a linux newbie and I have a very basic question. I have three machines - machineA 10.108.24.132 machineB 10.108.24.133 machineC 10.108.24.134 and all those machines have Ubuntu 12.04 installed in it and I have root access to all those three machines. Now I am supposed to do below things in my above machines - Create mount point /opt/exhibitor/conf Mount the directory in all servers. sudo mount <NFS-SERVER>:/opt/exhibitor/conf /opt/exhibitor/conf/ I have already created /opt/exhibitor/conf directory in all those three machines as mentioned above. Now I am trying to create a Mount Point on all those three machines. So I followed the below process - Install NFS support files and NFS kernel server in all the above three machines $ sudo apt-get install nfs-common nfs-kernel-server Create the shared directory in all the above three machines $ mkdir /opt/exhibitor/conf/ Edited the /etc/exports and added the entry like this in all the above three machines - # /etc/exports: the access control list for filesystems which may be exported # to NFS clients. See exports(5). # # Example for NFSv2 and NFSv3: # /srv/homes hostname1(rw,sync,no_subtree_check) hostname2(ro,sync,no_subtree_check) # # Example for NFSv4: # /srv/nfs4 gss/krb5i(rw,sync,fsid=0,crossmnt,no_subtree_check) # /srv/nfs4/homes gss/krb5i(rw,sync,no_subtree_check) # /opt/exhibitor/conf/ 10.108.24.*(rw) Run exportfs in all the above three machines root@machineA:/# exportfs -rv exportfs: /etc/exports [1]: Neither 'subtree_check' or 'no_subtree_check' specified for export "10.108.24.*:/opt/exhibitor/conf/". Assuming default behaviour ('no_subtree_check'). NOTE: this default has changed since nfs-utils version 1.0.x exporting 10.108.24.*:/opt/exhibitor/conf Now I did showmount on machineA root@machineA:/# showmount -e 10.108.24.132 Export list for 10.108.24.132: /opt/exhibitor/conf 10.108.24.* And also I have started the NFS server like this in all the above three machines - sudo /etc/init.d/nfs-kernel-server start And now when I did this, I am getting an error - root@machineA:/# sudo mount -t nfs 10.108.24.132:/opt/exhibitor/conf /opt/exhibitor/conf/ mount.nfs: access denied by server while mounting 10.108.24.132:/opt/exhibitor/conf I have also tried doing the same thing from machineB and machineC as well and still I get the same error- root@machineB:/# sudo mount -t nfs 10.108.24.132:/opt/exhibitor/conf /opt/exhibitor/conf/ root@machineC:/# sudo mount -t nfs 10.108.24.132:/opt/exhibitor/conf /opt/exhibitor/conf/ Did my /etc/exports file looks good? As I have the same content in all the three machines. And also are there any logs related to NFS which I can see to find any clues? Any idea what wrong I am doing here? UPDATE:- So my etc/exports files would be like this in all the three machines - # /etc/exports: the access control list for filesystems which may be exported # to NFS clients. See exports(5). # # Example for NFSv2 and NFSv3: # /srv/homes hostname1(rw,sync,no_subtree_check) hostname2(ro,sync,no_subtree_check) # # Example for NFSv4: # /srv/nfs4 gss/krb5i(rw,sync,fsid=0,crossmnt,no_subtree_check) # /srv/nfs4/homes gss/krb5i(rw,sync,no_subtree_check) # /opt/exhibitor/conf/ 10.108.24.132(rw) /opt/exhibitor/conf/ 10.108.24.133(rw) /opt/exhibitor/conf/ 10.108.24.134(rw) Just a quick check - The IP Address that I am taking for each machine as mentioned above is like this - root@machineB:/# ifconfig eth0 Link encap:Ethernet HWaddr 00:50:56:ad:5b:a7 inet addr:10.108.24.133 Bcast:10.108.27.255 Mask:255.255.252.0 UP BROADCAST RUNNING MULTICAST MTU:1500 Metric:1 RX packets:5696812 errors:0 dropped:12462 overruns:0 frame:0 TX packets:5083427 errors:0 dropped:0 overruns:0 carrier:0 collisions:0 txqueuelen:1000 RX bytes:7904369145 (7.9 GB) TX bytes:601844910 (601.8 MB) lo Link encap:Local Loopback inet addr:127.0.0.1 Mask:255.0.0.0 UP LOOPBACK RUNNING MTU:16436 Metric:1 RX packets:187144 errors:0 dropped:0 overruns:0 frame:0 TX packets:187144 errors:0 dropped:0 overruns:0 carrier:0 collisions:0 txqueuelen:0 RX bytes:24012302 (24.0 MB) TX bytes:24012302 (24.0 MB) Here the IP Address that I am taking for machineB is 10.108.24.133.

    Read the article

  • C#, Delegates and LINQ

    - by JustinGreenwood
    One of the topics many junior programmers struggle with is delegates. And today, anonymous delegates and lambda expressions are profuse in .net APIs.  To help some VB programmers adapt to C# and the many equivalent flavors of delegates, I walked through some simple samples to show them the different flavors of delegates. using System; using System.Collections.Generic; using System.Linq; namespace DelegateExample { class Program { public delegate string ProcessStringDelegate(string data); public static string ReverseStringStaticMethod(string data) { return new String(data.Reverse().ToArray()); } static void Main(string[] args) { var stringDelegates = new List<ProcessStringDelegate> { //========================================================== // Declare a new delegate instance and pass the name of the method in new ProcessStringDelegate(ReverseStringStaticMethod), //========================================================== // A shortcut is to just and pass the name of the method in ReverseStringStaticMethod, //========================================================== // You can create an anonymous delegate also delegate (string inputString) //Scramble { var outString = inputString; if (!string.IsNullOrWhiteSpace(inputString)) { var rand = new Random(); var chs = inputString.ToCharArray(); for (int i = 0; i < inputString.Length * 3; i++) { int x = rand.Next(chs.Length), y = rand.Next(chs.Length); char c = chs[x]; chs[x] = chs[y]; chs[y] = c; } outString = new string(chs); } return outString; }, //========================================================== // yet another syntax would be the lambda expression syntax inputString => { // ROT13 var array = inputString.ToCharArray(); for (int i = 0; i < array.Length; i++) { int n = (int)array[i]; n += (n >= 'a' && n <= 'z') ? ((n > 'm') ? 13 : -13) : ((n >= 'A' && n <= 'Z') ? ((n > 'M') ? 13 : -13) : 0); array[i] = (char)n; } return new string(array); } //========================================================== }; // Display the results of the delegate calls var stringToTransform = "Welcome to the jungle!"; System.Console.ForegroundColor = ConsoleColor.Cyan; System.Console.Write("String to Process: "); System.Console.ForegroundColor = ConsoleColor.Yellow; System.Console.WriteLine(stringToTransform); stringDelegates.ForEach(delegatePointer => { System.Console.WriteLine(); System.Console.ForegroundColor = ConsoleColor.Cyan; System.Console.Write("Delegate Method Name: "); System.Console.ForegroundColor = ConsoleColor.Magenta; System.Console.WriteLine(delegatePointer.Method.Name); System.Console.ForegroundColor = ConsoleColor.Cyan; System.Console.Write("Delegate Result: "); System.Console.ForegroundColor = ConsoleColor.White; System.Console.WriteLine(delegatePointer(stringToTransform)); }); System.Console.ReadKey(); } } } The output of the program is below: String to Process: Welcome to the jungle! Delegate Method Name: ReverseStringStaticMethod Delegate Result: !elgnuj eht ot emocleW Delegate Method Name: ReverseStringStaticMethod Delegate Result: !elgnuj eht ot emocleW Delegate Method Name: b__1 Delegate Result: cg ljotWotem!le une eh Delegate Method Name: b__2 Delegate Result: dX_V|`X ?| ?[X ]?{Z_X!

    Read the article

  • Would this be a good web application architecture?

    - by Gustav Bertram
    My problem Our MVC based framework does not allow us to cache only part of our output. Ideally we want to cahce static and semi-static bits, and run dynamic bits. In addition, we need to consider data caching that reacts to database changes. My idea The concept I came up with was to represent a page as a tree of XML fragment objects. (I say XML, but I mean XHTML). Some of the fragments are dynamic, and can pull their data directly from models or other sources, but most of the fragments are static scaffolding. If a subtree of fragments is completely static, then I imagine that they could unfold into pure XML that would then be cached as the text representation of their parent element. This process would ideally continue until we are left with a root element that contains all of the static XML, and has a couple of dynamic XML fragments that are resolved and attached to the relevant nodes of the XML tree just before the page is displayed. In addition to separating content into dynamic and static fragments, some fragments could be dynamic and cached. A simple expiry time which propagates up through the XML fragment tree would indicate that a specific fragment should periodically be refreshed. A newspaper section or front page does not need to be updated each second. Minutes or sometimes even longer is sufficient. Other fragments would be dynamic and uncached. Typically too many articles are viewed for them to be cached - the cache would overflow. Some individual articles may be cached if they are extremely popular. Functional notes The folding mechanism could be to be smart enough to judge when it would be more profitable to fold a dynamic cached fragment and propagate the expiry date to the parent fragment, or to keep it separate and simple attach to the XML tree when resolving the page. If some dynamic cached fragments are associated to database objects through mechanisms like a globally unique content id, then changes to the database could trigger changes to the output cache. If fragments store the identifiers of parent fragments, then they could trigger a refolding process that would then include the updated data. A set of pure XML with an ordered array of fragment objects (that each store the identifying information of the node to which they should be attached), can be resolved in a fairly simple way by walking the XML tree, and merging the data from the fragments. Because it is not necessary to parse and construct the entire tree in memory before attaching nodes, processing should be fairly fast. The identifiers of each fragment would be a combination of relevant identity data and the type of fragment object. Cached parent fragments would contain references to these identifiers, in order to then either pull them from the fragment cache, or to run their code. The controller's responsibility is reduced to making changes to the database, and telling the root XML fragment object to render itself. The Question My question has two parts: Is this a good design? Are there any obvious flaws I'm missing? Has somebody else thought of this before? References? Is there an existing alternative that I should consider? A cool templating engine maybe?

    Read the article

  • I am trying to create an windows application watcher? [migrated]

    - by Broken_Code
    I recently started coding in c #(in may this year) and well I find it best to learn by working with code. this application http://www.c-sharpcorner.com/UploadFile/satisharveti/ActiveApplicationWatcher01252007024921AM/ActiveApplicationWatcher.aspx. I am trying to recreate it however mine will be saving the information into an sql database(new at this as well). I am having some coding problems though as it does not do what I expect it to do. THis is the main code I am using. private void GetTotalTimer() { DateTime now = DateTime.Now; IntPtr hwnd = APIFunc.getforegroundWindow(); Int32 pid = APIFunc.GetWindowProcessID(hwnd); Process p = Process.GetProcessById(pid); appName = p.ProcessName; const int nChars = 256; int handle = 0; StringBuilder Buff = new StringBuilder(nChars); handle = GetForegroundWindow(); appltitle = APIFunc.ActiveApplTitle().Trim().Replace("\0", ""); //if (GetWindowText(handle, Buff, nChars) > 0) //{ // string strbuff = Buff.ToString(); // StrWindow = strbuff; #region insert statement try { if (Conn.State == ConnectionState.Closed) { Conn.Open(); } if (Conn.State == ConnectionState.Open) { SqlCommand com = new SqlCommand("Select top 1 [Window Title] From TimerLogs ORDER BY [Time of Event] DESC", Conn); SqlDataReader reader = com.ExecuteReader(); startTime = DateTime.Now; string time = now.ToString(); if (!reader.HasRows) { reader.Close(); cmd = new SqlCommand("insert into [TimerLogs] values(@time,@appName,@appltitle,@Elapsed_Time,@userName)", Conn); cmd.Parameters.AddWithValue("@time", time); cmd.Parameters.AddWithValue("@appName", appName); cmd.Parameters.AddWithValue("@appltitle", appltitle); cmd.Parameters.AddWithValue("@Elapsed_Time", blank.ToString()); cmd.Parameters.AddWithValue("@userName", userName); cmd.ExecuteNonQuery(); Conn.Close(); } else if(reader.HasRows) { reader.Read(); if (appltitle != reader.ToString()) { reader.Close(); endTime = DateTime.Now; appduration = endTime.Subtract(startTime); cmd = new SqlCommand("insert into [TimerLogs] values (@time,@appName,@appltitle,@Elapsed_Time,@userName)", Conn); cmd.Parameters.AddWithValue("@time", time); cmd.Parameters.AddWithValue("@appName", appName); cmd.Parameters.AddWithValue("@appltitle", appltitle); cmd.Parameters.AddWithValue("@Elapsed_Time", appduration.ToString()); cmd.Parameters.AddWithValue("@userName", userName); cmd.ExecuteNonQuery(); reader.Close(); Conn.Close(); } } } } catch (Exception) { } //} #endregion ActivityTimer.Start(); Processing = "Working"; } Unfortunately this is the result. it is not saving the data as I expect it to. What am i doing wrong I had thought that with the sql reader it would first check for a value and only save if they do not match however it is saving whether there is a match or not.

    Read the article

  • Oracle at ARM TechCon

    - by Tori Wieldt
    ARM TechCon is a technical conference for hardware and software engineers, Oct. 30-Nov 1 in Santa Clara, California. Days two and three of the conference will be geared towards systems designers and software developers, those interested in building ARM processor-based modules, boards, and systems. It will cover all of the hardware and software, tools, ranging from low-power design, networking and connectivity, open source software, and security. Oracle is a sponsor of ARM TechCon, and will present three Java sessions and a hands-on-lab:  "Do You Like Coffee with Your Dessert? Java and the Raspberry Pi" - The Raspberry Pi, an ARM-powered single board computer running a full Linux distro off an SD card has caused a huge wave of interest among developers. This session looks at how Java can be used on a device such as this. Using Java SE for embedded devices and a port of JavaFX, the presentation includes a variety of demonstrations of what the Raspberry Pi is capable of. The Raspberry Pi also provides GPIO line access, and the session covers how this can be used from Java applications. Prepare to be amazed at what this tiny board can do. (Angela Caicedo, Java Evangelist) "Modernizing the Explosion of Advanced Microcontrollers with Embedded Java" - This session explains why Oracle Java ME Embedded is the right choice for building small, connected, and intelligent embedded solutions, such as industrial control applications, smart sensing, wireless connectivity, e-health, or general machine-to-machine (M2M) functionality---extending your business to new areas, driving efficiency, and reducing cost. The new Oracle Java ME Embedded product brings the benefits of Java technology to microcontroller platforms. It is a full-featured, complete, compliant software runtime with value-add features targeted to the embedded space and has the ability to interface with additional hardware components, remote manageability, and over-the-air software updates. It is accompanied by a feature-rich set of tools free of charge. (Fareed Suliman, Java Product Manager) "Embedded Java in Smart Energy and Healthcare" - This session covers embedded Java products and technologies that enable smart and connect devices in the Smart Energy and Healthcare/Medical industries. (speaker Kevin Lee) "Java SE Embedded Development on ARM Made Easy" - This Hands-on Lab aims to show that developers already familiar with the Java develop/debug/deploy lifecycle can apply those same skills to develop Java applications, using Java SE Embedded, on embedded devices. (speaker Jim Connors) In the Oracle booth #603, you can see the following demos: Industry Solutions with JavaThis exhibit consists of a number of industry solutions and how they can be powered by Java technology deployed on embedded systems.  Examples in consumer devices, home gateways, mobile health, smart energy, industrial control, and tablets all powered by applications running on the Java platform are shown.  Some of the solutions demonstrate the ability of Java to connect intelligent devices at the edge of the network to the datacenter or the cloud as a total end-to-end platform.Java in M2M with QualcommThis station will exhibit a new M2M solutions platform co-developed by Oracle and Qualcomm that enables wireless communications for embedded smart devices powered by Java, and share the types of industry solutions that are possible.  In addition, a new platform for wearable devices based on the ARM Cortex M3 platform is exhibited.Why Java for Embedded?Demonstration platforms will show how traditional development environments, tools, and Java programming skills can be used to create applications for embedded devices.  The advantages that Java provides because of  the runtime's abstraction of software from hardware, modularity and scalability, security, and application portability and manageability are shared with attendees. Drop by and see why Java is an optimal applications platform for embedded systems.

    Read the article

  • How can I best implement 'cache until further notice' with memcache in multiple tiers?

    - by ajreal
    the term "client" used here is not referring to client's browser, but client server Before cache workflow 1. client make a HTTP request --> 2. server process --> 3. store parsed results into memcache for next use (cache indefinitely) --> 4. return results to client --> 5. client get the result, store into client's local memcache with TTL After cache workflow 1. another client make a HTTP request --> 2. memcache found return memcache results to client --> 3. client get the result, store into client's local memcache with TTL TTL = time to live Is possible for me to know when the data was updated, and to expire relevant memcache(s) accordingly. However, the pitfalls on client site cache TTL Any data update before the TTL is not pick-up by client memcache. In reverse manner, where there is no update, client memcache still expire after the TTL First request (or concurrent requests) after cache TTL will get throttle as it need to repeat the "Before cache workflow" In the event where client require several HTTP requests on a single web page, it could be very bad in performance. Ideal solution should be client to cache indefinitely until further notice. Here are the three proposals about futher notice Proposal 1 : Make use on HTTP header (current implementation) 1. client sent HTTP request last modified time header 2. server check if last data modified time=last cache time return status 304 3. client based on header to decide further processing GOOD? ---- - save some parsing for client - lesser data transfer BAD? ---- - fire a HTTP request is still slow - server end still need to process lots of requests Proposal 2 : Consistently issue a HTTP request to check all data group last modified time 1. client fire a HTTP request 2. server to return last modified time for all data group 3. client compare local last cache time with the result 4. if data group last cache time < server last modified time then request again for that data group only GOOD? ---- - only fetch what is no up-to-date - less requests for server BAD? ---- - every web page require a HTTP request Proposal 3 : Tell client when new data is available (Push) 1. when server end notice there is a change on a data group 2. notify clients on the changes 3. help clients to fetch again data 4. then reset client local memcache after data is parsed GOOD? ---- - let the cache act/behave like a true cache BAD? ---- - encourage race condition My preference is on proposal 3, and something like Gearman could be ideal Where there is a change, Gearman server to sent the task to multiple clients (workers). Am I crazy? (I know my first question is a bit crazy)

    Read the article

  • Class design issue

    - by user2865206
    I'm new to OOP and a lot of times I become stumped in situations similar to this example: Task: Generate an XML document that contains information about a person. Assume the information is readily available in a database. Here is an example of the structure: <Person> <Name>John Doe</Name> <Age>21</Age> <Address> <Street>100 Main St.</Street> <City>Sylvania</City> <State>OH</State> </Address> <Relatives> <Parents> <Mother> <Name>Jane Doe</Name> </Mother> <Father> <Name>John Doe Sr.</Name> </Father> </Parents> <Siblings> <Brother> <Name>Jeff Doe</Name> </Brother> <Brother> <Name>Steven Doe</Name> </Brother> </Siblings> </Relatives> </Person> Ok lets create a class for each tag (ie: Person, Name, Age, Address) Lets assume each class is only responsible for itself and the elements directly contained Each class will know (have defined by default) the classes that are directly contained within them Each class will have a process() function that will add itself and its childeren to the XML document we are creating When a child is drawn, as in the previous line, we will have them call process() as well Now we are in a recursive loop where each object draws their childeren until all are drawn But what if only some of the tags need to be drawn, and the rest are optional? Some are optional based on if the data exists (if we have it, we must draw it), and some are optional based on the preferences of the user generating the document How do we make sure each object has the data it needs to draw itself and it's childeren? We can pass down a massive array through every object, but that seems shitty doesnt it? We could have each object query the database for it, but thats a lot of queries, and how does it know what it's query is? What if we want to get rid of a tag later? There is no way to reference them. I've been thinking about this for 20 hours now. I feel like I am misunderstanding a design principle or am just approaching this all wrong. How would you go about programming something like this? I suppose this problem could apply to any senario where there are classes that create other classes, but the classes created need information to run. How do I get the information to them in a way that doesn't seem fucky? Thanks for all of your time, this has been kicking my ass.

    Read the article

  • Asynchrony in C# 5 (Part II)

    - by javarg
    This article is a continuation of the series of asynchronous features included in the new Async CTP preview for next versions of C# and VB. Check out Part I for more information. So, let’s continue with TPL Dataflow: Asynchronous functions TPL Dataflow Task based asynchronous Pattern Part II: TPL Dataflow Definition (by quote of Async CTP doc): “TPL Dataflow (TDF) is a new .NET library for building concurrent applications. It promotes actor/agent-oriented designs through primitives for in-process message passing, dataflow, and pipelining. TDF builds upon the APIs and scheduling infrastructure provided by the Task Parallel Library (TPL) in .NET 4, and integrates with the language support for asynchrony provided by C#, Visual Basic, and F#.” This means: data manipulation processed asynchronously. “TPL Dataflow is focused on providing building blocks for message passing and parallelizing CPU- and I/O-intensive applications”. Data manipulation is another hot area when designing asynchronous and parallel applications: how do you sync data access in a parallel environment? how do you avoid concurrency issues? how do you notify when data is available? how do you control how much data is waiting to be consumed? etc.  Dataflow Blocks TDF provides data and action processing blocks. Imagine having preconfigured data processing pipelines to choose from, depending on the type of behavior you want. The most basic block is the BufferBlock<T>, which provides an storage for some kind of data (instances of <T>). So, let’s review data processing blocks available. Blocks a categorized into three groups: Buffering Blocks Executor Blocks Joining Blocks Think of them as electronic circuitry components :).. 1. BufferBlock<T>: it is a FIFO (First in First Out) queue. You can Post data to it and then Receive it synchronously or asynchronously. It synchronizes data consumption for only one receiver at a time (you can have many receivers but only one will actually process it). 2. BroadcastBlock<T>: same FIFO queue for messages (instances of <T>) but link the receiving event to all consumers (it makes the data available for consumption to N number of consumers). The developer can provide a function to make a copy of the data if necessary. 3. WriteOnceBlock<T>: it stores only one value and once it’s been set, it can never be replaced or overwritten again (immutable after being set). As with BroadcastBlock<T>, all consumers can obtain a copy of the value. 4. ActionBlock<TInput>: this executor block allows us to define an operation to be executed when posting data to the queue. Thus, we must pass in a delegate/lambda when creating the block. Posting data will result in an execution of the delegate for each data in the queue. You could also specify how many parallel executions to allow (degree of parallelism). 5. TransformBlock<TInput, TOutput>: this is an executor block designed to transform each input, that is way it defines an output parameter. It ensures messages are processed and delivered in order. 6. TransformManyBlock<TInput, TOutput>: similar to TransformBlock but produces one or more outputs from each input. 7. BatchBlock<T>: combines N single items into one batch item (it buffers and batches inputs). 8. JoinBlock<T1, T2, …>: it generates tuples from all inputs (it aggregates inputs). Inputs could be of any type you want (T1, T2, etc.). 9. BatchJoinBlock<T1, T2, …>: aggregates tuples of collections. It generates collections for each type of input and then creates a tuple to contain each collection (Tuple<IList<T1>, IList<T2>>). Next time I will show some examples of usage for each TDF block. * Images taken from Microsoft’s Async CTP documentation.

    Read the article

  • What Counts For a DBA – Depth

    - by Louis Davidson
    SQL Server offers very simple interfaces to many of its features. Most people could open up SSMS, connect to a server, write a simple query and see the results. Even several of the core DBA tasks are deceptively straightforward. It doesn’t take a rocket scientist to perform a basic database backup or run a trace (even using the newfangled Extended Events!). However, appearances can be deceptive, and often times it is really important that a DBA understands not just the basics of how to perform a task, but why we do a task, and how that task works. As an analogy, consider a child walking into a darkened room. Most would know that they need to turn on the light, and how to do it, so they flick the switch. But what happens if light fails to shine forth. Most would immediately tell you that you need to consider changing the light bulb. So you hop in the car and take them to the local home store and instruct them to buy a replacement. Confronted with a 40 foot display of light bulbs, how will they decide which of the hundreds of types of bulbs, of different types, fittings, shapes, colors, power and efficiency ratings, is the right choice? Obviously the main lesson the child is going to learn this day is how to use their cell phone as a flashlight so they don’t have to ask for help the next time. Likewise, when the metaphorical toddlers who use your database server have issues, they will instinctively know something is wrong, and may even have some idea what caused it, but will have no depth of knowledge to figure out the right solution. That is where the DBA comes in and attempts to save the day. However, when one looks beneath the shiny UI, SQL Server has its own “40 foot display of light bulbs”, in the form of the tremendous number of tools and the often-bewildering amount of information they can present to the DBA, to help us find issues. Unfortunately, resorting to guesswork, to trying different “bulbs” over and over, hoping to stumble on the answer. This is where the right depth of knowledge goes a long way. If we need to write a SELECT statement, then knowing the syntax and where to find the data is not enough. Knowledge of indexes and query plans is essential. Without it, we might hit on a query that “works”, but we are basically still a user, not a programmer, because we have no real control over our platform. Is that level of knowledge deep enough? Probably not, since knowledge of the underlying metadata and structures would be very useful in helping us make sense of any query plan. Understanding the structure of an index makes the “key lookup” operator not sound like what you do when someone tapes your car key to the ceiling. So is even this level of understanding deep enough? Do we need to understand the memory architecture used to process the query? It might be a comforting level of knowledge, and will doubtless come in handy at some point, but is not strictly necessary in most cases. Beyond that lies (more or less) full knowledge of SQL language and the intricacies of every step the SQL Server engine takes to process our query. My personal theory is that, as a professional, our knowledge of a given task should extend, at a minimum, one level deeper than is strictly necessary to perform the task. Anything deeper can be left to the ridiculously smart, or obsessive, or both. As an example. tasked with storing an integer value between 0 and 99999999, it’s essential that I know that choosing an Integer over Decimal(8,0) will likely offer performance benefits. It is then useful that I also understand the value of adding a CHECK constraint, to make sure the values are valid to the desired range; and comforting that I know a little about the underlying processors, registers and computer math. Anything further, I leave to the likes of Joe Chang, whose recent blog post on the topic offers depth by the bucketful!  

    Read the article

  • Get More Value From Your Oracle Premier Support Investment

    - by Get Proactive Customer Adoption Team
    Untitled Document The Return on Investment in Support Training I’m a typical software user. I’ve been using spreadsheets almost daily for the past 10 years or so. I know how to enter simple formulas, format cells, import files, and I can sort and filter. Sometimes I even use a pivot table. I never attended training. I learnt everything I know on the fly. Sometimes it was intuitive and easy, other times I had to spend minutes and even hours searching for a solution. Yet when I see what some other people can do with their spreadsheets, I know I’m utilizing maybe 15% of the functionality. Pity, one day I really have to sign up for training. Why haven’t I done it yet? Ah, you know, I’m a busy person, I have work to do. And if I need to use a feature that I am unfamiliar with, I’ll spend time on it only when I really need it. Now wait. When I recall how much time I spent trying to figure how things work compared to time I spent doing the productive work, I realize it was not insignificant. I’m unable to sum up all the time I spent ‘learning’ on the fly, but I’m sure it’s been days or even weeks. And after all this time, I’ve mastered 15% of its features. If only I had attended training years ago. That investment would have paid back 10 times! Working with My Oracle Support is no different. Our customers typically use simple search, create service requests, and download patches. They think they know how to use My Oracle Support. And they’re right. They know something but often they’re utilizing only a fragment of My Oracle Support’s potential. For the investment that has been made, using only a small subset of the capabilities offered in My Oracle Support leaves value on the table. There is much more available in My Oracle Support. Dozens of diagnostic tools and proactive health checks will keep verifying your Oracle environments against best practices that Oracle gathers every day thanks to our comprehensive knowledge management process. Automated patch recommendations will help prevent known issues, and upgrade planning and more is included in My Oracle Support. Why are you not utilizing all of these best practices, capabilities and tools? Is it because you don’t have time to invest 2-3 hours of your time to learn about the features? Simply because you think you can learn on the fly like I thought I could? Does learning on the fly how to properly use the Service Request escalation process when you already have critical issue sound like a good idea? My advice is: Invest your time now to learn how My Oracle Support can help you prevent issues on your systems. Learn how to find answers faster and resolve problems more efficiently. Understand how to properly complete a service request. Invest in Support training, offered at no additional cost to Oracle Premier Support customers. It will pay back quicker than you think. It will bring you more value than you think. Discover your advantage with Oracle Premier Support's Proactive Portfolio.

    Read the article

  • When things go awry

    - by Phil Factor
    The moment the Entrepreneur opened his mouth on prime-time national TV, spelled out the URL and waxed big on how exciting ‘his’ new website was, I knew I was in for a busy night. I’d designed and built it. All at once, half a million people tried to log into the website. Although all my stress-testing paid off, I have to admit that the network locked up tight long before there was any danger of a database or website problem. Soon afterwards, the Entrepreneur and the Big Boss were there in the autopsy meeting. We picked through all our systems in detail to see how they’d borne the unexpected strain. Mercifully, in view of the sour mood of the Big Boss, it turned out that the only thing we could have done better was buy a bigger pipe to and from the internet. We’d specified that ‘big pipe’ when designing the system. The Big Boss had then railed at the cost and so we’d subsequently compromised. I felt that my design decisions were vindicated. The Big Boss brooded for a while. Then he made the significant comment: “What really ****** me off is the fact that, for ten minutes, we couldn’t take people’s money.” At that point I stopped feeling smug. Had the internet connection been better, the system would have reached its limit and failed rather precipitously, and that wasn’t what he wanted. Then it occurred to me that what had gummed up the connection was all those images on the site, that had made it so impressive for the visitors. If there had been a way to automatically pare down the site to the bare essentials under stress… Hmm. I began to consider disaster-recovery in the broadest sense – maintaining a service in spite of unusual or unexpected events. What he said makes a lot of sense: sacrifice whatever isn’t essential to keep the core service running when we approach the capacity limits. Maybe in IT we should borrow (or revive) the business concept of the ‘Skeleton service’, maintaining only the priority parts under stress, using a process that is well-prepared and carefully rehearsed. How might this work? Whatever the event we have to prepare for, it is all about understanding the priorities; knowing what one can dispense with when the going gets tough. In the event of database disaster, it’s much faster to deploy a skeletal system with only the essential data than to restore the entire system, though there would have to be a reconciliation process to update the revived database retrospectively, once the emergency was over. It isn’t just the database that could be designed for resilience. One could prepare for unusually high traffic in a website by designing a system that degraded gradually to a ‘skeletal’ site, one that maintained the commercial essentials without fat images, JavaScript libraries and razzmatazz. This is all what the Big Boss scathingly called ‘a mere technicality’. It seems to me that what is needed first is a culture of application and database design which acknowledges that we live in a very imperfect world, and react accordingly when things go awry.

    Read the article

  • When will EBS 12.2 be released?

    - by Steven Chan (Oracle Development)
    The most frequently asked question at OpenWorld this year was, "When will EBS 12.2 be released?" Sadly, Oracle's communication policies prohibit us from speculating about release dates for unreleased software. We are not permitted to give estimates, rough timelines, guesses, or anything else that remotely resembles specific guidance on release dates. You can monitor My Oracle Support and this blog for updates on EBS 12.2.  I'll post them here as soon as they're available.  I'm embedding an old favourite from 2007 in its entirety here, since it applies equally to new releases as well as certifications. "Loose Lips Sink Ships" (March 20, 2007)If I were to sort emails in my inbox into groups, the biggest -- by far -- would be the one for emails that start with, "When will _____ be certified with the E-Business Suite?"  I answer these dutifully but know that my replies can sometimes be maddening, for two reasons:  technical uncertainty, and Oracle's rules for such communications. On the Spiral Model of CertificationsTechnology stack certifications tend to be highly iterative in nature.  As a result, statements about certification dates tend to be accurate only when made in hindsight.  Laypeople are horrified to hear this, but it's the ugly truth.  Uncertainty is simply inherent to the process.  I've become inured to it over the years, but it might come as a surprise to you that it can take many cycles to get fully-released software to work together.  Take this scenario: We test a particular combination of Component A and B. If we encounter a problem, say, with Component A, we log a bug. We receive a new version of Component A. The process iterates again. The reality is this: until a certification is completed and released, there's no accurate way of telling how many iterations are yet to come.  This is true regardless of the number of iterations that have already been completed.  Our Lips Are SealedGenerally, people understand that things are subject to change, so the second reason I can't say anything specific is actually much more important than the first.  "Loose lips might sink ships" was coined in World War II in an effort to remind people that careless talk can have serious consequences.  Curiously, this applies to Oracle's communications about upcoming features, configurations, and releases, too.  As a publicly traded company, we have very strict policies that prohibit us from linking specific releases to specific dates.  If you've ever listened to an earnings call with analysts, you'll often hear them asking, "Can you add a little more color to that statement?"  For certifications, color is usually the only thing that I have.  Sometimes I can provide a bit more information about the technical nature of the certification in question, such as expected footprints or version levels.  I can occasionally share technical issues that we've found, too, to convey the degree of risk or complexity involved in the certification.  Aside from that, there's little additional information about specific dates, date ranges, or even speculation about dates that I can provide... that is, without having one of those uncomfortable conversations with Oracle Legal.  So, as much as it pains me to do so, when it comes to dates, I'm always forced to conclude with a generic reply that blandly states one of the following: We're working on that certification right now That certification is in the pipeline but hasn't been started yet We don't have plans for that certification Don't Shoot the MessengerThankfully, I've developed a thick skin over the years -- which is a good thing, considering the colorful and energetic responses I've received over the years after answering these questions.  However, on behalf of my Oracle colleagues who are faced with these questions every day in the field, I urge you to remember that they're required to follow these same corporate rules about date disclosures.  It never hurts to ask, but don't be too disappointed if we can't provide you with a detailed answer.  The Go-Go's had it right, after all.  Related Articles Webcast Replay Available: Technical Preview of EBS 12.2 Online Patching

    Read the article

  • Migrating VB6 to HTML5 is not a fiction - Customer success story

    - by Webgui
    All of you VB developers in the present or past would probably find it hard to believe that the old VB code can be migrated and modernized into the latest .NET based HTML5 without having to rewrite the application. But we have been working on such tools for the past couple of years and already have several real world applications that were fully 'transposed' from VB6. The solution is called Instant CloudMove and its main tool is called the TranspositionStudio. It is a unique solution that relies on the concept of transposition. Transposition comes from mathematics and music and refers to exchanging elements while everything else remains the same or moving an element as is from one environment to another. This means that we are taking the source code and put it in a modern technological environment with relatively few adjustments.The concept is based on a set of Mapping Expressions which are basically links between an element in the source environment and one in the target environment that has the same functionality. About 95% of the code is usually mapped out-of-the-box and the rest is handled with easy-to-use mapping tools designed for Visual Studio developers providing them with a familiar environment and concepts for completing the mapping and allowing them to extend and customize existing mapping expressions. The solution is also based on a circular workflow that enables developers to make any changes as required until the result is satisfying.As opposed to existing migration solutions that offer automation are usually a “black box” to the user, the transposition concept enables full visibility, flexibility and control over the code and process at all times allowing to also add/change functionalities or upgrade the UI within the process and tools.This is exactly the case with our customer’s aging VB6 PMS (Property Management System) which needed a technological update as well as a design refresh. The decision was to move the VB6 application which had about 1 million lines of code into the latest web technology. Since the application was initially written 13 years ago and had many upgrades since the code must be very patchy and includes unused sections. As a result, the company Mihshuv Group considered rewriting the entire application in Java since it already had the knowledge. Rewrite would allow starting with a clean slate and designing functionality, database architecture, UI without any constraints. On the other hand, rewrite entitles a long and detailed specification work as well as a thorough QA and this translates into a long project with high risk and costs.So the company looked for a migration solution as an alternative; the research lead to Gizmox and after examining the technology it was decided to perform a hybrid project which would include an automatic transposition of the core of the VB6 application (200,000 lines of code) while they redesigning the UI, adding new functionality, deleting unused code and rewriting about 140 reports with Crystal Reports will be done manually using Visual WebGui development tools.The migration part of the project was completed in 65 days by 3 developers from Mihshuv Group guided by Gizmox migration experts while the rewrite and UI upgrade tasks took about the same. So in only a few months period Mihshuv Group generated an up-to-date product, written in the latest Web technology with modern, friendly UI and improved functionality. Guest selection screen of the original VB6 PMS Guest selection screen on the new web–based PMS Compared to the initial plan to rewrite the entire application in Java, the hybrid migration/rewrite approach taken by Mihshuv Group using Gizmox technology proved as a great decision. In terms of time and cost there were substantial savings; from a project that was priced for at least a year (without taking into account the huge risk and uncertainty) it became a few months project only. More about this and other customer stories can be found here

    Read the article

  • ADO and Two Way Storage Tiering

    - by Andy-Oracle
    Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 We get asked the following question about Automatic Data Optimization (ADO) storage tiering quite a bit. Can you tier back to the original location if the data gets hot again? The answer is yes but not with standard Automatic Data Optimization policies, at least not reliably. That's not how ADO is meant to operate. ADO is meant to mirror a traditional view of Information Lifecycle Management (ILM) where data will be very volatile when first created, will become less active or cool, and then will eventually cease to be accessed at all (i.e. cold). I think the reason this question gets asked is because customers realize that many of their business processes are cyclical and the thinking goes that those segments that only get used during month end or year-end cycles could sit on lower cost storage when not being used. Unfortunately this doesn't fit very well with the ADO storage tiering model. ADO storage tiering is based on the amount of free and used space in the source tablespace. There are two parameters that control this behavior, TBS_PERCENT_USED and TBS_PERCENT_FREE. When the space in the tablespace exceeds the TBS_PERCENT_USED value then segments specified in storage tiering clause(s) can be moved until the percent of free space reaches the TBS_PERCENT_FREE value. It is worth mentioning that no checks are made for available space in the target tablespace. Now, it is certainly possible to create custom functions to control storage tiering, but this can get complicated. The biggest problem is insuring that there is enough space to move the segment back to tier 1 storage, assuming that that's the goal. This isn't as much of a problem when moving from tier 1 to tier 2 storage because there is typically more tier 2 storage available. At least that's the premise since it is supposed to be less costly, lower performing and higher capacity storage. In either case though, if there isn't enough space then the operation fails. In the case of a customized function, the question becomes do you attempt to free the space so the move can be made or do you just stop and return false so that the move cannot take place? This is really the crux of the issue. Once you cross into this territory you're really going to have to implement two-way hierarchical storage and the whole point of ADO was to provide automatic storage tiering. You're probably better off using heat map and/or business access requirements and building your own hierarchical storage management infrastructure if you really want two way storage tiering. /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;}

    Read the article

  • Can you/should you develop components for ASP.NET MVC?

    - by Vilx-
    Following from the previous question I've started to wonder - is it possible to implement "Components" in ASP.NET MVC (latest version)? And should you? Let's clarify what I mean with a "component". With that I mean a "control" (aka "widget"), similar to those that ASP.NET webforms is built upon. A gridview might be a good example. In webforms I can place on my form a datasource component (one line of code), a gridview component (another line of code) and bind them together (specify an attribute on the gridview). In the codebehind file I fill the datasource with data (a few lines of DB-querying code), and I'm all set. At this point the gridview is a fully functional standalone component. I can open the form, and I'll see all the data. I can sort it by clicking on the column headers; it is split into several pages; I can drag the column headers around and rearrange columns; I can turn on "grouping" mode; etc. And I don't need to write another line of code for any of it. The gridview, as a component, already has all the code tucked away in its classes and assemblies. I just place it on the form, initialize it, and it Just Works. At some times (like sorting or navigation to a different page) it will also perform ajax callbacks to the server, but those too will be handled internally, with my code having no knowledge at all about it. And then there are also events that I can attach if I want to get notified when something happens. In MVC I cannot see a way of doing this cleanly. Sure, there are the partial views, but those only handle half of the problem - they render the initial HTML. Some more can be achieved with client-side Javascript (like column re-arranging), but when the grid needs to do an ajax callback (say, to fetch the next page of data), my code will have to get involved and process that request. At best I guess I can provide some helper methods to process it, but I'll have to write the code that calls them, and also provide a controller method with signature matching the arguments of that callback. I guess that I could make some hacks with global events or special routes or something, but that just seems... hackish. Unelegant. Perhaps this is not the MVC way? Although I've completed one project in it, I'm still far from being an MVC expert. But then what is? In the intranet application that we're building there are dozens upon dozens of such grids. Naturally I want them all to have a unified look & behavior, and I don't want to repeat the same code all over the place. So what's the "MVC" approach to this problem?

    Read the article

  • How to handle multi-processing of libraries which already spawn sub-processes?

    - by exhuma
    I am having some trouble coming up with a good solution to limit sub-processes in a script which uses a multi-processed library and the script itself is also multi-processed. Both, the library and script are modifiable by us. I believe the question is more about design than actual code, but for what it's worth, it's written in Python. The goal of the library is to hide implementation details of various internet routers. For that reason, the library has a "Proxy" factory method which takes the IP of a router as parameter. The factory then probes the device using a set of possible proxies. Usually, there is one proxy which immediately knows that is is able to send commands to this device. All others usually take some time to return (given a timeout). One thought was already to simply query the device for an identifier, and then select the proper proxy using that, but in order to do so, you would already need to know how to query the device. Abstracting this knowledge is one of the main purposes of the library, so that becomes a little bit of a "circular-requirement"/deadlock: To connect to a device, you need to know what proxy to use, and to know what proxy to create, you need to connect to a device. So probing the device is - as we can see - the best solution so far, apart from keeping a lookup-table somewhere. The library currently kills all remaining processes once a valid proxy has been found. And yes, there is always only one good proxy per device. Currently there are about 12 proxies. So if one create a proxy instance using the factory, 12 sub-processes are spawned. So far, this has been really useful and worked very well. But recently someone else wanted to use this library to "broadcast" a command to all devices. So he took the library, and wrote his own multi-processed script. This obviously spawned 12 * n processes where n is the number of IPs to which he broadcasted. This has given us two problems: The host on which the command was executed slowed down to a near halt. Aborting the script with CTRL+C ground the system to a total halt. Not even the hardware console responded anymore! This may be due to some Python strangeness which still needs to be investigated. Maybe related to http://bugs.python.org/issue8296 The big underlying question, is how to design a library which does multi-processing, so other applications which use this library and want to be multi-processed themselves do not run into system limitations. My first thought was to require a pool to be passed to the library, and execute all tasks in that pool. In that way, the person using the library has control over the usage of system resources. But my gut tells me that there must be a better solution. Disclaimer: My experience with multiprocessing is fairly limited. I have implemented a few straightforward which did not require access control to resources. So I have not yet any practical experience with semaphores or mutexes. p.s.: In the future, we may have enough information to do this without the probing. But the database which would contain the proper information is not yet operational. Also, the design about multiprocessing a multiprocessed library intrigues me :)

    Read the article

  • WebLogic How-to Videos: Install, Upgrade, & Patch

    - by Ruma Sanyal
    Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} Here is another great YouTube video by our product manager Monica Riccelli. She talks about installers now being standardized in Oracle for greater consistency -- no more WebLogic native installers. Also, JDK is no longer a part of the WebLogic install. The various installers she discusses include OUI, ZIP, OEPE, Coherence and more. Monica then takes us through a step by step install process. After the install process is complete the video takes us through the configuration wizard. The ZIP installer is then discussed and its effectiveness, such as it being the smallest downloadable option, easy, and very popular with our customers and limitations (such as for development only and not to be used in production) highlighted. Monica then takes us through the configuration wizard, its usage, and when to use WLST scripts. The video then discusses NodeManager and its usage and discusses how to reconfigure a WebLogic domain on upgrade – through our GUI tools or through command line interface. Lastly, it highlights Opatch – a patch application tool used by our customers and standardized across all Oracle products. Really detailed video. Check it out!  /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;}

    Read the article

  • MySQL Enterprise Backup 3.8.2 has been released!

    - by Hema Sridharan
    MySQL Enterprise Backup v3.8.2, a maintenance release of online MySQL backup tool, is now available for download from My Oracle Support  (MOS) website as our latest GA release.  It will also be available via the Oracle Software Delivery Cloud in approximately 1-2 weeks. A brief summary of the changes in MySQL Enterprise Backup version 3.8.2 is given below.   A. Functionality Added or Changed:  MySQL Enterprise Backup has a new --on-disk-full command line option. mysqlbackup could hang when the disk became full, rather than detecting the low space condition. mysqlbackup now monitors disk space when running backup commands, and users can now specify the action to take at a disk-full condition with the --on-disk-full option. For more details, refer this page MySQL Enterprise Backup has a new progress report feature, which periodically outputs short progress indicators on its  operations to user-selected destinations (for example, stdout, stderr, a file, or other choices). For more details on progress report options, refer here   B. Bugs Fixed: When --innodb-file-per-table=ON, if a table was renamed and backup-to-image was in progress, apply-log would fail when being run on the backup. (Bug #16903973)   MySQL Server failed to start after a backup was restored if  there had been online DDL transactions on partitioned tables during the time of backup. (Bug #16924499)   apply-log failed if ALTER TABLE ... REORGANIZE PARTITION was applied to partitioned InnoDB tables during backup. (Bug #16721824, Bug #16903951)  apply-incremental-backup might fail with an assertion error if  the InnoDB tables being backed up were created in Barracuda format and with their KEY_BLOCK_SIZE  values  different from the innodb_page_size . This fix ensures that different KEY_BLOCK_SIZE  values are handled properly during incremental backup and apply-incremental-backup operations.  If a table was renamed following a full backup, a subsequent incremental backup could copy the .frm file with the new name, but not the associated .ibd file with the new name. After a  restore, the InnoDB data dictionary could be in an  inconsistent state. This issue primarily occurred if the table  was not changed between the full backup and the subsequent  incremental backup. Bug #16262690)  After a full backup, if a table was renamed and modified,  apply-incremental-backup would crash when run on the backup directory. (Bug #16262609) The value of the binary log position in backup_variables.txt  could be different from the output displayed during the   backup-and-apply-log operation. (This issue did not occur if  the backup and apply-log steps were done separately.) (Bug  #16195529) When using the --only-innodb-with-frm option, MySQL Enterprise Backup tried to create temporary files at unintended locations in the file system, which might cause a failure when, for example, the user had no write privilege for those locations.   This fix makes sure the paths for the temporary files are  correct. (Bug #14787324)  A backup process might hang when it ran into an LSN mismatch between a data file  and the redo log. This fix makes sure the process does not hang and it displays an error message showing the  name of the problematic data file (Bug #14791645) Please post your questions / comments about Backup in forums. Thanks, MEB Team

    Read the article

  • What do you need to know to be a world-class master software developer? [closed]

    - by glitch
    I wanted to bring up this question to you folks and see what you think, hopefully advise me on the matter: let's say you had 30 years of learning and practicing software development in front of you, how would you dedicate your time so that you'd get the biggest bang for your buck. What would you both learn and work on to be a world-class software developer that would make a large impact on the industry and leave behind a legacy? I think that most great developers end up being both broad generalists and specialists in one-two areas of interest. I'm thinking Bill Joy, John Carmack, Linus Torvalds, K&R and so on. I'm thinking that perhaps one approach would be to break things down by categories and establish a base minimum of "software development" greatness. I'm thinking: Operating Systems: completely internalize the core concepts of OS, perhaps gain a lot of familiarity with an OSS one such as Linux. Anything from memory management to device drivers has to be complete second nature. Programming Languages: this is one of those topics that imho has to be fully grokked even if it might take many years. I don't think there's quite anything like going through the process of developing your own compiler, understanding language design trade-offs and so on. Programming Language Pragmatics is one of my favorite books actually, I think you want to have that internalized back to back, and that's just the start. You could go significantly deeper, but I think it's time well spent, because it's such a crucial building block. As a subset of that, you want to really understand the different programming paradigms out there. Imperative, declarative, logic, functional and so on. Anything from assembly to LISP should be at the very least comfortable to write in. Contexts: I believe one should have experience working in different contexts to truly be able to appreciate the trade-offs that are being made every day. Embedded, web development, mobile development, UX development, distributed, cloud computing and so on. Hardware: I'm somewhat conflicted about this one. I think you want some understanding of computer architecture at a low level, but I feel like the concepts that will truly matter will be slightly higher level, such as CPU caching / memory hierarchy, ILP, and so on. Networking: we live in a completely network-dependent era. Having a good understanding of the OSI model, knowing how the Web works, how HTTP works and so on is pretty much a pre-requisite these days. Distributed systems: once again, everything's distributed these days, it's getting progressively harder to ignore this reality. Slightly related, perhaps add solid understanding of how browsers work to that, since the world seems to be moving so much to interfacing with everything through a browser. Tools: Have a really broad toolset that you're familiar with, one that continuously expands throughout the years. Communication: I think being a great writer, effective communicator and a phenomenal team player is pretty much a prerequisite for a lot of a software developer's greatness. It can't be overstated. Software engineering: understanding the process of building software, team dynamics, the requirements of the business-side, all the pitfalls. You want to deeply understand where what you're writing fits from the market perspective. The better you understand all of this, the more of your work will actually see the daylight. This is really just a starting list, I'm confident that there's a ton of other material that you need to master. As I mentioned, you most likely end up specializing in a bunch of these areas as you go along, but I was trying to come up with a baseline. Any thoughts, suggestions and words of wisdom from the grizzled veterans out there who would like to share their thoughts and experiences with this? I'd really love to know what you think!

    Read the article

  • Using 3rd Party JavaScript Plugins Hardwired With &lsquo;document.write&rsquo;

    - by ToStringTheory
    Introduction Have you ever had the need to implement a 3rd party JavaScript plugin, but your needs didn’t fit the model and usage defined by the API or documentation of the plugin?  Recently I ran into this issue when I was trying to implement a web snapshot plugin into our site.  To use their plugin, you had to include a script tag to the plugin on their server with an API key.  The second part of the usage was to include a <script> tag around a function call wherever you wanted a snapshot to appear. The Problem When trying to use the service, the images did not display.  I checked a couple of things and didn’t find anything wrong at first..  It wasn’t until I looked at the function that was called by the inline script did I find the issue – a call to the webservice, followed by a call to ‘document.write’ in its callback.  The solution in which I was trying to implement the plugin happened to be in response to an AJAX call after the document had completely loaded.  After the page has loaded, document.write does nothing. My first thought for a solution was to just cache the script from the service, and edit it do something like a return function or callback that I could use to edit the document from.  However, I quickly discovered that there is no way to cache the script from the service, as it had a hash in the function where it would call the server.  The hash was updated every few seconds/minutes, expiring old hashes.  This meant that I wouldn’t be able to edit the script and upload a new version to my server, as the script would not work after a few minutes from originally getting the script from the service. Solution The solution eluded me until I realized that this was JavaScript I was dealing with.  A language designed so that you could do just about anything to any library, function, or object…  At this point, the solution was simple – take control of the document.write function.  Using a buffer variable, and a simple function call, it is eerily simple to perform: //what would have been output to the document var buffer = ""; //store a reference to the real document.write var dw = document.write; //redefine document.write to store to our buffer document.write = function (str) {buffer += str;} //execute the function containing calls to document.write eval('{function encapsulated in <script></script> tags}'); //restore the original document.write function (just in case) document.write = dw; That’s it.  Instead of using the script tags where I wanted to include a snapshot, I called a function passing in the URL to the page I wanted a snapshot of.  After that last line of code, what would have been output to the document (or not in the case of the ajax call) was instead stored in buffer. Conclusion While the solution itself is simple, coming from a background much more footed in the .Net platform, I believe that this is a prime example of always keeping the language that you are working in in mind.  While this may seem obvious at first, as I KNEW I was in JavaScript, I never thought of taking control of the document.write function because I am more accustomed to the .Net world.  I can’t simply replace the functionality of Console.WriteLine.

    Read the article

  • Using JSON.NET for dynamic JSON parsing

    - by Rick Strahl
    With the release of ASP.NET Web API as part of .NET 4.5 and MVC 4.0, JSON.NET has effectively pushed out the .NET native serializers to become the default serializer for Web API. JSON.NET is vastly more flexible than the built in DataContractJsonSerializer or the older JavaScript serializer. The DataContractSerializer in particular has been very problematic in the past because it can't deal with untyped objects for serialization - like values of type object, or anonymous types which are quite common these days. The JavaScript Serializer that came before it actually does support non-typed objects for serialization but it can't do anything with untyped data coming in from JavaScript and it's overall model of extensibility was pretty limited (JavaScript Serializer is what MVC uses for JSON responses). JSON.NET provides a robust JSON serializer that has both high level and low level components, supports binary JSON, JSON contracts, Xml to JSON conversion, LINQ to JSON and many, many more features than either of the built in serializers. ASP.NET Web API now uses JSON.NET as its default serializer and is now pulled in as a NuGet dependency into Web API projects, which is great. Dynamic JSON Parsing One of the features that I think is getting ever more important is the ability to serialize and deserialize arbitrary JSON content dynamically - that is without mapping the JSON captured directly into a .NET type as DataContractSerializer or the JavaScript Serializers do. Sometimes it isn't possible to map types due to the differences in languages (think collections, dictionaries etc), and other times you simply don't have the structures in place or don't want to create them to actually import the data. If this topic sounds familiar - you're right! I wrote about dynamic JSON parsing a few months back before JSON.NET was added to Web API and when Web API and the System.Net HttpClient libraries included the System.Json classes like JsonObject and JsonArray. With the inclusion of JSON.NET in Web API these classes are now obsolete and didn't ship with Web API or the client libraries. I re-linked my original post to this one. In this post I'll discus JToken, JObject and JArray which are the dynamic JSON objects that make it very easy to create and retrieve JSON content on the fly without underlying types. Why Dynamic JSON? So, why Dynamic JSON parsing rather than strongly typed parsing? Since applications are interacting more and more with third party services it becomes ever more important to have easy access to those services with easy JSON parsing. Sometimes it just makes lot of sense to pull just a small amount of data out of large JSON document received from a service, because the third party service isn't directly related to your application's logic most of the time - and it makes little sense to map the entire service structure in your application. For example, recently I worked with the Google Maps Places API to return information about businesses close to me (or rather the app's) location. The Google API returns a ton of information that my application had no interest in - all I needed was few values out of the data. Dynamic JSON parsing makes it possible to map this data, without having to map the entire API to a C# data structure. Instead I could pull out the three or four values I needed from the API and directly store it on my business entities that needed to receive the data - no need to map the entire Maps API structure. Getting JSON.NET The easiest way to use JSON.NET is to grab it via NuGet and add it as a reference to your project. You can add it to your project with: PM> Install-Package Newtonsoft.Json From the Package Manager Console or by using Manage NuGet Packages in your project References. As mentioned if you're using ASP.NET Web API or MVC 4 JSON.NET will be automatically added to your project. Alternately you can also go to the CodePlex site and download the latest version including source code: http://json.codeplex.com/ Creating JSON on the fly with JObject and JArray Let's start with creating some JSON on the fly. It's super easy to create a dynamic object structure with any of the JToken derived JSON.NET objects. The most common JToken derived classes you are likely to use are JObject and JArray. JToken implements IDynamicMetaProvider and so uses the dynamic  keyword extensively to make it intuitive to create object structures and turn them into JSON via dynamic object syntax. Here's an example of creating a music album structure with child songs using JObject for the base object and songs and JArray for the actual collection of songs:[TestMethod] public void JObjectOutputTest() { // strong typed instance var jsonObject = new JObject(); // you can explicitly add values here using class interface jsonObject.Add("Entered", DateTime.Now); // or cast to dynamic to dynamically add/read properties dynamic album = jsonObject; album.AlbumName = "Dirty Deeds Done Dirt Cheap"; album.Artist = "AC/DC"; album.YearReleased = 1976; album.Songs = new JArray() as dynamic; dynamic song = new JObject(); song.SongName = "Dirty Deeds Done Dirt Cheap"; song.SongLength = "4:11"; album.Songs.Add(song); song = new JObject(); song.SongName = "Love at First Feel"; song.SongLength = "3:10"; album.Songs.Add(song); Console.WriteLine(album.ToString()); } This produces a complete JSON structure: { "Entered": "2012-08-18T13:26:37.7137482-10:00", "AlbumName": "Dirty Deeds Done Dirt Cheap", "Artist": "AC/DC", "YearReleased": 1976, "Songs": [ { "SongName": "Dirty Deeds Done Dirt Cheap", "SongLength": "4:11" }, { "SongName": "Love at First Feel", "SongLength": "3:10" } ] } Notice that JSON.NET does a nice job formatting the JSON, so it's easy to read and paste into blog posts :-). JSON.NET includes a bunch of configuration options that control how JSON is generated. Typically the defaults are just fine, but you can override with the JsonSettings object for most operations. The important thing about this code is that there's no explicit type used for holding the values to serialize to JSON. Rather the JSON.NET objects are the containers that receive the data as I build up my JSON structure dynamically, simply by adding properties. This means this code can be entirely driven at runtime without compile time restraints of structure for the JSON output. Here I use JObject to create a album 'object' and immediately cast it to dynamic. JObject() is kind of similar in behavior to ExpandoObject in that it allows you to add properties by simply assigning to them. Internally, JObject values are stored in pseudo collections of key value pairs that are exposed as properties through the IDynamicMetaObject interface exposed in JSON.NET's JToken base class. For objects the syntax is very clean - you add simple typed values as properties. For objects and arrays you have to explicitly create new JObject or JArray, cast them to dynamic and then add properties and items to them. Always remember though these values are dynamic - which means no Intellisense and no compiler type checking. It's up to you to ensure that the names and values you create are accessed consistently and without typos in your code. Note that you can also access the JObject instance directly (not as dynamic) and get access to the underlying JObject type. This means you can assign properties by string, which can be useful for fully data driven JSON generation from other structures. Below you can see both styles of access next to each other:// strong type instance var jsonObject = new JObject(); // you can explicitly add values here jsonObject.Add("Entered", DateTime.Now); // expando style instance you can just 'use' properties dynamic album = jsonObject; album.AlbumName = "Dirty Deeds Done Dirt Cheap"; JContainer (the base class for JObject and JArray) is a collection so you can also iterate over the properties at runtime easily:foreach (var item in jsonObject) { Console.WriteLine(item.Key + " " + item.Value.ToString()); } The functionality of the JSON objects are very similar to .NET's ExpandObject and if you used it before, you're already familiar with how the dynamic interfaces to the JSON objects works. Importing JSON with JObject.Parse() and JArray.Parse() The JValue structure supports importing JSON via the Parse() and Load() methods which can read JSON data from a string or various streams respectively. Essentially JValue includes the core JSON parsing to turn a JSON string into a collection of JsonValue objects that can be then referenced using familiar dynamic object syntax. Here's a simple example:public void JValueParsingTest() { var jsonString = @"{""Name"":""Rick"",""Company"":""West Wind"", ""Entered"":""2012-03-16T00:03:33.245-10:00""}"; dynamic json = JValue.Parse(jsonString); // values require casting string name = json.Name; string company = json.Company; DateTime entered = json.Entered; Assert.AreEqual(name, "Rick"); Assert.AreEqual(company, "West Wind"); } The JSON string represents an object with three properties which is parsed into a JObject class and cast to dynamic. Once cast to dynamic I can then go ahead and access the object using familiar object syntax. Note that the actual values - json.Name, json.Company, json.Entered - are actually of type JToken and I have to cast them to their appropriate types first before I can do type comparisons as in the Asserts at the end of the test method. This is required because of the way that dynamic types work which can't determine the type based on the method signature of the Assert.AreEqual(object,object) method. I have to either assign the dynamic value to a variable as I did above, or explicitly cast ( (string) json.Name) in the actual method call. The JSON structure can be much more complex than this simple example. Here's another example of an array of albums serialized to JSON and then parsed through with JsonValue():[TestMethod] public void JsonArrayParsingTest() { var jsonString = @"[ { ""Id"": ""b3ec4e5c"", ""AlbumName"": ""Dirty Deeds Done Dirt Cheap"", ""Artist"": ""AC/DC"", ""YearReleased"": 1976, ""Entered"": ""2012-03-16T00:13:12.2810521-10:00"", ""AlbumImageUrl"": ""http://ecx.images-amazon.com/images/I/61kTaH-uZBL._AA115_.jpg"", ""AmazonUrl"": ""http://www.amazon.com/gp/product/…ASIN=B00008BXJ4"", ""Songs"": [ { ""AlbumId"": ""b3ec4e5c"", ""SongName"": ""Dirty Deeds Done Dirt Cheap"", ""SongLength"": ""4:11"" }, { ""AlbumId"": ""b3ec4e5c"", ""SongName"": ""Love at First Feel"", ""SongLength"": ""3:10"" }, { ""AlbumId"": ""b3ec4e5c"", ""SongName"": ""Big Balls"", ""SongLength"": ""2:38"" } ] }, { ""Id"": ""7b919432"", ""AlbumName"": ""End of the Silence"", ""Artist"": ""Henry Rollins Band"", ""YearReleased"": 1992, ""Entered"": ""2012-03-16T00:13:12.2800521-10:00"", ""AlbumImageUrl"": ""http://ecx.images-amazon.com/images/I/51FO3rb1tuL._SL160_AA160_.jpg"", ""AmazonUrl"": ""http://www.amazon.com/End-Silence-Rollins-Band/dp/B0000040OX/ref=sr_1_5?ie=UTF8&qid=1302232195&sr=8-5"", ""Songs"": [ { ""AlbumId"": ""7b919432"", ""SongName"": ""Low Self Opinion"", ""SongLength"": ""5:24"" }, { ""AlbumId"": ""7b919432"", ""SongName"": ""Grip"", ""SongLength"": ""4:51"" } ] } ]"; JArray jsonVal = JArray.Parse(jsonString) as JArray; dynamic albums = jsonVal; foreach (dynamic album in albums) { Console.WriteLine(album.AlbumName + " (" + album.YearReleased.ToString() + ")"); foreach (dynamic song in album.Songs) { Console.WriteLine("\t" + song.SongName); } } Console.WriteLine(albums[0].AlbumName); Console.WriteLine(albums[0].Songs[1].SongName); } JObject and JArray in ASP.NET Web API Of course these types also work in ASP.NET Web API controller methods. If you want you can accept parameters using these object or return them back to the server. The following contrived example receives dynamic JSON input, and then creates a new dynamic JSON object and returns it based on data from the first:[HttpPost] public JObject PostAlbumJObject(JObject jAlbum) { // dynamic input from inbound JSON dynamic album = jAlbum; // create a new JSON object to write out dynamic newAlbum = new JObject(); // Create properties on the new instance // with values from the first newAlbum.AlbumName = album.AlbumName + " New"; newAlbum.NewProperty = "something new"; newAlbum.Songs = new JArray(); foreach (dynamic song in album.Songs) { song.SongName = song.SongName + " New"; newAlbum.Songs.Add(song); } return newAlbum; } The raw POST request to the server looks something like this: POST http://localhost/aspnetwebapi/samples/PostAlbumJObject HTTP/1.1User-Agent: FiddlerContent-type: application/jsonHost: localhostContent-Length: 88 {AlbumName: "Dirty Deeds",Songs:[ { SongName: "Problem Child"},{ SongName: "Squealer"}]} and the output that comes back looks like this: {  "AlbumName": "Dirty Deeds New",  "NewProperty": "something new",  "Songs": [    {      "SongName": "Problem Child New"    },    {      "SongName": "Squealer New"    }  ]} The original values are echoed back with something extra appended to demonstrate that we're working with a new object. When you receive or return a JObject, JValue, JToken or JArray instance in a Web API method, Web API ignores normal content negotiation and assumes your content is going to be received and returned as JSON, so effectively the parameter and result type explicitly determines the input and output format which is nice. Dynamic to Strong Type Mapping You can also map JObject and JArray instances to a strongly typed object, so you can mix dynamic and static typing in the same piece of code. Using the 2 Album jsonString shown earlier, the code below takes an array of albums and picks out only a single album and casts that album to a static Album instance.[TestMethod] public void JsonParseToStrongTypeTest() { JArray albums = JArray.Parse(jsonString) as JArray; // pick out one album JObject jalbum = albums[0] as JObject; // Copy to a static Album instance Album album = jalbum.ToObject<Album>(); Assert.IsNotNull(album); Assert.AreEqual(album.AlbumName,jalbum.Value<string>("AlbumName")); Assert.IsTrue(album.Songs.Count > 0); } This is pretty damn useful for the scenario I mentioned earlier - you can read a large chunk of JSON and dynamically walk the property hierarchy down to the item you want to access, and then either access the specific item dynamically (as shown earlier) or map a part of the JSON to a strongly typed object. That's very powerful if you think about it - it leaves you in total control to decide what's dynamic and what's static. Strongly typed JSON Parsing With all this talk of dynamic let's not forget that JSON.NET of course also does strongly typed serialization which is drop dead easy. Here's a simple example on how to serialize and deserialize an object with JSON.NET:[TestMethod] public void StronglyTypedSerializationTest() { // Demonstrate deserialization from a raw string var album = new Album() { AlbumName = "Dirty Deeds Done Dirt Cheap", Artist = "AC/DC", Entered = DateTime.Now, YearReleased = 1976, Songs = new List<Song>() { new Song() { SongName = "Dirty Deeds Done Dirt Cheap", SongLength = "4:11" }, new Song() { SongName = "Love at First Feel", SongLength = "3:10" } } }; // serialize to string string json2 = JsonConvert.SerializeObject(album,Formatting.Indented); Console.WriteLine(json2); // make sure we can serialize back var album2 = JsonConvert.DeserializeObject<Album>(json2); Assert.IsNotNull(album2); Assert.IsTrue(album2.AlbumName == "Dirty Deeds Done Dirt Cheap"); Assert.IsTrue(album2.Songs.Count == 2); } JsonConvert is a high level static class that wraps lower level functionality, but you can also use the JsonSerializer class, which allows you to serialize/parse to and from streams. It's a little more work, but gives you a bit more control. The functionality available is easy to discover with Intellisense, and that's good because there's not a lot in the way of documentation that's actually useful. Summary JSON.NET is a pretty complete JSON implementation with lots of different choices for JSON parsing from dynamic parsing to static serialization, to complex querying of JSON objects using LINQ. It's good to see this open source library getting integrated into .NET, and pushing out the old and tired stock .NET parsers so that we finally have a bit more flexibility - and extensibility - in our JSON parsing. Good to go! Resources Sample Test Project http://json.codeplex.com/© Rick Strahl, West Wind Technologies, 2005-2012Posted in .NET  Web Api  AJAX   Tweet !function(d,s,id){var js,fjs=d.getElementsByTagName(s)[0];if(!d.getElementById(id)){js=d.createElement(s);js.id=id;js.src="//platform.twitter.com/widgets.js";fjs.parentNode.insertBefore(js,fjs);}}(document,"script","twitter-wjs"); (function() { var po = document.createElement('script'); po.type = 'text/javascript'; po.async = true; po.src = 'https://apis.google.com/js/plusone.js'; var s = document.getElementsByTagName('script')[0]; s.parentNode.insertBefore(po, s); })();

    Read the article

  • Agile Development

    - by James Oloo Onyango
    Alot of literature has and is being written about agile developement and its surrounding philosophies. In my quest to find the best way to express the importance of agile methodologies, i have found Robert C. Martin's "A Satire Of Two Companies" to be both the most concise and thorough! Enjoy the read! Rufus Inc Project Kick Off Your name is Bob. The date is January 3, 2001, and your head still aches from the recent millennial revelry. You are sitting in a conference room with several managers and a group of your peers. You are a project team leader. Your boss is there, and he has brought along all of his team leaders. His boss called the meeting. "We have a new project to develop," says your boss's boss. Call him BB. The points in his hair are so long that they scrape the ceiling. Your boss's points are just starting to grow, but he eagerly awaits the day when he can leave Brylcream stains on the acoustic tiles. BB describes the essence of the new market they have identified and the product they want to develop to exploit this market. "We must have this new project up and working by fourth quarter October 1," BB demands. "Nothing is of higher priority, so we are cancelling your current project." The reaction in the room is stunned silence. Months of work are simply going to be thrown away. Slowly, a murmur of objection begins to circulate around the conference table.   His points give off an evil green glow as BB meets the eyes of everyone in the room. One by one, that insidious stare reduces each attendee to quivering lumps of protoplasm. It is clear that he will brook no discussion on this matter. Once silence has been restored, BB says, "We need to begin immediately. How long will it take you to do the analysis?" You raise your hand. Your boss tries to stop you, but his spitwad misses you and you are unaware of his efforts.   "Sir, we can't tell you how long the analysis will take until we have some requirements." "The requirements document won't be ready for 3 or 4 weeks," BB says, his points vibrating with frustration. "So, pretend that you have the requirements in front of you now. How long will you require for analysis?" No one breathes. Everyone looks around to see whether anyone has some idea. "If analysis goes beyond April 1, we have a problem. Can you finish the analysis by then?" Your boss visibly gathers his courage: "We'll find a way, sir!" His points grow 3 mm, and your headache increases by two Tylenol. "Good." BB smiles. "Now, how long will it take to do the design?" "Sir," you say. Your boss visibly pales. He is clearly worried that his 3 mms are at risk. "Without an analysis, it will not be possible to tell you how long design will take." BB's expression shifts beyond austere.   "PRETEND you have the analysis already!" he says, while fixing you with his vacant, beady little eyes. "How long will it take you to do the design?" Two Tylenol are not going to cut it. Your boss, in a desperate attempt to save his new growth, babbles: "Well, sir, with only six months left to complete the project, design had better take no longer than 3 months."   "I'm glad you agree, Smithers!" BB says, beaming. Your boss relaxes. He knows his points are secure. After a while, he starts lightly humming the Brylcream jingle. BB continues, "So, analysis will be complete by April 1, design will be complete by July 1, and that gives you 3 months to implement the project. This meeting is an example of how well our new consensus and empowerment policies are working. Now, get out there and start working. I'll expect to see TQM plans and QIT assignments on my desk by next week. Oh, and don't forget that your crossfunctional team meetings and reports will be needed for next month's quality audit." "Forget the Tylenol," you think to yourself as you return to your cubicle. "I need bourbon."   Visibly excited, your boss comes over to you and says, "Gosh, what a great meeting. I think we're really going to do some world shaking with this project." You nod in agreement, too disgusted to do anything else. "Oh," your boss continues, "I almost forgot." He hands you a 30-page document. "Remember that the SEI is coming to do an evaluation next week. This is the evaluation guide. You need to read through it, memorize it, and then shred it. It tells you how to answer any questions that the SEI auditors ask you. It also tells you what parts of the building you are allowed to take them to and what parts to avoid. We are determined to be a CMM level 3 organization by June!"   You and your peers start working on the analysis of the new project. This is difficult because you have no requirements. But from the 10-minute introduction given by BB on that fateful morning, you have some idea of what the product is supposed to do.   Corporate process demands that you begin by creating a use case document. You and your team begin enumerating use cases and drawing oval and stick diagrams. Philosophical debates break out among the team members. There is disagreement as to whether certain use cases should be connected with <<extends>> or <<includes>> relationships. Competing models are created, but nobody knows how to evaluate them. The debate continues, effectively paralyzing progress.   After a week, somebody finds the iceberg.com Web site, which recommends disposing entirely of <<extends>> and <<includes>> and replacing them with <<precedes>> and <<uses>>. The documents on this Web site, authored by Don Sengroiux, describes a method known as stalwart-analysis, which claims to be a step-by-step method for translating use cases into design diagrams. More competing use case models are created using this new scheme, but again, people can't agree on how to evaluate them. The thrashing continues. More and more, the use case meetings are driven by emotion rather than by reason. If it weren't for the fact that you don't have requirements, you'd be pretty upset by the lack of progress you are making. The requirements document arrives on February 15. And then again on February 20, 25, and every week thereafter. Each new version contradicts the previous one. Clearly, the marketing folks who are writing the requirements, empowered though they might be, are not finding consensus.   At the same time, several new competing use case templates have been proposed by the various team members. Each template presents its own particularly creative way of delaying progress. The debates rage on. On March 1, Prudence Putrigence, the process proctor, succeeds in integrating all the competing use case forms and templates into a single, all-encompassing form. Just the blank form is 15 pages long. She has managed to include every field that appeared on all the competing templates. She also presents a 159- page document describing how to fill out the use case form. All current use cases must be rewritten according to the new standard.   You marvel to yourself that it now requires 15 pages of fill-in-the-blank and essay questions to answer the question: What should the system do when the user presses Return? The corporate process (authored by L. E. Ott, famed author of "Holistic Analysis: A Progressive Dialectic for Software Engineers") insists that you discover all primary use cases, 87 percent of all secondary use cases, and 36.274 percent of all tertiary use cases before you can complete analysis and enter the design phase. You have no idea what a tertiary use case is. So in an attempt to meet this requirement, you try to get your use case document reviewed by the marketing department, which you hope will know what a tertiary use case is.   Unfortunately, the marketing folks are too busy with sales support to talk to you. Indeed, since the project started, you have not been able to get a single meeting with marketing, which has provided a never-ending stream of changing and contradictory requirements documents.   While one team has been spinning endlessly on the use case document, another team has been working out the domain model. Endless variations of UML documents are pouring out of this team. Every week, the model is reworked.   The team members can't decide whether to use <<interfaces>> or <<types>> in the model. A huge disagreement has been raging on the proper syntax and application of OCL. Others on the team just got back from a 5-day class on catabolism, and have been producing incredibly detailed and arcane diagrams that nobody else can fathom.   On March 27, with one week to go before analysis is to be complete, you have produced a sea of documents and diagrams but are no closer to a cogent analysis of the problem than you were on January 3. **** And then, a miracle happens.   **** On Saturday, April 1, you check your e-mail from home. You see a memo from your boss to BB. It states unequivocally that you are done with the analysis! You phone your boss and complain. "How could you have told BB that we were done with the analysis?" "Have you looked at a calendar lately?" he responds. "It's April 1!" The irony of that date does not escape you. "But we have so much more to think about. So much more to analyze! We haven't even decided whether to use <<extends>> or <<precedes>>!" "Where is your evidence that you are not done?" inquires your boss, impatiently. "Whaaa . . . ." But he cuts you off. "Analysis can go on forever; it has to be stopped at some point. And since this is the date it was scheduled to stop, it has been stopped. Now, on Monday, I want you to gather up all existing analysis materials and put them into a public folder. Release that folder to Prudence so that she can log it in the CM system by Monday afternoon. Then get busy and start designing."   As you hang up the phone, you begin to consider the benefits of keeping a bottle of bourbon in your bottom desk drawer. They threw a party to celebrate the on-time completion of the analysis phase. BB gave a colon-stirring speech on empowerment. And your boss, another 3 mm taller, congratulated his team on the incredible show of unity and teamwork. Finally, the CIO takes the stage to tell everyone that the SEI audit went very well and to thank everyone for studying and shredding the evaluation guides that were passed out. Level 3 now seems assured and will be awarded by June. (Scuttlebutt has it that managers at the level of BB and above are to receive significant bonuses once the SEI awards level 3.)   As the weeks flow by, you and your team work on the design of the system. Of course, you find that the analysis that the design is supposedly based on is flawedno, useless; no, worse than useless. But when you tell your boss that you need to go back and work some more on the analysis to shore up its weaker sections, he simply states, "The analysis phase is over. The only allowable activity is design. Now get back to it."   So, you and your team hack the design as best you can, unsure of whether the requirements have been properly analyzed. Of course, it really doesn't matter much, since the requirements document is still thrashing with weekly revisions, and the marketing department still refuses to meet with you.     The design is a nightmare. Your boss recently misread a book named The Finish Line in which the author, Mark DeThomaso, blithely suggested that design documents should be taken down to code-level detail. "If we are going to be working at that level of detail," you ask, "why don't we simply write the code instead?" "Because then you wouldn't be designing, of course. And the only allowable activity in the design phase is design!" "Besides," he continues, "we have just purchased a companywide license for Dandelion! This tool enables 'Round the Horn Engineering!' You are to transfer all design diagrams into this tool. It will automatically generate our code for us! It will also keep the design diagrams in sync with the code!" Your boss hands you a brightly colored shrinkwrapped box containing the Dandelion distribution. You accept it numbly and shuffle off to your cubicle. Twelve hours, eight crashes, one disk reformatting, and eight shots of 151 later, you finally have the tool installed on your server. You consider the week your team will lose while attending Dandelion training. Then you smile and think, "Any week I'm not here is a good week." Design diagram after design diagram is created by your team. Dandelion makes it very difficult to draw these diagrams. There are dozens and dozens of deeply nested dialog boxes with funny text fields and check boxes that must all be filled in correctly. And then there's the problem of moving classes between packages. At first, these diagram are driven from the use cases. But the requirements are changing so often that the use cases rapidly become meaningless. Debates rage about whether VISITOR or DECORATOR design patterns should be used. One developer refuses to use VISITOR in any form, claiming that it's not a properly object-oriented construct. Someone refuses to use multiple inheritance, since it is the spawn of the devil. Review meetings rapidly degenerate into debates about the meaning of object orientation, the definition of analysis versus design, or when to use aggregation versus association. Midway through the design cycle, the marketing folks announce that they have rethought the focus of the system. Their new requirements document is completely restructured. They have eliminated several major feature areas and replaced them with feature areas that they anticipate customer surveys will show to be more appropriate. You tell your boss that these changes mean that you need to reanalyze and redesign much of the system. But he says, "The analysis phase is system. But he says, "The analysis phase is over. The only allowable activity is design. Now get back to it."   You suggest that it might be better to create a simple prototype to show to the marketing folks and even some potential customers. But your boss says, "The analysis phase is over. The only allowable activity is design. Now get back to it." Hack, hack, hack, hack. You try to create some kind of a design document that might reflect the new requirements documents. However, the revolution of the requirements has not caused them to stop thrashing. Indeed, if anything, the wild oscillations of the requirements document have only increased in frequency and amplitude.   You slog your way through them.   On June 15, the Dandelion database gets corrupted. Apparently, the corruption has been progressive. Small errors in the DB accumulated over the months into bigger and bigger errors. Eventually, the CASE tool just stopped working. Of course, the slowly encroaching corruption is present on all the backups. Calls to the Dandelion technical support line go unanswered for several days. Finally, you receive a brief e-mail from Dandelion, informing you that this is a known problem and that the solution is to purchase the new version, which they promise will be ready some time next quarter, and then reenter all the diagrams by hand.   ****   Then, on July 1 another miracle happens! You are done with the design!   Rather than go to your boss and complain, you stock your middle desk drawer with some vodka.   **** They threw a party to celebrate the on-time completion of the design phase and their graduation to CMM level 3. This time, you find BB's speech so stirring that you have to use the restroom before it begins. New banners and plaques are all over your workplace. They show pictures of eagles and mountain climbers, and they talk about teamwork and empowerment. They read better after a few scotches. That reminds you that you need to clear out your file cabinet to make room for the brandy. You and your team begin to code. But you rapidly discover that the design is lacking in some significant areas. Actually, it's lacking any significance at all. You convene a design session in one of the conference rooms to try to work through some of the nastier problems. But your boss catches you at it and disbands the meeting, saying, "The design phase is over. The only allowable activity is coding. Now get back to it."   ****   The code generated by Dandelion is really hideous. It turns out that you and your team were using association and aggregation the wrong way, after all. All the generated code has to be edited to correct these flaws. Editing this code is extremely difficult because it has been instrumented with ugly comment blocks that have special syntax that Dandelion needs in order to keep the diagrams in sync with the code. If you accidentally alter one of these comments, the diagrams will be regenerated incorrectly. It turns out that "Round the Horn Engineering" requires an awful lot of effort. The more you try to keep the code compatible with Dandelion, the more errors Dandelion generates. In the end, you give up and decide to keep the diagrams up to date manually. A second later, you decide that there's no point in keeping the diagrams up to date at all. Besides, who has time?   Your boss hires a consultant to build tools to count the number of lines of code that are being produced. He puts a big thermometer graph on the wall with the number 1,000,000 on the top. Every day, he extends the red line to show how many lines have been added. Three days after the thermometer appears on the wall, your boss stops you in the hall. "That graph isn't growing quickly enough. We need to have a million lines done by October 1." "We aren't even sh-sh-sure that the proshect will require a m-million linezh," you blather. "We have to have a million lines done by October 1," your boss reiterates. His points have grown again, and the Grecian formula he uses on them creates an aura of authority and competence. "Are you sure your comment blocks are big enough?" Then, in a flash of managerial insight, he says, "I have it! I want you to institute a new policy among the engineers. No line of code is to be longer than 20 characters. Any such line must be split into two or more preferably more. All existing code needs to be reworked to this standard. That'll get our line count up!"   You decide not to tell him that this will require two unscheduled work months. You decide not to tell him anything at all. You decide that intravenous injections of pure ethanol are the only solution. You make the appropriate arrangements. Hack, hack, hack, and hack. You and your team madly code away. By August 1, your boss, frowning at the thermometer on the wall, institutes a mandatory 50-hour workweek.   Hack, hack, hack, and hack. By September 1st, the thermometer is at 1.2 million lines and your boss asks you to write a report describing why you exceeded the coding budget by 20 percent. He institutes mandatory Saturdays and demands that the project be brought back down to a million lines. You start a campaign of remerging lines. Hack, hack, hack, and hack. Tempers are flaring; people are quitting; QA is raining trouble reports down on you. Customers are demanding installation and user manuals; salespeople are demanding advance demonstrations for special customers; the requirements document is still thrashing, the marketing folks are complaining that the product isn't anything like they specified, and the liquor store won't accept your credit card anymore. Something has to give.    On September 15, BB calls a meeting. As he enters the room, his points are emitting clouds of steam. When he speaks, the bass overtones of his carefully manicured voice cause the pit of your stomach to roll over. "The QA manager has told me that this project has less than 50 percent of the required features implemented. He has also informed me that the system crashes all the time, yields wrong results, and is hideously slow. He has also complained that he cannot keep up with the continuous train of daily releases, each more buggy than the last!" He stops for a few seconds, visibly trying to compose himself. "The QA manager estimates that, at this rate of development, we won't be able to ship the product until December!" Actually, you think it's more like March, but you don't say anything. "December!" BB roars with such derision that people duck their heads as though he were pointing an assault rifle at them. "December is absolutely out of the question. Team leaders, I want new estimates on my desk in the morning. I am hereby mandating 65-hour work weeks until this project is complete. And it better be complete by November 1."   As he leaves the conference room, he is heard to mutter: "Empowermentbah!" * * * Your boss is bald; his points are mounted on BB's wall. The fluorescent lights reflecting off his pate momentarily dazzle you. "Do you have anything to drink?" he asks. Having just finished your last bottle of Boone's Farm, you pull a bottle of Thunderbird from your bookshelf and pour it into his coffee mug. "What's it going to take to get this project done? " he asks. "We need to freeze the requirements, analyze them, design them, and then implement them," you say callously. "By November 1?" your boss exclaims incredulously. "No way! Just get back to coding the damned thing." He storms out, scratching his vacant head.   A few days later, you find that your boss has been transferred to the corporate research division. Turnover has skyrocketed. Customers, informed at the last minute that their orders cannot be fulfilled on time, have begun to cancel their orders. Marketing is re-evaluating whether this product aligns with the overall goals of the company. Memos fly, heads roll, policies change, and things are, overall, pretty grim. Finally, by March, after far too many sixty-five hour weeks, a very shaky version of the software is ready. In the field, bug-discovery rates are high, and the technical support staff are at their wits' end, trying to cope with the complaints and demands of the irate customers. Nobody is happy.   In April, BB decides to buy his way out of the problem by licensing a product produced by Rupert Industries and redistributing it. The customers are mollified, the marketing folks are smug, and you are laid off.     Rupert Industries: Project Alpha   Your name is Robert. The date is January 3, 2001. The quiet hours spent with your family this holiday have left you refreshed and ready for work. You are sitting in a conference room with your team of professionals. The manager of the division called the meeting. "We have some ideas for a new project," says the division manager. Call him Russ. He is a high-strung British chap with more energy than a fusion reactor. He is ambitious and driven but understands the value of a team. Russ describes the essence of the new market opportunity the company has identified and introduces you to Jane, the marketing manager, who is responsible for defining the products that will address it. Addressing you, Jane says, "We'd like to start defining our first product offering as soon as possible. When can you and your team meet with me?" You reply, "We'll be done with the current iteration of our project this Friday. We can spare a few hours for you between now and then. After that, we'll take a few people from the team and dedicate them to you. We'll begin hiring their replacements and the new people for your team immediately." "Great," says Russ, "but I want you to understand that it is critical that we have something to exhibit at the trade show coming up this July. If we can't be there with something significant, we'll lose the opportunity."   "I understand," you reply. "I don't yet know what it is that you have in mind, but I'm sure we can have something by July. I just can't tell you what that something will be right now. In any case, you and Jane are going to have complete control over what we developers do, so you can rest assured that by July, you'll have the most important things that can be accomplished in that time ready to exhibit."   Russ nods in satisfaction. He knows how this works. Your team has always kept him advised and allowed him to steer their development. He has the utmost confidence that your team will work on the most important things first and will produce a high-quality product.   * * *   "So, Robert," says Jane at their first meeting, "How does your team feel about being split up?" "We'll miss working with each other," you answer, "but some of us were getting pretty tired of that last project and are looking forward to a change. So, what are you people cooking up?" Jane beams. "You know how much trouble our customers currently have . . ." And she spends a half hour or so describing the problem and possible solution. "OK, wait a second" you respond. "I need to be clear about this." And so you and Jane talk about how this system might work. Some of her ideas aren't fully formed. You suggest possible solutions. She likes some of them. You continue discussing.   During the discussion, as each new topic is addressed, Jane writes user story cards. Each card represents something that the new system has to do. The cards accumulate on the table and are spread out in front of you. Both you and Jane point at them, pick them up, and make notes on them as you discuss the stories. The cards are powerful mnemonic devices that you can use to represent complex ideas that are barely formed.   At the end of the meeting, you say, "OK, I've got a general idea of what you want. I'm going to talk to the team about it. I imagine they'll want to run some experiments with various database structures and presentation formats. Next time we meet, it'll be as a group, and we'll start identifying the most important features of the system."   A week later, your nascent team meets with Jane. They spread the existing user story cards out on the table and begin to get into some of the details of the system. The meeting is very dynamic. Jane presents the stories in the order of their importance. There is much discussion about each one. The developers are concerned about keeping the stories small enough to estimate and test. So they continually ask Jane to split one story into several smaller stories. Jane is concerned that each story have a clear business value and priority, so as she splits them, she makes sure that this stays true.   The stories accumulate on the table. Jane writes them, but the developers make notes on them as needed. Nobody tries to capture everything that is said; the cards are not meant to capture everything but are simply reminders of the conversation.   As the developers become more comfortable with the stories, they begin writing estimates on them. These estimates are crude and budgetary, but they give Jane an idea of what the story will cost.   At the end of the meeting, it is clear that many more stories could be discussed. It is also clear that the most important stories have been addressed and that they represent several months worth of work. Jane closes the meeting by taking the cards with her and promising to have a proposal for the first release in the morning.   * * *   The next morning, you reconvene the meeting. Jane chooses five cards and places them on the table. "According to your estimates, these cards represent about one perfect team-week's worth of work. The last iteration of the previous project managed to get one perfect team-week done in 3 real weeks. If we can get these five stories done in 3 weeks, we'll be able to demonstrate them to Russ. That will make him feel very comfortable about our progress." Jane is pushing it. The sheepish look on her face lets you know that she knows it too. You reply, "Jane, this is a new team, working on a new project. It's a bit presumptuous to expect that our velocity will be the same as the previous team's. However, I met with the team yesterday afternoon, and we all agreed that our initial velocity should, in fact, be set to one perfectweek for every 3 real-weeks. So you've lucked out on this one." "Just remember," you continue, "that the story estimates and the story velocity are very tentative at this point. We'll learn more when we plan the iteration and even more when we implement it."   Jane looks over her glasses at you as if to say "Who's the boss around here, anyway?" and then smiles and says, "Yeah, don't worry. I know the drill by now."Jane then puts 15 more cards on the table. She says, "If we can get all these cards done by the end of March, we can turn the system over to our beta test customers. And we'll get good feedback from them."   You reply, "OK, so we've got our first iteration defined, and we have the stories for the next three iterations after that. These four iterations will make our first release."   "So," says Jane, can you really do these five stories in the next 3 weeks?" "I don't know for sure, Jane," you reply. "Let's break them down into tasks and see what we get."   So Jane, you, and your team spend the next several hours taking each of the five stories that Jane chose for the first iteration and breaking them down into small tasks. The developers quickly realize that some of the tasks can be shared between stories and that other tasks have commonalities that can probably be taken advantage of. It is clear that potential designs are popping into the developers' heads. From time to time, they form little discussion knots and scribble UML diagrams on some cards.   Soon, the whiteboard is filled with the tasks that, once completed, will implement the five stories for this iteration. You start the sign-up process by saying, "OK, let's sign up for these tasks." "I'll take the initial database generation." Says Pete. "That's what I did on the last project, and this doesn't look very different. I estimate it at two of my perfect workdays." "OK, well, then, I'll take the login screen," says Joe. "Aw, darn," says Elaine, the junior member of the team, "I've never done a GUI, and kinda wanted to try that one."   "Ah, the impatience of youth," Joe says sagely, with a wink in your direction. "You can assist me with it, young Jedi." To Jane: "I think it'll take me about three of my perfect workdays."   One by one, the developers sign up for tasks and estimate them in terms of their own perfect workdays. Both you and Jane know that it is best to let the developers volunteer for tasks than to assign the tasks to them. You also know full well that you daren't challenge any of the developers' estimates. You know these people, and you trust them. You know that they are going to do the very best they can.   The developers know that they can't sign up for more perfect workdays than they finished in the last iteration they worked on. Once each developer has filled his or her schedule for the iteration, they stop signing up for tasks.   Eventually, all the developers have stopped signing up for tasks. But, of course, tasks are still left on the board.   "I was worried that that might happen," you say, "OK, there's only one thing to do, Jane. We've got too much to do in this iteration. What stories or tasks can we remove?" Jane sighs. She knows that this is the only option. Working overtime at the beginning of a project is insane, and projects where she's tried it have not fared well.   So Jane starts to remove the least-important functionality. "Well, we really don't need the login screen just yet. We can simply start the system in the logged-in state." "Rats!" cries Elaine. "I really wanted to do that." "Patience, grasshopper." says Joe. "Those who wait for the bees to leave the hive will not have lips too swollen to relish the honey." Elaine looks confused. Everyone looks confused. "So . . .," Jane continues, "I think we can also do away with . . ." And so, bit by bit, the list of tasks shrinks. Developers who lose a task sign up for one of the remaining ones.   The negotiation is not painless. Several times, Jane exhibits obvious frustration and impatience. Once, when tensions are especially high, Elaine volunteers, "I'll work extra hard to make up some of the missing time." You are about to correct her when, fortunately, Joe looks her in the eye and says, "When once you proceed down the dark path, forever will it dominate your destiny."   In the end, an iteration acceptable to Jane is reached. It's not what Jane wanted. Indeed, it is significantly less. But it's something the team feels that can be achieved in the next 3 weeks.   And, after all, it still addresses the most important things that Jane wanted in the iteration. "So, Jane," you say when things had quieted down a bit, "when can we expect acceptance tests from you?" Jane sighs. This is the other side of the coin. For every story the development team implements,   Jane must supply a suite of acceptance tests that prove that it works. And the team needs these long before the end of the iteration, since they will certainly point out differences in the way Jane and the developers imagine the system's behaviour.   "I'll get you some example test scripts today," Jane promises. "I'll add to them every day after that. You'll have the entire suite by the middle of the iteration."   * * *   The iteration begins on Monday morning with a flurry of Class, Responsibilities, Collaborators sessions. By midmorning, all the developers have assembled into pairs and are rapidly coding away. "And now, my young apprentice," Joe says to Elaine, "you shall learn the mysteries of test-first design!"   "Wow, that sounds pretty rad," Elaine replies. "How do you do it?" Joe beams. It's clear that he has been anticipating this moment. "OK, what does the code do right now?" "Huh?" replied Elaine, "It doesn't do anything at all; there is no code."   "So, consider our task; can you think of something the code should do?" "Sure," Elaine said with youthful assurance, "First, it should connect to the database." "And thereupon, what must needs be required to connecteth the database?" "You sure talk weird," laughed Elaine. "I think we'd have to get the database object from some registry and call the Connect() method. "Ah, astute young wizard. Thou perceives correctly that we requireth an object within which we can cacheth the database object." "Is 'cacheth' really a word?" "It is when I say it! So, what test can we write that we know the database registry should pass?" Elaine sighs. She knows she'll just have to play along. "We should be able to create a database object and pass it to the registry in a Store() method. And then we should be able to pull it out of the registry with a Get() method and make sure it's the same object." "Oh, well said, my prepubescent sprite!" "Hay!" "So, now, let's write a test function that proves your case." "But shouldn't we write the database object and registry object first?" "Ah, you've much to learn, my young impatient one. Just write the test first." "But it won't even compile!" "Are you sure? What if it did?" "Uh . . ." "Just write the test, Elaine. Trust me." And so Joe, Elaine, and all the other developers began to code their tasks, one test case at a time. The room in which they worked was abuzz with the conversations between the pairs. The murmur was punctuated by an occasional high five when a pair managed to finish a task or a difficult test case.   As development proceeded, the developers changed partners once or twice a day. Each developer got to see what all the others were doing, and so knowledge of the code spread generally throughout the team.   Whenever a pair finished something significant whether a whole task or simply an important part of a task they integrated what they had with the rest of the system. Thus, the code base grew daily, and integration difficulties were minimized.   The developers communicated with Jane on a daily basis. They'd go to her whenever they had a question about the functionality of the system or the interpretation of an acceptance test case.   Jane, good as her word, supplied the team with a steady stream of acceptance test scripts. The team read these carefully and thereby gained a much better understanding of what Jane expected the system to do. By the beginning of the second week, there was enough functionality to demonstrate to Jane. She watched eagerly as the demonstration passed test case after test case. "This is really cool," Jane said as the demonstration finally ended. "But this doesn't seem like one-third of the tasks. Is your velocity slower than anticipated?"   You grimace. You'd been waiting for a good time to mention this to Jane but now she was forcing the issue. "Yes, unfortunately, we are going more slowly than we had expected. The new application server we are using is turning out to be a pain to configure. Also, it takes forever to reboot, and we have to reboot it whenever we make even the slightest change to its configuration."   Jane eyes you with suspicion. The stress of last Monday's negotiations had still not entirely dissipated. She says, "And what does this mean to our schedule? We can't slip it again, we just can't. Russ will have a fit! He'll haul us all into the woodshed and ream us some new ones."   You look Jane right in the eyes. There's no pleasant way to give someone news like this. So you just blurt out, "Look, if things keep going like they're going, we're not going to be done with everything by next Friday. Now it's possible that we'll figure out a way to go faster. But, frankly, I wouldn't depend on that. You should start thinking about one or two tasks that could be removed from the iteration without ruining the demonstration for Russ. Come hell or high water, we are going to give that demonstration on Friday, and I don't think you want us to choose which tasks to omit."   "Aw forchrisakes!" Jane barely manages to stifle yelling that last word as she stalks away, shaking her head. Not for the first time, you say to yourself, "Nobody ever promised me project management would be easy." You are pretty sure it won't be the last time, either.   Actually, things went a bit better than you had hoped. The team did, in fact, have to drop one task from the iteration, but Jane had chosen wisely, and the demonstration for Russ went without a hitch. Russ was not impressed with the progress, but neither was he dismayed. He simply said, "This is pretty good. But remember, we have to be able to demonstrate this system at the trade show in July, and at this rate, it doesn't look like you'll have all that much to show." Jane, whose attitude had improved dramatically with the completion of the iteration, responded to Russ by saying, "Russ, this team is working hard, and well. When July comes around, I am confident that we'll have something significant to demonstrate. It won't be everything, and some of it may be smoke and mirrors, but we'll have something."   Painful though the last iteration was, it had calibrated your velocity numbers. The next iteration went much better. Not because your team got more done than in the last iteration but simply because the team didn't have to remove any tasks or stories in the middle of the iteration.   By the start of the fourth iteration, a natural rhythm has been established. Jane, you, and the team know exactly what to expect from one another. The team is running hard, but the pace is sustainable. You are confident that the team can keep up this pace for a year or more.   The number of surprises in the schedule diminishes to near zero; however, the number of surprises in the requirements does not. Jane and Russ frequently look over the growing system and make recommendations or changes to the existing functionality. But all parties realize that these changes take time and must be scheduled. So the changes do not cause anyone's expectations to be violated. In March, there is a major demonstration of the system to the board of directors. The system is very limited and is not yet in a form good enough to take to the trade show, but progress is steady, and the board is reasonably impressed.   The second release goes even more smoothly than the first. By now, the team has figured out a way to automate Jane's acceptance test scripts. The team has also refactored the design of the system to the point that it is really easy to add new features and change old ones. The second release was done by the end of June and was taken to the trade show. It had less in it than Jane and Russ would have liked, but it did demonstrate the most important features of the system. Although customers at the trade show noticed that certain features were missing, they were very impressed overall. You, Russ, and Jane all returned from the trade show with smiles on your faces. You all felt as though this project was a winner.   Indeed, many months later, you are contacted by Rufus Inc. That company had been working on a system like this for its internal operations. Rufus has canceled the development of that system after a death-march project and is negotiating to license your technology for its environment.   Indeed, things are looking up!

    Read the article

< Previous Page | 637 638 639 640 641 642 643 644 645 646 647 648  | Next Page >