Search Results

Search found 1829 results on 74 pages for 'automated'.

Page 66/74 | < Previous Page | 62 63 64 65 66 67 68 69 70 71 72 73  | Next Page >

  • The Winds of Change are a Blowin&rsquo;

    - by Ajarn Mark Caldwell
    For six years I have been an avid and outspoken fan and paying customer of SourceGear products…from Vault to Dragnet to Fortress and on to Vault Professional, but that is all changing now.  Not the fan part, but the paying customer part.  I’m still a huge fan.  I think that SourceGear does a great job with their product and support has been fantastic when needed (which is not very often).  I think that Eric Sink has done a fine job building a quality company and products, and I appreciate his contributions to the tech community through this blogging and books.  I still think their products are high quality and do a fantastic job of what they do.  But there’s the rub…what they do is no longer enough for me. As I have rebuilt our development team over the last couple of years, and we have begun to investigate Scrum and Kanban, I realize that I need more visibility into the progress of the team.  I need better project management tools, and this is where Vault Professional lags behind several other tools.  Granted, in the latest release (Vault 6.0) they added a nice time tracking feature, but I want more.  (Note, I did contact SourceGear about my quest for more, but apparently, the rest of their customer base has not been clamoring for this and so they have not built it.  Granted, I wasn’t clamoring for it either until just recently, but unfortunately for SourceGear, I want it now and don’t want to wait for them to build it into their system.) Ironically, it was SourceGear themselves who started to turn me on to the possibilities of other tools.  They built a limited integration with Axosoft OnTime which I read about several times on their support site (I used to regularly read and occasionally comment on their Support Forum).  I decided to check out OnTime and was very impressed with the tool for work item tracking and project management (not to mention their great Scrum Master in 10 Minutes video).  I fell in love with the capabilities of OnTime.  Unfortunately, the integration with Vault for source control management was, as I mentioned, limited.  I could have forfeited the integration between work items and source code, but there is too much benefit to linking check-ins to work items for me to give that up.  So then I did what was previously unthinkable for me, I considered switching not just the work tracking tool, but also the source code management tool.  This was really stepping outside my comfort zone because source code is Gold, and not to be trifled with.  When you find a good weapon to protect your gold, stick with it. I looked at Git and Tortoise SVN, but the integration methods for those was pretty rough compared to what I was used to.  The recommended tool from Axosoft’s point of view appeared to be RocketSVN, but I really wasn’t sure I wanted to go the “flavor of Subversion” route.  Then I started thinking about that other tool I liked back when I first chose to go with Vault, but couldn’t afford:  Team Foundation Server.  And what do you know…Microsoft has not only radically improved it over that version from back in 2006, but they also came to their senses about how it should be licensed, and it is much more affordable now.  So I started looking into the latest capabilities in the 2012 version, and I fell in love all over again. I really went deep on checking out the tools.  I watched numerous webcasts from Microsoft partners, went to a beta preview on Microsoft’s campus, and watched a lot of Channel 9 videos on the new ALM features (oooh…shiny).  Frankly, I was very impressed with the capabilities of the newest version, and figured this was probably our direction.  As an interesting twist of fate, one of my employees crossed paths with an ALM Consultant from Northwest Cadence, a local Microsoft Partner, and one of the companies that produced several of the webcasts that I had been watching.  So I gave Bryon a call and started grilling him to see if he really knew anything or was just another guy who couldn’t find a job so he called himself a consultant.  It turns out Bryon actually knows a lot, especially in an area that was becoming a frustration point for us: Branching strategies and automated builds (that’s probably a whole separate blog entry).  As we talked, Bryon suggested we look into doing a DTDPS (Developer Tools Deployment Planning Services) session with his company.  This is a service that can be paid for by Microsoft Enterprise Agreement planning services credits or SA training benefits, and, again, coincidentally, we had several that were just about to expire, so I put them to good use. The DTDPS sessions were great; and Bryon, Rick, and the rest of the folks at Northwest Cadence have been a pleasure to work with.  We have just purchased a new server for our TFS rollout and are planning the steps and options right now.  This is still a big project ahead of us to not only install and configure TFS, but also to load all of our source code (many different systems, not just one program) and transition to the new way of life with TFS, but I am convinced that it is the right move for my team at this point in time.  We need the new capabilities that are in alignment with Scrum and Kanban methodologies in order to more efficiently manage all the different projects that we have going on at one time. I would still wholeheartedly endorse SourceGear’s products and Axosoft’s OnTime for those whose needs are met by those tools, but for me and my team, I think that TFS is the right fit, and I am looking forward to the change.

    Read the article

  • SQLAuthority News – Why VoIP Service Providers Should Think About NuoDB’s Geo Distribution

    - by Pinal Dave
    You can always tell when someone’s showing off their cool, cutting edge comms technology. They tend to raise their voice a lot. Back in the day they’d announce their gadget leadership to the rest of the herd by shouting into their cellphone. Usually the message was no more urgent than “Hi, I’m on my cellphone!” Now the same types will loudly name-drop a different technology to the rest of the airport lounge. “I’m leveraging the wifi,” a fellow passenger bellowed, the other day, as we filtered through the departure gate. Nobody needed to know that, but the subtext was “look at me everybody”. You can tell the really advanced mobile user – they tend to whisper. Their handset has a microphone (how cool is that!) and they know how to use it. Sometimes these shouty public broadcasters aren’t even connected anyway because the database for their Voice over IP (VoIP) platform can’t cope. This will happen if they are using a traditional SQL model to try and cope with a phone network which has far flung offices and hundreds of mobile employees. That, like shouting into your phone, is just wrong on so many levels. What VoIP needs now is a single, logical database across multiple servers in different geographies. It needs to be updated in real-time and automatically scaled out during times of peak demand. A VoIP system should scale up to handle increased traffic, but just as importantly is must then go back down in the off peak hours. Try this with a MySQL database. It can’t scale easily enough, so it will keep your developers busy. They’ll have spent many hours trying to knit the different databases together. Traditional relational databases can possibly achieve this, at a price. Mind you, you could extend baked bean cans and string to every point on the network and that would be no less elegant. That’s not really following engineering principles though is it? Having said that, most telcos and VoIP systems use a separate, independent solution for each office location, which they link together – loosely.  The more office locations, the more complex and expensive the solution becomes and so the more you spend on maintenance. Ideally, you’d have a fluid system that can automatically shift its shape as the need arises. That’s the point of software isn’t it – it adapts. Otherwise, we might as well return to the old days. A MySQL system isn’t exactly baked bean cans attached by string, but it’s closer in spirit to the old many teethed mechanical beast that was employed in the first type of automated switchboard. NuoBD’s NewSQL is designed to be a single database that works across multiple servers, which can scale easily, and scale on demand. That’s one system that gives high connectivity but no latency, complexity or maintenance issues. MySQL works in some circumstances, but a period of growth isn’t one of them. So as a company moves forward, the MySQL database can’t keep pace. Data storage and data replication errors creep in. Soon the diaspora of offices becomes a problem. Your telephone system isn’t just distributed, it is literally all over the place. Though voice calls are often a software function, some of the old habits of telephony remain. When you call an engineer out, some of them will listen to what you’re asking for and announce that it cannot be done. This is what happens if you ask, say, database engineers familiar with Oracle or Microsoft to fulfill your wish for a low maintenance system built on a single, fluid, scalable database. No can do, they’d say. In fact, I heard one shouting something similar into his VoIP handset at the airport. “I can’t get on the network, Mac. I’m on MySQL.” You can download NuoDB from here. “NuoDB provides the ability to replicate data globally in real-time, which is not available with any other product offering,” states Weeks.  “That alone is remarkable and it works. I’ve seen it. I’ve used it.  I’ve tested it. The ability to deploy NuoDB removes a tremendous burden from our support and engineering teams.” Filed under: PostADay, SQL, SQL Authority, SQL Query, SQL Server, SQL Tips and Tricks, T SQL Tagged: NuoDB

    Read the article

  • Agile Testing Days 2012 – Day 1 – The birth of the #unicorn…

    - by Chris George
    Still riding the high from the tutorial day, I arrived at the conference venue eager to get cracking with the days talks. The opening Keynote was “Disciplined Agile Delivery: The Foundation for Scaling Agile” presented by Scott Ambler. The general ideas behind the methodology such as not re-inventing the wheel, and being goal driven, not prescriptive in how you work certainly struck chords with how we are trying to work in my team. Scott made some interesting observations about how scrum is quite prescriptive and is this really agile? I agreed with quite a few of his points on how what works for one team may not work for another. How a team works should be driven by context and reflection, not process and prescription. However was somewhat dubious about some of the statistics he rolled out towards the end. However, out of this keynote was born something that was to transcend this one presentation. During the talk, Scott mentioned on more than one occasion “In the real world”, and at one point made reference to people living in the land of unicorns and rainbows. The challenge was then laid down on twitter for all speakers to include a unicorn in their presentations… and for the most part this happened! It became an identity for this years conference, and I’m sure something that any attendee will always associate with Agile Testing Days 2012! Following this keynote, I attended “Going agile with Automated GUI Testing – Some personal insights” by Jan Zdunek from codecentric on the vendor track. My speciality is test automation, and in particular GUI testing, so this drew me to this talk more than the others. Thankfully, it was made clear from the very start that this was not peddling any particular product (even though it was on the vendor track), and Jan faithfully stuck to that. Most of the content was not new to me, but it was really comforting to hear someone else with very similar experiences to my own. In particular, things like how GUI testing is hard and is not a silver bullet; how record & replay is NOT a good thing to do (which drew a somewhat inflammatory tweet from an automation company when I tweeted that!). Something that I have started hearing around the place, and has certainly been murmuring at work is to push more of the automation coding onto the developers. After all they are the coding experts. I agree with this to a degree, but I personally enjoy coding and find it very rewarding doing so, therefore I’d be reluctant to give it up. I think there are some better alternatives such as pairing with a developer. Lastly, Jan mentioned, almost in passing, that we should consider virtualisation for gui testing for covering configuration combinations. On my project we’ve been running our win32/.NET GUI tests in cloud virtualisation for a couple of years now… I really should write about that! After lunch the second keynote of the day was by Lisa Crispin and Janet Gregory,”Myths about Agile Testing, De-Bunked”. It started off well… with the two ladies donning Medusa style head bands whilst they disbanding several myths about agile testing! I got the impression that it was perhaps not as slick as they would have liked, but then Janet was suffering with a very sore throat so kept losing her voice. Nevertheless, the presentation was captivating, and they debunked several myths such as : “Testing is dead”, “Testers must write code”, “Agile teams always deliver faster”. I didn’t take many notes for this because it was being recorded, but unfortunately the recordings have not been posted yet so I’ll write more about this when they are. The TestLab was held during a somewhat free for all time during most of the afternoon. It looked intriguing and proved to be one of the surprising experiences of the conference for me. Run by James Lyndsay and Bart Knaack, it consisted of a number of ‘stations’ that offered different testing problems. I opted for testing a mathematical drawing app call Geogebra, the task being to pair up and exploratory test it. After an allotted time, we discussed issues we’d found and decided if we wanted to continue ‘playing’ to which we all agreed! It was fun! The last track talk of the day was “Developers Exploratory Testing – Raising the bar” by Sigge Birgisson. One of the teams at Red Gate have tried Dev or Team exploratory testing a couple of times, and I was really interested to go to the presentation that prompted that. I was not disappointed! Sigge gave a first class presentation, and not only explained what DET was all about, but also how to go about implementing it. Little tips like calling it a ‘workshop’ rather than ‘testing’ I can really see working! Monday evening saw the presentation of the award for the Most Influential Agile Testing Professional Person go to a much deserved Lisa Crispin. The evening was great, with acrobatics, magic and music. My Takeaway Triple from Day 1:  Some of the cool stuff that was suggested in the GUI Testing talk, we are already doing. I should write about that! Testing is not dead! Perhaps testing will become more of a skill than a specific role, but it is certainly not dead. Team/Developer exploratory testing… seems like a no-brainer assuming you have a team who is willing.  Day 2 – Coming soon…

    Read the article

  • A Rose by Any Other Name..

    - by Geoff N. Hiten
    It is always a good start when you can steal a title line from one of the best writers in the English language.  Let’s hope I can make the rest of this post live up to the opening.  One recurring problem with SQL server is moving databases to new servers.  Client applications use a variety of ways to resolve SQL Server names, some of which are not changed easily <cough SharePoint /cough>.  If you happen to be using default instances on both the source and target SQL Server, then the solution is pretty simple.  You create (or bug the network admin until she creates) two DNS “A” records. One points the old name to the new IP address.  The other creates a new alias for the old server, since the original system name is now redirected.  Note this will redirect ALL traffic from the old server to the new server, including RDP and file share connection attempts.    Figure 1 – Microsoft DNS MMC Snap-In   Figure 2 – DNS New Host Dialog Box Both records are necessary so you can still access the old server via an alternate name. Server Role IP Address Name Alias Source 10.97.230.60 SQL01 SQL01_Old Target 10.97.230.80 SQL02 SQL01 Table 1 – Alias List If you or somebody set up connections via IP address, you deserve to have to go to each app and fix it by hand.  That is the only way to fix that particular foul-up. If have to deal with Named Instances either as a source or a target, then it gets more complicated.  The standard fix is to use the SQL Server Configuration Manager (or one of its earlier incarnations) to create a SQL client alias to redirect the connection.  This can be a pain installing and configuring the app on multiple client servers.  The good news is that SQL Server Configuration Manager AND all of its earlier versions simply write a few registry keys.  Extracting the keys into a .reg file makes centralized automated deployment a snap. If the client is a 32-bit system, you have to extract the native key.  If it is a 64-bit, you have to extract the native key and the WoW (32 bit on 64 bit host) key. First, pick a development system to create the actual registry key.  If you do this repeatedly, you can simply edit an existing registry file.  Create the entry using the SQL Configuration Manager.  You must use a 64-bit system to create the WoW key.  The following example redirects from a named instance “SQL01\SQLUtiluty” to a default instance on “SQL02”.   Figure 3 – SQL Server Configuration Manager - Native Figure 3 shows the native key listing. Figure 4 – SQL Server Configuration Manager – WoW If you think you don’t need the WoW key because your app is 64 it, think again.  SQL Server Management Server is a 32-bit app, as are most SQL test utilities.  Always create both keys for 64-bit target systems. Now that the keys exist, we can extract them into a .reg file. Fire up REGEDIT and browse to the following location:  HKLM\Software\Microsoft\MSSQLServer\Client\ConnectTo.  You can also search the registry for the string value of one of the server names (old or new). Right click on the “ConnectTo” label and choose “Export”.  Save with an appropriate name and location.  The resulting file should look something like this: Figure 5 – SQL01_Alias.reg Repeat the process with the location: HKLM\Software\Wow6432Node\Microsoft\MSSQLServer\Client\ConnectTo Note that if you have multiple alias entries, ALL of the entries will be exported.  In that case, you can edit the file and remove the extra aliases. You can edit the files together into a single file.  Just leave a blank line between new keys like this: Figure 6 – SQL01_Alias_All.reg Of course if you have an automatic way to deploy, it makes sense to have an automatic way to Un-deploy.  To delete a registry key, simply edit the .reg file and replace the target with a “-“ sign like so. Figure 7 – SQL01_Alias_UNDO.reg Now we have the ability to move any database to any server without having to install or change any applications on any client server.  The whole process should be transparent to the applications, which makes planning and coordinating database moves a far simpler task.

    Read the article

  • Silverlight 5 &ndash; What&rsquo;s New? (Including Screenshots &amp; Code Snippets)

    - by mbcrump
    Silverlight 5 is coming next year (2011) and this blog post will tell you what you need to know before the beta ships. First, let me address people saying that it is dead after PDC 2010. I believe that it’s best to see what the market is doing, not the vendor. Below is a list of companies that are developing Silverlight 4 applications shown during the Silverlight Firestarter. Some of the companies have shipped and some haven’t. It’s just great to see the actual company names that are working on Silverlight instead of “people are developing for Silverlight”. The next thing that I wanted to point out was that HTML5, WPF and Silverlight can co-exist. In case you missed Scott Gutherie’s keynote, they actually had a slide with all three stacked together. This shows Microsoft will be heavily investing in each technology.  Even I, a Silverlight developer, am reading Pro HTML5. Microsoft said that according to the Silverlight Feature Voting site, 21k votes were entered. Microsoft has implemented about 70% of these votes in Silverlight 5. That is an amazing number, and I am crossing my fingers that Microsoft bundles Silverlight with Windows 8. Let’s get started… what’s new in Silverlight 5? I am going to show you some great application and actual code shown during the Firestarter event. Media Hardware Video Decode – Instead of using CPU to decode, we will offload it to GPU. This will allow netbooks, etc to play videos. Trickplay – Variable Speed Playback – Pitch Correction (If you speed up someone talking they won’t sound like a chipmunk). Power Management – Less battery when playing video. Screensavers will no longer kick in if watching a video. If you pause a video then screensaver will kick in. Remote Control Support – This will allow users to control playback functions like Pause, Rewind and Fastforward. IIS Media Services 4 has shipped and now supports Azure. Data Binding Layout Transitions – Just with a few lines of XAML you can create a really rich experience that is not using Storyboards or animations. RelativeSource FindAncestor – Ancestor RelativeSource bindings make it much easier for a DataTemplate to bind to a property on a container control. Custom Markup Extensions – Markup extensions allow code to be run at XAML parse time for both properties and event handlers. This is great for MVVM support. Changing Styles during Runtime By Binding in Style Setters – Changing Styles at runtime used to be a real pain in Silverlight 4, now it’s much easier. Binding in style setters allows bindings to reference other properties. XAML Debugging – Below you can see that we set a breakpoint in XAML. This shows us exactly what is going on with our binding.  WCF & RIA Services WS-Trust Support – Taken from Wikipedia: WS-Trust is a WS-* specification and OASIS standard that provides extensions to WS-Security, specifically dealing with the issuing, renewing, and validating of security tokens, as well as with ways to establish, assess the presence of, and broker trust relationships between participants in a secure message exchange. You can reduce network latency by using a background thread for networking. Supports Azure now.  Text and Printing Improved text clarity that enables better text rendering. Multi-column text flow, Character tracking and leading support, and full OpenType font support.  Includes a new Postscript Vector Printing API that provides control over what you print . Pivot functionality baked into Silverlight 5 SDK. Graphics Immediate mode graphics support that will enable you to use the GPU and 3D graphics supports. Take a look at what was shown in the demos below. 1) 3D view of the Earth – not really a real-world application though. A doctor’s portal. This demo really stood out for me as it shows what we can do with the 3D / GPU support. Out of Browser OOB applications can now create and manage childwindows as shown in the screenshot below.  Trusted OOB applications can use P/Invoke to call Win32 APIs and unmanaged libraries.  Enterprise Group Policy Support allow enterprises to lock down or up the sandbox capabilities of Silverlight 5 applications. In this demo, he tore the “notes” off of the application and it appeared in a new window. See the black arrow below. In this demo, he connected a USB Device which fired off a local Win32 application that provided the data off the USB stick to Silverlight. Another demo of a Silverlight 5 application exporting data right into Excel running inside of browser. Testing They demoed Coded UI, which is available now in the Visual Studio Feature Pack 2. This will allow you to create automated testing without writing any code manually. Performance: Microsoft has worked to improve the Silverlight startup time. Silverlight 5 provides 64-bit browser support.  Silverlight 5 also provides IE9 Hardware acceleration.   I am looking forward to Silverlight 5 and I hope you are too. Thanks for reading and I hope you visit again soon.  Subscribe to my feed CodeProject

    Read the article

  • Upgrading to Oracle Enterprise Manager 12c Release 2: Top Tips One Must Know

    - by AnkurGupta
    Recently Oracle announced incremental release of Enterprise Manager 12c called Enterprise Manager 12c Release 2 (EM12c R2) which includes several new exciting features (Press announcement). Right before the official release, we upgraded an internal production site from EM 12c R1 to EM 12c R2 and had an extremely pleasant experience. Let me share few key takeaways as well as few tips from this upgrade exercise. I - Why Should You Upgrade To Enterprise Manager 12c Release 2 While an upgrade is usually recommended primarily to take benefit of the latest features (which is valid for this upgrade as well), I found several other compelling reasons purely from deployment perspective. Standardize your EM deployment:  Enterprise Manager comprises of several different components (OMS, agents, plug-ins, etc) and it might be possible that these are at varied patch levels in your environment. For instance, in case of an environment containing Bundle Patch 1 (customer announcement), there is a good chance that you may not have all the components up-to-date. There are two possible reasons. Bundle Patch 1 involved patching different components (OMS, agents, plug-ins) with multiple one-off patches which may not have been applied to all components yet. Bundle Patch 1 for different platforms were not released together. Which means you may not have got the chance to patch all the components on different platforms. Note: BP1 patches are not mandatory to upgrade to EM12c R2 release EM 12c R2 provides an excellent opportunity to standardize your Cloud Control environment (OMS, repository and agents) and plug-ins to latest versions in single shot. All platform releases are made available simultaneously: For the very first time in the history of EM release, all the platforms were released on day one itself, which means you do not need to wait for platform specific binaries for EM OMS or Agent to perform install or upgrades in a heterogeneous environment. Highly refined and automated process – Upgrade process is by far the smoothest and the cleanest as compared to previous releases of Enterprise manager. Following are the ones that stand out. Automatic Plug-in management – Plug-in upgrade along with new plug-in deployment is supported in upgrade installer wizard which means bulk of the updates to OMS and repository can be done in the same workflow. Saves time and minimizes user inputs. Plug-in Upgrade or Migrate Auto Update: While doing the OMS and repository upgrade, you can use Auto Update screen in Oracle Universal Installer to check for any updates/patches. That will help you to avoid the know issues and will make sure that your upgrade is successful. Allows mass upgrade of EM Agents – A new dedicated menu has been added in the EM console for agent upgrade. Agent upgrade workflow is extremely simple that requires agent name as the only input. ADM / JVMD Manager/Agent upgrade – complete process is supported via UI screens. EM12c R2 Upgrade Guide is much simpler to follow as compared to those for earlier releases. This is attributed to the simpler upgrade process. Robust and Performing Platform: EM12c R2 release not only includes several new features, but also provides a more stable platform which incorporates several fixes and enhancements in the Enterprise Manager framework. II - Few Tips To Remember In my last post (blog link) I shared few tips and tricks from my experience applying the Bundle Patch. Recently I upgraded the same site to EM 12c R2 and found few points that you must take note of, while planning this upgrade. The tips below are also applicable to EM 12c R1 environments that do not have Bundle Patch 1 patches applied. Verify the monitored application certification – Specific targets like E-Business Suite have not yet been certified as managed target in EM 12c R2. Therefore make sure to recheck the Enterprise Manager certification Matrix on My Oracle Support before planning the upgrade. Plan downtime – Because EM 12c R2 is an incremental release of EM 12c, for EM 12c R1 to EM 12c R2 upgrade supports only 1-system upgrade approach, which mean there will be downtime. OMS name change after upgrade – In case of multi OMS environments, additional OMS is renamed after upgrade, which has few implications when you upgrade JVMD and ADP agents on OMS. This is well documented in upgrade guide but make sure you read through all the notes. Upgrading BI Publisher– EM12c R2 is certified with BI Publisher 11.1.1.6.0 only. Therefore in case you are using EM 12c R1 which is integrated with BI Publisher 11.1.1.5.0, you must upgrade the BI Publisher to 11.1.1.6.0. Follow the steps from Advanced Installation and Configuration Guide here. Perform Post upgrade Tasks – Make sure to perform post upgrade steps mentioned in documentation here. These include critical changes that must be done right after upgrade to get the right configuration. For instance Database plug-in should be upgraded to Revision 3 (12.1.0.2.0 [u120804]). Delete old OMS Home – EM12c R1 to EM12c R2 is an out of place upgrade, which means it creates a new oracle home for OMS, plug-ins, etc. Therefore please ensure that You have sufficient extra space for new OMS before starting the upgrade process. You clean up the old OMS home after the upgrade process. Steps are available here. DO NOT remove the agent home on OMS host, because agent is upgraded in-place. If you have standby OMS setup then do look into the steps to upgrade the standby OMS from the upgrade guide before going ahead. Read the right documentation – Make sure to follow the Upgrade guide which provides the most comprehensive information on EM12c R2 upgrade process. Additionally you can refer other resources to get familiar with upgrade concepts. Recorded webcast - Oracle Enterprise Manager Cloud Control 12c Release 2 Installation and Upgrade Overview Presentation - Understanding Enterprise Manager 12.1.0.2 Upgrade We are very excited about this latest release and will look forward to hear back any feedback from your upgrade experience!

    Read the article

  • Migrating SQL Server Databases – The DBA’s Checklist (Part 2)

    - by Sadequl Hussain
    Continuing from Part 1  , our Migration Checklist continues: Step 5: Update statistics It is always a good idea to update the statistics of the database that you have just installed or migrated. To do this, run the following command against the target database: sp_updatestats The sp_updatestats system stored procedure runs the UPDATE STATISTICS command against every user and system table in the database.  However, a word of caution: running the sp_updatestats against a database with a compatibility level below 90 (SQL Server 2005) will reset the automatic UPDATE STATISTICS settings for every index and statistics of every table in the database. You may therefore want to change the compatibility mode before you run the command. Another thing you should remember to do is to ensure the new database has its AUTO_CREATE_STATISTICS and AUTO_UPDATE_STATISTICS properties set to ON. You can do so using the ALTER DATABASE command or from the SSMS. Step 6: Set database options You may have to change the state of a database after it has been restored. If the database was changed to single-user or read-only mode before backup, the restored copy will also retain these settings. This may not be an issue when you are manually restoring from Enterprise Manager or the Management Studio since you can change the properties. However, this is something to be mindful of if the restore process is invoked by an automated job or script and the database needs to be written to immediately after restore. You may want to check the database’s status programmatically in such cases. Another important option you may want to set for the newly restored / attached database is PAGE_VERIFY. This option specifies how you want SQL Server to ensure the physical integrity of the data. It is a new option from SQL Server 2005 and can have three values: CHECKSUM (default for SQL Server 2005 and latter databases), TORN_PAGE_DETECTION (default when restoring a pre-SQL Server 2005 database) or NONE. Torn page detection was itself an option for SQL Server 2000 databases. From SQL Server 2005, when PAGE_VERIFY is set to CHECKSUM, the database engine calculates the checksum for a page’s contents and writes it to the page header before storing it in disk. When the page is read from the disk, the checksum is computed again and compared with the checksum stored in the header.  Torn page detection works much like the same way in that it stores a bit in the page header for every 512 byte sector. When data is read from the page, the torn page bits stored in the header is compared with the respective sector contents. When PAGE_VERIFY is set to NONE, SQL Server does not perform any checking, even if torn page data or checksums are present in the page header.  This may not be something you would want to set unless there is a very specific reason.  Microsoft suggests using the CHECKSUM page verify option as this offers more protection. Step 7: Map database users to logins A common database migration issue is related to user access. Windows and SQL Server native logins that existed in the source instance and had access to the database may not be present in the destination. Even if the logins exist in the destination, the mapping between the user accounts and the logins will not be automatic. You can use a special system stored procedure called sp_change_users_login to address these situations. The procedure needs to be run against the newly attached or restored database and can accept four parameters. Depending on what you want to do, you may be using less than four though. The first parameter, @Action, can take three values. When you specify @Action = ‘Report’, the system will provide you with a list of database users which are not mapped to any login. If you want to map a database user to an existing SQL Server login, the value for @Action will be ‘Update_One’. In this case, you will only need to provide the database user name and the login it will map to. So if your newly restored database has a user account called “bob” and there is already a SQL Server login with the same name and you want to map the user to the login, you will execute a query like the following: sp_change_users_login         @Action = ‘Update_One’,         @UserNamePattern = ‘bob’,         @LoginName = ‘bob’ If the login does not exist, you can instruct SQL Server to create the login with the same name. In this case you will need to provide a password for the login and the value of the @Action parameter will be ‘Auto_Fix’. If the login already exists, it will be automatically mapped to the user account. Unfortunately sp_change_users_login system stored procedure cannot be used to map database users to trusted logins (Windows accounts) in SQL Server. You will need to follow a manual process to re-map the database user accounts.  Continues…

    Read the article

  • Simple-Talk development: a quick history lesson

    - by Michael Williamson
    Up until a few months ago, Simple-Talk ran on a pure .NET stack, with IIS as the web server and SQL Server as the database. Unfortunately, the platform for the site hadn’t quite gotten the love and attention it deserved. On the one hand, in the words of our esteemed editor Tony “I’d consider the current platform to be a “success”; it cost $10K, has lasted for 6 years, was finished, end to end in 6 months, and although we moan about it has got us quite a long way.” On the other hand, it was becoming increasingly clear that it needed some serious work. Among other issues, we had authors that wouldn’t blog because our current blogging platform, Community Server, was too painful for them to use. Forgetting about Simple-Talk for a moment, if you ask somebody what blogging platform they’d choose, the odds are they’d say WordPress. Regardless of its technical merits, it’s probably the most popular blogging platform, and it certainly seemed easier to use than Community Server. The issue was that WordPress is normally hosted on a Linux stack running PHP, Apache and MySQL — quite a difference from our Microsoft technology stack. We certainly didn’t want to rewrite the entire site — we just wanted a better blogging platform, with the rest of the existing, legacy site left as is. At a very high level, Simple-Talk’s technical design was originally very straightforward: when your browser sends an HTTP request to Simple-Talk, IIS (the web server) takes the request, does some work, and sends back a response. In order to keep the legacy site running, except with WordPress running the blogs, a different design is called for. We now use nginx as a reverse-proxy, which can then delegate requests to the appropriate application: So, when your browser sends a request to Simple-Talk, nginx takes that request and checks which part of the site you’re trying to access. Most of the time, it just passes the request along to IIS, which can then respond in much the same way it always has. However, if your request is for the blogs, then nginx delegates the request to WordPress. Unfortunately, as simple as that diagram looks, it hides an awful lot of complexity. In particular, the legacy site running on IIS was made up of four .NET applications. I’ve already mentioned one of these applications, Community Server, which handled the old blogs as well as managing membership and the forums. We have a couple of other applications to manage both our newsletters and our articles, and our own custom application to do some of the rendering on the site, such as the front page and the articles. When I say that it was made up of four .NET applications, this might conjure up an image in your mind of how they fit together: You might imagine four .NET applications, each with their own database, communicating over well-defined APIs. Sadly, reality was a little disappointing: We had four .NET applications that all ran on the same database. Worse still, there were many queries that happily joined across tables from multiple applications, meaning that each application was heavily dependent on the exact data schema that each other application used. Add to this that many of the queries were at least dozens of lines long, and practically identical to other queries except in a few key spots, and we can see that attempting to replace one component of the system would be more than a little tricky. However, the problems with the old system do give us a good place to start thinking about desirable qualities from any changes to the platform. Specifically: Maintainability — the tight coupling between each .NET application made it difficult to update any one application without also having to make changes elsewhere Replaceability — the tight coupling also meant that replacing one component wouldn’t be straightforward, especially if it wasn’t on a similar Microsoft stack. We’d like to be able to replace different parts without having to modify the existing codebase extensively Reusability — we’d like to be able to combine the different pieces of the system in different ways for different sites Repeatable deployments — rather than having to deploy the site manually with a long list of instructions, we should be able to deploy the entire site with a single command, allowing you to create a new instance of the site easily whether on production, staging servers, test servers or your own local machine Testability — if we can deploy the site with a single command, and each part of the site is no longer dependent on the specifics of how every other part of the site works, we can begin to run automated tests against the site, and against individual parts, both to prevent regressions and to do a little test-driven development In the next part, I’ll describe the high-level architecture we now have that hopefully brings us a little closer to these five traits.

    Read the article

  • PASS Summit 2010 Recap

    - by AjarnMark
    Last week I attended my eighth PASS Summit in nine years, and every year it is a fantastic event!  I was fortunate my first year to have a contact (Bill Graziano (blog | Twitter) from SQLTeam) that I was expecting to meet, and who got me started on a good track of making new contacts.  Each year I have made a few more, and renewed friendships from years past.  Many of the attendees agree that the pure networking opportunities are one of the best benefits of attending the Summit.  And there’s a lot of great technical stuff, too, some of the things that stick out for me this year include… Pre-Con Monday: PowerShell with Allen White (blog | Twitter).  This was the first time that I attended a pre-con.  For those not familiar with the concept, the regular sessions for the conference are 75-90 minutes long.  For an extra fee, you can attend a full-day session on a single topic during a pre- or post-conference training day.  I had been meaning for several months to dive in and learn PowerShell, but just never seemed to find (or make) the time for it, so when I saw this was one of the all-day sessions, and I was planning to be there on Monday anyway, I decided to go for it.  And it was well worth it!  I definitely came out of there with a good foundation to build my own PowerShell scripts, plus several sample scripts that he showed which already cover the first four or five things I was planning to do with PowerShell anyway.  This looks like the right tool for me to build an automated version of our software deployment process, which right now contains many repeated steps.  Thanks Allen! Service Broker with Denny Cherry (blog | Twitter).  I remembered reading Denny’s blog post on Using Service Broker instead of Replication, and ever since then I have been thinking about using this to populate a new reporting-focused Data Repository that we will be building in the near future.  When I saw he was doing this session, I thought it would be great to get more information and be able to ask the author questions.  When I brought this idea back to my boss, he really liked it, as we had previously been discussing doing nightly data loads, with an option to manually trigger a mid-day load if up-to-the-minute data was needed for something.  If we go the Service Broker route, we can keep the Repository current in near real-time.  Hooray! DBA Mythbusters with Paul Randal (blog | Twitter).  Even though I read every one of the posts in Paul’s blog series of the same name, I had to go see the legend in person.  It was great, and I still learned something new! How to Conduct Effective Meetings with Joe Webb (blog | Twitter).  I always like to sit in on a session that Joe does.  I met Joe several years ago when both he and Bill Graziano were on the PASS Board of Directors together, and we have kept in touch.  Joe is very well-spoken and has great experience with both SQL Server and business.  And we could certainly use some pointers at my work (probably yours, too) on making our meetings more effective and to run on-time.  Of course, now that I’m the Chapter Leader for the Professional Development virtual chapter, I also had to sit in on this ProfDev session and recruit Joe to do a presentation or two for the chapter next year. Query Optimization with David DeWitt.  Anyone who has seen Dr. David DeWitt present the 3rd keynote at a PASS Summit over the last three years knows what a great time it is to sit and listen to him make some really complicated and advanced topic easy to understand (although it still makes your head hurt).  It still amazes me that the simple two-table join query from pubs that he used in his example can possibly have 22 million possible physical query plans.  Ouch! Exhibit Hall:  This year I spent more serious time in the exhibit hall than any year past.  I have talked my boss into making a significant (for us) investment in monitoring tools next year, and this was a great opportunity to talk with all the big-hitters.  Readers of mine may recall that I fell in love with the SQL Sentry Power Suite several months ago and wrote a blog entry about it just from the trial version.  Well as things turned out, short-term budget priorities shifted, and we weren’t able to make the purchase then.  I have it in the budget for next year, but since I was going to the Summit, my boss wanted me to look at the other options to see if this was really the one that we wanted.  I spent a couple of hours talking with representatives from Red-Gate, Idera, Confio, and Quest about their offerings, and giving them each the same 3 scenarios that I wanted to be able to accomplish based on the questions and issues that arise in our company.  It was interesting to discover the different approaches or “world view” that each vendor takes to the subject of performance monitoring and troubleshooting.  I may write a separate article that goes into this in more depth, but the product that best aligned with our point of view, and met the current needs we have is still the SQL Sentry Power Suite.  I’m not saying that the others are bad or wrong or anything like that, just that the way they tackled the issue did not align as well with our particular needs as does SQL Sentry’s product.  And that was something I learned too, when you go shopping for these products, you really need to know what you want to get from them.  It’s best if you have a few example scenarios from work that you can use to test out how well each tool fits your particular needs. Overall, another GREAT event.  I can’t wait to get the DVDs so I can sit in on a bunch of other sessions that I couldn’t get to because I was in one of the ones above.  And I can hardly wait until next year!

    Read the article

  • OTN Architect Day Headed to Reston, VA - May 16

    - by Bob Rhubart
    In 2011 OTN Architect Day made stops in Chicago, Denver, Phoenix, Redwood Shores, and Toronto. The 2012 series begins with OTN Architect Day in Reston, VA on Wednesday May 16. Registration is now open for this free event, but don't get caught napping -- seating is limited, and the event is just 5 weeks away. The information below reflects the most recent updates to the event agenda, including the addition of Oracle ACE Director Kai Yu as the guest keynote speaker. Kai is Senior System Engineer / Architect at Dell, Inc., and has been very busy of late as a speaker at various industry and Oracle User Group events. I'm very happy Kai has agreed to make the trek from his hometown in Austin, TX to share his insight at the Architect Day event in Reston.  If you're in the area, put this one on your calendar. You won't be sorry.   Venue Sheraton Reston Hotel 11810 Sunrise Valley Drive Reston, VA 20191 Event Agenda 8:30 am - 9:00 am Registration and Continental Breakfast 9:00 am - 9:15 am Welcome and Opening Comments 9:15 am - 10:00 am Engineered Systems: Oracle's Vision for the Future | Ralf Dossman Oracle's Exadata and Exalogic are impressive products in their own right. But working in combination they deliver unparalleled transaction processing performance with up to a 30x increase over existing legacy systems, with the lowest cost of ownership over a 3 or 5 year basis than any other hardware. In this session you'll learn how to leverage Oracle's Engineered Systems within your enterprise to deliver record-breaking performance at the lowest TCO. 10:00 am - 10:30 am High Availability Infrastructure for Cloud Computing | Kai Yu Infrastructure high availability is extremely critical to Cloud Computing. In a Cloud system that hosts a large number of databases and applications with different SLAs, any unplanned outage can be devastating, and even a small planned downtime may be unacceptable. This presentation will discuss various technology solutions and the related best practices that system architects should consider in cloud infrastructure design to ensure high availability. 10:30 am - 10:45 am Break 10:45 am - 11:30 am Breakout Sessions: (pick one) Innovations in Grid Computing with Oracle Coherence | Bjorn Boe Learn how Coherence can increase the availability, scalability and performance of your existing applications with its advanced low-latency data-grid technologies. Also hear some interesting industry-specific use cases that customers had implemented and how Oracle is integrating Coherence into its Enterprise Java stack. Cloud Computing - Making IT Simple | Scott Mattoon The road to Cloud Computing is not without a few bumps. This session will help to smooth out your journey by tackling some of the potential complications. We'll examine whether standardization is a prerequisite for the Cloud. We'll look at why refactoring isn't just for application code. We'll check out deployable entities and their simplification via higher levels of abstraction. And we'll close out the session with a look at engineered systems and modular clouds. 11:30 pm - 12:15 pm Breakout Sessions: (pick one) Oracle Enterprise Manager | Joe Diemer Oracle Enterprise Manager (EM) provides complete lifecycle management for the cloud - from automated cloud setup to self-service delivery to cloud operations. In this session you'll learn how to take control of your cloud infrastructure with EM features including Consolidation Planning and Self-Service provisioning with Metering and Chargeback. Come hear how Oracle is expanding its management capabilities into the cloud! Rationalization and Defense in Depth - Two Steps Closer to the Clouds | Dave Chappelle Security represents one of the biggest concerns about cloud computing. In this session we'll get past the FUD with a real-world look at some key issues. We'll discuss the infrastructure necessary to support rationalization and security services, explore architecture for defense -in-depth, and deal frankly with the good, the bad, and the ugly in Cloud security. 12:15 pm - 1:15 pm Lunch 1:40 pm - 2:00 pm Panel Discussion - Q&A 2:00 pm - 2:45 pm Breakout Sessions: (pick one) 21st Century SOA | Peter Belknap Service Oriented Architecture has evolved from concept to reality in the last decade. The right methodology coupled with mature SOA technologies has helped customers demonstrate success in both innovation and ROI. In this session you will learn how Oracle SOA Suite's orchestration, virtualization, and governance capabilities provide the infrastructure to run mission critical business and system applications. And we'll take a special look at the convergence of SOA & BPM using Oracle's Unified technology stack. Track B: Oracle Cloud Reference Architecture | Anbu Krishnaswamy Cloud initiatives are beginning to dominate enterprise IT roadmaps. Successful adoption of Cloud and the subsequent governance challenges warrant a Cloud reference architecture that is applied consistently across the enterprise. This presentation gives an overview of Oracle's Cloud Reference Architecture, which is part of the Cloud Enterprise Technology Strategy (ETS). Concepts covered include common management layer capabilities, service models, resource pools, and use cases. 2:45 pm - 3:00 pm Break 3:00 pm - 4:00 pm Roundtable Discussions 4:00 pm - 4:15 pm Closing Comments & Readouts from Roundtable 4:15 pm - 5:00 pm Cocktail Reception / Networking Session schedule and content subject to change.

    Read the article

  • How to restore your production database without needing additional storage

    - by David Atkinson
    Production databases can get very large. This in itself is to be expected, but when a copy of the database is needed the database must be restored, requiring additional and costly storage.  For example, if you want to give each developer a full copy of your production server, you'll need n times the storage cost for your n-developer team. The same is true for any test databases that are created during the course of your project lifecycle. If you've read my previous blog posts, you'll be aware that I've been focusing on the database continuous integration theme. In my CI setup I create a "production"-equivalent database directly from its source control representation, and use this to test my upgrade scripts. Despite this being a perfectly valid and practical thing to do as part of a CI setup, it's not the exact equivalent to running the upgrade script on a copy of the actual production database. So why shouldn't I instead simply restore the most recent production backup as part of my CI process? There are two reasons why this would be impractical. 1. My CI environment isn't an exact copy of my production environment. Indeed, this would be the case in a perfect world, and it is strongly recommended as a good practice if you follow Jez Humble and David Farley's "Continuous Delivery" teachings, but in practical terms this might not always be possible, especially where storage is concerned. It may just not be possible to restore a huge production database on the environment you've been allotted. 2. It's not just about the storage requirements, it's also the time it takes to do the restore. The whole point of continuous integration is that you are alerted as early as possible whether the build (yes, the database upgrade script counts!) is broken. If I have to run an hour-long restore each time I commit a change to source control I'm just not going to get the feedback quickly enough to react. So what's the solution? Red Gate has a technology, SQL Virtual Restore, that is able to restore a database without using up additional storage. Although this sounds too good to be true, the explanation is quite simple (although I'm sure the technical implementation details under the hood are quite complex!) Instead of restoring the backup in the conventional sense, SQL Virtual Restore will effectively mount the backup using its HyperBac technology. It creates a data and log file, .vmdf, and .vldf, that becomes the delta between the .bak file and the virtual database. This means that both read and write operations are permitted on a virtual database as from SQL Server's point of view it is no different from a conventional database. Instead of doubling the storage requirements upon a restore, there is no 'duplicate' storage requirements, other than the trivially small virtual log and data files (see illustration below). The benefit is magnified the more databases you mount to the same backup file. This technique could be used to provide a large development team a full development instance of a large production database. It is also incredibly easy to set up. Once SQL Virtual Restore is installed, you simply run a conventional RESTORE command to create the virtual database. This is what I have running as part of a nightly "release test" process triggered by my CI tool. RESTORE DATABASE WidgetProduction_virtual FROM DISK=N'C:\WidgetWF\ProdBackup\WidgetProduction.bak' WITH MOVE N'WidgetProduction' TO N'C:\WidgetWF\ProdBackup\WidgetProduction_WidgetProduction_Virtual.vmdf', MOVE N'WidgetProduction_log' TO N'C:\WidgetWF\ProdBackup\WidgetProduction_log_WidgetProduction_Virtual.vldf', NORECOVERY, STATS=1, REPLACE GO RESTORE DATABASE mydatabase WITH RECOVERY   Note the only change from what you would do normally is the naming of the .vmdf and .vldf files. SQL Virtual Restore intercepts this by monitoring the extension and applies its magic, ensuring the 'virtual' restore happens rather than the conventional storage-heavy restore. My automated release test then applies the upgrade scripts to the virtual production database and runs some validation tests, giving me confidence that were I to run this on production for real, all would go smoothly. For illustration, here is my 8Gb production database: And its corresponding backup file: Here are the .vldf and .vmdf files, which represent the only additional used storage for the new database following the virtual restore.   The beauty of this product is its simplicity. Once it is installed, the interaction with the backup and virtual database is exactly the same as before, as the clever stuff is being done at a lower level. SQL Virtual Restore can be downloaded as a fully functional 14-day trial. Technorati Tags: SQL Server

    Read the article

  • How to restore your production database without needing additional storage

    - by David Atkinson
    Production databases can get very large. This in itself is to be expected, but when a copy of the database is needed the database must be restored, requiring additional and costly storage.  For example, if you want to give each developer a full copy of your production server, you’ll need n times the storage cost for your n-developer team. The same is true for any test databases that are created during the course of your project lifecycle. If you’ve read my previous blog posts, you’ll be aware that I’ve been focusing on the database continuous integration theme. In my CI setup I create a “production”-equivalent database directly from its source control representation, and use this to test my upgrade scripts. Despite this being a perfectly valid and practical thing to do as part of a CI setup, it’s not the exact equivalent to running the upgrade script on a copy of the actual production database. So why shouldn’t I instead simply restore the most recent production backup as part of my CI process? There are two reasons why this would be impractical. 1. My CI environment isn’t an exact copy of my production environment. Indeed, this would be the case in a perfect world, and it is strongly recommended as a good practice if you follow Jez Humble and David Farley’s “Continuous Delivery” teachings, but in practical terms this might not always be possible, especially where storage is concerned. It may just not be possible to restore a huge production database on the environment you’ve been allotted. 2. It’s not just about the storage requirements, it’s also the time it takes to do the restore. The whole point of continuous integration is that you are alerted as early as possible whether the build (yes, the database upgrade script counts!) is broken. If I have to run an hour-long restore each time I commit a change to source control I’m just not going to get the feedback quickly enough to react. So what’s the solution? Red Gate has a technology, SQL Virtual Restore, that is able to restore a database without using up additional storage. Although this sounds too good to be true, the explanation is quite simple (although I’m sure the technical implementation details under the hood are quite complex!) Instead of restoring the backup in the conventional sense, SQL Virtual Restore will effectively mount the backup using its HyperBac technology. It creates a data and log file, .vmdf, and .vldf, that becomes the delta between the .bak file and the virtual database. This means that both read and write operations are permitted on a virtual database as from SQL Server’s point of view it is no different from a conventional database. Instead of doubling the storage requirements upon a restore, there is no ‘duplicate’ storage requirements, other than the trivially small virtual log and data files (see illustration below). The benefit is magnified the more databases you mount to the same backup file. This technique could be used to provide a large development team a full development instance of a large production database. It is also incredibly easy to set up. Once SQL Virtual Restore is installed, you simply run a conventional RESTORE command to create the virtual database. This is what I have running as part of a nightly “release test” process triggered by my CI tool. RESTORE DATABASE WidgetProduction_Virtual FROM DISK=N'D:\VirtualDatabase\WidgetProduction.bak' WITH MOVE N'WidgetProduction' TO N'C:\WidgetWF\ProdBackup\WidgetProduction_WidgetProduction_Virtual.vmdf', MOVE N'WidgetProduction_log' TO N'C:\WidgetWF\ProdBackup\WidgetProduction_log_WidgetProduction_Virtual.vldf', NORECOVERY, STATS=1, REPLACE GO RESTORE DATABASE WidgetProduction_Virtual WITH RECOVERY   Note the only change from what you would do normally is the naming of the .vmdf and .vldf files. SQL Virtual Restore intercepts this by monitoring the extension and applies its magic, ensuring the ‘virtual’ restore happens rather than the conventional storage-heavy restore. My automated release test then applies the upgrade scripts to the virtual production database and runs some validation tests, giving me confidence that were I to run this on production for real, all would go smoothly. For illustration, here is my 8Gb production database: And its corresponding backup file: Here are the .vldf and .vmdf files, which represent the only additional used storage for the new database following the virtual restore.   The beauty of this product is its simplicity. Once it is installed, the interaction with the backup and virtual database is exactly the same as before, as the clever stuff is being done at a lower level. SQL Virtual Restore can be downloaded as a fully functional 14-day trial. Technorati Tags: SQL Server

    Read the article

  • Solaris 11 pkg fix is my new friend

    - by user12611829
    While putting together some examples of the Solaris 11 Automated Installer (AI), I managed to really mess up my system, to the point where AI was completely unusable. This was my fault as a combination of unfortunate incidents left some remnants that were causing problems, so I tried to clean things up. Unsuccessfully. Perhaps that was a bad idea (OK, it was a terrible idea), but this is Solaris 11 and there are a few more tricks in the sysadmin toolbox. Here's what I did. # rm -rf /install/* # rm -rf /var/ai # installadm create-service -n solaris11-x86 --imagepath /install/solaris11-x86 \ -s [email protected] Warning: Service svc:/network/dns/multicast:default is not online. Installation services will not be advertised via multicast DNS. Creating service from: [email protected] DOWNLOAD PKGS FILES XFER (MB) SPEED Completed 1/1 130/130 264.4/264.4 0B/s PHASE ITEMS Installing new actions 284/284 Updating package state database Done Updating image state Done Creating fast lookup database Done Reading search index Done Updating search index 1/1 Creating i386 service: solaris11-x86 Image path: /install/solaris11-x86 So far so good. Then comes an oops..... setup-service[168]: cd: /var/ai//service/.conf-templ: [No such file or directory] ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ This is where you generally say a few things to yourself, and then promise to quit deleting configuration files and directories when you don't know what you are doing. Then you recall that the new Solaris 11 packaging system has some ability to correct common mistakes (like the one I just made). Let's give it a try. # pkg fix installadm Verifying: pkg://solaris/install/installadm ERROR dir: var/ai Group: 'root (0)' should be 'sys (3)' dir: var/ai/ai-webserver Missing: directory does not exist dir: var/ai/ai-webserver/compatibility-configuration Missing: directory does not exist dir: var/ai/ai-webserver/conf.d Missing: directory does not exist dir: var/ai/image-server Group: 'root (0)' should be 'sys (3)' dir: var/ai/image-server/cgi-bin Missing: directory does not exist dir: var/ai/image-server/images Group: 'root (0)' should be 'sys (3)' dir: var/ai/image-server/logs Missing: directory does not exist dir: var/ai/profile Missing: directory does not exist dir: var/ai/service Group: 'root (0)' should be 'sys (3)' dir: var/ai/service/.conf-templ Missing: directory does not exist dir: var/ai/service/.conf-templ/AI_data Missing: directory does not exist dir: var/ai/service/.conf-templ/AI_files Missing: directory does not exist file: var/ai/ai-webserver/ai-httpd-templ.conf Missing: regular file does not exist file: var/ai/service/.conf-templ/AI.db Missing: regular file does not exist file: var/ai/image-server/cgi-bin/cgi_get_manifest.py Missing: regular file does not exist Created ZFS snapshot: 2012-12-11-21:09:53 Repairing: pkg://solaris/install/installadm Creating Plan (Evaluating mediators): | DOWNLOAD PKGS FILES XFER (MB) SPEED Completed 1/1 3/3 0.0/0.0 0B/s PHASE ITEMS Updating modified actions 16/16 Updating image state Done Creating fast lookup database Done In just a few moments, IPS found the missing files and incorrect ownerships/permissions. Instead of reinstalling the system, or falling back to an earlier Live Upgrade boot environment, I was able to create my AI services and now all is well. # installadm create-service -n solaris11-x86 --imagepath /install/solaris11-x86 \ -s [email protected] Warning: Service svc:/network/dns/multicast:default is not online. Installation services will not be advertised via multicast DNS. Creating service from: [email protected] DOWNLOAD PKGS FILES XFER (MB) SPEED Completed 1/1 130/130 264.4/264.4 0B/s PHASE ITEMS Installing new actions 284/284 Updating package state database Done Updating image state Done Creating fast lookup database Done Reading search index Done Updating search index 1/1 Creating i386 service: solaris11-x86 Image path: /install/solaris11-x86 Refreshing install services Warning: mDNS registry of service solaris11-x86 could not be verified. Creating default-i386 alias Setting the default PXE bootfile(s) in the local DHCP configuration to: bios clients (arch 00:00): default-i386/boot/grub/pxegrub Refreshing install services Warning: mDNS registry of service default-i386 could not be verified. # installadm create-service -n solaris11u1-x86 --imagepath /install/solaris11u1-x86 \ -s [email protected] Warning: Service svc:/network/dns/multicast:default is not online. Installation services will not be advertised via multicast DNS. Creating service from: [email protected] DOWNLOAD PKGS FILES XFER (MB) SPEED Completed 1/1 514/514 292.3/292.3 0B/s PHASE ITEMS Installing new actions 661/661 Updating package state database Done Updating image state Done Creating fast lookup database Done Reading search index Done Updating search index 1/1 Creating i386 service: solaris11u1-x86 Image path: /install/solaris11u1-x86 Refreshing install services Warning: mDNS registry of service solaris11u1-x86 could not be verified. # installadm list Service Name Alias Of Status Arch Image Path ------------ -------- ------ ---- ---------- default-i386 solaris11-x86 on i386 /install/solaris11-x86 solaris11-x86 - on i386 /install/solaris11-x86 solaris11u1-x86 - on i386 /install/solaris11u1-x86 This is way way better than pkgchk -f in Solaris 10. I'm really beginning to like this new IPS packaging system.

    Read the article

  • Selling Visual Studio ALM

    - by Tarun Arora
    Introduction As a consultant I have been selling Application Lifecycle Management services using Visual Studio and Team Foundation Server. I’ve been contacted various times by friends working in organization telling me that ALM processes in their company were benchmarked when dinosaurs walked the earth. Most of these individuals already know the great features Microsoft ALM tools offer and are keen to start a conversation with the CIO but don’t exactly know where to start. It is very important how you engage in your first conversation, if you start the conversation with ‘There is this great tooling from Microsoft which offers amazing features to boost developer productivity, … ‘ from experience I can tell you the reply from your CIO would be ‘I already know! Our existing landscape has a combination of bleeding edge open source and cutting edge licensed tools which already cover these features quite well, more over Microsoft products have a high licensing cost associated to them.’ You will always find it harder to sell by feature, the trick is to highlight the gap in the existing processes & tools and then highlight the impact of these gaps to the overall development processes, by now you would have captured enough attention to show off how the ALM tooling offered by Microsoft not only fills those gaps but offers great value adds to take their development practices to the next level. Rangers ALM Assessment Guide Image 1 – Welcome! First look at the Rangers ALM assessment guide Most organization already have some processes in place to cover aspects of ALM. How do you go about proving that there isn’t enough cover in place? This is where Visual Studio ALM Rangers ALM Assessment guide can help. The ALM assessment guide is really a tool that helps you gather information about Development practices and processes within a customer's environment. Several questionnaires are used to identify the current state of individual development lifecycle areas and decide on a desired state for those processes. It also presents guidance and roll-up summaries to help with recommendations moving forward. The ALM Rangers assessment guide can be downloaded from here. Image 2 – ALM Assessment guide divided into different functions of SDLC The assessment guide is divided into different functions of Software Development Lifecycle (listed below), this gives you the ability to access how mature the company is in different areas of SDLC. Architecture & Design Requirement Engineering & UX Development Software Configuration Management Governance Deployment & Operations Testing & Quality Assurance Project Planning & Management Each section has a set of questions, fill in the assessment by selecting “Never/Sometimes/Always” from the Answer column in the question sheets.  Each answer has weightage to the overall score. Each question has a link next to it, clicking the link takes you to the Reference sheet which gives you more details about the question along with a reason for “why you need to ask this question?”, “other ways to phrase the question” and “what to expect as an answer from the customer”. The trick is to engage the customer in a discussion. You need to probe a lot, listen to the customer and have a discussion with several team members, preferably without management to ensure that you receive candid feedback. This reminds me of a funny incident when during an ALM review a customer told me that they have a sophisticated semi-automated application deployment process, further discussions revealed that deployment actually involved 72 manual configuration steps per production node. Such observations can be recorded in the Issue Brainstorming worksheet for further consideration later. It is also worth mentioning the different levels of ALM maturity to the customer. By default the desired state of ALM maturity is set to Standard, it is possible to set a desired state by area, you should strive for Advanced or Dynamic, it always helps by explaining the classification and advantages. Image 3 – ALM levels by description The ALM assessment guide helps you arrive at a quantitative measure of the company’s ALM maturity. The resultant graph plotted on a spider’s web shows you the company’s current state of ALM maturity and the desired state of ALM maturity. Further since the results are classified by area you can immediately spot the areas where the customer needs immediate help. Image 4 – The spiders web! The red cross icons are areas shouting out for immediate attention, the yellow exclamation icons are areas that need improvement. These icons are calculated on the difference between the Current State of ALM maturity VS the Desired state of ALM maturity. Image 5 – Results by area Conclusion To conclude the Rangers ALM assessment guide gives you the ability to, Measure the customer’s current ALM maturity level Understand the ALM maturity level the customer desires to achieve Capture a healthy list of issues the customer wants to brainstorm further Now What’s next…? Download and get started with the Rangers ALM Assessment Guide. If you have successfully captured the above listed three pieces of information you are in a great state to make recommendations on the identified areas highlighting the benefits that Visual Studio ALM tools would offer. In the next post I will be covering how to take the ALM assessment results as the base to actually convert your recommendation into a sell.  Remember to subscribe to http://feeds.feedburner.com/TarunArora. I would love to hear your feedback! If you have any recommendations on things that I should consider or any questions or feedback, feel free to leave a comment. *** A special thanks goes out to fellow ranges Willy, Ethem and Philip for reviewing the blog post and providing valuable feedback. ***

    Read the article

  • SQL Saturday 43 in Redmond

    - by AjarnMark
    I attended my first SQLSaturday a couple of days ago, SQLSaturday #43 in Redmond (at Microsoft).  I got there really early, primarily because I forgot how fast I can get there from my home when nobody else is on the road.  On a weekday in rush hour traffic, that would have taken two hours to get there.  I gave myself 90 minutes, and actually got there in about 45.  Crazy! I made the mistake of going to the main Microsoft campus, but that’s not where the event was being held.  Instead it was in a big Microsoft conference center on the other side of the highway.  Fortunately, I had the address with me and quickly realized my mistake.  When I got back on track, I noticed that there were bright yellow signs out on the street corner that looked like they said they were for SOL Saturday, which actually was appropriate since it was the sunniest day around here in a long time. Since I was there so early, the registration was just getting setup, so I found Greg Larsen who was coordinating things and offered to help.  He put me to work with a group of people organizing the pre-printed raffle tickets and stuffing swag bags. I had never been to a SQLSaturday before this one, so I wasn’t exactly sure what to expect even though I have read about a few on some blogs.  It makes sense that each one will be a little bit different since they are almost completely volunteer driven, and the whole concept is still in its early stages.  I have been to the PASS Summit for the last several years, and was hoping for a smaller version of that.  Now, it’s not really fair to compare one free day of training run entirely by volunteers with a multi-day, $1,000+ event put on under the direction of a professional event management company.  But there are some parallels. At this SQLSaturday, there was no opening general session, just coffee and pastries in the common area / expo hallway and straight into the first group of sessions.  I don’t know if that was because there was no single room large enough to hold everyone, or for other reasons.  This worked out okay, but the organization guy in me would have preferred to have even a 15 minute welcome message from the organizers with a little overview of the day.  Even something as simple as, “Thanks to persons X, Y, and Z for helping put this together…Sessions will start in 20 minutes and are all in rooms down this hallway…the bathrooms are on the other side of the conference center…lunch today is pizza and we would like to thank sponsor Q for providing it.”  It doesn’t need to be much, certainly not a full-blown Keynote like at the PASS Summit, but something to use as a rallying point to pull everyone together and get the day off to an official start would be nice.  Again, there may have been logistical reasons why that was not feasible here.  I’m just putting out my thoughts for other SQLSaturday coordinators to consider. The event overall was great.  I believe that there were over 300 in attendance, and everything seemed to run smoothly.  At least from an attendee’s point of view where there was plenty of muffins in the morning and pizza in the afternoon, with plenty of pop to drink.  And hey, if you’ve got the food and drink covered, a lot of other stuff could go wrong and people will be very forgiving.  But as I said, everything appeared to run pretty smoothly, at least until Buck Woody showed up in his Oracle shirt.  Other than that, the volunteers did a great job! I was a little surprised by how few people in my own backyard that I know.  It makes sense if you really think about it, given how many companies must be using SQL Server around here.  I guess I just got spoiled coming into the PASS Summit with a few contacts that I already knew would be there.  Perhaps I have been spending too much time with too few people at the Summits and I need to step out and meet more folks.  Of course, it also is different since the Summit is the big national event and a number of the folks I know are spread out across the country, so the Summit is the only time we’re all in the same place at the same time.  I did make a few new contacts at SQLSaturday, and bumped into a couple of people that I knew (and a couple others that I only knew from Twitter, and didn’t even realize that they were here in the area). Other than the sheer entertainment value of Buck Woody’s session, the one that was probably the greatest value for me was a quick introduction to PowerShell.  I have not done anything with it yet, but I think it will be a good tool to use to implement my plans for automated database recovery testing.  I saw just enough at the session to take away some of the intimidation factor, and I am getting ready to jump in and see what I can put together in the next few weeks.  And that right there made the investment worthwhile.  So I encourage you, if you have the opportunity to go to a SQLSaturday event near you, go for it!

    Read the article

  • Use WLST to Delete All JMS Messages From a Destination

    - by james.bayer
    I got a question today about whether WebLogic Server has any tools to delete all messages from a JMS Queue.  It just so happens that the WLS Console has this capability already.  It’s available on the screen after the “Show Messages” button is clicked on a destination’s Monitoring tab as seen in the screen shot below. The console is great for something ad-hoc, but what if I want to automate this?  Well it just so happens that the console is just a weblogic application layered on top of the JMX Management interface.  If you look at the MBean Reference, you’ll find a JMSDestinationRuntimeMBean that includes the operation deleteMessages that takes a JMS Message Selector as an argument.  If you pass an empty string, that is essentially a wild card that matches all messages. Coding a stand-alone JMX client for this is kind of lame, so let’s do something more suitable to scripting.  In addition to the console, WebLogic Scripting Tool (WLST) based on Jython is another way to browse and invoke MBeans, so an equivalent interactive shell session to delete messages from a destination would looks like this: D:\Oracle\fmw11gr1ps3\user_projects\domains\hotspot_domain\bin>setDomainEnv.cmd D:\Oracle\fmw11gr1ps3\user_projects\domains\hotspot_domain>java weblogic.WLST   Initializing WebLogic Scripting Tool (WLST) ...   Welcome to WebLogic Server Administration Scripting Shell   Type help() for help on available commands   wls:/offline> connect('weblogic','welcome1','t3://localhost:7001') Connecting to t3://localhost:7001 with userid weblogic ... Successfully connected to Admin Server 'AdminServer' that belongs to domain 'hotspot_domain'.   Warning: An insecure protocol was used to connect to the server. To ensure on-the-wire security, the SSL port or Admin port should be used instead.   wls:/hotspot_domain/serverConfig> serverRuntime() Location changed to serverRuntime tree. This is a read-only tree with ServerRuntimeMBean as the root. For more help, use help(serverRuntime)   wls:/hotspot_domain/serverRuntime> cd('JMSRuntime/AdminServer.jms/JMSServers/JMSServer-0/Destinations/SystemModule-0!Queue-0') wls:/hotspot_domain/serverRuntime/JMSRuntime/AdminServer.jms/JMSServers/JMSServer-0/Destinations/SystemModule-0!Queue-0> ls() dr-- DurableSubscribers   -r-- BytesCurrentCount 0 -r-- BytesHighCount 174620 -r-- BytesPendingCount 0 -r-- BytesReceivedCount 253548 -r-- BytesThresholdTime 0 -r-- ConsumersCurrentCount 0 -r-- ConsumersHighCount 0 -r-- ConsumersTotalCount 0 -r-- ConsumptionPaused false -r-- ConsumptionPausedState Consumption-Enabled -r-- DestinationInfo javax.management.openmbean.CompositeDataSupport(compositeType=javax.management.openmbean.CompositeType(name=DestinationInfo,items=((itemName=ApplicationName,itemType=javax.management.openmbean.SimpleType(name=java.lang.String)),(itemName=ModuleName,itemType=javax.management.openmbean.SimpleType(name=java.lang.String)),(itemName openmbean.SimpleType(name=java.lang.Boolean)),(itemName=SerializedDestination,itemType=javax.management.openmbean.SimpleType(name=java.lang.String)),(itemName=ServerName,itemType=javax.management.openmbean.SimpleType(name=java.lang.String)),(itemName=Topic,itemType=javax.management.openmbean.SimpleType(name=java.lang.Boolean)),(itemName=VersionNumber,itemType=javax.management.op ule-0!Queue-0, Queue=true, SerializedDestination=rO0ABXNyACN3ZWJsb2dpYy5qbXMuY29tbW9uLkRlc3RpbmF0aW9uSW1wbFSmyJ1qZfv8DAAAeHB3kLZBABZTeXN0ZW1Nb2R1bGUtMCFRdWV1ZS0wAAtKTVNTZXJ2ZXItMAAOU3lzdGVtTW9kdWxlLTABAANBbGwCAlb6IS6T5qL/AAAACgEAC0FkbWluU2VydmVyAC2EGgJW+iEuk+ai/wAAAAsBAAtBZG1pblNlcnZlcgAthBoAAQAQX1dMU19BZG1pblNlcnZlcng=, ServerName=JMSServer-0, Topic=false, VersionNumber=1}) -r-- DestinationType Queue -r-- DurableSubscribers null -r-- InsertionPaused false -r-- InsertionPausedState Insertion-Enabled -r-- MessagesCurrentCount 0 -r-- MessagesDeletedCurrentCount 3 -r-- MessagesHighCount 2 -r-- MessagesMovedCurrentCount 0 -r-- MessagesPendingCount 0 -r-- MessagesReceivedCount 3 -r-- MessagesThresholdTime 0 -r-- Name SystemModule-0!Queue-0 -r-- Paused false -r-- ProductionPaused false -r-- ProductionPausedState Production-Enabled -r-- State advertised_in_cluster_jndi -r-- Type JMSDestinationRuntime   -r-x closeCursor Void : String(cursorHandle) -r-x deleteMessages Integer : String(selector) -r-x getCursorEndPosition Long : String(cursorHandle) -r-x getCursorSize Long : String(cursorHandle) -r-x getCursorStartPosition Long : String(cursorHandle) -r-x getItems javax.management.openmbean.CompositeData[] : String(cursorHandle),Long(start),Integer(count) -r-x getMessage javax.management.openmbean.CompositeData : String(cursorHandle),Long(messageHandle) -r-x getMessage javax.management.openmbean.CompositeData : String(cursorHandle),String(messageID) -r-x getMessage javax.management.openmbean.CompositeData : String(messageID) -r-x getMessages String : String(selector),Integer(timeout) -r-x getMessages String : String(selector),Integer(timeout),Integer(state) -r-x getNext javax.management.openmbean.CompositeData[] : String(cursorHandle),Integer(count) -r-x getPrevious javax.management.openmbean.CompositeData[] : String(cursorHandle),Integer(count) -r-x importMessages Void : javax.management.openmbean.CompositeData[],Boolean(replaceOnly) -r-x moveMessages Integer : String(java.lang.String),javax.management.openmbean.CompositeData,Integer(java.lang.Integer) -r-x moveMessages Integer : String(selector),javax.management.openmbean.CompositeData -r-x pause Void : -r-x pauseConsumption Void : -r-x pauseInsertion Void : -r-x pauseProduction Void : -r-x preDeregister Void : -r-x resume Void : -r-x resumeConsumption Void : -r-x resumeInsertion Void : -r-x resumeProduction Void : -r-x sort Long : String(cursorHandle),Long(start),String[](fields),Boolean[](ascending)   wls:/hotspot_domain/serverRuntime/JMSRuntime/AdminServer.jms/JMSServers/JMSServer-0/Destinations/SystemModule-0!Queue-0> cmo.deleteMessages('') 2 where the domain name is “hotspot_domain”, the JMS Server name is “JMSServer-0”, the Queue name is “Queue-0” and the System Module is named “SystemModule-0”.  To invoke the operation, I use the “cmo” object, which is the “Current Management Object” that represents the currently navigated to MBean.  The 2 indicates that two messages were deleted.  Combining this WLST code with a recent post by my colleague Steve that shows you how to use an encrypted file to store the authentication credentials, you could easily turn this into a secure automated script.  If you need help with that step, a long while back I blogged about some WLST basics.  Happy scripting.

    Read the article

  • Oracle Delivers Latest Release of Oracle Enterprise Manager 12c

    - by Scott McNeil
    Richer Service Catalog for Database and Middleware as a Service; Enhanced Database and Middleware Management Help Drive Enterprise-Scale Private Cloud Adoption News Summary IT organizations are adopting private clouds as a stepping-stone to business-driven, self-service IT. Successful implementations hinge on the ability to efficiently deploy and manage cloud services at enterprise scale. Having a complete cloud management solution integrated with an enterprise-class technology stack is a fundamental requirement for IT. Oracle Enterprise Manager 12c Release 4 meets that requirement by helping businesses become more agile and responsive, while reducing cost, complexity, and risk. News Facts Oracle Enterprise Manager 12c Release 4, available today, lets organizations rapidly adopt Oracle-based, enterprise-scale private clouds. New capabilities provide advanced technology stack management, secure database administration, and enterprise service governance, enabling Oracle customers and partners to maximize database and application performance and drive innovation using self-service IT platforms. The enhancements have been driven by customers and the growing Oracle Enterprise Manager Ecosystem, comprised of more than 750 Oracle PartnerNetwork (OPN) Specialized partners. Oracle and its partners and customers have built over 140 plug-ins and connectors for Oracle Enterprise Manager. Watch the video highlights. Automation for Broader Cloud Services Oracle Enterprise Manager 12c Release 4 allows for a rapid enterprise-wide adoption of database, middleware and infrastructure services in the private cloud, driven by an enhanced API-enabled service catalog. The release features “push button” style provisioning of complete environments such as SOA and Oracle Active Data Guard, and fast data cloning that enables rapid deployment and testing of enterprise applications. Out-of-the-box capabilities to detect data and configuration vulnerabilities provide enhanced cloud service governance along with greater operational control through a flexible and extensible showback mechanism. Enhanced Database Management A new performance warehouse enables predictive database diagnostics and trend analysis and helps identify database problems before they occur. New enterprise data-governance capabilities enhance security by helping systematically discover and protect sensitive data. Step-by-step orchestration of upgrades with the ability to rollback changes enables faster adoption of Oracle Database 12c. Expanded Fusion Middleware Management A new consolidated view of Oracle Fusion Middleware 12c deployments with a guided management capability lets administrators apply best management practices to diverse middleware environments and identify performance issues quickly. A Java VM Diagnostics as a Service feature allows governed access to diagnostics data for IT workers across multiple disciplines for accelerated DevOps resolutions of defects and performance optimization. New automated provisioning for SOA lets middleware administrators perform mass SOA provisioning with ease. Superior Enterprise-Grade Management Private roles and preferred credentials have been added to Oracle Enterprise Manager to provide additional fine-grained security for organizations with complex access control requirements. A new security console provides a single point of control for managing the security of Oracle Enterprise Manager environments. Support for the latest industry standard SNMP v3 protocol, including encryption, enables more secure heterogeneous management. “Smart monitoring” adapts to observed environmental changes and adds self-management capabilities to help Oracle Enterprise Manager run at peak performance, while demanding less IT supervision. Supporting Quotes “Lawrence Livermore National Laboratory has a strong tradition of technology breakthroughs and leadership. As a member of Oracle’s Customer Advisory Board for Oracle Enterprise Manager, we have consistently provided feedback and guidance in the areas of enterprise-scale cloud, self-diagnosability, and secure administration for the product,” said Tim Frazier, CIO, NIF and Photon Sciences, Lawrence Livermore National Laboratory. “We intend to take advantage of the Release 4 features that support enterprise-scale availability and fine-grained security capabilities for private cloud deployments.” “IDC's most recent CloudTrack survey shows that most enterprises plan to adopt hybrid cloud architectures over the next three years,” said Mary Johnston Turner, Research Vice President, Enterprise System Management Software, IDC. “These organizations plan to deploy a wide range of workloads into cloud environments including mission critical database and middleware services that require high levels of fault tolerance and disaster recovery. Such capabilities were traditionally custom configured for each application but cloud offers the possibility to incorporate such properties within the service definition, enabling organizations to adopt cloud without compromise. With the latest release of Oracle Enterprise Manager 12c, Oracle is providing customers with an out-of-the-box experience for delivering highly-resilient cloud services for databases and applications.” “Since its inception, Oracle has been leading the way in innovative, scalable and high performance solutions for the enterprise. With this release of Oracle Enterprise Manager, we are extending this leadership by providing enterprise-scale capabilities for planning, delivering, and managing private clouds. We call this ‘zero-to-cloud – accelerated.’ These enhancements help our customers to expedite their adoption of cloud computing and prepares them for the next generation of self-service IT,” said Prakash Ramamurthy, senior vice president of Systems and Cloud Management at Oracle. Supporting Resources Oracle Enterprise Manager 12c Video: Cerner Delivers High Performance Private Cloud Video: BIAS Achieves Outstanding Results with Private Cloud Press Release Stay Connected: Twitter | Facebook | YouTube | Linkedin | Newsletter Download the Oracle Enterprise Manager 12c Mobile app

    Read the article

  • How to restore your production database without needing additional storage

    - by David Atkinson
    Production databases can get very large. This in itself is to be expected, but when a copy of the database is needed the database must be restored, requiring additional and costly storage.  For example, if you want to give each developer a full copy of your production server, you'll need n times the storage cost for your n-developer team. The same is true for any test databases that are created during the course of your project lifecycle. If you've read my previous blog posts, you'll be aware that I've been focusing on the database continuous integration theme. In my CI setup I create a "production"-equivalent database directly from its source control representation, and use this to test my upgrade scripts. Despite this being a perfectly valid and practical thing to do as part of a CI setup, it's not the exact equivalent to running the upgrade script on a copy of the actual production database. So why shouldn't I instead simply restore the most recent production backup as part of my CI process? There are two reasons why this would be impractical. 1. My CI environment isn't an exact copy of my production environment. Indeed, this would be the case in a perfect world, and it is strongly recommended as a good practice if you follow Jez Humble and David Farley's "Continuous Delivery" teachings, but in practical terms this might not always be possible, especially where storage is concerned. It may just not be possible to restore a huge production database on the environment you've been allotted. 2. It's not just about the storage requirements, it's also the time it takes to do the restore. The whole point of continuous integration is that you are alerted as early as possible whether the build (yes, the database upgrade script counts!) is broken. If I have to run an hour-long restore each time I commit a change to source control I'm just not going to get the feedback quickly enough to react. So what's the solution? Red Gate has a technology, SQL Virtual Restore, that is able to restore a database without using up additional storage. Although this sounds too good to be true, the explanation is quite simple (although I'm sure the technical implementation details under the hood are quite complex!) Instead of restoring the backup in the conventional sense, SQL Virtual Restore will effectively mount the backup using its HyperBac technology. It creates a data and log file, .vmdf, and .vldf, that becomes the delta between the .bak file and the virtual database. This means that both read and write operations are permitted on a virtual database as from SQL Server's point of view it is no different from a conventional database. Instead of doubling the storage requirements upon a restore, there is no 'duplicate' storage requirements, other than the trivially small virtual log and data files (see illustration below). The benefit is magnified the more databases you mount to the same backup file. This technique could be used to provide a large development team a full development instance of a large production database. It is also incredibly easy to set up. Once SQL Virtual Restore is installed, you simply run a conventional RESTORE command to create the virtual database. This is what I have running as part of a nightly "release test" process triggered by my CI tool. RESTORE DATABASE WidgetProduction_virtual FROM DISK=N'C:\WidgetWF\ProdBackup\WidgetProduction.bak' WITH MOVE N'WidgetProduction' TO N'C:\WidgetWF\ProdBackup\WidgetProduction_WidgetProduction_Virtual.vmdf', MOVE N'WidgetProduction_log' TO N'C:\WidgetWF\ProdBackup\WidgetProduction_log_WidgetProduction_Virtual.vldf', NORECOVERY, STATS=1, REPLACE GO RESTORE DATABASE mydatabase WITH RECOVERY   Note the only change from what you would do normally is the naming of the .vmdf and .vldf files. SQL Virtual Restore intercepts this by monitoring the extension and applies its magic, ensuring the 'virtual' restore happens rather than the conventional storage-heavy restore. My automated release test then applies the upgrade scripts to the virtual production database and runs some validation tests, giving me confidence that were I to run this on production for real, all would go smoothly. For illustration, here is my 8Gb production database: And its corresponding backup file: Here are the .vldf and .vmdf files, which represent the only additional used storage for the new database following the virtual restore.   The beauty of this product is its simplicity. Once it is installed, the interaction with the backup and virtual database is exactly the same as before, as the clever stuff is being done at a lower level. SQL Virtual Restore can be downloaded as a fully functional 14-day trial. Technorati Tags: SQL Server

    Read the article

  • What Counts For a DBA: Simplicity

    - by Louis Davidson
    Too many computer processes do an apparently simple task in a bizarrely complex way. They remind me of this strip by one of my favorite artists: Rube Goldberg. In order to keep the boss from knowing one was late, a process is devised whereby the cuckoo clock kisses a live cuckoo bird, who then pulls a string, which triggers a hat flinging, which in turn lands on a rod that removes a typewriter cover…and so on. We rely on creating automated processes to keep on top of tasks. DBAs have a lot of tasks to perform: backups, performance tuning, data movement, system monitoring, and of course, avoiding being noticed.  Every day, there are many steps to perform to maintain the database infrastructure, including: checking physical structures, re-indexing tables where needed, backing up the databases, checking those backups, running the ETL, and preparing the daily reports and yes, all of these processes have to complete before you can call it a day, and probably before many others have started that same day. Some of these tasks are just naturally complicated on their own. Other tasks become complicated because the database architecture is excessively rigid, and we often discover during “production testing” that certain processes need to be changed because the written requirements barely resembled the actual customer requirements.   Then, with no time to change that rigid structure, we are forced to heap layer upon layer of code onto the problematic processes. Instead of a slight table change and a new index, we end up with 4 new ETL processes, 20 temp tables, 30 extra queries, and 1000 lines of SQL code.  Report writers then need to build reports and make magical numbers appear from those toxic data structures that are overly complex and probably filled with inconsistent data. What starts out as a collection of fairly simple tasks turns into a Goldbergian nightmare of daily processes that are likely to cause your dinner to be interrupted by the smartphone doing the vibration dance that signifies trouble at the mill. So what to do? Well, if it is at all possible, simplify the problem by either going into the code and refactoring the complex code to simple, or taking all of the processes and simplifying them into small, independent, easily-tested steps.  The former approach usually requires an agreement on changing underlying structures that requires countless mind-numbing meetings; while the latter can generally be done to any complex process without the same frustration or anger, though it will still leave you with lots of steps to complete, the ability to test each step independently will definitely increase the quality of the overall process (and with each step reporting status back, finding an actual problem within the process will be definitely less unpleasant.) We all know the principle behind simplifying a sequence of processes because we learned it in math classes in our early years of attending school, starting with elementary school. In my 4 years (ok, 9 years) of undergraduate work, I remember pretty much one thing from my many math classes that I apply daily to my career as a data architect, data programmer, and as an occasional indentured DBA: “show your work”. This process of showing your work was my first lesson in simplification. Each step in the process was in fact, far simpler than the entire process.  When you were working an equation that took both sides of 4 sheets of paper, showing your work was important because the teacher could see every step, judge it, and mark it accordingly.  So often I would make an error in the first few lines of a problem which meant that the rest of the work was actually moving me closer to a very wrong answer, no matter how correct the math was in the subsequent steps. Yet, when I got my grade back, I would sometimes be pleasantly surprised. I passed, yet missed every problem on the test. But why? While I got the fact that 1+1=2 wrong in every problem, the teacher could see that I was using the right process. In a computer process, the process is very similar. We take complex processes, show our work by storing intermediate values, and test each step independently. When a process has 100 steps, each step becomes a simple step that is tested and verified, such that there will be 100 places where data is stored, validated, and can be checked off as complete. If you get step 1 of 100 wrong, you can fix it and be confident (that if you did your job of testing the other steps better than the one you had to repair,) that the rest of the process works. If you have 100 steps, and store the state of the process exactly once, the resulting testable chunk of code will be far more complex and finding the error will require checking all 100 steps as one, and usually it would be easier to find a specific needle in a stack of similarly shaped needles.  The goal is to strive for simplicity either in the solution, or at least by simplifying every process down to as many, independent, testable, simple tasks as possible.  For the tasks that really can’t be done completely independently, minimally take those tasks and break them down into simpler steps that can be tested independently.  Like working out division problems longhand, have each step of the larger problem verified and tested.

    Read the article

  • Great event : Microsoft Visual Studio 2010 Launch @ Microsoft TechEd Blore

    - by sathya
    Great event : Microsoft Visual Studio 2010 Launch @ Microsoft TechEd Blore   I was really excited on attending the day 1 of Microsoft TechEd 2010 in Bangalore. This is the first Teched that am attending. The event was really fun filled with lot of knowledge sharing sessions and lots of goodies and gifts by the partners Initially the Event Started by Murthy's Session. He explained about the Developers relating to the 5 elements of nature (Pancha Boothaas) 1. Fire - Passion 2. Wave (Water) - Catch the right wave which we need to apply. 3. Earth - Connections and lots of opportunities around the world 4. Air -  Its whatever we breathe. Developers.. Without them nothing is possible. they are like the air 5. Sky - Cloud based applications   Next the Keynote and the announcement of Visual Studio by SomaSegar. List of things that he delivered his speech on : 1. Announcement of Visual Studio 2010 2. Announcement of .NET 4.0 3. Announcement of Silverlight later this week 4. What is the current Trend? Microsoft has done a research with many developers across the globe and have got the following feedback from the users. Get Lost (interrupted) - When we do some work and somebody is calling or interrepting by someother way we lose track of what we were doing and we need to do from the start Falling Behind- Technology gets updated  phenomenally over a period of time and developers always have a scenario like they are not in the state of the art technology and they always have a doubt whether they are staying updated. Lack of Collobaration - When a Manager asks a person what the team members have done and some might be done and some might not be and finally all are into a state like we dont know where we are. So they have addressed these 3 points in the VS 2010 by the following features : Get Lost - Some cool features which could overcome this. We have some Graphical interface. which could show what we have done and where we are. Some Zoom features in the code level. Falling Behind - Everything is based on .NET language base. 2010 has been built in such a way that if developers know the native language that's enough for building good applications. Lack of Collobaration - Some Dashboard Features which would show where exactly the project is. And a graphical user interface is shown on clicking which it directly drills down even to the code level. 5. An overview on all new features in VS 2010. 6. Some good demos of new features in VS 2010 by Polita and one more girl. Some of the new features included : 1. Team Explorer 2. Zoom in Code 3. Ribbon Development 4. Development in Single Platform for Windows Phone, XBox, Zune, Azure, Web Based and Windows based applications 5. Sequence Diagram Generation directly from code 6. Dashboards to show project status 7. Javascript and JQuery intellisense 8. Native support for JQuery 9. Packaging feature while deploying. 10. Generation of different versions of web.config like Web.Config.Production, Web.Config.Staging, etc. 11. IntelliTrace - Eliminating the "Not Reproducible" statement. 12. Automated User Interface Testing. At last in the closing of the day we had a great event called Demo Extravaganza, where lot of cool projects that were launched by Microsoft and also the projects that are under research were also shown. I got a lot of info about Bing today. BING really rocks!!! It has the following : 1. Visual Search 2. Product based search. For each product different menu filters were provided to make an advanced search 3. BING Maps was awesome!! It zoomed in to the street level and we can assume that we are the persons who are walking or running on the road and we can see the real objects like buildings moving by our side. 4. PhotoSynth was used in BING to show up all the images taken around the globe in a 3D format. 5. Formula - If we give some formula it automatically gives the value for the variable or derivation of expression Also some info about some kool touch apps which does an authentication and computation of Teched Attendee's Points that they have scored and the sessions attended. One guy won an XBOX in lucky draw as a gift. There were lot of Partner Stalls like Accenture,Intel,Citrix,MicroFocus,Telerik,infragistics,Sapient etc. Some Offers were provided for us like 50% off on Certifications, 1 free Elearning Course, etc. Stay tuned!! Wil update you on other events too..

    Read the article

  • Limiting Audit Exposure and Managing Risk – Q&A and Follow-Up Conversation

    - by Tanu Sood
    Thanks to all who attended the live ISACA webcast on Limiting Audit Exposure and Managing Risk with Metrics-Driven Identity Analytics. We were really fortunate to have Don Sparks from ISACA moderate the webcast featuring Stuart Lincoln, Vice President, IT P&L Client Services, BNP Paribas, North America and Neil Gandhi, Principal Product Manager, Oracle Identity Analytics. Stuart’s insights given the team’s role in providing IT for P&L Client Services and his tremendous experience in identity management and establishing sustainable compliance programs were true value-add at yesterday’s webcast. And if you are a healthcare organization looking to solve your compliance and security challenges, we recommend you join us for a live webcast on Tuesday, November 29 at 10 am PT. The webcast will feature experts from Kaiser Permanente, PricewaterhouseCoopers and Oracle and the focus of the discussion will be around the compliance challenges a healthcare organization faces and best practices for tackling those. Here are the details: Healthcare IT News Webcast: Managing Risk and Enforcing Compliance in Healthcare with Identity Analytics Tuesday, November 29, 201110:00 a.m. PT / 1:00 p.m. ET Register Today The ISACA webcast replay is now available on-demand and the slides are also available for download. Since we didn’t have time to address all the questions we received during the live Q&A portion of the webcast, we have captured responses to the remaining questions here. Please continue to provide us your feedback and insights from your experience in deploying identity compliance solutions. Q. Can you please clarify the mechanism utilized to populate the Identity Warehouse from each individual application's access management function / files? A. Oracle Identity Analytics (OIA) supports direct imports from applications. Data collection is based on Extract, Transform and Load (ETL) that eliminates the need to write connectors to different applications. Oracle Identity Analytics’ import engine supports complex entitlement feeds saved as either text files or XML. The imports can be scheduled on a periodic basis or triggered as needed. If the applications are synchronized with a user provisioning solution like Oracle Identity Manager, Oracle Identity Analytics has a seamless integration to pull in data from Oracle Identity Manager. Q.  Can you provide a short summary of the new features in your latest release of Oracle Identity Analytics? A. Oracle recently announced availability of enhanced Oracle Identity Analytics. This release focused on easing the certification process by offering risk analytics driven certification, advanced certification screens, business centric views and significant improvement in performance including 3X faster data imports, 3X faster certification campaign generation and advanced auto-certification features, that  will allow organizations to improve user productivity by up to 80%. Closed-loop risk feedback and IT policy monitoring with Oracle Identity Manager, a leading user provisioning solution, allows for more accurate certification reviews. And, OIA's improved performance enables customers to scale compliance initiatives supporting millions of user entitlements across thousands of applications, whether on premise or in the cloud, without compromising speed or integrity. Q. Will ISACA grant a CPE credit for attending this ISACA-sponsored webinar today? A. From ISACA: Hello and thank you for your interest in the 2011 ISACA Webinar Program!  Unfortunately, there are no CPEs offered for this program, archived or live.  We will be looking into the feasibility of offering them in the future.  Q. Would you be able to use this to help manage licenses for software? That is to say - could it track software that is not used by a user, thus eliminating the software license? A. OIA’s integration with Oracle Identity Manager, a leading user provisioning solution, allows organizations to detect ghost accounts or unused accounts via account reconciliation. Based on company’s policies, this could trigger an automated workflow for account deletion or asking for further investigation. Closed-loop feedback between the two solutions would then allow visibility into the complete audit trail of when the account was detected, the action taken, by whom, when and the current status. Q. We have quarterly attestations and .xls mechanisms are not working. Once the identity data is correlated in Identity Analytics, do you then automate access certification? A. OIA’s identity warehouse analyzes and correlates identity data across various resources that allows OIA to determine a user’s risk profile, who the access review request should go to, along with all the relevant access details of the user. The access certification manager gets notification on what to review, when and the relevant data is presented in a business friendly screen. Based on the result of the access certification process, actions are triggered and results recorded and archived. Access review managers have visual risk indicators that also allow them to prioritize access certification tasks and efforts. Q. How does Oracle Identity Analytics work with Cloud Security? A. For enterprises looking to build their own cloud(s), Oracle offers a set of security services that cloud developers can leverage including Oracle Identity Analytics.  For enterprises looking to manage their compliance requirements but without hosting those in-house and instead having a hosting provider offer managed Identity Management services to the organizations, Oracle Identity Analytics can be leveraged much the same way as you’d in an on-premise (within the enterprise) environment. In fact, organizations today are leveraging Oracle Identity Analytics to manage identity compliance in both these ways. Q. Would you recommend this as a cost effective solution for a smaller organization with @ 2,500 users? A. The key return-on-investment (ROI) on Oracle Identity Analytics is derived from automating compliance processes thereby eliminating administrative overhead, minimizing errors, maintaining cost- and time-effective sustainable compliance processes and minimizing audit exposures and penalties.  Of course, there are other tangible benefits that are derived from an Oracle Identity Analytics implementation as outlined in the webcast. For a quantitative analysis of your requirements and potential ROI calculation, we recommend you refer to the Forrester Study on Total Economic Impact of Oracle Identity Analytics. For an in-person discussion, please email Richard Caldwell.

    Read the article

  • A Gentle Introduction to NuGet

    - by Joe Mayo
    Not too long ago, Microsoft released, NuGet, an automated package manager for Visual Studio.  NuGet makes it easy to download and install assemblies, and their references, into a Visual Studio project.  These assemblies, which I loosely refer to as packages, are often open source, and include projects such as LINQ to Twitter. In this post, I'll explain how to get started in using NuGet with your projects to include: installng NuGet, installing/uninstalling LINQ to Twitter via console command, and installing/uninstalling LINQ to Twitter via graphical reference menu. Installing NuGet The first step you'll need to take is to install NuGet.  Visit the NuGet site, at http://nuget.org/, click on the Install NuGet button, and download the NuGet.Tools.vsix installation file, shown below. Each browser is different (i.e. FireFox, Chrome, IE, etc), so you might see options to run right away, save to a location, or access to the file through the browser's download manager.  Regardless of how you receive the NuGet installer, execute the downloaded NuGet.Tools.vsix to install Nuget into visual Studio. The NuGet Footprint When you open visual Studio, observe that there is a new menu option on the Tools menu, titled Library Package Manager; This is where you use NuGet.  There are two menu options, from the Library Package Manager Menu that you can use: Package Manager Console and Package Manager Settings.  I won't discuss Package Manager Settings in this post, except to give you a general idea that, as one of a set of capabilities, it manages the path to the NuGet server, which is already set for you. Another menu, added by the NuGet installer, is Add Library Package Reference, found by opening the context menu for either a Solution Explorer project or a project's References folder or via the Project menu.  I'll discuss how to use this later in the post. The following discussion is concerned with the other menu option, Package Manager Console, which allows you to manage NuGet packages. Gettng a NuGet Package Selecting Tools -> Library Package Manager -> Package Manager Console opens the Package Manager Console.  As you can see, below, the Package Manager Console is text-based and you'll need to type in commands to work with packages. In this post, I'll explain how to use the Package Manager Console to install LINQ to Twitter, but there are many more commands, explained in the NuGet Package Manager Console Commands documentation.  To install LINQ to Twitter, open your current project where you want LINQ to Twitter installed, and type the following at the PM> prompt: Install-Package linqtotwitter If all works well, you'll receive a confirmation message, similar to the following, after a brief pause: Successfully installed 'linqtotwitter 2.0.20'. Successfully added 'linqtotwitter 2.0.20' to NuGetInstall. Also, observe that a reference to the LinqToTwitter.dll assembly was added to your current project. Uninstalling a NuGet Package I won't be so bold as to assume that you would only want to use LINQ to Twitter because there are other Twitter libraries available; I recommend Twitterizer if you don't care for LINQ to Twitter.  So, you might want to use the following command at the PM> prompt to remove LINQ to Twitter from your project: Uninstall-Package linqtotwitter After a brief pause, you'll see a confirmation message similar to the following: Successfully removed 'linqtotwitter 2.0.20' from NuGetInstall. Also, observe that the LinqToTwitter.dll assembly no longer appears in your project references list. Sometimes using the Package Manager Console is required for more sophisticated scenarios.  However, LINQ to Twitter doesn't have any dependencies and is a very simple install, so you can use another method of installing graphically, which I'll show you next. Graphical Installations As explained earlier, clicking Add Library Package Reference, from the context menu for either a Solution Explorer project or a project's References folder or via the Project menu opens the Add Library Package Reference window. This window will allow you to add a reference a NuGet package in your project. To the left of the window are a few accordian folders to help you find packages that are either on-line or already installed.  Just like the previous section, I'll assume you are installing LINQ to Twitter for the first time, so you would select the Online folder and click All.  After waiting for package descriptions to download, you'll notice that there are too many to scroll through in a short period of time, over 900 as I write this.  Therefore, use the search box located at the top right corner of the window and type LINQ to Twitter as I've done in the previous figure. You'll see LINQ to Twitter appear in the list. Click the Install button on the LINQ to Twitter entry. If the installation was successful, you'll see a message box display and disappear quickly (or maybe not if your machine is very fast or you blink at that moment). Then you'll see a reference to the LinqToTwitter.dll assembly in your project's references list. Note: While running this demo, I ran into an issue where VS had created a file lock on an installation folder without releasing it, causing an error with "packagename already exists. Skipping..." and then an error describing that it couldn't write to a destination folder.  I resolved the problem by closing and reopening VS. If you open the Add a Library Package Reference window again, you'll see LINQ to Twitter listed in the Recent packages folder. Summary You can install NuGet via the on-line home page with a click of a button.  Nuget provides two ways to work with packages, via console or graphical window.  While the graphical window is easiest, the console window is more powerful. You can now quickly add project references to many available packages via the NuGet service. Joe

    Read the article

  • My First Weeks at Red Gate

    - by Jess Nickson
    Hi, my name’s Jess and early September 2012 I started working at Red Gate as a Software Engineer down in The Agency (the Publishing team). This was a bit of a shock, as I didn’t think this team would have any developers! I admit, I was a little worried when it was mentioned that my role was going to be different from normal dev. roles within the company. However, as luck would have it, I was placed within a team that was responsible for the development and maintenance of Simple-Talk and SQL Server Central (SSC). I felt rather unprepared for this role. I hadn’t used many of the technologies involved and of those that I had, I hadn’t looked at them for quite a while. I was, nevertheless, quite excited about this turn of events. As I had predicted, the role has been quite challenging so far. I expected that I would struggle to get my head round the large codebase already in place, having never used anything so much as a fraction of the size of this before. However, I was perhaps a bit naive when it came to how quickly things would move. I was required to start learning/remembering a number of different languages and technologies within time frames I would never have tried to set myself previously. Having said that, my first week was pretty easy. It was filled with meetings that were designed to get the new starters up to speed with the different departments, ideals and rules within the company. I also attended some lightning talks being presented by other employees, which were pretty useful. These occur once a fortnight and normally consist of around four speakers. In my spare time, we set up the Simple-Talk codebase on my computer and I started exploring it and worked on my first feature – redirecting requests for URLs that used incorrect casing! It was also during this time that I was given my first introduction to test-driven development (TDD) with Michael via a code kata. Although I had heard of the general ideas behind TDD, I had definitely never tried it before. Indeed, I hadn’t really done any automated testing of code before, either. The session was therefore very useful and gave me insights as to some of the coding practices used in my team. Although I now understand the importance of TDD, it still seems odd in my head and I’ve yet to master how to sensibly step up the functionality of the code a bit at a time. The second week was both easier and more difficult than the first. I was given a new project to work on, meaning I was no longer using the codebase already in place. My job was to take some designs, a WordPress theme, and some initial content and build a page that allowed users of the site to read provided resources and give feedback. This feedback could include their thoughts about the resource, the topics covered and the page design itself. Although it didn’t sound the most challenging of projects when compared to fixing bugs in our current codebase, it nevertheless provided a few sneaky problems that had me stumped. I really enjoyed working on this project as it allowed me to play around with HTML, CSS and JavaScript; all things that I like working with but rarely have a chance to use. I completed the aims for the project on time and was happy with the final outcome – though it still needs a good designer to take a look at it! I am now into my third week at Red Gate and I have temporarily been pulled off the website from week 2. I am again back to figuring out the Simple-Talk codebase. Monday provided me with the chance to learn a bunch of new things: system level testing, Selenium and Python. I was set the challenge of testing a bug fix dealing with the search bars in Simple-Talk. The exercise was pretty fun, although Mike did have to point me in the right direction when I started making the tests a bit too complex. The rest of the week looks set to be focussed on pair programming with Mike as we work together on a new feature. I look forward to the challenges that still face me and hope that I will be able to get up to speed quickly. *fingers crossed*

    Read the article

  • Oracle CRM On Demand Release 24 is Generally Available

    - by Richard Lefebvre
    Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 We are pleased to announce that Oracle CRM On Demand Release 24 is Generally Available as of October 25, 2013 Get smarter, more productive and the best value with Oracle CRM On Demand Release 24. Oracle CRM On Demand continues to be the most complete Software-as-a-Service (SaaS) CRM solution available. Now, with Release 24, organizations of all types and sizes benefit from actionable insight anywhere, anytime, as well as key enhancements in mobility, embedded social, analytics, integration and extensibility, and ease of use.Next Generation Mobile and Desktop Solutions : Oracle CRM On Demand Release 24 offers a complete set of mobile and desktop solutions that improve productivity by enabling reps to access and update information anywhere, anytime. Capabilities include: Oracle CRM On Demand Disconnected Mobile Sales (DMS) – A disconnected native iPad solution, DMS has been further streamlined mobile sales process by adding Structured Product Messaging to record brand specific call objectives, enhancements in HTML5 eDetailing including message response tracking and improvements in administration and configuration such as more field management options for read only fields, role management and enhanced logging. Oracle CRM On Demand Connected Mobile Sales. This add-on mobile service provides a configurable mobile solution on iOS, BlackBerry and now Android devices. You can access data from CRM On Demand in real time with a rich, native user experience, that is comfortable and familiar to current iOS, BlackBerry and Android users. New features also include Single Sign On to enhance security for mobile users.  Oracle CRM On Demand Desktop: This application centralizes essential CRM information in the familiar Microsoft Outlook environment,increasing user adoption and decreasing training costs. Users can manage CRM data while disconnected, then synchronize bi-directionally when they are back on the network. New in Oracle CRM On Demand Desktop Version 3 is the ability to synchronize by Books of Business, and improved Online Lookup. Mobile Browser Support: The following mobile device browsers are now supported: Apple iPhone, Apple iPad, Windows 8 Tablets, and Google Android. Leverage the Social Enterprise Engaging customers via social channels is rapidly becoming a significant key to enhanced customer experience as it provides proactive customer service, targeted messaging and greater intimacy throughout the entire customer lifecycle. Listening to customers on the social channels can identify a customers’ sphere of influence and the real value they bring to their organization, or the impact they can have on the opportunity. Servicing the customer’s need is the first step towards loyalty to a brand, integrating with social channels allows us to maximize brand affinity and virally expand customer engagements thus increasing revenue. Oracle CRM On Demand is leveraging the Social Enterprise through its integration with Oracle’s Social Relationship Management (SRM) product suite by providing out-of-the-box integration with Social Engagement and Monitoring (SEM), Social Marketing (SM) and Oracle Social Network (OSN). With Oracle CRM On Demand Release 24, users are able to create a service request from a social post via SEM and have leads entered on a SM lead form automatically entered into Oracle CRM On Demand along with the campaign, streamlining the lead qualification process. Get Smarter with Actionable Insight The difference between making good decisions and great decisions depends heavily upon the quality, structure, and availability of information at hand. Oracle CRM On Demand Release 24 expands upon its industry-leading analytics capabilities to provide greater business insight than ever before. New capabilities include flexible permissions on analytics reports folders, allowing for read only access to reports, and additional field and object coverage. Get More Productive with Powerful Tools Oracle CRM On Demand Release 24 introduces a new set of powerful capabilities designed to maximize productivity. A significant new feature for customizing Oracle CRM On Demand is a JavaScript API. The JS API allows customers to add new buttons, suppress existing buttons and even change what happens when a user clicks an existing button. Other usability enhancements, such as personalized related information applets, extended case insensitive search provide users with better, more intuitive, experience. Additional privileges for viewing private activities and notes allow administrators to reassign records as needed, and Custom Object management. Workflow has been added to the Order Item object; and now tasks can be assigned to a relative user, such as an Account Owner, allowing more complex business processes to be automated and adhered to. Get the Best Value Oracle CRM On Demand delivers unprecedented value with the broadest set of capabilities from a single-provider solution, the industry’s lowest total cost of ownership, the most on-demand deployment options, the deepest CRM expertise and experience of any CRM provider, and the most secure CRM in the cloud. With Release 24, Oracle CRM On Demand now includes even more enterprise-grade security, integration, and extensibility features, along with enhanced industry editions to save you time and money. New features include: Business Process Administration: A new privilege has been added that allows administrators to override a Business Process Administration rule.This privilege permits users to edit a locked record, or unlock a record, in the event of a material change that needs to be reflected per corporatepolicy. Additionally, the Products Detailed object has been added to Business Process Administration, enabling record locking and logic to be applied. Expanded Integration: Oracle continues to improve Web Services each release, by adding more object coverage enabling customers and partners to easily integrate with CRM On Demand. Bottom Line Oracle CRM On Demand Release 24 enables organizations to get smarter, get more productive, and get the best value, period. For more information on Oracle CRM On Demand Release 24, please visit oracle.com/crmondemand

    Read the article

  • Odd company release cycle: Go Distributed Source Control?

    - by MrLane
    sorry about this long post, but I think it is worth it! I have just started with a small .NET shop that operates quite a bit differently to other places that I have worked. Unlike any of my previous positions, the software written here is targetted at multiple customers and not every customer gets the latest release of the software at the same time. As such, there is no "current production version." When a customer does get an update, they also get all of the features added to he software since their last update, which could be a long time ago. The software is highly configurable and features can be turned on and off: so called "feature toggles." Release cycles are very tight here, in fact they are not on a shedule: when a feature is complete the software is deployed to the relevant customer. The team only last year moved from Visual Source Safe to Team Foundation Server. The problem is they still use TFS as if it were VSS and enforce Checkout locks on a single code branch. Whenever a bug fix gets put out into the field (even for a single customer) they simply build whatever is in TFS, test the bug was fixed and deploy to the customer! (Myself coming from a pharma and medical devices software background this is unbeliveable!). The result is that half baked dev code gets put into production without being even tested. Bugs are always slipping into release builds, but often a customer who just got a build will not see these bugs if they don't use the feature the bug is in. The director knows this is a problem as the company is starting to grow all of a sudden with some big clients coming on board and more smaller ones. I have been asked to look at source control options in order to eliminate deploying of buggy or unfinished code but to not sacrifice the somewhat asyncronous nature of the teams releases. I have used VSS, TFS, SVN and Bazaar in my career, but TFS is where most of my experience has been. Previously most teams I have worked with use a two or three branch solution of Dev-Test-Prod, where for a month developers work directly in Dev and then changes are merged to Test then Prod, or promoted "when its done" rather than on a fixed cycle. Automated builds were used, using either Cruise Control or Team Build. In my previous job Bazaar was used sitting on top of SVN: devs worked in their own small feature branches then pushed their changes to SVN (which was tied into TeamCity). This was nice in that it was easy to isolate changes and share them with other peoples branches. With both of these models there was a central dev and prod (and sometimes test) branch through which code was pushed (and labels were used to mark builds in prod from which releases were made...and these were made into branches for bug fixes to releases and merged back to dev). This doesn't really suit the way of working here, however: there is no order to when various features will be released, they get pushed when they are complete. With this requirement the "continuous integration" approach as I see it breaks down. To get a new feature out with continuous integration it has to be pushed via dev-test-prod and that will capture any unfinished work in dev. I am thinking that to overcome this we should go down a heavily feature branched model with NO dev-test-prod branches, rather the source should exist as a series of feature branches which when development work is complete are locked, tested, fixed, locked, tested and then released. Other feature branches can grab changes from other branches when they need/want, so eventually all changes get absorbed into everyone elses. This fits very much down a pure Bazaar model from what I experienced at my last job. As flexible as this sounds it just seems odd to not have a dev trunk or prod branch somewhere, and I am worried about branches forking never to re-integrate, or small late changes made that never get pulled across to other branches and developers complaining about merge disasters... What are peoples thoughts on this? A second final question: I am somewhat confused about the exact definition of distributed source control: some people seem to suggest it is about just not having a central repository like TFS or SVN, some say it is about being disconnected (SVN is 90% disconnected and TFS has a perfectly functional offline mode) and others say it is about Feature Branching and ease of merging between branches with no parent-child relationship (TFS also has baseless merging!). Perhaps this is a second question!

    Read the article

< Previous Page | 62 63 64 65 66 67 68 69 70 71 72 73  | Next Page >