Search Results

Search found 991 results on 40 pages for 'quartz scheduler'.

Page 7/40 | < Previous Page | 3 4 5 6 7 8 9 10 11 12 13 14  | Next Page >

  • Windows Server Task Scheduler: Running scheduled executable fail-safe?

    - by Mikael Koskinen
    I have an executable which I've scheduled to run once in every five minutes (using Window's built-in Task Scheduler). It's crucial that this executable is run because it updates few time critical files. But how can I react if the virtual server running the executable goes down? At no point there shouldn't be more than 15 minutes break between the runs. As I'm using Windows Server and its Task Scheduler, I wonder is it possible to create some kind of a cluster which automatically handles the situation? The problem is that the server in question is running on Windows Azure and I don't think I can create actual clusters using the virtual machines. If the problem can be solved using a 3rd party tool, that's OK too. To generalize the question a little bit: How to make sure that an executable is run once in every 5 minutes, even if there might be server failures?

    Read the article

  • can server 2008's task scheduler run a php file?

    - by rg89
    Hello. I have a server 2008 64 bit machine with php5 via fastcgi installed. I want to run a .php script every day at 3 AM. I set up a task and "Last Run Result" says "%1 is not a valid Win32 application" The event properties describe more failure: "Task Scheduler failed to launch action "D:\InetPub\tools\something\build.php" in instance "{88cc01f4-9554-4b8f-9836-34d806337d7f}" of task "\Something". Additional Data: Error Value: 2147942593." Task Category: Action failed to start Is it possible to run scripts using the task scheduler? If not, how should I go about automating the execution of a php script? Thanks

    Read the article

  • How to print out information about Task Scheduler in powershell script?

    - by Jimboy
    I am trying to print out information from the Task Scheduler from the local computer in a powershell script so other users can print out this information as well and not have to access the Task Scheduler. I need the script to print out the name, status, triggers, next run time, last run time, last run result, author and created. I can print out the information about the name, next run time, and last run time, but the rest wont print out when i run the script. I have already got a little start on my script and got the fields down. $schedule = new-object -com("Schedule.Service") $schedule.connect() $tasks = $schedule.getfolder("\").gettasks(0) $tasks | select Name,Status,Triggers,NextRunTime,LastRunTime,LastRunResult,Author,Created | ft foreach ($t in $tasks) { foreach ($a in $t.Actions) { $a.Path } } Any help or suggestions would be appreciated.

    Read the article

  • How To Easily Send Emails From The Windows Task Scheduler

    - by Chris Hoffman
    The Windows Task Scheduler can automatically send email at a specific time or in response to a specific event, but its integrated email feature won’t work very well for most users. Instead of using the Task Scheduler’s email feature to send emails, you can use the SendEmail utility. It allows you to construct a single-line command that authenticates with an SMTP server and sends an email. How To Create a Customized Windows 7 Installation Disc With Integrated Updates How to Get Pro Features in Windows Home Versions with Third Party Tools HTG Explains: Is ReadyBoost Worth Using?

    Read the article

  • HTG Explains: How Windows Uses The Task Scheduler for System Tasks

    - by Chris Hoffman
    While you can use the Windows Task Scheduler to schedule your own automatic tasks, Windows also uses it behind the scenes to perform many system tasks – defragmenting your hard disks when you’re not using your computer, for example. You can even modify these system tasks to tweak Windows to your liking – for example, you can change how often Windows creates system restore points. Third-party programs also often use the Task Scheduler for their own tasks. HTG Explains: Why Do Hard Drives Show the Wrong Capacity in Windows? Java is Insecure and Awful, It’s Time to Disable It, and Here’s How What Are the Windows A: and B: Drives Used For?

    Read the article

  • Cocos2d: Using single timer/scheduler for multiple sprites

    - by Shailesh_ios
    want to know if is it possible to use single timer or scheduler method for multiple sprites ? Like I am now working on a game and there could be any number of sprites and i want to perform some actions on all of that sprites, So do I have to use as many timers or schedulers as sprites ? Or How can the job be done using only a single timer or scheduler ? What is I schedule a method and use it for, Say 10 sprites ? Will it affect the performance..?

    Read the article

  • Why would Windows Task Scheduler spawn multiple instances of the same task that run into each other?

    - by swagner88
    Overview: I use Windows Task Scheduler to run automated tasks. Occasionally I will see that randomly a task has failed to perform its duties. When I check Task Scheduler to see what has occurred in the history log, I see that for some reason, when the tasks are triggered at their schedules, they are spawning several instances of themselves simultaneously which turns into a train wreck for the task and it either kills the other instances and tries to run the "first" one, or it just does not run at all as it believes another instance of itself is already running. Sometimes this occurs in the same tasks and then occasionally it happens with others. The fix is just to end all instances and start the task manually. Question: Why would one single task with one single schedule decide to spawn multiple instance of itself simultaneously? Note: I've got a separate user account set to run the tasks instead of myself. That user is indeed an admin on the machine that runs the tasks and the tasks are set to tun whether or not the user is logged on. Also, the machine is windows server 08 R2.

    Read the article

  • Using windowmaker with quartz-wm in proxy mode on Snow Leopard

    - by Graham Lee
    I can modify my .xinitrc file to exec /opt/local/bin/wmaker, and get WindowMaker 0.90.2 as my window manager in X11.app. I'd like to use quartz-wm not as a window manager, but to provide the pasteboard integration with Aqua using the --only-proxy flag (see the man page). If I add the following line to .xinitrc: exec /usr/bin/quartz-wm --only-proxy & then WindowMaker never starts, complaining that there's already a window manager running. Is it possible to get the two to play nicely together, or is proxy feature part of the Xquartz server now? It seems that the Xquartz manpage has a number of pasteboard-to-clipboard synchronisation settings, but it's not clear whether quartz-wm needs to be running for those to work.

    Read the article

  • Using windowmaker with quartz-wm in proxy mode on Snow Leopard

    - by Graham Lee
    I can modify my .xinitrc file to exec /opt/local/bin/wmaker, and get WindowMaker 0.90.2 as my window manager in X11.app. I'd like to use quartz-wm not as a window manager, but to provide the pasteboard integration with Aqua using the --only-proxy flag (see the man page). If I add the following line to .xinitrc: exec /usr/bin/quartz-wm --only-proxy & then WindowMaker never starts, complaining that there's already a window manager running. Is it possible to get the two to play nicely together, or is proxy feature part of the Xquartz server now? It seems that the Xquartz manpage has a number of pasteboard-to-clipboard synchronisation settings, but it's not clear whether quartz-wm needs to be running for those to work.

    Read the article

  • Quartz 2D or OpenGL ES? Pros and cons in the long term, possibility of migration to other platforms.

    - by fspirit
    Hi all! I'm having a hard time deciding whether to go with Quartz2D or OpenGL for an iPad game. It will be 2D mostly, but effect-intense (simultaneous lighting effects for 10-30 objects, 10-20 simultaneous animations on the screen). So far, assuming i'm equally dumb in both technologies and have to learn them from the ground, i came to this list. (I've read several topics here, on SO, with names like "Quartz or OpenGL", but i'm still left with some questions) Quartz: Better time-to-market, because of ready to use absractions like UIView, UIImageView, CoreAnimation abstractions Open GL ES Closer to hardware, thus, performance is better. App, implemented with OpenGL ES can be easier migrated to Android, MeeGo, Windows Phone, etc. My questions are: How time will it take to rewrite Quartz 2d app to use OpenGL? Lets say it took me 2 man-month to write Quartz app, how much time will i need to rewrite it? (Please, just some subjective opinions, i'll try to summarize them somehow) Regarding the ease of migration to other platforms, when using OpenGL, is it really so? Or efforts when migrating Quartz app from iPhoneOS to Android will be not so much bigger, compared to OpenGL app migration? (Ease of migration is quite important criterion) Regarding OpenGL, should i go with OpenGL 1.1 or 2.0, concerning migration? (Android supports 2.0 through NDK, but dont know whether NDK's use will increase or decrease migration efforts)

    Read the article

  • CPU and Scheduler Performance Monitoring using SQL Server and Excel

    This article will demonstrate a method of creating an Excel-based CPU/scheduler performance dashboard for SQL Server 2005+. NEW! Deployment Manager Early Access ReleaseDeploy SQL Server changes and .NET applications fast, frequently, and without fuss, using Deployment Manager, the new tool from Red Gate. Try the Early Access Release to get a 20% discount on Version 1. Download the Early Access Release.

    Read the article

  • drawing images and lines over UIScrollView

    - by Jorge
    I'm programming an app in which one of the ViewControllers is showing an UIScrollView that shows an image. I'd like to load an image (pushpin in png format) and draw it (and delete it) in some points of the UIScrollView image. I'd also would like to draw bezier paths in that image (and deleting them). I've programmed several apps but this is the first time I face graphic programming and don't know where to start from. Any suggestions? Thanks!

    Read the article

  • Touch draw in Quatz 2D/Core Graphics

    - by OgreSwamp
    Hello, I'm trying to implement "hand draw tool". At the moment algorythm looks like that (I don't insert any code because methods are quite big, will try to explain an idea): Drawing In touchesStarted: method I create NSMutableArray *pointsArray and add point into it. Call setNeedsDisplay: method. In touchesMoved: method I calculate points between last added point from the pointsArray and current point. Add all points to the pointsArray. Call setNeedsDisplay: method. In touchesFinished: event I calculate points between last added point from the array and current point. Set flag touchesWereFinished. Call setNeedsDisplay:. Render: drawRect: method checks is pointsArray != nil and is there any data in it. If there is - it starts to traw circles in each point of this array. If flag touchesWereFinished is set - save current context to the UIImage, release pointsArray, set it to nil and reset the flag. There are a lot disadvantages of this method: It is slow It becomes extremely slow when user touches and move finger for long time. Array becomes enormous "Lines" composed by circles are ugly I would like to change my algorithm to make it bit faster and line smoother. In result I would like to have lines like on the picture at following URL (sorry, not enough reputation to insert an image): http://2.bp.blogspot.com/_r5VzEAUYXJ4/SrOYp8tJCPI/AAAAAAAAAMw/ZwDKXiHlhV0/s320/SketchBook+Mobile(4).png Can you advice me, ho I can draw lines this way (smooth and slim on the edges)? I thought to draw circles with alpha gradient on the edges (to make lines smoother), but it will be extremely slowly IMHO. Thanks for help

    Read the article

  • Why are all my masked views unmasked in my view snapshot?

    - by mystify
    I'm taking a snapshot of an view. This view has got some subviews which have layer masks applied to them. For some reason, those masks take no effect in the snapshot and the masked parts are completely visible. UIGraphicsBeginImageContext(theView.frame.size); [theView.layer renderInContext:UIGraphicsGetCurrentContext()]; UIImage *newImage = UIGraphicsGetImageFromCurrentImageContext(); UIGraphicsEndImageContext(); I assume this is a bug in the framework. But maybe it's not? Did I do anything wrong here?

    Read the article

  • How to set up Task Scheduler task that cleans up firefox window it opens?

    - by WilliamKF
    I have a Task Scheduler Windows 7 task that invokes firefox.exe on a URL which is an iMacro. Upon completion, the firefox window is left open. I always have firefox running, but it brings up a new window, not sure if this is a new instance of firefox, or a second window. Upon completion of the macro, I'd like the extra window closed. The extra window has a blank tab and a tab for the macro that ran. How can I set up the task to clean up after itself?

    Read the article

  • Task scheduler ran a task twice

    - by Ross Buggins
    Update: This has now happened two days in a row. Update: XML of scheduled tasks and images now included. Two servers located in London, both Windows 2012, have a scheduled task set to run at 3pm Monday to Friday. This has been set up for the last 5 months without a problem. However, on Monday the 28th of August they both ran the scheduled task at 3pm and then again at 4pm. When it was first reported, I thought it was too much of a coincidence to be the day after the clocks had gone back an hour. However, I’m failing in being able to explain why it has happened and if it is related to the clock change at all. The relevant logs from one server (the logs for the other follow this pattern as well): Event 129 15:00:20 Task Scheduler launch task "\3pm", instance "C:\Program Files (x86)\PHP\v5.4\php.exe" with process ID 2388. Event 100 15:00:20 Task Scheduler started "{75a3590f-dec1-4dee-bd27-73d63a50a9d7}" instance of the "\3pm" task for user "x\y". Event 200 15:00:20 Task Scheduler launched action "C:\Program Files (x86)\PHP\v5.4\php.exe" in instance "{75a3590f-dec1-4dee-bd27-73d63a50a9d7}" of task "\3pm". Event 201 15:00:23 Task Scheduler successfully completed task "\3pm" , instance "{75a3590f-dec1-4dee-bd27-73d63a50a9d7}" , action "C:\Program Files (x86)\PHP\v5.4\php.exe" with return code 0. Event 129 16:00:20 Task Scheduler launch task "\3pm", instance "C:\Program Files (x86)\PHP\v5.4\php.exe" with process ID 1224. Event 100 16:00:20 Task Scheduler started "{3dd46ca9-c525-4796-86b5-5e513fd45f26}" instance of the "\3pm" task for user "x\y". Event 200 16:00:20 Task Scheduler launched action "C:\Program Files (x86)\PHP\v5.4\php.exe" in instance "{3dd46ca9-c525-4796-86b5-5e513fd45f26}" of task "\3pm". Event 201 16:00:23 Task Scheduler successfully completed task "\3pm" , instance "{3dd46ca9-c525-4796-86b5-5e513fd45f26}" , action "C:\Program Files (x86)\PHP\v5.4\php.exe" with return code 0. I've seen this question Scheduled task running twice from time to time which points to a bug at http://support.microsoft.com/kb/2461249 being the cause. However, this doesn't include Server 2012 in it's list of problem operating systems. I’m struggling to explain this, can anyone else? The XML export for the scheduled task is: <?xml version="1.0" encoding="UTF-16"?> <Task version="1.2" xmlns="http://schemas.microsoft.com/windows/2004/02/mit/task"> <RegistrationInfo> <Date>2013-04-16T14:04:17.4897806</Date> <Author>x\y</Author> </RegistrationInfo> <Triggers> <CalendarTrigger> <StartBoundary>2013-04-17T15:00:20</StartBoundary> <Enabled>true</Enabled> <ScheduleByWeek> <DaysOfWeek> <Monday /> <Tuesday /> <Wednesday /> <Thursday /> <Friday /> </DaysOfWeek> <WeeksInterval>1</WeeksInterval> </ScheduleByWeek> </CalendarTrigger> </Triggers> <Principals> <Principal id="Author"> <UserId>x\y</UserId> <LogonType>Password</LogonType> <RunLevel>LeastPrivilege</RunLevel> </Principal> </Principals> <Settings> <MultipleInstancesPolicy>IgnoreNew</MultipleInstancesPolicy> <DisallowStartIfOnBatteries>true</DisallowStartIfOnBatteries> <StopIfGoingOnBatteries>true</StopIfGoingOnBatteries> <AllowHardTerminate>true</AllowHardTerminate> <StartWhenAvailable>false</StartWhenAvailable> <RunOnlyIfNetworkAvailable>false</RunOnlyIfNetworkAvailable> <IdleSettings> <StopOnIdleEnd>true</StopOnIdleEnd> <RestartOnIdle>false</RestartOnIdle> </IdleSettings> <AllowStartOnDemand>true</AllowStartOnDemand> <Enabled>true</Enabled> <Hidden>false</Hidden> <RunOnlyIfIdle>false</RunOnlyIfIdle> <WakeToRun>false</WakeToRun> <ExecutionTimeLimit>P3D</ExecutionTimeLimit> <Priority>7</Priority> </Settings> <Actions Context="Author"> <Exec> <Command>"C:\Program Files (x86)\PHP\v5.4\php.exe"</Command> <Arguments>-f "c:\a.php"</Arguments> </Exec> </Actions> </Task> 29 October 17:00 - Update - Both servers have again run the scheduled task at 15:00 and 16:00. I've now updated the php file that is run by the scheduler to not actually do anything whilst I'm going through trying to solve this. I'm planning on restarting one server to see if this changes anything tomorrow. 30 October 08:25 - Update - When exporting the task XML I remembered that I hadn't included the fact that the scheduled task on second server was created by importing the XML of the task created on the first. The only difference between the two tasks is the path of the php file they are executing and the user account that they are running as.

    Read the article

  • Windows 2008 R2 Task Scheduler triggered an event for unknown reasons.

    - by Mike
    Today I arrived at the office only to find that a task, which was scheduled to trigger at 5:30PM EST each Friday, had triggered on its own at 6:01AM EST this morning. I checked the event logs as well as the task schedule log and all of the evidence points to a timed trigger starting this task with the correct credentials, however the task history reports the task has not been triggered since last Friday when it ran to completion successfully. I do not have this task set to random start times or start if missed. This is the first time I have observed this happen in the Windows Task Scheduler and want to know if anyone else has come across this, why it happened and how to fix it?

    Read the article

  • Why am I getting a warning that windows is logging on with a temporary profile to run a task scheduler task?

    - by Dan C
    I am having a strange problem with the Windows Server 2008 Task Scheduler. I have to run a small command-line application every few minutes. This application just executes a quick web service call on the localhost and adds an entry to a log file; so it should not need anything special in terms of permissions. First, I created a new user account "my_scheduler" just for the task. This account is a member of the Users group (not sure what other settings I should turn on/off) and set it's password to not expire. I then create a task to run the application every few minutes. I set it to "Run whether user is logged on or not" and turned on "Do not store password. The task will only have access to local resources" (I did this since it's not hitting anything on the network. I did not turn on "Run with highest privileges" since it does not seem to need them. I set the schedule to "After triggered, repeat every 30 minutes for a duration of 1 day" and "Allow task to be run on demand" (no other settings enabled). However, I notice that in the Event Log, I see a bunch of these warnings whenever the task is run: "Windows cannot find the local profile and is logging you on with a temporary profile. Changes you make to this profile will be lost when you log off." Even though I get the warning, the task is executing (I see the log entries appearing). Another (possibly related) issue is that I also see that it's starting multiple copies of the task (within a few seconds of each other) even though it should only start one. This is also a big problem. Any idea how I can fix this? Thanks in advance, Dan

    Read the article

  • Windows Server 2008 Task Scheduler: Task Started (Task=100) but did task did not complete (Task=102) when the result code is 2

    - by MacGyver
    Can someone give me a use case for setting up a Windows Server 2008 Task Scheduler task (we'll call this "test") that completes (action completed is task=201) with an error (result code=2)? This is event trigger code for another task (called "notification" that sends out an email based on the event history of the "test" task. I've got use cases for tasks that opens a program successfully and when a program fails to find the program. I'm just trying to think of how I can test a scenario when it finds the program, but something fails with warnings or errors. /* Failed - task started but had errors (result code of 2) */ <QueryList> <Query Id="0" Path="Microsoft-Windows-TaskScheduler/Operational"> <Select Path="Microsoft-Windows-TaskScheduler/Operational"> *[ System [ Provider[@Name='Microsoft-Windows-TaskScheduler'] and (Level=0 or Level=1 or Level=2 or Level=3 or Level=4 or Level=5) and (Task = 201) ] ] and *[ EventData [ Data [ @Name='TaskName' ]='\Tasks\test' ] ] and *[ EventData [ Data [ @Name='ResultCode' ]='2' ] ] </Select> </Query> </QueryList>

    Read the article

  • Triggering Quartz job from JSF (Any front end)- How to wait for the job execution to be over

    - by Maximus
    I am developing a front end to trigger a quartz job on the fly. I have a form in the JSF page whose click action will dynamically trigger a quartz job. The job is invoked by the following statement, the job is triggered and everything works fine. scheduler.triggerJob("Job1",Scheduler.DEFAULT_GROUP,jobDataMap); From what I understand the job seems to run in a separate thread and the execution of the calling function does not wait for the job to be over. Since I am invoking the job from front end, I would like to wait till the job is over before I navigate to a different JSF page. So I can display an error message if the job fails. I would also like to display a message to the user, "Processing job, please wait.." until the job is actually over. Any ideas on how to accomplish this will be appreciated. Thanks !

    Read the article

  • Scheduler Controls for ASP.NET and WinForms - v2010 vol 1

    Check out the features that the ASPxScheduler and XtraScheduler suites will be getting for DXperience v2010 vol 1: Automatic Time Cell Sizing in Scheduler Reports Time cells can now automatically adjust size depending on content. You can control whether cells should be shrink so that no empty space is used and whether they can be automatically enlarged to fit all available appointments. The following image demonstrates how a calendar changes when you activate Auto Time Cell Sizing. Smart...Did you know that DotNetSlackers also publishes .net articles written by top known .net Authors? We already have over 80 articles in several categories including Silverlight. Take a look: here.

    Read the article

  • New Layout Features In ASP.NET and WinForms Scheduler Reporting - v2010.1

    Check out these 2 new features of the ASPxScheduler and XtraScheduler that helps you improve appointment layout and display. Quick recap: Our Scheduler controls use the powerful XtraReports Suite for exporting and printing. This gives you added benefits for more flexibility, control and features. Read the 'ASP.NET Calendar SchedulingNew DevExpress Reporting Integration' post to learn more. CanShrink And CanGrow The 2 new layout properties are called CanShrink and CanGrow: CanShrink...Did you know that DotNetSlackers also publishes .net articles written by top known .net Authors? We already have over 80 articles in several categories including Silverlight. Take a look: here.

    Read the article

  • New Layout Features In ASP.NET and WinForms Scheduler Reporting - v2010.1

    Check out these 2 new features of the ASPxScheduler and XtraScheduler that helps you improve appointment layout and display. Quick recap: Our Scheduler controls use the powerful XtraReports Suite for exporting and printing. This gives you added benefits for more flexibility, control and features. Read the 'ASP.NET Calendar SchedulingNew DevExpress Reporting Integration' post to learn more. CanShrink And CanGrow The 2 new layout properties are called CanShrink and CanGrow: CanShrink...Did you know that DotNetSlackers also publishes .net articles written by top known .net Authors? We already have over 80 articles in several categories including Silverlight. Take a look: here.

    Read the article

  • how to set a name for a TriggerListener?

    - by Gilbert
    i cant find the method that sets the triggerListener name, i added to the quartz properties file the following: org.quartz.triggerListener.NAME.class=wavemark.interfaceserver.interfaceengine.action.EngineListener org.quartz.triggerListener.NAME.propName=myListener org.quartz.triggerListener.NAME.prop2Name=myListener2 but i still get the Exception: org.quartz.SchedulerException: TriggerListener 'wavemark.interfaceserver.interfaceengine.action.EngineListener' props could not be configured. [See nested exception: java.lang.NoSuchMethodException: wavemark.interfaceserver.interfaceengine.action.EngineListener.setName(java.lang.String)] please help!!

    Read the article

< Previous Page | 3 4 5 6 7 8 9 10 11 12 13 14  | Next Page >