Search Results

Search found 1237 results on 50 pages for 'tfs workitem'.

Page 7/50 | < Previous Page | 3 4 5 6 7 8 9 10 11 12 13 14  | Next Page >

  • Transitioning to Branching with TFS

    - by Rob
    Our team is currently using plain old TFS 2005, no branching, shared checkouts etc... I would like to introduce a DEV/MAIN/PROD branching system simillar to the basic flavor in the TFS Guidance document so that we can do some parallel dev, isolation, and firm up review and deployment processes. I have read most of the whitepapers etc. Do you guys have any practical advice, suggested tools, gotchas or reccomendations. Also, we plan to migrate to 2010 once it comes out - not sure if that would affect anything. I appreciate all the suggestions and help I can get as I am a branching neophyte. Thanks in advance.

    Read the article

  • Can I use the TFS Object Model to interact with TFS via F#?

    - by Russell
    I am looking for some quick ways to do some (more) complex queries across who has what checked out and things like that (eg. which files have 1 person checked out). I have been learning F# over the last year or so and saw the potential to use both the functional aspects of F# to quickly create some useful and more complex TFS commands. I was wondering if anyone else has done this, or have any ideas on how I would go about doing this. PS: I am using TFS 2005. Thanks Russell

    Read the article

  • Strange TFS Source Repository Problem

    - by Brian
    We have a web project we are working on using TFS and we are kind of new to it (TFS). One of my teammates is unable to see a particular page (three associated files) in the IDE. To the rest of us, it looks as though it is checked out to her. When she ran the unlock command through the console, it returned that the files for the page were not locked. Yet we are unable to check it out due to her apparently having a lock. Any thoughts, ideas, or suggestions would be greatly appreciated!

    Read the article

  • TFS: cannot setup up new build

    - by anthares
    I have a problem that is described here: http://stackoverflow.com/questions/2146198/tfs-cannot-set-up-new-build I use Visual Studio 2008. Unfortunately, the solution provided there, didn't help. I tried to remove and add again my TFS server - no help. Also, it's not a problem with security policies or lack of proper right, because I can initiate a new build, with the same user through Visual Studio 2005, also installed on my computer. In addition my colleagues have no problems at all. If someone else have experienced similar problem - I will appreciate any help !

    Read the article

  • TFS Best Practices Project Hierarchy

    - by CWinKY
    I've recently installed and started using TFS. Mainly using for source repository initially and then will get into using the Work Item features. I'm moving from using Vault as repository and have some questions on best practices for setting up the project structure. My current structure from Vault is: Projects - CustomerName1 -- Application1 -- Application2 - CustomerName2 -- Application1 -- Application2 Can I have a smiliar structure in TFS? Is there any good documentation that has real examples and instructions on how to set this up? From what I see is all real basic and the books I have don't have real-life repository examples that mimic the structure I have. I have created a new Team Project called CustomerName1, then added other Team Projects, Application1, underneath CustomerName1. However, I lose on the Application1 the separate folders like Work Items, Documents, Reports, and Builds. So this doesn't appear set-up correctly. Thanks ...

    Read the article

  • What permissions are required to create a new work item type in TFS

    - by harsha
    I am new to creating work item types in TFS and want to create a new Work Item type. I looked at work item template option, but that is not sufficient for me. I need to add few new fields and have a customized form. From search I got information about Work Item Type definition but I am looking for some detailed example. Also I would like to know the permissions needed to add a new work item type. I got administrator privileges for my project, but not on TFS as a whole. With that can I add a new template for my project. Please provide me direction.

    Read the article

  • TFS Security and Documents Folder

    - by pm_2
    I'm getting an issue with TFS where the documents folder is marked with a red cross. As far as I can tell, this seems to be a security issue, however, I am set-up as project admin on the relevant projects. I’ve come to the conclusion that it’s a security issue from running the TFS Project Admin tool (available here). When I run this, it tells me that I don’t have sufficient access rights to open the project. I’ve checked, and I’m not included in any groups that are denied access. Please can anyone shed any light as to why I may not have sufficient access to these projects?

    Read the article

  • Conditionally execute a task after building a solution with MSBuild + TFS

    - by SoMoS
    Hello, I'm using MSBuild with TFS and I have to build 4 solutions. When the compilation is done I should launch upon to 4 different Exec tasks depending on wherever the compilation was successful or not. I know how to do that with MSBuild alone using targets with conditions using the var $(BuildBreak) because I can do build solution - check result - exec task - build ... but I don't know how to do that with the TFS extensions ... any help will be very appreciated. Thanks mates.

    Read the article

  • C2360 compiler error on TFS build, but not on desktop

    - by pdmaguire
    A c++ code snippet similar to the code below caused our TFS build to fail with a C2360 compiler error. switch (i) { case 0 : for each (int n in a) System::Console::WriteLine(n.ToString()); break; case 1 : System::Console::WriteLine("n is not in scope here"); break; } This is fixed by using {} brackets within the body of case 0, as below: switch (i) { case 0 : { for each (int n in a) System::Console::WriteLine(n.ToString()); } break; case 1 : System::Console::WriteLine("n is not in scope here"); break; } The developer had successfully compiled the code on their desktop before committing the changes. A cursory look at versions of things like compilers, Visual Studio etc on the server and desktop suggest they are the same. The source code is the same, obviously. What is the difference between a desktop build and TFS build that would smother a compiler error like this?

    Read the article

  • Finding IterationID in TFS

    - by Kolchak
    Hi - we are linking Iterations within TFS to an external system for tracking projects through the entire company. In the past, we were linking using the IterationPath in a TFS Project, but the problem is that people rename these IterationPaths as the projects progress, and the link is lost. So after some research, I'm thinking of doing the linking by using the IterationID. The IterationID in the TFSWarehouse is NOT the same as the IterationID in the WorkItemTracking table, and I can't seem to find an easy way to find the IterationID of an IterationPath? Anyone got any idea how we may be able to achieve this?

    Read the article

  • Printing Work Items in TFS

    - by user351671
    Hi, I am looking for a fancy way the print individual work items in TFS. OK ... maybe not the work item directly but I need to produce printable forms based on data on a work item. And by fancy I mean: header, footer, formatting, tables maybe ... stuff like that. No, I am not trying to print a list of work items, read carefully, I need an output based on a single work item. For those who are wondering "Why on earth do you need that?" I should say: We are keeping everything on TFS around here. (For now only software development stuff, but I am thinking bigger...) Sometimes somethings need to be on hard copy, to be signed for instance, and that is why I need printable forms.

    Read the article

  • TFS Notifications - change title

    - by Sebastian
    On action WorkItemChangeEvent TFS sending an email. Title of maile looks like: [Project] [Work Item Created] [Type of Work Item][Id] [Title of WorkItem] I would like to change this title. Can I do this ? I can't find it in WorkItemChangedEvent.xsl

    Read the article

  • When should I use Areas in TFS instead of Team Projects

    - by Martin Hinshelwood
    Well, it depends…. If you are a small company that creates a finite number of internal projects then you will find it easier to create a single project for each of your products and have TFS do the heavy lifting with reporting, SharePoint sites and Version Control. But what if you are not… Update 9th March 2010 Michael Fourie gave me some feedback which I have integrated. Ed Blankenship via @edblankenship offered encouragement and a nice quote. Ewald Hofman gave me a couple of Cons, and maybe a few more soon. Ewald’s company, Avanade, currently uses Areas, but it looks like the manual management is getting too much and the project is getting cluttered. What if you are likely to have hundreds of projects, possibly with a multitude of internal and external projects? You might have 1 project for a customer or 10. This is the situation that most consultancies find themselves in and thus they need a more sustainable and maintainable option. What I am advocating is that we should have 1 “Team Project” per customer, and use areas to create “sub projects” within that single “Team Project”. "What you describe is what we generally do internally and what we recommend. We make very heavy use of area path to categorize the work within a larger project." - Brian Harry, Microsoft Technical Fellow & Product Unit Manager for Team Foundation Server   "We tend to use areas to segregate multiple projects in the same team project and it works well." - Tiago Pascoal, Visual Studio ALM MVP   "In general, I believe this approach provides consistency [to multi-product engagements] and lowers the administration and maintenance costs. All good." - Michael Fourie, Visual Studio ALM MVP   “@MrHinsh BTW, I'm very much a fan of very large, if not huge, team projects in TFS. Just FYI :) Use Areas & Iterations.” Ed Blankenship, Visual Studio ALM MVP   This would mean that SSW would have a single Team Project called “SSW” that contains all of our internal projects and consequently all of the Areas and Iteration move down one hierarchy to accommodate this. Where we would have had “\SSW\Sprint 1” we now have “\SSW\SqlDeploy\Sprint1” with “SqlDeploy” being our internal project. At the moment SSW has over 70 internal projects and more than 170 total projects in TFS. This method has long term benefits that help to simplify the support model for companies that often have limited internal support time and many projects. But, there are implications as TFS does not provide this model “out-of-the-box”. These implications stretch across Areas, Iterations, Queries, Project Portal and Version Control. Michael made a good comment, he said: I agree with your approach, assuming that in a multi-product engagement with a client, they are happy to adopt the same process template across all products. If they are not, then it’ll either be easy to convince them or there is a valid reason for having a different template - Michael Fourie, Visual Studio ALM MVP   At SSW we have a standard template that we use and this is applied across the board, to all of our projects. We even apply any changes to the core process template to all of our existing projects as well. If you have multiple projects for the same clients on multiple templates and you want to keep it that way, then this approach will not work for you. However, if you want to standardise as we have at SSW then this approach may benefit you as well. Implications around Areas Areas should be used for topological classification/isolation of work items. You can think of this as architecture areas, organisational areas or even the main features of your application. In our scenario there is an additional top level item that represents the Project / Product that we want to chop our Team Project into. Figure: Creating a sub area to represent a product/project is easy. <teamproject> <teamproject>\<Functional Area/module whatever> Becomes: <teamproject> <teamproject>\<ProjectName>\ <teamproject>\<ProjectName>\<Functional Area/module whatever> Implications around Iterations Iterations should be used for chronological classification/isolation of work items. This could include isolated time boxes, milestones or release timelines and really depends on the logical flow of your project or projects. Due to the new level in Area we need to add the same level to Iteration. This is primarily because it is unlikely that the sprints in each of your projects/products will start and end at the same time. This is just a reality of managing multiple projects. Figure: Adding the same Area value to Iteration as the top level item adds flexibility to Iteration. <teamproject>\Sprint 1 Or <teamproject>\Release 1\Sprint 1 Becomes: <teamproject>\<ProjectName>\Sprint 1 Or <teamproject>\<ProjectName>\Release 1\Sprint 1 Implications around Queries Queries are used to filter your work items based on a specified level of granularity. There are a number of queries that are built into a project created using the MSF Agile 5.0 template, but we now have multiple projects and it would be a pain to have to edit all of the work items every time we changed project, and that would only allow one team to work on one project at a time.   Figure: The Queries that are created in a normal MSF Agile 5.0 project do not quite suit our new needs. In order for project contributors to be able to query based on their project we need a couple of things. The first thing I did was to create an “_Area Template” folder that has a copy of the project layout with all the queries setup to filter based on the “_Area Template” Area and the “_Sprint template” you can see in the Area and Iteration views. Figure: The template is currently easily drag and drop, but you then need to edit the queries to point at the right Area and Iteration. This needs a tool. I then created an “Areas” folder to hold all of the area specific queries. So, when you go to create a new TFS Sub-Project you just drag “_Area Template” while holding “Ctrl” and drop it onto “Areas”. There is a little setup here. That said I managed it in around 10 minutes which is not so bad, and I can imagine it being quite easy to build a tool to create these queries Figure: These new queries can be configured in around 10 minutes, which includes setting up the Area and Iteration as well. Version Control What about your source code? Well, that is the easiest of the lot. Just create a sub folder for each of your projects/products.   Figure: Creating sub folders in source control is easy as “Right click | Create new folder”. <teamproject>\DEV\Main\ Becomes: <teamproject>\<ProjectName>\DEV\Main\ Conclusion I think it is up to each company to make a call on how you want to configure your Team Projects and it depends completely on how many projects/products you are going to have for each customer including yourself. If we decide to utilise this route it will require some configuration to get our 170+ projects into this format, and I will probably be writing some tools to help. Pros You only have one project to upgrade when a process template changes – After going through an upgrade of over 170 project prior to the changes in the RC I can tell you that that many projects is no fun. Standardises your Process Template – You will always have the same Process implementation across projects/products without exception You get tighter control over the permissions – Yes, you can do this on a standard Team Project, but it gets a lot easier with practice. You can “move” work items from one “product” to another – Have we not always wanted to do that. You can rename your projects – Wahoo: everyone wants to do this, now you can. One set of Reporting Services reports to manage – You set an area and iteration to run reports anyway, so you may as well set both. Simplified Check-In Policies– There is only one set of check-in policies per client. This simplifies administration of policies. Simplified Alerts – As alerts are applied across multiple projects this simplifies your alert rules as per client. Cons All of these cons could be mitigated by a custom tool that helps automate creation of “Sub-projects” within Team Projects. This custom tool could create areas, Iteration, permissions, SharePoint and queries. It just does not exist yet :) You need to configure the Areas and Iterations You need to configure the permissions You may need to configure sub sites for SharePoint (depends on your requirement) – If you have two projects/products in the same Team Project then you will not see the burn down for each one out-of-the-box, but rather a cumulative for the Team Project. This is not really that much of a problem as you would have to configure your burndown graphs for your current iteration anyway. note: When you create a sub site to a TFS linked portal it will inherit the settings of its parent site :) This is fantastic as it means that you can easily create sub sites and then set the Area and Iteration path in each of the reports to be the correct one. Every team wants their own customization (via Ewald Hofman) - small teams of 2 persons against teams of 30 – or even outsourcing – need their own process, you cannot allow that because everybody gets the same work item types. note: Luckily at SSW this is not a problem as our template is standardised across all projects and customers. Large list of builds (via Ewald Hofman) – As the build list in Team Explorer is just a flat list it can get very cluttered. note: I would mitigate this by removing any build that has not been run in over 30 days. The build template and workflow will still be available in version control, but it will clean the list. Feedback Now that I have explained this method, what do you think? What other pros and cons can you see? What do you think of this approach? Will you be using it? What tools would you like to support you?   Technorati Tags: Visual Studio ALM,TFS Administration,TFS,Team Foundation Server,Project Planning,TFS Customisation

    Read the article

  • trigger config transformation in TFS 2010 or msbuild

    - by grenade
    I'm attempting to make use of configuration transformations in a continuous integration environment. I need a way to tell the TFS build agent to perform the transformations. I was kind of hoping it would just work after discovering the config transform files (web.qa-release.config, web.production-release.config, etc...). But it doesn't. I have a TFS build definition that builds the right configurations (qa-release, production-release, etc...) and I have some specific .proj files that get built within these definitions and those contain some environment specific parameters eg: <PropertyGroup Condition=" '$(Configuration)'=='production-release' "> <TargetHost Condition=" '$(TargetHost)'=='' ">qa.web</TargetHost> ... </PropertyGroup> <PropertyGroup Condition=" '$(Configuration)'=='qa-release' "> <TargetHost Condition=" '$(TargetHost)'=='' ">production.web</TargetHost> ... </PropertyGroup> I know from the output that the correct configurations are being built. Now I just need to learn how to trigger the config transformations. Is there some hocus pocus that I can add to the final .proj in the build to kick off the transform and blow away the individual transform files?

    Read the article

  • How do I add IIS Virtual Directories and arbitrary files in TFS Solution

    - by chriscena
    We have a web portal product from which we customize portals from customers. We use the precompiled web app and create a virtual directory (vd) where the customization resides. In addition to this we do some changes web.config in the web app folder. We would obviously like to keep these customizations under TFS source control. When I try to add the precompiled web app (which I don't want to add to source control), a warning tells me that the vds cannot be added. If I only add the folder that is referenced to by the vd, I lose the references to assemblies in the precompiled web app. My questions are: How do I structure a solution for adding IIS (sub application level) virtual directories and still retain the references to assemblies? Is it possible to add other directories/files from the web application level (like App_Theme, web.config etc.) to the solution? Since we already use Visual Source Safe, we have established a tree structure for each customization project: Project Root | |-Custom Sql | |-Custom Portal Files (which is added as a virtual directory) | |-Other Customizations I could probably do a lot of this manually through the source control explorer, but I'd like to have everything done through a solution. I've followed the instructions using this article: http://msdn.microsoft.com/en-us/library/bb668986.aspx, but this doesn't address the exact problem that I have. Oh, and we are currently using Visual Source Safe for portal customizaton, but are eager to make the move to TFS. TIA

    Read the article

  • how can I make a "downstream only" copy of a file in TFS

    - by jcollum
    I've got this SQL script that needs to exist in two places in source control. I want to have only one real copy of this file and keep a virtual copy of the file in the other solution. One is needed for a unit test and the other for a development tool. The files, should, by definition, always be the same. If they have differences then there's a problem with our process. In Sourcegear I could make a virtual copy of a specific version of a file and keep it somewhere else in the source tree. That doesn't seem to be possible in TFS. Is it possible in SVN? So what are my options here? Branching/merging -- which is what the TFS team says I should be doing here -- means just another step that I have to remember to do. Plus it isn't automatic and I would prefer that this be automated. Is there some way to run an exe on checkin of a specific file? I'm thinking if I could do that then I could do a checkout-edit-checkin of the downstream copy of the file.

    Read the article

  • Integrate SharePoint 2010 with Team Foundation Server 2010

    - by Martin Hinshelwood
    Our client is using a brand new shiny installation of SharePoint 2010, so we need to integrate our upgraded Team Foundation Server 2010 instance into it. In order to do that you need to run the Team Foundation Server 2010 install on the SharePoint 2010 server and choose to install only the “Extensions for SharePoint Products and Technologies”. We want out upgraded Team Project Collection to create any new portal in this SharePoint 2010 server farm. There a number of goodies above and beyond a solution file that requires the install, with the main one being the TFS2010 client API. These goodies allow proper integration with the creation and viewing of Work Items from SharePoint a new feature with TFS 2010. This works in both SharePoint 2007 and SharePoint 2010 with the level of integration dependant on the version of SharePoint that you are running. There are three levels of integration with “SharePoint Services 3.0” or “SharePoint Foundation 2010” being the lowest. This level only offers reporting services framed integration for reporting along with Work Item Integration and document management. The highest is Microsoft Office SharePoint Services (MOSS) Enterprise with Excel Services integration providing some lovely dashboards. Figure: Dashboards take the guessing out of Project Planning and estimation. Plus writing these reports would be boring!   The Extensions that you need are on the same installation media as the main TFS install and the only difference is the options you pick during the install. Figure: Installing the TFS 2010 Extensions for SharePoint Products and Technologies onto SharePoint 2010   Annoyingly you may need to reboot a couple of times, but on this server the process was MUCH smother than on our internal server. I think this was mostly to do with this being a clean install. Once it is installed you need to run the configuration. This will add all of the Solution and Templates that are needed for SharePoint to work properly with TFS. Figure: This is where all the TFS 2010 goodies are added to your SharePoint 2010 server and the TFS 2010 object model is installed.   Figure: All done, you have everything installed, but you still need to configure it Now that we have the TFS 2010 SharePoint Extensions installed on our SharePoint 2010 server we need to configure them both so that they will talk happily to each other. Configuring the SharePoint 2010 Managed path for Team Foundation Server 2010 In order for TFS to automatically create your project portals you need a wildcard managed path setup. This is where TFS will create the portal during the creation of a new Team project. To find the managed paths page for any application you need to first select the “Managed web applications”  link from the SharePoint 2010 Central Administration screen. Figure: Find the “Manage web applications” link under the “Application Management” section. On you are there you will see that the “Managed Paths” are there, they are just greyed out and selecting one of the applications will enable it to be clicked. Figure: You need to select an application for the SharePoint 2010 ribbon to activate.   Figure: You need to select an application before you can get to the Managed Paths for that application. Now we need to add a managed path for TFS 2010 to create its portals under. I have gone for the obvious option of just calling the managed path “TFS02” as the TFS 2010 server is the second TFS server that the client has installed, TFS 2008 being the first. This links the location to the server name, and as you can’t have two projects of the same name in two separate project collections there is unlikely to be any conflicts. Figure: Add a “tfs02” wildcard inclusion path to your SharePoint site. Configure the Team Foundation Server 2010 connection to SharePoint 2010 In order to have you new TFS 2010 Server talk to and create sites in SharePoint 2010 you need to tell the TFS server where to put them. As this TFS 2010 server was installed in out-of-the-box mode it has a SharePoint Services 3.0 (the free one) server running on the same box. But we want to change that so we can use the external SharePoint 2010 instance. Just open the “Team Foundation Server Administration Console” and navigate to the “SharePoint Web Applications” section. Here you click “Add” and enter the details for the Managed path we just created. Figure: If you have special permissions on your SharePoint you may need to add accounts to the “Service Accounts” section.    Before we can se this new SharePoint 2010 instance to be the default for our upgraded Team Project Collection we need to configure SharePoint to take instructions from our TFS server. Configure SharePoint 2010 to connect to Team Foundation Server 2010 On your SharePoint 2010 server open the Team Foundation Server Administration Console and select the “Extensions for SharePoint Products and Technologies” node. Here we need to “grant access” for our TFS 2010 server to create sites. Click the “Grant access” link and  fill out the full URL to the  TFS server, for example http://servername.domain.com:8080/tfs, and if need be restrict the path that TFS sites can be created on. Remember that when the users create a new team project they can change the default and point it anywhere they like as long as it is an authorised SharePoint location. Figure: Grant access for your TFS 2010 server to create sites in SharePoint 2010 Now that we have an authorised location for our team project portals to be created we need to tell our Team Project Collection that this is where it should stick sites by default for any new Team Projects created. Configure the Team Foundation Server 2010 Team Project Collection to create new sites in SharePoint 2010 Back on out TFS 2010 server we need to setup the defaults for our upgraded Team Project Collection to the new SharePoint 2010 integration we have just set up. On the TFS 2010 server open up the “Team Foundation Server Administration Console” again and navigate to the “Team Project Collections” node. Once you are there you will see a list of all of your TPC’s and in our case we have a DefaultCollection as well as out named and Upgraded collection for TFS 2008. If you select the “SharePoint Site” tab we can see that it is not currently configured. Figure: Our new Upgrade TFS2008 Team Project Collection does not have SharePoint configured Select to “Edit Default Site Location” and select the new integration point that we just set up for SharePoint 2010. Once you have selected the “SharePoint Web Application” (the thing we just configured) then it will give you an example based on that configuration point and the name of the Team Project Collection that we are configuring. Figure: Set the default location for new Team Project Portals to be created for this Team Project Collection This is where the reason for configuring the Extensions on the SharePoint 2010 server before doing this last bit becomes apparent. TFS 2010 is going to create a site at our http://sharepointserver/tfs02/ location called http://sharepointserver/tfs02/[TeamProjectCollection], or whatever we had specified, and it would have had difficulty doing this if we had not given it permission first. Figure: If there is no Team Project Collection site at this location the TFS 2010 server is going to create one This will create a nice Team Project Collection parent site to contain the Portals for any new Team Projects that are created. It is with noting that it will not create portals for existing Team Projects as this process is run during the Team Project Creation wizard. Figure: Just a basic parent site to host all of your new Team Project Portals as sub sites   You will need to add all of the users that will be creating Team Projects to be Administrators of this site so that they will not get an error during the Project Creation Wizard. You may also want to customise this as a proper portal to your projects if you are going to be having lots of them, but it is really just a default placeholder so you have a top level site that you can backup and point at. You have now integrated SharePoint 2010 and team Foundation Server 2010! You can now go forth and multiple your Team Projects for this Team Project Collection or you can continue to add portals to your other Collections.   Technorati Tags: TFS 2010,Sharepoint 2010,VS ALM

    Read the article

  • Getting TF215097 error after modifying a build process template in TFS Team Build 2010

    - by Jakob Ehn
    When embracing Team Build 2010, you typically want to define several different build process templates for different scenarios. Common examples here are CI builds, QA builds and release builds. For example, in a contiuous build you often have no interest in publishing to the symbol store, you might or might not want to associate changesets and work items etc. The build server is often heavily occupied as it is, so you don’t want to have it doing more that necessary. Try to define a set of build process templates that are used across your company. In previous versions of TFS Team Build, there was no easy way to do this. But in TFS 2010 it is very easy so there is no excuse to not do it! :-)   I ran into a scenario today where I had an existing build definition that was based on our release build process template. In this template, we have defined several different build process parameters that control the release build. These are placed into its own sectionin the Build Process Parameters editor. This is done using the ProcessParameterMetadataCollection element, I will explain how this works in a future post.   I won’t go into details on these parametes, the issue for this blog post is what happens when you modify a build process template so that it is no longer compatible with the build definition, i.e. a breaking change. In this case, I removed a parameter that was no longer necessary. After merging the new build process template to one of the projects and queued a new release build, I got this error:   TF215097: An error occurred while initializing a build for build definition <Build Definition Name>: The values provided for the root activity's arguments did not satisfy the root activity's requirements: 'DynamicActivity': The following keys from the input dictionary do not map to arguments and must be removed: <Parameter Name>.  Please note that argument names are case sensitive. Parameter name: rootArgumentValues <Parameter Name> was the parameter that I removed so it was pretty easy to understand why the error had occurred. However, it is not entirely obvious how to fix the problem. When open the build definition everything looks OK, the removed build process parameter is not there, and I can open the build process template without any validation warnings. The problem here is that all settings specific to a particular build definition is stored in the TFS database. In TFS 2005, everything that was related to a build was stored in TFS source control in files (TFSBuild.proj, WorkspaceMapping.xml..). In TFS 2008, many of these settings were moved into the database. Still, lots of things were stored in TFSBuild.proj, such as the solution and configuration to build, wether to execute tests or not. In TFS 2010, all settings for a build definition is stored in the database. If we look inside the database we can see what this looks like. The table tbl_BuildDefinition contains all information for a build definition. One of the columns is called ProcessParameters and contains a serialized representation of a Dictionary that is the underlying object where these settings are stoded. Here is an example:   <Dictionary x:TypeArguments="x:String, x:Object" xmlns="clr-namespace:System.Collections.Generic;assembly=mscorlib" xmlns:mtbwa="clr-namespace:Microsoft.TeamFoundation.Build.Workflow.Activities;assembly=Microsoft.TeamFoundation.Build.Workflow" xmlns:x="http://schemas.microsoft.com/winfx/2006/xaml"> <mtbwa:BuildSettings x:Key="BuildSettings" ProjectsToBuild="$/PathToProject.sln"> <mtbwa:BuildSettings.PlatformConfigurations> <mtbwa:PlatformConfigurationList Capacity="4"> <mtbwa:PlatformConfiguration Configuration="Release" Platform="Any CPU" /> </mtbwa:PlatformConfigurationList> </mtbwa:BuildSettings.PlatformConfigurations> </mtbwa:BuildSettings> <mtbwa:AgentSettings x:Key="AgentSettings" Tags="Agent1" /> <x:Boolean x:Key="DisableTests">True</x:Boolean> <x:String x:Key="ReleaseRepositorySolution">ERP</x:String> <x:Int32 x:Key="Major">2</x:Int32> <x:Int32 x:Key="Minor">3</x:Int32> </Dictionary> Here we can see that it is really only the non-default values that are persisted into the databasen. So, the problem in my case was that I removed one of the parameteres from the build process template, but the parameter and its value still existed in the build definition database. The solution to the problem is to refresh the build definition and save it. In the process tab, there is a Refresh button that will reload the build definition and the process template and synchronize them:   After refreshing the build definition and saving it, the build was running successfully again.

    Read the article

  • Creating a Build Definition using the TFS 2010 API

    - by Jakob Ehn
    In this post I will show how to create a new build definition in TFS 2010 using the TFS API. When creating a build definition manually, using Team Explorer, the necessary steps are lined out in the New Build Definition Wizard:     So, lets see how the code looks like, using the same order. To start off, we need to connect to TFS and get a reference to the IBuildServer object: TfsTeamProjectCollection server = newTfsTeamProjectCollection(newUri("http://<tfs>:<port>/tfs")); server.EnsureAuthenticated(); IBuildServer buildServer = (IBuildServer) server.GetService(typeof (IBuildServer)); General First we create a IBuildDefinition object for the team project and set a name and description for it: var buildDefinition = buildServer.CreateBuildDefinition(teamProject); buildDefinition.Name = "TestBuild"; buildDefinition.Description = "description here..."; Trigger Next up, we set the trigger type. For this one, we set it to individual which corresponds to the Continuous Integration - Build each check-in trigger option buildDefinition.ContinuousIntegrationType = ContinuousIntegrationType.Individual; Workspace For the workspace mappings, we create two mappings here, where one is a cloak. Note the user of $(SourceDir) variable, which is expanded by Team Build into the sources directory when running the build. buildDefinition.Workspace.AddMapping("$/Path/project.sln", "$(SourceDir)", WorkspaceMappingType.Map); buildDefinition.Workspace.AddMapping("$/OtherPath/", "", WorkspaceMappingType.Cloak); Build Defaults In the build defaults, we set the build controller and the drop location. To get a build controller, we can (for example) use the GetBuildController method to get an existing build controller by name: buildDefinition.BuildController = buildServer.GetBuildController(buildController); buildDefinition.DefaultDropLocation = @\\SERVER\Drop\TestBuild; Process So far, this wasy easy. Now we get to the tricky part. TFS 2010 Build is based on Windows Workflow 4.0. The build process is defined in a separate .XAML file called a Build Process Template. By default, every new team team project containtwo build process templates called DefaultTemplate and UpgradeTemplate. In this sample, we want to create a build definition using the default template. We use te QueryProcessTemplates method to get a reference to the default for the current team project   //Get default template var defaultTemplate = buildServer.QueryProcessTemplates(teamProject).Where(p => p.TemplateType == ProcessTemplateType.Default).First(); buildDefinition.Process = defaultTemplate;   There are several build process templates that can be set for the default build process template. Only one of these are required, the ProjectsToBuild parameters which contains the solution(s) and configuration(s) that should be built. To set this info, we use the ProcessParameters property of thhe IBuildDefinition interface. The format of this property is actually just a serialized dictionary (IDictionary<string, object>) that maps a key (parameter name) to a value which can be any kind of object. This is rather messy, but fortunately, there is a helper class called WorkflowHelpers inthe Microsoft.TeamFoundation.Build.Workflow namespace, that simplifies working with this persistence format a bit. The following code shows how to set the BuildSettings information for a build definition: //Set process parameters varprocess = WorkflowHelpers.DeserializeProcessParameters(buildDefinition.ProcessParameters); //Set BuildSettings properties BuildSettings settings = newBuildSettings(); settings.ProjectsToBuild = newStringList("$/pathToProject/project.sln"); settings.PlatformConfigurations = newPlatformConfigurationList(); settings.PlatformConfigurations.Add(newPlatformConfiguration("Any CPU", "Debug")); process.Add("BuildSettings", settings); buildDefinition.ProcessParameters = WorkflowHelpers.SerializeProcessParameters(process); The other build process parameters of a build definition can be set using the same approach   Retention  Policy This one is easy, we just clear the default settings and set our own: buildDefinition.RetentionPolicyList.Clear(); buildDefinition.AddRetentionPolicy(BuildReason.Triggered, BuildStatus.Succeeded, 10, DeleteOptions.All); buildDefinition.AddRetentionPolicy(BuildReason.Triggered, BuildStatus.Failed, 10, DeleteOptions.All); buildDefinition.AddRetentionPolicy(BuildReason.Triggered, BuildStatus.Stopped, 1, DeleteOptions.All); buildDefinition.AddRetentionPolicy(BuildReason.Triggered, BuildStatus.PartiallySucceeded, 10, DeleteOptions.All); Save It! And we’re done, lets save the build definition: buildDefinition.Save(); That’s it!

    Read the article

  • WMI Security error TF255437 when installing TFS 2010 RC

    - by Daniel O
    Does anyone know the resolution to the following error. In this scenario, TFS will be using a local report server instance which points uses a separate SQL Server database engine instance. An error occurred while querying the Windows Management Instrumentation (WMI) interface on the following computer databaseServer. The following error message was received: Access is denied. (Exception from HRESULT: 0x80070005 (E_ACCESSDENIED)).

    Read the article

  • tfs integration with delphi 2010

    - by Robert McCabe
    We are currently upgrading from Delphi 7 to Delphi 2010. With Delphi 7 we use Source Connection to integrate Delphi 7 with TFS, but there does not look like there is going to be a Delphi 2010 version in time. Is there any other integration option out there?

    Read the article

< Previous Page | 3 4 5 6 7 8 9 10 11 12 13 14  | Next Page >