Search Results

Search found 29225 results on 1169 pages for 'microsoft powerpoint 2010'.

Page 81/1169 | < Previous Page | 77 78 79 80 81 82 83 84 85 86 87 88  | Next Page >

  • No IntelliSense for c++/cli in visual studio 2010?

    - by Sam
    I just moved from Visual Studio 2008 to 2010, and noticed one major flaw: When I try to use AutoComplete in a C++ Source file for managed c++, a small note in the footer appers: intellisense for c++/cli not available Uh, has IntelliSense for c++/cli been dropped from Visual Studio 2010? Is there any way to get this back? It is rather useful...

    Read the article

  • How do I set Environment Variables in Visual Studio 2010?

    - by xarzu
    How do I set Environment Variables in Visual Studio 2010? I found this web page: http://msdn.microsoft.com/en-us/library/ee479070.aspx Which says: From the Project menu, choose Properties. In the left pane, select Configuration Properties, and then select Environment. But when I select "Configuration Properties", there is no "Enviroment" option: http://i67.photobucket.com/albums/h292/Athono/microsoft/newstuff.jpg This is an example in VS 2008: http://i21.photobucket.com/albums/b279/GrunchCan/env.jpg But how is it done in VS 2010?

    Read the article

  • Why would Visual Studio 2010 say it can't show a variable during debug?

    - by Edward Tanguay
    In Visual Studio 2010 sometimes when I want to get the value of a variable while debugging, it tells me that it "does not exist in this context" when it obviously does. I have found that if I use the variable, as in the screenshot below, then it is able to show it. Has anyone experienced this? Visual Studio 2008 never did this. How can I get Visual Studio 2010 to always show me variable values while debugging?

    Read the article

  • Did Visual Studio 2010 break "Project Dependencies" between C++ projects?

    - by Roger Lipscombe
    In Visual Studio 2008, if I had a solution containing multiple C++ projects, I could make them depend on each-other and correctly link by using the "Project Dependencies" option. This fixed up the build order and also made (e.g.) the main application project link against the static library outputs. In Visual Studio 2010, this doesn't seem to work. Did Visual Studio 2010 change the way this works?

    Read the article

  • Can I use Visual Studio 2010 and not upgrade to .NET Framework 4.0?

    - by Ben Mills
    I have many Visual Studio 2008 web projects targeted at the .NET Framework 3.5. I want to start using Visual Studio 2010, but the .NET Framework 4.0 isn't very well supported by web hosting companies just yet. It seems to make sense to stick with the .NET Framework 3.5 for now. If I open my projects in Visual Studio 2010 and leave them targeted at the .NET Framework 3.5, am I going to have problems?

    Read the article

  • Cannot download Microsoft Project 2010 demo videos

    - by Nam Gi VU
    Hi everyone, I need to download the demo videos at my office so that I can view it later at home since I have slow internet connection there but it seems to be no way to download the videos at [the site][1], and other resources in this site. Using some of the firefox addons to download them is not possible. Do you have any tips for me? Please share. [1]: http://www.microsoft.com/showcase/en/US/search?phrase="project conference 2009"

    Read the article

  • VBA does not run Powerpoint

    - by user1557188
    This is very frustrating, first lines of programming Powerpoint VBA after a long while .... Please help this is killing me Writing a small sub connecting to an action using name test Sub test() MSGBOX "this is a test " end sub I placed this in a module I just created and it works I copy the same test in named as a module and it does not work any more .... I'm trying to make PPT connect to events to do things on a per slide basis ..... using google.... this worked a few times ... but now nothing works any more. The simple test above fails since I renamed the module. As I further change the second routine to test1() ipv test None of the macros can be executed any more (module1 NOT CHNANGED) Module NAME..... contains the same code, except test1() ipv test. ... now all macro processing stops the color of text changes (as is clicked on it) but nothing gets obviously executed. Are things that unstable recenty in VBA for powerpoint 2010 how did I run: connect to empty slide using 3 lines test 1 test 2 test 3 on each of the lines I defined an action for each in different modules run: Go into slide show and on the first slide just click.... color changes but nothing happens any more Saved all closed restarted .... simply refuses except on first created pptm

    Read the article

  • Why is lassoing ink in OneNote so slow in general? Doesn't anyone care?

    - by GuoLiang Oon
    Now I understand that this is especially an (known) issue in the OneNote 2013 preview and that it will probably be fixed in the final release. But lassoing in OneNote 2010 was no sprightly affair either. I'm just perplexed really, why on earth is there such an issue? Is lassoing intrinsically computationally expensive? OneNote would be soooooooooooo much more useful if there's no lasso lag. And doing a laggy lasso on tablet pcs with weak processors is just so much worse. Or do most folks just don't use the lasso feature much? I use it primarily to shrink intermediate calculations for future retrieval.

    Read the article

  • "The Operation Failed." accepting METHOD: PUBLISH iCalendar files in .pst account

    - by Jamie Kitson
    if I create a new Mail Profile using the Internet E-mail wizard, ie, creating a new local .pst account, and then try to add a .ics iCalendar file with a METHOD of PUBLISH to the calendar of that account, I get the error "The Operation Failed." If I change any of the above it works ok, eg, if I use an Exchange account or METHOD: REQUEST in the iCalendar file. I'm using Outlook 2010 on Windows 7 but I think the user that originally reported this was using Outlook 2007. Does anyone have any idea of why this might be? Thanks, Jamie Kitson

    Read the article

  • How to make Excel's "Auto Fit Row Height" feature actually auto fit the row height?

    - by DanM
    For every generation of Excel I can remember (including 2010, which I'm using now), Excel's "Auto Size Row" features sometimes fails to actually auto size a row when the cell contains wrapped text. When it works properly, all the text is revealed and there is no additional space below the last line of text. When it fails, it adds extra space below the text. To make matters worse, what you see is not always what you get, i.e., text that appeared okay on screen gets cut off when it's printed. You also get different sizing depending on whether you are zoomed in/out or at actual size. Simple test case: Why is there a one-line gap after the text in cell A1 but in A2? (I double-checked that I applied Auto Fit Row Height to both rows. Zoom level is 100%.) Is there any known remedy for this without resorting to manually adjusting the row heights (which is not practical for more than a handful of rows)?

    Read the article

  • Why do my numbered headings break when I apply a watermark?

    - by gef05
    I have an MS Word 2010 document. I am editing it in compatibility mode. I have heading 1s as a numbered list. When I apply a watermark to the document the headings break. The number and background shading remain correct, but the text "collapses" - so the word "Introduction" appears one letter wide with all letters drawn one on top of the other (you can open Font properties for the headings and see the entire word in the preview; font spacing shows as normal). Why does this happen? Windows 7, SP1. Opening doc over network from Sharepoint.

    Read the article

  • Using a PivotTable to Count Items in Access

    - by Sandra
    I have a list of text entries and I want to count how often each entry appears in the list. e.g. Berlin Paris London London Paris Paris Paris The result would be Berlin 1 Paris 4 London 2 This result easy do to achieve with an pivot table in MS Excel (see: Count Items in Excel). My data not in spreadsheet in Excel but in a MS Access database table. So in order to avoid constant switching between Access and Excel and I would like to handle everything in Access (either Access 2007 or 2010). I know there are pivot tables in Access and I know how to display one, but I was unable to find out how to count the number of occurrences. Thank you!

    Read the article

  • How can I compare two columns in Excel to highlight words that don't match?

    - by Jez Vander Brown
    (I'm using Microsoft excel 2010) OK, lets say I have a list of phrases in both column A and column B (see screen shot below) What I would like to happen whether it be with a macro, VBA or formula is: If there is a word in any cell in column A that isn't any of the words in any cell in column B to highlight that word in red. For example: in cell A9 the word "buy" is there, but the word buy isn't mentioned anywhere in column B so i would like the word buy to highlight in red. How can I accomplish this? (I think a macro/vba would be the best option but I have no idea how to create it, or even if its possible.)

    Read the article

  • How to save Word documents as HTML to be viewed in Firefox

    - by private_meta
    I'm in need for saving a Word document as HTML. It has some background images, other images, texts, ... It opens correctly in Internet Explorer, but how can I save a word doc as HTML so that Firefox and other current browsers render it correctly? All images are missing in the document. I looked through the generated html document, but the paths for the images appear to be correct. Any idea? Things like "Don't save docs as html" won't be helpful here. Edit: To make myself clear, the normal "Save as HTML" doesn't cut it, the result is broken in any browser other than Internet Explorer. Edit 2: What I'm using is Word 2010 and Firefox 4. I also tried rendering it in the latest Chrome version, which failed as well. I used different compatibility settings for saving as html, it did not help

    Read the article

  • How to create a new word document from document template in Sharepoint

    - by sjlewis
    Is there an easier way to create a new document (in Word 2010) from a document template in Sharepoint? Right now, this is how I do it: Go to Sharepoint site and edit .dotx in Word. Click "File" from the ribbon and choose "New". From the "Available templates" section, click "New from existing". From the "New from Existing Document" dialog, choose the Sharepoint document, and click "Create New". Once the new document opens, click "File" from the ribbon again, and choose "Save as". The document will be saved as .docx

    Read the article

  • How to embed video in powerpoint with relative paths?

    - by Gabe
    Does anyone know how to embed a video in a powerpoint presentation in such a way that it can be moved to another computer? Possible solutions I'm considering: Actually embed the video file into the powerpoint file. This would be ideal, but I don't know how to do this. Insert a reference to the video into the presentation. I need this to be a relative path, though, not an absolute path. EDIT: I forgot to mention I'm using powerpoint 2003

    Read the article

  • Way to update / refresh / reschedule project plan after adding a vacation / changing calendar

    - by CodeCanvas
    I had created a project plan using MS-Project 2010 (not server). I had set the task schedule mode to "Auto Scheduled" and entered the necessary tasks. Since it is a single person project I also added one person to the Resource of the file and assigned that resource to all the tasks and leveled the project. After the plan was put in and tasks were leveled I figured the calendar was not correctly set (in UAE the weekend is Friday and Saturday instead of Saturday and Sunday). So, I updated the default calendar (Standard) of the project by going to Project-Change Working Time-Work Weeks and changed them as needed. But after doing this, the tasks are still scheduled over Friday and Saturday even though I have marked them as nonworking days in the standard calendar. I tried the following for the tasks to refresh, but I was not successful: Updated all tasks to use the "Standard" calendar in the project Selected option so that tasks do not ignore resource calendars Added a constraint "As Soon As Possible" Executed "Level All" Any help on solving this issue would be much appreciated, thanks in advance.

    Read the article

  • How do I stop Outlook from stealing mailto protocol from Gmail?

    - by AngryHacker
    In Chrome, when I click on a mailto: link, I'd like to be taken to my Gmail's Compose window. So I downloaded ChromeMailer and it works relatively well. However, after using Outlook 2010, the default for the mailto reverts to Outlook. I went into Outlook's Options, clicked Default Programs... and was greeted with this: As you can see, the checkbox is grayed out and I can't do anything to changed it. Clicking Select All checkbox does nothing either. How do I stop Outlook from stealing the mailto protocol handler?

    Read the article

< Previous Page | 77 78 79 80 81 82 83 84 85 86 87 88  | Next Page >