Search Results

Search found 2429 results on 98 pages for 'monitoring'.

Page 84/98 | < Previous Page | 80 81 82 83 84 85 86 87 88 89 90 91  | Next Page >

  • Expanding the Partner Ecosystem with Third-Party Plug-ins

    - by Joe Diemer
    Oracle Enterprise Manager’s extensibility capabilities are designed to allow customers and partners to adapt Enterprise Manager for management of heterogeneous environments with Plug-ins and Connectors.  Third-party developers continue to take advantage of Oracle Enterprise Manager’s Extensibility Development Kit (EDK) to build plug-ins to Enterprise Manager 12c, such as F5’s BIG IP Plug-in and Entuity’s Eye of the Storm Network Management Plug-In.  Partners can also validate their plug-ins through the Oracle Validated Integration (OVI) program, which assures customers that the plug-in has been tested and is functionally and technically sound, is designed in a reliable and standardized manner, and operates and performs as documented.   Two very recent examples of partners which have beta versions of their plug-ins are Blue Medora's VMware vSphere plug-in and the NetApp Storage plug-in.  VMware vSphere Plug-in by Blue Medora Blue Medora, an Oracle Partner Network (OPN) “Gold” member, which just announced that it is now signing up customers to try a beta version of their new VMware vSphere plug-in for Enterprise Manager 12c.  According to Blue Medora, the vSphere plug-in monitors critical VMware metrics (CPU, Memory, Disk, Network, etc) at the Host, VM, Cluster and Resource Pool levels.  It has minimal performance impact via an “agentless” approach that requires no installation directly on VMware servers.  It has discovery capabilities for VMware Datacenters, ESX Hosts, Clusters, Virtual Machines, and Datastores.  It offers integration of native VMware Events into Enterprise Manager, and it provides over 300 VMware-related health, availability, performance, and configuration metrics.  It comes with more than 30 out-of-the-box pre-defined thresholds and can manage VMware via a series of jobs split between cluster, host and VM target types.The company reports that the Enterprise Manager 12c plug-in supports vSphere versions 4.0, 4.5 and 5.0.  Platforms supported include Linux 64-bit, Windows, AIX and Solaris SPARC and x86.  Information about the plug-in, including how to sign up for the beta, is available at their web site at http://bluemedora.com after selecting the "Products" tab. NetApp Storage Plug-in NetApp believes the combination of storage system monitoring with comprehensive management of Oracle systems with Enterprise Manager will help customers reduce the cost and complexity of managing applications that rely on NetApp storage and Oracle technologies.  So, NetApp built a plug-in and reports that it has comprehensive availability and performance information for NetApp storage systems.  Using the plug-in, Oracle Enterprise Manager customers with NetApp storage solutions can track the association between databases and storage components and thereby respond to faults and IO performance bottlenecks quickly. With the latest configuration management capabilities, one can also perform drift analysis to make sure all storage systems are configured as per established gold standards. The company is also now signing up beta customers, which can be done at the NetApp Communities site at https://communities.netapp.com/groups/netapp-storage-system-plug-in-for-oem12c-beta. Learn More about Enterprise Manager Extensibility More plug-ins from other partners are soon to come, which I'll be reporting on them here.  To learn more about Enterprise Manager and how customers and partners can build plug-ins using the EDK to manage a multi-vendor data center, go to http://oracle.com/enterprisemanager in the Heterogeneous Management solution area.  The site also lists the plug-ins available with information on how to obtain them.  More info about the Oracle Validated Integration program can be found at the OPN Enterprise Manager Knowledge Zone in the "Develop" tab.

    Read the article

  • Drinking Our Own Champagne: Fusion Accounting Hub at Oracle

    - by Di Seghposs
    A guest post by Corey West, Senior Vice President, Oracle's Corporate Controller and Chief Accounting Officer There's no better story to tell than one about Oracle using its own products with blowout success. Here's how this one goes. As you know, Oracle has increased its share of the software market through a number of high-profile acquisitions. Legally combining companies is a very complicated process -- it can take months to complete, especially for the acquisitions with offices in several countries, each with its own unique laws and regulations. It's a mission critical and time sensitive process to roll an acquired company's legacy systems (running vital operations, such as accounts receivable and general ledger (GL)) into the existing systems at Oracle. To date, we've run our primary financial ledgers in E-Business Suite R12 -- and we've successfully met the requirements of the business and closed the books on time every single quarter. But there's always room for improvement and that comes in the form of Fusion Applications. We are now live on Fusion Accounting Hub (FAH), which is the first critical step in moving to a full Fusion Financials instance. We started with FAH so that we could design a global chart of accounts. Eventually, every transaction in every country will originate from this global chart of accounts -- it becomes the structure for managing our business more uniformly. In conjunction, we're using Oracle Hyperion Data Relationship Management (DRM) to centralize and automate governance of our global chart of accounts and related hierarchies, which will help us lower our costs and greatly reduce risk. Each month, we have to consolidate data from our primary general ledgers. We have been able to simplify this process considerably using FAH. We can now submit our primary ledgers running in E-Business Suite (EBS) R12 directly to FAH, eliminating the need for more than 90 redundant consolidation ledgers. Also we can submit incrementally, so if we need to book an adjustment in a primary ledger after close, we can do so without re-opening it and re-submitting. As a result, we have earlier visibility to period-end actuals during the close. A goal of this implementation, and one that we successfully achieved, is that we are able to use FAH globally with no customization. This means we have the ability to fully deploy ledger sets at the consolidation level, plus we can use standard functionality for currency translation and mass allocations. We're able to use account monitoring and drill down functionality from the consolidation level all the way through to EBS primary ledgers and sub-ledgers, which allows someone to click through a transaction appearing at the consolidation level clear through to its original source, a significant productivity enhancement when doing research. We also see a significant improvement in reporting using Essbase cube and Hyperion Smart View. Specifically, "the addition of an Essbase cube on top of the GL gives us tremendous versatility to automate and speed our elimination process," says Claire Sebti, Senior Director of Corporate Accounting at Oracle. A highlight of this story is that FAH is running in a co-existence environment. Our plan is to move to Fusion Financials in steps, starting with FAH. Next, our Oracle Financial Services Software subsidiary will move to a full Fusion Financials instance. Then we'll replace our EBS instance with Fusion Financials. This approach allows us to plan in steps, learn as we go, and not overwhelm our teams. It also reduces the risk that comes with moving the entire instance at once. Maria Smith, Vice President of Global Controller Operations, is confident about how they've positioned themselves to uptake more Fusion functionality and is eager to "continue to drive additional efficiency and cost savings." In this story, the happy customers are Oracle controllers, financial analysts, accounting specialists, and our management team that get earlier access to more flexible reporting. "Fusion Accounting Hub simplifies our processes and gives us more transparency into account activity," raves Alex SanJuan, Senior Director, Record to Report Strategic Process Owner. Overall, the team has been very impressed with the usability and functionality of FAH and are pleased with the quantifiable improvements. Claire Sebti states, "Our WD5 close activities have been reduced by at least four hours of system processing time, just for the consolidation group." Fusion Accounting Hub is an inspiring beginning to our Fusion Financials implementation story. There's no doubt it's going to be an international bestseller! Corey West, Senior Vice President Oracle's Corporate Controller and Chief Accounting Officer

    Read the article

  • SOA Community Newsletter May 2014

    - by JuergenKress
    Registration for the Fusion Middleware Summer Camps 2014 is open – Register asap for one of our bootcamps August 4th – 8th 2014 in Lisbon. Please read details and pre-requisitions careful before you register. We expect that like in the past, the conference will be booked out soon! If you can’t make it to Lisbon attend our SOA Suite 11c free on-demand Bootcamp or  Managing the Complexity of IoT online trainings. With more than 5000 customers, SOA Suite Achieves Significant Customer Adoption and Industry Recognition.Thanks to all our SOA Specialized partners for making our joins SOA customers successful! As a summary of the Industrial SOA series we published the Podcast Show Notes: SOA and Cloud - Where's This Relationship Going? Make sure you use the Oracle Demo Systems for your customer presentations. The demo systems are hosted by Oracle and include complete scenarios based on the latest Middleware version like the new B2B SOA Suite Demo System! For local presentations without fast internet use the SOA/BPM 11.1.1.7.1 Virtual Machine and Case Management Sample. At our SOA Community Workspace (SOA Community membership required) you can get new IoT presentations for Location Based Offers for Banking & Whitepaper and online Webcast & Utility presentation. In this newsletter you will find many articles about OSB: OSB 11g – A Hands-on Tutorial & Using Split-Joins in OSB Services for parallel processing of messages & OSB, Service Callouts and OQL & Working with Oracle Security Token Service. Thanks for sharing all the additional SOA articles within the community: How to configure Oracle SOA/BPM task auto release & Controlling BPEL process flow at runtime & Upgrading to Oracle SOA Suite 11g PS6 (11.1.1.7)? Do this. & BPEL and BPM's performance monitoring using DMS & SOA 11g - Create RESTful Service In Oracle SOA & Wrong timezone causes TopLink warning in SOA suite. Highlight of the BPM and ACM section is the IDC BPM vendor report. The new bundle Patch including the ACM UI is now available. If you want to learn more about ACM, get the ACM training material at our SOA Community Workspace (SOA Community membership required). A great demo for your next BPM presentation is the BPM iPad app. It’s simpleMobile BPM is Not An Option. It’s a Necessity. Thanks for sharing all the additional BPM articles within the community: BPM update adds Case Management Web Interface and REST APIs & Implementing deadline functionality with Oracle Adaptive Case Management & BPM 11g Timeout Heuristics & Humantask Assignment: Names and Expressions Assignment via Rules. In our last section Architecture, it is all about design. Usability is a key factor for customer satisfaction, worth to spend some time and read the Simplified User Experience Design Patterns eBook. Great blueprint for your project! See you in Lisbon! To read the newsletter please visit www.tinyurl.com/soaNewsMay2014 (OPN Account required) To become a member of the SOA Partner Community please register at http://www.oracle.com/goto/emea/soa (OPN account required) If you need support with your account please contact the Oracle Partner Business Center. Blog Twitter LinkedIn Facebook Wiki Mix Forum Technorati Tags: newsletter,SOA Community newsletter,SOA Community,Oracle,OPN,Jürgen Kress

    Read the article

  • Oracle MDM Maturity Model

    - by David Butler
    A few weeks ago, I discussed the results of a survey conducted by Oracle’s Insight team. The survey was based on the data management maturity model that the Oracle Insight team has developed over the years as they analyzed customer IT organizations to help them get more out of everything they already have. I thought you might like to learn more about the maturity model itself. It can help you figure out where you stand when it comes to getting your organizations data management act together. The model covers maturity levels around five key areas: Profiling data sources; Defining a data strategy; Defining a data consolidation plan; Data maintenance; and Data utilization. Profile data sources: Profiling data sources involves taking an inventory of all data sources from across your IT landscape. Then evaluate the quality of the data in each source system. This enables the scoping of what data to collect into an MDM hub and what rules are needed to insure data harmonization across systems. Define data strategy: A data strategy requires an understanding of the data usage. Given data usage, various data governance requirements need to be developed. This includes data controls and security rules as well as data structure and usage policies. Define data consolidation strategy: Consolidation requires defining your operational data model. How integration is to be accomplished. Cross referencing common data attributes from multiple systems is needed. Synchronization policies also need to be developed. Data maintenance: The desired standardization needs to be defined, including what constitutes a ‘match’ once the data has been standardized. Cleansing rules are a part of this methodology. Data quality monitoring requirements also need to be defined. Utilize the data: What data gets published, and who consumes the data must be determined. How to get the right data to the right place in the right format given its intended use must be understood. Validating the data and insuring security rules are in place and enforced are crucial aspects for full no-risk data utilization. For each of the above data management areas, a maturity level needs to be assessed. Where your organization wants to be should also be identified using the same maturity levels. This results in a sound gap analysis your organization can use to create action plans to achieve the ultimate goals. Marginal is the lowest level. It is characterized by manually maintaining trusted sources; lacking or inconsistent, silo’d structures with limited integration, and gaps in automation. Stable is the next leg up the MDM maturity staircase. It is characterized by tactical MDM implementations that are limited in scope and target a specific division.  It includes limited data stewardship capabilities as well. Best Practice is a serious MDM maturity level characterized by process automation improvements. The scope is enterprise wide. It is a business solution that provides a single version of the truth, with closed-loop data quality capabilities. It is typically driven by an enterprise architecture group with both business and IT representation.   Transformational is the highest MDM maturity level. At this level, MDM is quantitatively managed. It is integrated with Business Intelligence, SOA, and BPM. MDM is leveraged in business process orchestration. Take an inventory using this MDM Maturity Model and see where you are in your journey to full MDM maturity with all the business benefits that accrue to organizations who have mastered their data for the benefit of all operational applications, business processes, and analytical systems. To learn more, Trevor Naidoo and I have written the Oracle MDM Maturity Model whitepaper. It’s free, so go ahead and download it and use it as you see fit.

    Read the article

  • Tuning Default WorkManager - Advantages and Disadvantages

    - by Murali Veligeti
    Before discussing on Tuning Default WorkManager, lets have a brief introduction on What is Default WorkManger Before Weblogic Server 9.0 release, we had the concept of Execute Queues. WebLogic Server (before WLS 9.0), processing was performed in multiple execute queues. Different classes of work were executed in different queues, based on priority and ordering requirements, and to avoid deadlocks. In addition to the default execute queue, weblogic.kernel.default, there were pre-configured queues dedicated to internal administrative traffic, such as weblogic.admin.HTTP and weblogic.admin.RMI.Users could control thread usage by altering the number of threads in the default queue, or configure custom execute queues to ensure that particular applications had access to a fixed number of execute threads, regardless of overall system load. From WLS 9.0 release onwards WebLogic Server uses is a single thread pool (single thread pool which is called Default WorkManager), in which all types of work are executed. WebLogic Server prioritizes work based on rules you define, and run-time metrics, including the actual time it takes to execute a request and the rate at which requests are entering and leaving the pool.The common thread pool changes its size automatically to maximize throughput. The queue monitors throughput over time and based on history, determines whether to adjust the thread count. For example, if historical throughput statistics indicate that a higher thread count increased throughput, WebLogic increases the thread count. Similarly, if statistics indicate that fewer threads did not reduce throughput, WebLogic decreases the thread count. This new strategy makes it easier for administrators to allocate processing resources and manage performance, avoiding the effort and complexity involved in configuring, monitoring, and tuning custom executes queues. The Default WorkManager is used to handle thread management and perform self-tuning.This Work Manager is used by an application when no other Work Managers are specified in the application’s deployment descriptors. In many situations, the default Work Manager may be sufficient for most application requirements. WebLogic Server’s thread-handling algorithms assign each application its own fair share by default. Applications are given equal priority for threads and are prevented from monopolizing them. The default work-manager, as its name tells, is the work-manager defined by default.Thus, all applications deployed on WLS will use it. But sometimes, when your application is already in production, it's obvious you can't take your EAR / WAR, update the deployment descriptor(s) and redeploy it.The default work-manager belongs to a thread-pool, as initial thread-pool comes with only five threads, that's not much. If your application has to face a large number of hits, you may want to start with more than that.Well, that's quite easy. You have  two option to do so.1) Modify the config.xmlJust add the following line(s) in your server definition : <server> <name>AdminServer</name> <self-tuning-thread-pool-size-min>100</self-tuning-thread-pool-size-min> <self-tuning-thread-pool-size-max>200</self-tuning-thread-pool-size-max> [...] </server> 2) Adding some JVM parameters Add the following system property in setDomainEnv.sh/setDomainEnv.cmd or startWebLogic.sh/startWebLogic.cmd : -Dweblogic.threadpool.MinPoolSize=100 -Dweblogic.threadpool.MaxPoolSize=100 Reboot WLS and see the option has been taken into account . Disadvantage: So far its fine. But here there is an disadvantage in tuning Default WorkManager. Internally Weblogic Server has many work managers configured for different types of work.  if we run out of threads in the self-tuning pool(because of system property -Dweblogic.threadpool.MaxPoolSize) due to being undersized, then important work that WLS might need to do could be starved.  So, while limiting the self-tuning would limit the default WorkManager and internally it also limits all other internal WorkManagers which WLS uses.So the best alternative is to override the default WorkManager that means creating a WorkManager for the Application and assign the WorkManager for the application instead of tuning the Default WorkManager.

    Read the article

  • Launching Ops Center 12c

    - by user12601629
    Oracle Enterprise Manager Ops Center 12c is most ambitious version of the Ops Center tooling that we've ever released. I think that make it appropriate that we launched it in grand style! When it became clear we were going to be complete with the 12c final release about this time of year, the marketing team proposed that we roll the launch of 12c into Oracle OpenWorld Tokyo.  I thought that sounded like a fine idea!  You see, I have always loved Japan.  I even studied a bit of Japanese language back in school. OpenWorld Tokyo was an outstanding even this year.  It was held in Roppongi, one of the most stylish districts in Tokyo. And, to make things even better, the Sakura (cherry blossoms) were blooming.  If you've never been in Japan for cherry blossom season, it's a must see!  Here are a couple of pics for you. Here is a picture from Roppongi, near the conference.  Here's a picture near the Imperial Palace.  A couple of friends from the local sales team took me here before my flight out. So, now back to the product launch! We choose to launch the product in John Fowler's "Engineered Systems" keynote address.  It made perfect sense because of the close ties of Ops Center to the Systems portfolio of products.  It was a packed house for the keynote.  Here's a picture I took just before we started -- there were also hundreds more people in "overflow" rooms in other parts of the venue. Here's a picture of me on stage during the launch. While there are countless new features in Ops Center 12c that customers will love, I had to limit myself to discussing just three. Mission Critical Clouds Solaris 11 Engineered Systems So, what does Mission Critical Cloud mean?  It means we've expanded EM's cloud capabilities in a couple of key areas. First, we've expanded the "self service provisioning" capabilities we have to include SPARC -- not just x86.  Now you can build clouds of Solaris Zones with ease!  Second, we've much more deeply integrated high-end storage and network management into the cloud layers.  These may our IaaS story is now much more powerful! For Solaris 11, we didn't simply port our monitoring agent to S11.  That would have been easy, but also boring! We support S11 deeply.  Full access to the power of the IPS packaging system, the new virtualized networking stack, new Zones features, the Auto Install framework.  If you're ready to try Solaris 11 then Ops Center is ready for you. Last is on the area of Engineered Systems.  These combinations of hardware and software are fast and powerful. However, we're also on a mission to make them ever easier to manage.  We've made major strides with Ops Center 12c. Manage these systems as racks, not individual components.  The new capabilities for the new engineered systems like Exalogic and SPARC SuperCluster and striking. You can read more here: Oracle Unveils Oracle Enterprise Manager Ops Center 12c So, I'll wrap this up with one final bit of fun. One of my friends from the Oracle marketing department found a super cool place to get dinner.  It's a restaurant called Gonpachi. It turns out this is the place that inspired the scene in the Quentin Taratino movie Kill Bill where Uma Thurman fights 88 Ninjas.  Here is a picture I snapped while we were there. It was surely a good time. Check it out next time you're in Tokyo.

    Read the article

  • Guest blog: A Closer Look at Oracle Price Analytics by Will Hutchinson

    - by Takin Babaei
    Overview:  Price Analytics helps companies understand how much of each sale goes into discounts, special terms, and allowances. This visibility lets sales management see the panoply of discounts and start seeing whether each discount drives desired behavior. In Price Analytics monitors parts of the quote-to-order process, tracking quotes, including the whole price waterfall and seeing which result in orders. The “price waterfall” shows all discounts between list price and “pocket price”. Pocket price is the final price the vendor puts in its pocket after all discounts are taken. The value proposition: Based on benchmarks from leading consultancies and companies I have talked to, where they have studied the effects of discounting and started enforcing what many of them call “discount discipline”, they find they can increase the pocket price by 0.8-3%. Yes, in today’s zero or negative inflation environment, one can, through better monitoring of discounts, collect what amounts to a price rise of a few percent. We are not talking about selling more product, merely about collecting a higher pocket price without decreasing quantities sold. Higher prices fall straight to the bottom line. The best reference I have ever found for understanding this phenomenon comes from an article from the September-October 1992 issue of Harvard Business Review called “Managing Price, Gaining Profit” by Michael Marn and Robert Rosiello of McKinsey & Co. They describe the outsized impact price management has on bottom line performance compared to selling more product or cutting variable or fixed costs. Price Analytics manages what Marn and Rosiello call “transaction pricing”, namely the prices of a given transaction, as opposed to what is on the price list or pricing according to the value received. They make the point that if the vendor does not manage the price waterfall, customers will, to the vendor’s detriment. It also discusses its findings that in companies it studied, there was no correlation between discount levels and any indication of customer value. I urge you to read this article. What Price Analytics does: Price analytics looks at quotes the company issues and tracks them until either the quote is accepted or rejected or it expires. There are prebuilt adapters for EBS and Siebel as well as a universal adapter. The target audience includes pricing analysts, product managers, sales managers, and VP’s of sales, marketing, finance, and sales operations. It tracks how effective discounts have been, the win rate on quotes, how well pricing policies have been followed, customer and product profitability, and customer performance against commitments. It has the concept of price waterfall, the deal lifecycle, and price segmentation built into the product. These help product and sales managers understand their pricing and its effectiveness on driving revenue and profit. They also help understand how terms are adhered to during negotiations. They also help people understand what segments exist and how well they are adhered to. To help your company increase its profits and revenues, I urge you to look at this product. If you have questions, please contact me. Will HutchinsonMaster Principal Sales Consultant – Analytics, Oracle Corp. Will Hutchinson has worked in the business intelligence and data warehousing for over 25 years. He started building data warehouses in 1986 at Metaphor, advancing to running Metaphor UK’s sales consulting area. He also worked in A.T. Kearney’s business intelligence practice for over four years, running projects and providing training to new consultants in the IT practice. He also worked at Informatica and then Siebel, before coming to Oracle with the Siebel acquisition. He became Master Principal Sales Consultant in 2009. He has worked on developing ROI and TCO models for business intelligence for over ten years. Mr. Hutchinson has a BS degree in Chemical Engineering from Princeton University and an MBA in Finance from the University of Chicago.

    Read the article

  • Oracle EMEA News Digest - May 2014

    - by Steve Walker
    Systems Oracle introduced a technology preview of an OpenStack® distribution that allows Oracle Linux and Oracle VM users to work with the open source cloud software. This provides customers with additional choices and interoperability while taking advantage of the efficiency, performance, scalability, and security of Oracle Linux and Oracle VM. The distribution is delivered as part of the Oracle Linux and Oracle VM Premier Support offerings, at no additional cost. Oracle plans to work further with the OpenStack community to develop and enhance its enterprise-class capabilities to meet customer demands. Also in the Open Source arena, Oracle announced the general availability of MySQL Fabric. MySQL Fabric provides an integrated system that makes it simpler to manage groups of MySQL databases. It delivers both high availability - via failure detection and failover - and scalability through automated data sharding. Oracle Database, Middleware and Technology The company made two announcements for Oracle Tuxedo, the #1 application server for C, C++, COBOL and Java deployments in private cloud or traditional data center environments. With enhanced management and monitoring features and tighter integration with Oracle technologies, the latest release of Oracle Tuxedo 12c enables organizations to dramatically increase application throughput, while reducing total cost of ownership and time to market for new application development and deployment. Oracle also introduced the latest release of its mainframe application rehosting platform, Oracle Tuxedo ART 12c, to help organizations speed up migration projects and accelerate the adoption of the new environment by current IT staff. It enables organizations to accelerate the rehosting of IBM mainframe applications and greatly enhance management and supportability of the rehosted applications while reducing costs and risk. Applications According to new Oracle studies, B2B and B2C commerce professionals find integrated, omni-channel customer experiences increasingly valuable to their organizations, and are continuing to invest in technologies and digital content strategies to facilitate them. The studies—one for B2B and one for B2C—surveyed e-commerce professionals in business and technology departments from around the world. Although the priorities, success metrics, and technology investments differed between the two groups, customer acquisition and retention emerged as common themes across B2B and B2C. Growing market share and enhancing customer experience are cited as top investment areas for all e-commerce professionals. In product news, Oracle announced the latest release of Oracle Business Intelligence (BI) Applications (version 11.1.1.8.1, in case anyone asks). It includes prebuilt connectors between Oracle Procurement and Spend Analytics and Oracle’s JD Edwards. Additionally, a new Oracle Human Resources Analytics module for developing and maintaining a skilled workforce has been introduced. In use at more than 4,000 companies worldwide, Oracle BI Applications support leading enterprise applications, including Oracle E-Business Suite, Oracle’s PeopleSoft, Oracle's Siebel CRM, Oracle’s JD Edwards EnterpriseOne offering high-performing analytics at a lower cost. Industries For the Communications Industry, Oracle has launched a new release of the Oracle Communications Core Session Manager. This gives CSPs a new way to design, deploy and manage complex networking services and embrace next-generation technology, It provides them with an immediate entry point for  network function virtualization (NFV) efforts, allowing them to realize immediate benefits associated with network virtualization – including increased service agility and improved network resource sharing. And for the Utilities Industry, Oracle is releasing solutions with new business features and enhanced technical architecture that help position utilities for success now and into the future. Oracle has provided new releases for its customer information system,  meter data management system, customer self-service solution and mobile workforce management solution.

    Read the article

  • Partner Webcast - Focus on Oracle Data Profiling and Data Quality 11g

    - by lukasz.romaszewski(at)oracle.com
    Normal 0 false false false EN-US X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin-top:0cm; mso-para-margin-right:0cm; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi; mso-ansi-language:RO;} Partner Webcast Focus on Oracle Data Profiling and Data Quality 11g February 24th, 12am  CET   Oracle offers an integrated suite Data Quality software architected to discover and correct today's data quality problems and establish a platform prepared for tomorrow's yet unknown data challenges. Oracle Data Profiling provides data investigation, discovery, and profiling in support of quality, migration, integration, stewardship, and governance initiatives. It includes a broad range of features that expand upon basic profiling, including automated monitoring, business-rule validation, and trend analysis. Oracle Data Quality for Data Integrator provides cleansing, standardization, matching, address validation, location enrichment, and linking functions for global customer data and operational business data. It ensures that data adheres to established standards that are adaptable to fit each organization's specific needs.  Both single - and double - byte data are processed in local languages to provide a unique and centralized view of customers, products and services.   During this in-person briefing, Data Integration Solution Specialists will be providing a technical overview and a walkthrough.   Agenda ·         Oracle Data Integration Strategy overview ·         A focus on Oracle Data Profiling and Oracle Data Quality for Data Integrator: o   Oracle Data Profiling o   Oracle Data Quality for Data Integrator o   Live demoo   Q&A Delivery Format  This FREE online LIVE eSeminar will be delivered over the Web and Conference Call. Registrations   received less than 24hours  prior to start time may not receive confirmation to attend. To register , click here. For any questions please contact [email protected]

    Read the article

  • Create a Remote Git Repository from an Existing XCode Repository

    - by codeWithoutFear
    Introduction Distributed version control systems (VCS’s), like Git, provide a rich set of features for managing source code.  Many development tools, including XCode, provide built-in support for various VCS’s.  These tools provide simple configuration with limited customization to get you up and running quickly while still providing the safety net of basic version control. I hate losing (and re-doing) work.  I have OCD when it comes to saving and versioning source code.  Save early, save often, and commit to the VCS often.  I also hate merging code.  Smaller and more frequent commits enable me to minimize merge time and effort as well. The work flow I prefer even for personal exploratory projects is: Make small local changes to the codebase to create an incrementally improved (and working) system. Commit these changes to the local repository.  Local repositories are quick to access, function even while offline, and provides the confidence to continue making bold changes to the system.  After all, I can easily recover to a recent working state. Repeat 1 & 2 until the codebase contains “significant” functionality and I have connectivity to the remote repository. Push the accumulated changes to the remote repository.  The smaller the change set, the less likely extensive merging will be required.  Smaller is better, IMHO. The remote repository typically has a greater degree of fault tolerance and active management dedicated to it.  This can be as simple as a network share that is backed up nightly or as complex as dedicated hardware with specialized server-side processing and significant administrative monitoring. XCode’s out-of-the-box Git integration enables steps 1 and 2 above.  Time Machine backups of the local repository add an additional degree of fault tolerance, but do not support collaboration or take advantage of managed infrastructure such as on-premises or cloud-based storage. Creating a Remote Repository These are the steps I use to enable the full workflow identified above.  For simplicity the “remote” repository is created on the local file system.  This location could easily be on a mounted network volume. Create a Test Project My project is called HelloGit and is located at /Users/Don/Dev/HelloGit.  Be sure to commit all outstanding changes.  XCode always leaves a single changed file for me after the project is created and the initial commit is submitted. Clone the Local Repository We want to clone the XCode-created Git repository to the location where the remote repository will reside.  In this case it will be /Users/Don/Dev/RemoteHelloGit. Open the Terminal application. Clone the local repository to the remote repository location: git clone /Users/Don/Dev/HelloGit /Users/Don/Dev/RemoteHelloGit Convert the Remote Repository to a Bare Repository The remote repository only needs to contain the Git database.  It does not need a checked out branch or local files. Go to the remote repository folder: cd /Users/Don/Dev/RemoteHelloGit Indicate the repository is “bare”: git config --bool core.bare true Remove files, leaving the .git folder: rm -R * Remove the “origin” remote: git remote rm origin Configure the Local Repository The local repository should reference the remote repository.  The remote name “origin” is used by convention to indicate the originating repository.  This is set automatically when a repository is cloned.  We will use the “origin” name here to reflect that relationship. Go to the local repository folder: cd /Users/Don/Dev/HelloGit Add the remote: git remote add origin /Users/Don/Dev/RemoteHelloGit Test Connectivity Any changes made to the local Git repository can be pushed to the remote repository subject to the merging rules Git enforces. Create a new local file: date > date.txt /li> Add the new file to the local index: git add date.txt Commit the change to the local repository: git commit -m "New file: date.txt" Push the change to the remote repository: git push origin master Now you can save, commit, and push/pull to your OCD hearts’ content! Code without fear! --Don

    Read the article

  • Seamless STP with Oracle SOA Suite

    - by user12339860
    STP stands for “Straight Through Processing”. Wikipedia describes STP as a solution that enables “the entire trade process for capital markets and payment transactions to be conducted electronically without the need for re-keying or manual intervention, subject to legal and regulatory restrictions” .I will deal with the later part of the definition i.e “payment transactions without manual intervention” in this article. The STP that I am writing about involves the interaction between a Bank and its’ corporate customers,to that extent this business case is also called “Corporate Payments”.Simply put a  Corporate Payment-STP solution needs to connect the payment transaction right from the Corporate ERP into the Bank’s Payment Hub. A SOA based STP solution can do a lot more than just process transaction. But before I get to the solution let me describe the perspectives of the two primary parties in this interaction. The Corporate customer and the Bank. Corporate's Interaction with Bank:  Typically it is the treasury department of an enterprise which interacts with the Bank on a daily basis. Here is how a day of interaction would look like from the treasury department of a corp. Corporate Cash Retrieve Beginning of day totals Monitor Cash Accounts Send or receive cash between accounts Supply chain payments Payment Settlements Calculate settlement positions Retrieve End of Day totals Assess Transaction Financial Impact Short Term Investment Desk Retrieve Current Account information Conduct Investment activities Bank’s Interaction with the Corporate :  From the Bank’s perspective, the interaction starts from the point of on boarding a corporate customer to billing the corporate for the value added services it provides. Once the corporate is on-boarded the daily interaction involves Handle the various formats of data arriving from customers Process Beginning of Day & End of Day reporting request from customers Meet compliance requirements Process Payments Transmit Payment Status Challenges with this Interaction :  Both the Bank & the Corporate face many challenges from these interactions. Some of the challenges include Keeping a consistent view of transaction data for various LOBs of the corporate & the Bank Corporate customers use different ERPs, hence the data formats are bound to be different Can the Bank’s IT systems convert the data formats that can be easily mapped to the corporate ERP How does the Bank manage the communication profiles of these customers?  Corporate customers are demanding near real time visibility on their corporate accounts Corporate customers can make better cash management decisions if they can analyse the impact. Can the Bank create opportunities to sell its products to the investment desks at corporate houses & manage their orders? How will the Bank bill the corporate customer for the value added services it provides. What does a SOA based Seamless STP solution bring to the table? Highlights of Oracle SOA based STP solution For the Corporate Customer: No Manual or Paper based banking transactions Secure Delivery of Payment data to the Bank from multiple ERPs without customization Single Portal for monitoring & administering payment transactions Rule based validation of payments Customer has data necessary for more effective handling of payment and cash management decisions  Business measurements track progress toward payment cost goals  For the Bank: Reduces time & complexity of transactions Simplifies the process of introducing new products to corporate customers Single Payment hub for all corporate ERP payments across multiple instruments New Revenue sources by delivering value added services to customers Leverages existing payment infrastructure Remove Inconsistent data formats and interchange between bank and corporate systems  Compliance and many other benefits

    Read the article

  • Exadata X3, 11.2.3.2 and Oracle Platinum Services

    - by Rene Kundersma
    Oracle recently announced an Exadata Hardware Update. The overall architecture will remain the same, however some interesting hardware refreshes are done especially for the storage server (X3-2L). Each cell will now have 1600GB of flash, this means an X3-2 full rack will have 20.3 TB of total flash ! For all the details I would like to refer to the Oracle Exadata product page: www.oracle.com/exadata Together with the announcement of the X3 generation. A new Exadata release, 11.2.3.2 is made available. New Exadata systems will be shipped with this release and existing installations can be updated to that release. As always there is a storage cell patch and a patch for the compute node, which again needs to be applied using YUM. Instructions and requirements for patching existing Exadata compute nodes to 11.2.3.2 using YUM can be found in the patch README. Depending on the release you have installed on your compute nodes the README will direct you to a particular section in MOS note 1473002.1. MOS 1473002.1 should only be followed with the instructions from the 11.2.3.2 patch README. Like with 11.2.3.1.0 and 11.2.3.1.1 instructions are added to prepare your systems to use YUM for the first time in case you are still on release 11.2.2.4.2 and earlier. You will also find these One Time Setup instructions in MOS note 1473002.1 By default compute nodes that will be updated to 11.2.3.2.0 will have the UEK kernel. Before 11.2.3.2.0 the 'compatible kernel' was used for the compute nodes. For 11.2.3.2.0 customer will have the choice to replace the UEK kernel with the Exadata standard 'compatible kernel' which is also in the ULN 11.2.3.2 channel. Recommended is to use the kernel that is installed by default. One of the other great new things 11.2.3.2 brings is Writeback Flashcache (wbfc). By default wbfc is disabled after the upgrade to 11.2.3.2. Enable wbfc after patching on the storage servers of your test environment and see the improvements this brings for your applications. Writeback FlashCache can be enabled  by dropping the existing FlashCache, stopping the cellsrv process and changing the FlashCacheMode attribute of the cell. Of course stopping cellsrv can only be done in a controlled manner. Steps: drop flashcache alter cell shutdown services cellsrv again, cellsrv can only be stopped in a controlled manner alter cell flashCacheMode = WriteBack alter cell startup services cellsrv create flashcache all Going back to WriteThrough FlashCache is also possible, but only after flushing the FlashCache: alter cell flashcache all flush Last item I like to highlight in particular is already from a while ago, but a great thing to emphasis: Oracle Platinum Services. On top of the remote fault monitoring with faster response times Oracle has included update and patch deployment services.These services are delivered by Oracle Advanced Customer Support at no additional costs for qualified Oracle Premier Support customers. References: 11.2.3.2.0 README Exadata YUM Repository Population, One-Time Setup Configuration and YUM upgrades  1473002.1 Oracle Platinum Services

    Read the article

  • Crime Scene Investigation: SQL Server

    - by Rodney Landrum
    “The packages are running slower in Prod than they are in Dev” My week began with this simple declaration from one of our lead BI developers, quickly followed by an emailed spreadsheet demonstrating that, over 5 executions, an extensive ETL process was running average 630 seconds faster on Dev than on Prod. The situation needed some scientific investigation to determine why the same code, the same data, the same schema would yield consistently slower results on a more powerful server. Prod had yet to be officially christened with a “Go Live” date so I had the time, and having recently been binge watching CSI: New York, I also had the inclination. An inspection of the two systems, Prod and Dev, revealed the first surprise: although Prod was indeed a “bigger” system, with double the amount of RAM of Dev, the latter actually had twice as many processor cores. On neither system did I see much sign of resources being heavily taxed, while the ETL process was running. Without any real supporting evidence, I jumped to a conclusion that my years of performance tuning should have helped me avoid, and that was that the hardware differences explained the better performance on Dev. We spent time setting up a Test system, similarly scoped to Prod except with 4 times the cores, and ported everything across. The results of our careful benchmarks left us truly bemused; the ETL process on the new server was slower than on both other systems. We burned more time tweaking server configurations, monitoring IO and network latency, several times believing we’d uncovered the smoking gun, until the results of subsequent test runs pitched us back into confusion. Finally, I decided, enough was enough. Hadn’t I learned very early in my DBA career that almost all bottlenecks were caused by code and database design, not hardware? It was time to get back to basics. With over 100 SSIS packages and hundreds of queries, each handling specific tasks such as file loads, bulk inserts, transforms, logging, and so on, the task seemed formidable. And yet, after barely an hour spent with Profiler, Extended Events, and wait statistics DMVs, I had a lead in the shape of a query that joined three tables, containing millions of rows, returned 3279 results, but performed 239K logical reads. As soon as I looked at the execution plans for the query in Dev and Test I saw the culprit, an implicit conversion warning on a join predicate field that was numeric in one table and a varchar(50) in another! I turned this information over to the BI developers who quickly resolved the data type mismatches and found and fixed “several” others as well. After the schema changes the same query with the same databases ran in under 1 second on all systems and reduced the logical reads down to fewer than 300. The analysis also revealed that on Dev, the ETL task was pulling data across a LAN, whereas Prod and Test were connected across slower WAN, in large part explaining why the same process ran slower on the latter two systems. Loading the data locally on Prod delivered a further 20% gain in performance. As we progress through our DBA careers we learn valuable lessons. Sometimes, with a project deadline looming and pressure mounting, we choose to forget them. I was close to giving into the temptation to throw more hardware at the problem. I’m pleased at least that I resisted, though I still kick myself for not looking at the code on day one. It can seem a daunting prospect to return to the fundamentals of the code so close to roll out, but with the right tools, and surprisingly little time, you can collect the evidence that reveals the true problem. It is a lesson I trust I will remember for my next 20 years as a DBA, if I’m ever again tempted to bypass the evidence.

    Read the article

  • World Record Siebel PSPP Benchmark on SPARC T4 Servers

    - by Brian
    Oracle's SPARC T4 servers set a new World Record for Oracle's Siebel Platform Sizing and Performance Program (PSPP) benchmark suite. The result used Oracle's Siebel Customer Relationship Management (CRM) Industry Applications Release 8.1.1.4 and Oracle Database 11g Release 2 running Oracle Solaris on three SPARC T4-2 and two SPARC T4-1 servers. The SPARC T4 servers running the Siebel PSPP 8.1.1.4 workload which includes Siebel Call Center and Order Management System demonstrates impressive throughput performance of the SPARC T4 processor by achieving 29,000 users. This is the first Siebel PSPP 8.1.1.4 benchmark supporting 29,000 concurrent users with a rate of 239,748 Business Transactions/hour. The benchmark demonstrates vertical and horizontal scalability of Siebel CRM Release 8.1.1.4 on SPARC T4 servers. Performance Landscape Systems Txn/hr Users Call Center Order Management Response Times (sec) 1 x SPARC T4-1 (1 x SPARC T4 2.85 GHz) – Web 3 x SPARC T4-2 (2 x SPARC T4 2.85 GHz) – App/Gateway 1 x SPARC T4-1 (1 x SPARC T4 2.85 GHz) – DB 239,748 29,000 0.165 0.925 Oracle: Call Center + Order Management Transactions: 197,128 + 42,620 Users: 20300 + 8700 Configuration Summary Web Server Configuration: 1 x SPARC T4-1 server 1 x SPARC T4 processor, 2.85 GHz 128 GB memory Oracle Solaris 10 8/11 iPlanet Web Server 7 Application Server Configuration: 3 x SPARC T4-2 servers, each with 2 x SPARC T4 processor, 2.85 GHz 256 GB memory 3 x 300 GB SAS internal disks Oracle Solaris 10 8/11 Siebel CRM 8.1.1.5 SIA Database Server Configuration: 1 x SPARC T4-1 server 1 x SPARC T4 processor, 2.85 GHz 128 GB memory Oracle Solaris 11 11/11 Oracle Database 11g Release 2 (11.2.0.2) Storage Configuration: 1 x Sun Storage F5100 Flash Array 80 x 24 GB flash modules Benchmark Description Siebel 8.1 PSPP benchmark includes Call Center and Order Management: Siebel Financial Services Call Center – Provides the most complete solution for sales and service, allowing customer service and telesales representatives to provide superior customer support, improve customer loyalty, and increase revenues through cross-selling and up-selling. High-level description of the use cases tested: Incoming Call Creates Opportunity, Quote and Order and Incoming Call Creates Service Request . Three complex business transactions are executed simultaneously for specific number of concurrent users. The ratios of these 3 scenarios were 30%, 40%, 30% respectively, which together were totaling 70% of all transactions simulated in this benchmark. Between each user operation and the next one, the think time averaged approximately 10, 13, and 35 seconds respectively. Siebel Order Management – Oracle's Siebel Order Management allows employees such as salespeople and call center agents to create and manage quotes and orders through their entire life cycle. Siebel Order Management can be tightly integrated with back-office applications allowing users to perform tasks such as checking credit, confirming availability, and monitoring the fulfillment process. High-level description of the use cases tested: Order & Order Items Creation and Order Updates. Two complex Order Management transactions were executed simultaneously for specific number of concurrent users concurrently with aforementioned three Call Center scenarios above. The ratio of these 2 scenarios was 50% each, which together were totaling 30% of all transactions simulated in this benchmark. Between each user operation and the next one, the think time averaged approximately 20 and 67 seconds respectively. Key Points and Best Practices No processor cores or cache were activated or deactivated on the SPARC T-Series systems to achieve special benchmark effects. See Also Siebel White Papers SPARC T4-1 Server oracle.com OTN SPARC T4-2 Server oracle.com OTN Siebel CRM oracle.com OTN Oracle Solaris oracle.com OTN Oracle Database 11g Release 2 Enterprise Edition oracle.com OTN Disclosure Statement Copyright 2012, Oracle and/or its affiliates. All rights reserved. Oracle and Java are registered trademarks of Oracle and/or its affiliates. Other names may be trademarks of their respective owners. Results as of 30 September 2012.

    Read the article

  • Oracle GoldenGate Active-Active Part 1

    - by Nick_W
    My name is Nick Wagner, and I'm a recent addition to the Oracle Maximum Availability Architecture (MAA) product management team.  I've spent the last 15+ years working on database replication products, and I've spent the last 10 years working on the Oracle GoldenGate product.  So most of my posting will probably be focused on OGG.  One question that comes up all the time is around active-active replication with Oracle GoldenGate.  How do I know if my application is a good fit for active-active replication with GoldenGate?   To answer that, it really comes down to how you plan on handling conflict resolution.  I will delve into topology and deployment in a later blog, but here is a simple architecture: The two most common resolution routines are host based resolution and timestamp based resolution. Host based resolution is used less often, but works with the fewest application changes.  Think of it like this: any transactions from SystemA always take precedence over any transactions from SystemB.  If there is a conflict on SystemB, then the record from SystemA will overwrite it.  If there is a conflict on SystemA, then it will be ignored.  It is quite a bit less restrictive, and in most cases, as long as all the tables have primary keys, host based resolution will work just fine.  Timestamp based resolution, on the other hand, is a little trickier. In this case, you can decide which record is overwritten based on timestamps. For example, does the older record get overwritten with the newer record?  Or vice-versa?  This method not only requires primary keys on every table, but it also requires every table to have a timestamp/date column that is updated each time a record is inserted or updated on the table.  Most homegrown applications can always be customized to include these requirements, but it's a little more difficult with 3rd party applications, and might even be impossible for large ERP type applications.  If your database has these features - whether it’s primary keys for host based resolution, or primary keys and timestamp columns for timestamp based resolution - then your application could be a great candidate for active-active replication.  But table structure is not the only requirement.  The other consideration applies when there is a conflict; i.e., do I need to perform any notification or track down the user that had their data overwritten?  In most cases, I don't think it's necessary, but if it is required, OGG can always create an exceptions table that contains all of the overwritten transactions so that people can be notified. It's a bit of extra work to implement this type of option, but if the business requires it, then it can be done. Unless someone is constantly monitoring this exception table or has an automated process in dealing with exceptions, there will be a delay in getting a response back to the end user. Ideally, when setting up active-active resolution we can include some simple procedural steps or configuration options that can reduce, or in some cases eliminate the potential for conflicts.  This makes the whole implementation that much easier and foolproof.  And I'll cover these in my next blog. 

    Read the article

  • Good DBAs Do Baselines

    - by Louis Davidson
    One morning, you wake up and feel funny. You can’t quite put your finger on it, but something isn’t quite right. What now? Unless you happen to be a hypochondriac, you likely drag yourself out of bed, get on with the day and gather more “evidence”. You check your symptoms over the next few days; do you feel the same, better, worse? If better, then great, it was some temporal issue, perhaps caused by an allergic reaction to some suspiciously spicy chicken. If the same or worse then you go to the doctor for some health advice, but armed with some data to share, and having ruled out certain possible causes that are fixed with a bit of rest and perhaps an antacid. Whether you realize it or not, in comparing how you feel one day to the next, you have taken baseline measurements. In much the same way, a DBA uses baselines to gauge the gauge health of their database servers. Of course, while SQL Server is very willing to share data regarding its health and activities, it has almost no idea of the difference between good and bad. Over time, experienced DBAs develop “mental” baselines with which they can gauge the health of their servers almost as easily as their own body. They accumulate knowledge of the daily, natural state of each part of their database system, and so know instinctively when one of their databases “feels funny”. Equally, they know when an “issue” is just a passing tremor. They see their SQL Server with all of its four CPU cores running close 100% and don’t panic anymore. Why? It’s 5PM and every day the same thing occurs when the end-of-day reports, which are very CPU intensive, are running. Equally, they know when they need to respond in earnest when it is the first time they have heard about an issue, even if it has been happening every day. Nevertheless, no DBA can retain mental baselines for every characteristic of their systems, so we need to collect physical baselines too. In my experience, surprisingly few DBAs do this very well. Part of the problem is that SQL Server provides a lot of instrumentation. If you look, you will find an almost overwhelming amount of data regarding user activity on your SQL Server instances, and use and abuse of the available CPU, I/O and memory. It seems like a huge task even to work out which data you need to collect, let alone start collecting it on a regular basis, managing its storage over time, and performing detailed comparative analysis. However, without baselines, though, it is very difficult to pinpoint what ails a server, just by looking at a single snapshot of the data, or to spot retrospectively what caused the problem by examining aggregated data for the server, collected over many months. It isn’t as hard as you think to get started. You’ve probably already established some troubleshooting queries of the type SELECT Value FROM SomeSystemTableOrView. Capturing a set of baseline values for such a query can be as easy as changing it as follows: INSERT into BaseLine.SomeSystemTable (value, captureTime) SELECT Value, SYSDATETIME() FROM SomeSystemTableOrView; Of course, there are monitoring tools that will collect and manage this baseline data for you, automatically, and allow you to perform comparison of metrics over different periods. However, to get yourself started and to prove to yourself (or perhaps the person who writes the checks for tools) the value of baselines, stick something similar to the above query into an agent job, running every hour or so, and you are on your way with no excuses! Then, the next time you investigate a slow server, and see x open transactions, y users logged in, and z rows added per hour in the Orders table, compare to your baselines and see immediately what, if anything, has changed!

    Read the article

  • disks not ready in array causes mdadm to force initramfs shell

    - by RaidPinata
    Okay, this is starting to get pretty frustrating. I've read most of the other answers on this site that have anything to do with this issue but I'm still not getting anywhere. I have a RAID 6 array with 10 devices and 1 spare. The OS is on a completely separate device. At boot only three of the 10 devices in the raid are available, the others become available later in the boot process. Currently, unless I go through initramfs I can't get the system to boot - it just hangs with a blank screen. When I do boot through recovery (initramfs), I get a message asking if I want to assemble the degraded array. If I say no and then exit initramfs the system boots fine and my array is mounted exactly where I intend it to. Here are the pertinent files as near as I can tell. Ask me if you want to see anything else. # mdadm.conf # # Please refer to mdadm.conf(5) for information about this file. # # by default (built-in), scan all partitions (/proc/partitions) and all # containers for MD superblocks. alternatively, specify devices to scan, using # wildcards if desired. #DEVICE partitions containers # auto-create devices with Debian standard permissions # CREATE owner=root group=disk mode=0660 auto=yes # automatically tag new arrays as belonging to the local system HOMEHOST <system> # instruct the monitoring daemon where to send mail alerts MAILADDR root # definitions of existing MD arrays # This file was auto-generated on Tue, 13 Nov 2012 13:50:41 -0700 # by mkconf $Id$ ARRAY /dev/md0 level=raid6 num-devices=10 metadata=1.2 spares=1 name=Craggenmore:data UUID=37eea980:24df7b7a:f11a1226:afaf53ae Here is fstab # /etc/fstab: static file system information. # # Use 'blkid' to print the universally unique identifier for a # device; this may be used with UUID= as a more robust way to name devices # that works even if disks are added and removed. See fstab(5). # # <file system> <mount point> <type> <options> <dump> <pass> # / was on /dev/sdc2 during installation UUID=3fa1e73f-3d83-4afe-9415-6285d432c133 / ext4 errors=remount-ro 0 1 # swap was on /dev/sdc3 during installation UUID=c4988662-67f3-4069-a16e-db740e054727 none swap sw 0 0 # mount large raid device on /data /dev/md0 /data ext4 defaults,nofail,noatime,nobootwait 0 0 output of cat /proc/mdstat Personalities : [linear] [multipath] [raid0] [raid1] [raid6] [raid5] [raid4] [raid10] md0 : active raid6 sda[0] sdd[10](S) sdl[9] sdk[8] sdj[7] sdi[6] sdh[5] sdg[4] sdf[3] sde[2] sdb[1] 23441080320 blocks super 1.2 level 6, 512k chunk, algorithm 2 [10/10] [UUUUUUUUUU] unused devices: <none> Here is the output of mdadm --detail --scan --verbose ARRAY /dev/md0 level=raid6 num-devices=10 metadata=1.2 spares=1 name=Craggenmore:data UUID=37eea980:24df7b7a:f11a1226:afaf53ae devices=/dev/sda,/dev/sdb,/dev/sde,/dev/sdf,/dev/sdg,/dev/sdh,/dev/sdi,/dev/sdj,/dev/sdk,/dev/sdl,/dev/sdd Please let me know if there is anything else you think might be useful in troubleshooting this... I just can't seem to figure out how to change the boot process so that mdadm waits until the drives are ready to build the array. Everything works just fine if the drives are given enough time to come online. edit: changed title to properly reflect situation

    Read the article

  • Something about Property Management or &hellip; the understanding of SharePoint Admins/roles ?!?

    - by Enrique Lima
    When I talk about SharePoint, for some reason it comes to my mind as if it were property management and all the tasks associated with it. So, imagine you have a lot ( a piece of land of sorts), you then decide there is something you want to do with it.  So, you make the choice of having a building built.  Now, in order to go forward with your plan, you need to check what the rules/regulations are.  Has is it been zoned residential, commercial, industrial … you get the idea.  This to me sounds like Governance.  The what am I to do given a defined set of rules. We keep on moving forward based on those rules.  And with this we start the process of building, the building process takes us to survey the land, identify what our boundaries are.  And as we go along we start getting the idea in our head as to what we will do as far as the building goes.  We identify the essentials of the building, basic services and such.  All in all, we plan.  And as with many things we do, we like solid foundations.  What a solid foundation looks like will depend on where and what we build.  The way buildings are built depends in many ways in being able to foresee the potential for natural disasters or to try to leverage the lay of the land.  Sound familiar?  We have done our Requirements Gathering. We have the building in place, we have followed the zoning rules, we have implemented services.  But we need someone to manage the building, now we move on to the human side of the story.  We want to establish a means to normalcy in the building, someone that can be the monitoring agent as to the “what’s going on?” of it.  This person will be tasked with making sure all basic services are functional, that measures are taken if there is an issue and so on.  Enter the Farm Administrator. In a way, we establish an extension of the rules to make sure the building and the apartments/offices build follow a standard set of rules too. Now, in turn you will have people leasing or buying the apartments/offices, they will be the keepers of that space.  So, now we are building sites, we have moved from having the building (farm) ready, to leasing/selling offices/apartments (site collections).  There will be someone assuming responsibility for those offices, that person will authorize or be informed about activities and also who not only gets a code into the building, but perhaps a key to the office.  Enter Site Collection Administrator.  And then perhaps we move on to the person that would be responsible for specifics within the office, for example a Human Resources Manager or Coordinator.  They will have specific control and knowledge about people.  A facilities coordinator, and so on.  I would translate that into Site Administrators. With that said then, we identify the following: Role Name Responsibility (but not limited to) Farm Administrator Infrastructure Site Collection Admin Policies for Content, Hierarchy, Recycle Bin, Security and Access Site Owner (Site Admin) Security and Access, Training, Guidance, Manage Templates All in all there are different levels of responsibility to be handled, but it is very important to understand what they are and what they mean. Here is a link to very well laid out explanation on this … http://www.endusersharepoint.com/2009/08/11/site-managers-and-end-user-expectations-roles-and-responsibilities/

    Read the article

  • Heterogeneous Datacenter Management with Enterprise Manager 12c

    - by Joe Diemer
    The following is a Guest Blog, contributed by Bryce Kaiser, Product Manager at Blue MedoraWhen I envision a perfect datacenter, it would consist of technologies acquired from a single vendor across the entire server, middleware, application, network, and storage stack - Apps to Disk - that meets your organization’s every IT requirement with absolute best-of-breed solutions in every category.   To quote a familiar motto, your datacenter would consist of "Hardware and Software, Engineered to Work Together".  In almost all cases, practical realities dictate something far less than the IT Utopia mentioned above.   You may wish to leverage multiple vendors to keep licensing costs down, a single vendor may not have an offering in the IT category you need, or your preferred vendor may quite simply not have the solution that meets your needs.    In other words, your IT needs dictate a heterogeneous IT environment.  Heterogeneity, however, comes with additional complexity. The following are two pretty typical challenges:1) No End-to-End Visibility into the Enterprise Wide Application Deployment. Each vendor solution which is added to an infrastructure may bring its own tooling creating different consoles for different vendor applications and platforms.2) No Visibility into Performance Bottlenecks. When multiple management tools operate independently, you lose diagnostic capabilities including identifying cross-tier issues with database, hung-requests, slowness, memory leaks and hardware errors/failures causing DB/MW issues. As adoption of Oracle Enterprise Manager (EM) has increased, especially since the release of Enterprise Manager 12c, Oracle has seen an increase in the number of customers who want to leverage their investments in EM to manage non-Oracle workloads.  Enterprise Manager provides a single pane of glass view into their entire datacenter.  By creating a highly extensible framework via the Oracle EM Extensibility Development Kit (EDK), Oracle has provided the tooling for business partners such as my company Blue Medora as well as customers to easily fill gaps in the ecosystem and enhance existing solutions.  As mentioned in the previous post on the Enterprise Manager Extensibility Exchange, customers have access to an assortment of Oracle and Partner provided solutions through this Exchange, which is accessed at http://www.oracle.com/goto/emextensibility.  Currently, there are over 80 Oracle and partner provided plug-ins across the EM 11g and EM 12c versions.  Blue Medora is one of those contributing partners, for which you will find 3 of our solutions including our flagship plugin for VMware.  Let's look at Blue Medora’s VMware plug-in as an example to what I'm trying to convey.  Here is a common situation solved by true visibility into your entire stack:Symptoms•    My database is bogging down, however the database appears okay internally.  Maybe it’s starved for resources?•    My OS tooling is showing everything is “OK”.  Something doesn’t add up. Root cause•    Through the VMware plugin we can see the problem is actually on the virtualization layer Solution•    From within Enterprise Manager  -- the same tool you use for all of your database tuning -- we can overlay the data of the database target, host target, and virtual machine target for a true picture of the true root cause. Here is the console view: Perhaps your monitoring conditions are more specific to your environment.  No worries, Enterprise Manager still has you covered.  With Metric Extensions you have the “Next Generation” of User-Defined Metrics, which easily bring the power of your existing management scripts into a single console while leveraging the proven Enterprise Manager framework. Simply put, Oracle Enterprise manager boasts a growing ecosystem that provides the single pane of glass for your entire datacenter from the database and beyond.  Bryce can be contacted at [email protected]

    Read the article

  • LUKOIL Overseas Holding Optimizes Oil Field Development Projects with Integrated Project Management

    - by Melissa Centurio Lopes
    Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} LUKOIL Overseas Group is a growing oil and gas company that is an integral part of the vertically integrated oil company OAO LUKOIL. It is engaged in the exploration, acquisition, integration, and efficient development of oil and gas fields outside the Russian Federation to promote transforming LUKOIL into a transnational energy company. In 2010, the company signed a 20-year development project for the giant, West Qurna 2 oil field in Iraq. Executing 10,000 to 15,000 project activities simultaneously on 14 major construction and drilling projects in Iraq for the West Qurna-2 project meant the company needed a clear picture, in real time, of dependencies between its capital construction, geologic exploration and sinking projects—required for its building infrastructure oil field development projects in Iraq. LUKOIL Overseas Holding deployed Oracle’s Primavera P6 Enterprise Project Portfolio Management to generate structured project management information and optimize planning, monitoring, and analysis of all engineering and commercial activities—such as tenders, and bulk procurement of materials and equipment—related to oil field development projects. A word from LUKOIL Overseas Holding Ltd. “Previously, we created project schedules on desktop computers and uploaded them to the project server to be merged into one big file for each project participant to access. This was not scalable, as we’ve grown and now run up to 15,000 activities in numerous projects and subprojects at any time. With Oracle’s Primavera P6 Enterprise Project Portfolio Management, we can now work concurrently on projects with many team members, enjoy absolute security, and issue new baselines for all projects and project participants once a week, with ease.” – Sergey Kotov, Head of IT and the Communication Office, LUKOIL Mid-East Ltd. Oracle Primavera Solutions: · Facilitated managing dependencies between projects by enabling the general scheduler to reschedule all projects and subprojects once a week, realigning 10,000 to 15,000 project activities that the company runs at any time · Replaced Microsoft Project and a paper-based system with a complete solution that provides structured project data · Enhanced data security by establishing project management security policies that enable only authorized project members to edit their project tasks, while enabling each project participant to view all project data that are relevant to that individual’s task · Enabled the company to monitor project progress in comparison to the projected plan, based on physical project assets to determine if each project is on track to conclude within its time and budget limitations To view the full list of solutions view here. “Oracle Gold Partner Parma Telecom was key to our successful Primavera deployment, implementing the software’s basic functionalities, such as project content, timeframes management, and cost management, in addition to performing its integration with our enterprise resource planning system and intranet portal within ten months and in accordance with budgets,” said Rafik Baynazarov, head of the master planning and control office, LUKOIL Mid-East Ltd. “ To read the full version of the customer success story, please view here.

    Read the article

  • Openmatics Revolutionizes Fleet Management with Standards-Based Vehicle Telematics Platform

    - by Michael Snow
    Openmatics s.r.o. was founded in 2010 as a subsidiary of ZF Friedrichshafen AG, a global player in driveline and chassis technology. Oracle Customer:  Openmatics s.r.o.Location:  Pilsen, Czech RepublicIndustry:  AutomotiveEmployees:  70 Its goal was to develop and operate a flexible, open telematics platform for automotive applications, which is independent from vehicle and component suppliers—recognizing that the fragmented telematics market was not meeting today’s fleet management needs. Openmatics provides a rich product portfolio, and customers can extend the platform, as required, to meet their needs. Partners and third-parties can develop their own applications using the Openmatics’ software development kit and can sell them via the Openmatics app shop.ZF Friedrichshafen AG is a global player in driveline and chassis technology. With 121 production companies and 650 service partners in 26 countries, ZF is among the top 10 largest automotive suppliers worldwide. Founded in 1915 to develop and produce transmissions for airships and vehicles, the group’s product offerings now include transmissions and steering systems as well as chassis components and complete axle systems and modules.  A word from Openmatics s.r.o.  “Oracle WebCenter Portal, together with the underlying Oracle Application Development Framework, provided the fundamental infrastructure for the Openmatics platform. Fleet managers can now reduce fuel consumption and operating costs, and more efficiently manage vehicle usage, maintenance, and safety. The standards-based platform allows third-party suppliers to deploy their own vehicle telematics services as Openmatics apps and creates a de facto standard for the automotive industry, independent from a single manufacturer or service provider.” – Gero Strobel, Head of Development, Openmatics s.r.o. Challenges Create an industry standard for vehicle telematics by establishing a customizable platform that enables access to telematics information, such as current and past fuel consumption, through a web browser to better meet automotive market and customer needs Reduce fleet-management costs by eliminating the need to invest in isolated telematics hardware and software solutions per vehicle brand and vehicle component manufacturer Establish an open platform where third-party providers—such as original equipment manufacturers (OEM), insurers, fleet operators, and individual developers—can deploy their own vehicle telematics services Allow users to purchase targeted telematics services as single apps to reduce costs and ensure rapid growth of telematics services available on the platform Enable users to configure their telematics apps with ease to make sure the platform meets individual fleet management requirements, such as analyzing past and current fuel consumption of a truck fleet Solutions Deployed Oracle WebCenter Portal as a foundation for Openmatics, a standards-based automotive telematics platform that provides next-generation fleet management with unified digital communication from and to vehicles on the move Used Oracle Application Development Framework as the development framework for Oracle WebCenter Portal’s components and services, providing developers with ready-to-use software development kits with application programming interfaces, design templates, and visual tools that accelerated time to market Used Oracle Enterprise Pack for Eclipse to simplify telematics application development in Java Enabled fleet monitoring by recording vehicle data—such as fuel consumption information—through onboard units, delivering the information to Oracle Database, and making it accessible through a customizable app portfolio on any web browser Stored vehicle telematics data—sent as encrypted information—in Oracle Database, ensuring data integrity and immediate availability for the platform’s telematics applications Enabled a wide range of telematics services suppliers, from vehicle component manufacturers to fleet application developers, to offer vehicle telematics services on the Openmatics platform, ensuring platform independence from OEMs Provided Openmatics customers with the means to individually select the automotive telematics services that are relevant to their business requirements, eliminating the need to pay for superfluous information and reducing fleet management costs Oracle Products & Services Oracle Application Development Framework Oracle WebCenter Portal Oracle SOA Suite Oracle Enterprise Pack for Eclipse Oracle Database Oracle Consulting &amp;amp;amp;amp;amp;amp;amp;&amp;amp;amp;amp;amp;lt;span id=&amp;amp;amp;amp;amp;quot;XinhaEditingPostion&amp;amp;amp;amp;amp;quot;&amp;amp;amp;amp;amp;gt;&amp;amp;amp;amp;amp;lt;/span&amp;amp;amp;amp;amp;gt;amp;&amp;amp;amp;amp;amp;amp;lt;span id=&amp;amp;amp;amp;amp;amp;quot;XinhaEditingPostion&amp;amp;amp;amp;amp;amp;quot;&amp;amp;amp;amp;amp;amp;gt;&amp;amp;amp;amp;amp;amp;lt;/span&amp;amp;amp;amp;amp;amp;gt;lt;p&amp;amp;amp;amp;amp;amp;amp;amp;gt; &amp;amp;amp;amp;amp;amp;amp;amp;lt;/p&amp;amp;amp;amp;amp;amp;amp;amp;gt;

    Read the article

  • What 5 things should SQL Server get rid of?

    - by BuckWoody
    I’ve been “tagged” by my friend Paul Randal. It’s a high-tech way of making someone else do what you want, but since it’s Paul, well, I guess I’m OK with that. He’s asked in his recent blog entry “What five things would you get rid of in SQL Server if you were in charge?” This is, of course, a delicate issue. After all, I work at Microsoft, so anything I say here might be taken as a criticism that would require action – but of course it really doesn’t. Interestingly, you may have more to do with what goes in to SQL Server than I did even as a Program Manager where I “owned” a feature. Unlike many places I’ve worked, Microsoft really does drive its products by what its users want – not every time, and not every user request, mind you, but overall I think we hit the mark pretty well. So, with all of that said, and of course the obligatory statement of “these are my own opinions, and have nothing to do with any official Microsoft position in any way, and do not reflect the opinions of other Microsoft employees or management”, here goes. 1. Get rid of SQL Server Management Studio Does that surprise you? After all, when I was a Program Manager, I actually owned the general architecture for SSMS. But those on my team probably would have been able to guess this one for you. I think that SSMS is a fine development tool. But I think that it does less of a good job for managing a system. It’s based on Visual Studio, probably one of the best development IDE’s around. And when I develop code, I really like it. But for a monitoring/management tool, I prefer a snap-in to the Microsoft Management Console (MMC). I know, the old one (prior to 3.0) was kludgy, difficult to use and program in. But that’s changed. Of course, when I bring this up, you’ll probably immediately say “But I don’t have that in XP.” And that’s one of the reasons we didn’t go there. (But I still don’t like SSMS for management.) 2. ShrinkDB I think this discussion has been done to death, so I’ll leave it at that. 3. SQL Server Agent Does that one surprise you as well? In my mind, since we ALWAYS ride on Windows, just use the task scheduler there, along with PowerShell. You could log the results in Windows logs, files, back into SQL Server, whatever. It’s just a complexity we don’t need in SQL Server. 4. SQL Server Error Logs We have a full logging setup in Windows. They’re well done, easy to understand and ubiquitous. We should just use that. 5. Several SKU’s I won’t say which, but we have a few SKU’s of SQL Server that need to go. And we need to figure out how to help you understand clearly where you need to go to Enterprise or Data Center.  Most folks are trying to push Standard edition to do things it isn’t designed to do, and then they think SQL Server won’t scale. I think we can do a better job of showing you where Standard Edition will hit the wall, and I think with fewer choices it would be pretty simple for you to pick the right one. Well, once again I’ve probably puzzled some folks and angered others. I think my work here is done. :) Back to you, Paul. Share this post: email it! | bookmark it! | digg it! | reddit! | kick it! | live it!

    Read the article

  • The Rise of Project Intelligence and Why It Matters

    - by Melissa Centurio Lopes
    Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} By Amy DeWolf Are you doing any of these in your organization? How are you leveraging historical data to forecast projects? There’s a lot going on in government today. The economic pressures agencies feel from the uncertainty of budget cuts and sequestration effect every part of an organization, including the Project Management Office (PMO).  The PMO is responsible for monitoring and administering government IT projects. As time goes on, priorities shift, technology advances, and new regulations are imposed, all of which make planning and executing projects more difficult.  For example, think about your own projects.  How many boxes do you need to check and hoops do you need to jump through to ensure you comply with new regulations? While new regulations and technology advancements can be a good thing, they add an additional layer of complexity to already complex projects. To overcome some of these pressures, particularly new regulations, many in the PMO world are adopting a new approach- Project Intelligence (PI). According to a new Oracle Primavera white paper, The Rise of Project Intelligence: When Project Management is Just Not Enough, “PI uses Business Intelligence methods to leverage historical project data to make more informed decisions and greatly enhance project execution.” Currently, project managers plan and forecast the possible phases in an execution cycle.  However, most project managers don’t have the proper tools to do this as effectively as they would like. As the white paper noted, “The underlying deficiencies in most forecasting approaches are that 1) the PM fails in most instances to leverage historical data and 2) the PM doesn’t employ current Business Intelligence tools.” PI seeks to overturn this by combining modeling tools used in Business Intelligence for projects with the understanding of Emotional Intelligence for managing people.   Simply put, Project Intelligence is built off four main pillars: Actively use historical data to forecast project cycles Understand the intricacies of complex projects Enhance social and emotional intelligence in projects Actively use Business intelligence tools Read our complimentary whitepaper and discover the importance of emotional intelligence and best practices for improving projects, specifically in terms of communication.

    Read the article

  • Mastering snow and Java development at jDays in Gothenburg

    - by JavaCecilia
    Last weekend, I took the train from Stockholm to Gothenburg to attend and present at the new Java developer conference jDays. It was professionally arranged in the Swedish exhibition hall close to the amusement park Liseberg and we got a great deal out of the top-level presenters and hallway discussions. Understanding and Improving Your Java Process Our main purpose was to spread information on JVM and our monitoring tools for Java processes, so I held a crash course in the most important terms and concepts if you want to affect the performance of your Java process. From the beginning - the JVM specification to interpretation of heap usage graphs. For correct analysis, you also need to understand something about process memory - you need space for the Java heap (-Xms for initial size and -Xmx for max heap size), but the process memory also contain the thread stacks (to a size of -Xss), JVM internal data structures used for keeping track of Java objects on the heap, method compilation/optimization, native libraries, etc. If you get long pause times, make sure to monitor your application, see the allocation rate and frequency of pause times.My colleague Klara Ward then held a presentation on the Java Mission Control product, the profiling and diagnostics tools suite for HotSpot, coming soon. The room was packed and very appreciated, Klara demonstrated four different scenarios, e.g. how to diagnose and fix latencies due to lock contention for logging.My German colleague, OpenJDK ambassador Dalibor Topic travelled to Sweden to do the second keynote on "Make the Future Java". He let us in on the coming features and roadmaps of Java, now delivering major versions on a two-year schedule (Java 7 2011, Java 8 2013, etc). Also letting us in on where to download early versions of 8, to report problems early on. Software Development in teams Being a scout leader, I'm drilled in different team building and workshop techniques, creating strong groups - of course, I had to attend Henrik Berglund's session on building successful teams. He spoke about the importance of clear goals, autonomy and agreed processes. Thomas Sundberg ended the conference by doing live remote pair programming with Alex in Rumania and a concrete tips for people wanting to try it out (for local collaboration, remember to wash and change clothes). Memory Master Keynote The conference keynote was delivered by the Swedish memory master Mattias Ribbing, showing off by remembering the order of a deck of cards he'd seen once. He made it interactive by forcing the audience to learn a memory mastering technique of remembering ten ordered things by heart, asking us to shout out the order backwards and we made it! I desperately need this - bought the book, will get back on the subject. Continuous Delivery The most impressive presenter was Axel Fontaine on Continuous Delivery. Very well prepared slides with key images of his message and moved about the stage like a rock star. The topic is of course highly interesting, how to create an infrastructure enabling immediate feedback to developers and ability to release your product several times per day. Tomek Kaczanowski delivered a funny and useful presentation on good and bad tests, providing comic relief with poorly written tests and the useful rules of thumb how to rewrite them. To conclude, we had a great time and hope to see you at jDays next year :)

    Read the article

  • Implementing Service Level Agreements in Enterprise Manager 12c for Oracle Packaged Applications

    - by Anand Akela
    Contributed by Eunjoo Lee, Product Manager, Oracle Enterprise Manager. Service Level Management, or SLM, is a key tool in the proactive management of any Oracle Packaged Application (e.g., E-Business Suite, Siebel, PeopleSoft, JD Edwards E1, Fusion Apps, etc.). The benefits of SLM are that administrators can utilize representative Application transactions, which are constantly and automatically running behind the scenes, to verify that all of the key application and technology components of an Application are available and performing to expectations. A single transaction can verify the availability and performance of the underlying Application Tech Stack in a much more efficient manner than by monitoring the same underlying targets individually. In this article, we’ll be demonstrating SLM using Siebel Applications, but the same tools and processes apply to any of the Package Applications mentioned above. In this demonstration, we will log into the Siebel Application, navigate to the Contacts View, update a contact phone record, and then log-out. This transaction exposes availability and performance metrics of multiple Siebel Servers, multiple Components and Component Groups, and the Siebel Database - in a single unified manner. We can then monitor and manage these transactions like any other target in EM 12c, including placing pro-active alerts on them if the transaction is either unavailable or is not performing to required levels. The first step in the SLM process is recording the Siebel transaction. The following screenwatch demonstrates how to record Siebel transaction using an EM tool called “OpenScript”. A completed recording is called a “Synthetic Transaction”. The second step in the SLM process is uploading the Synthetic Transaction into EM 12c, and creating Generic Service Tests. We can create a Generic Service Test to execute our synthetic transactions at regular intervals to evaluate the performance of various business flows. As these transactions are running periodically, it is possible to monitor the performance of the Siebel Application by evaluating the performance of the synthetic transactions. The process of creating a Generic Service Test is detailed in the next screenwatch. EM 12c provides a guided workflow for all of the key creation steps, including configuring the Service Test, uploading of the Synthetic Test, determining the frequency of the Service Test, establishing beacons, and selecting performance and usage metrics, just to name a few. The third and final step in the SLM process is the creation of Service Level Agreements (SLA). Service Level Agreements allow Administrators to utilize the previously created Service Tests to specify expected service levels for Application availability, performance, and usage. SLAs can be created for different time periods and for different Service Tests. This last screenwatch demonstrates the process of creating an SLA, as well as highlights the Dashboards and Reports that Administrators can use to monitor Service Test results. Hopefully, this article provides you with a good start point for creating Service Level Agreements for your E-Business Suite, Siebel, PeopleSoft, JD Edwards E1, or Fusion Applications. Enterprise Manager Cloud Control 12c, with the Application Management Suites, represents a quick and easy way to implement Service Level Management capabilities at customer sites. Stay Connected: Twitter |  Face book |  You Tube |  Linked in |  Google+ |  Newsletter

    Read the article

< Previous Page | 80 81 82 83 84 85 86 87 88 89 90 91  | Next Page >