Search Results

Search found 6716 results on 269 pages for 'distributed algorithm'.

Page 98/269 | < Previous Page | 94 95 96 97 98 99 100 101 102 103 104 105  | Next Page >

  • Another Nim's Game Variant

    - by Terry Smith
    Given N binary sequence Example : given one sequence 101001 means player 0 can only choose a position with 0 element and cut the sequence from that position {1,101,1010} player 1 can only choose a position with 1 element ans cut the sequence from that position {null,10,101000} now player 0 and player 1 take turn cutting the sequence, on each turn they can cut any one non-null sequence, if a player k can't make a move because there's no more k element on any sequence, he lose. Assume both player play optimally, who will win ? I tried to solve this problem with grundy but i'm unable to reduce the sequence to a grundy number because it both player don't have the same option to move. Can anyone give me a hint to solve this problem ?

    Read the article

  • How can I solve the Log Pile wooden puzzle with a computer program?

    - by craig1410
    Can anyone suggest how to solve the Log Pile wooden puzzle using a computer program? See here to visualise the puzzle: http://www.puzzlethis.co.uk/products/madcow/the_log_pile.htm The picture only shows some of the pieces. The full set of 10 pieces are configured as follows with 1 representing a peg, -1 representing a hole and 0 representing neither a peg nor a hole. -1,1,0,-1,0 1,0,1,0,0 1,-1,1,0,0 -1,-1,0,0,-1 -1,1,0,1,0 0,1,0,0,1 1,0,-1,0,-1 0,-1,0,1,0 0,0,-1,1,-1 1,0,-1,0,0 The pieces can be interlocked in two layers of 5 pieces each with the top layer at 90 degrees to the bottom layer as shown in the above link. I have already created a solution to this problem myself using Java but I feel that it was a clumsy solution and I am interested to see some more sophisticated solutions. Feel free to either suggest a general approach or to provide a working program in the language of your choice. My approach was to use the numeric notation above to create an array of "Logs". I then used a combination/permutation generator to try all possible arrangements of the Logs until a solution was found where all the intersections equated to zero (ie. Peg to Hole, Hole to Peg or Blank to Blank). I used some speed-ups to detect the first failed intersection for a given permutation and move on to the next permutation. I hope you find this as interesting as I have. Thanks, Craig.

    Read the article

  • Find the set of largest contiguous rectangles to cover multiple areas

    - by joelpt
    I'm working on a tool called Quickfort for the game Dwarf Fortress. Quickfort turns spreadsheets in csv/xls format into a series of commands for Dwarf Fortress to carry out in order to plot a "blueprint" within the game. I am currently trying to optimally solve an area-plotting problem for the 2.0 release of this tool. Consider the following "blueprint" which defines plotting commands for a 2-dimensional grid. Each cell in the grid should either be dug out ("d"), channeled ("c"), or left unplotted ("."). Any number of distinct plotting commands might be present in actual usage. . d . d c c d d d d c c . d d d . c d d d d d c . d . d d c To minimize the number of instructions that need to be sent to Dwarf Fortress, I would like to find the set of largest contiguous rectangles that can be formed to completely cover, or "plot", all of the plottable cells. To be valid, all of a given rectangle's cells must contain the same command. This is a faster approach than Quickfort 1.0 took: plotting every cell individually as a 1x1 rectangle. This video shows the performance difference between the two versions. For the above blueprint, the solution looks like this: . 9 . 0 3 2 8 1 1 1 3 2 . 1 1 1 . 2 7 1 1 1 4 2 . 6 . 5 4 2 Each same-numbered rectangle above denotes a contiguous rectangle. The largest rectangles take precedence over smaller rectangles that could also be formed in their areas. The order of the numbering/rectangles is unimportant. My current approach is iterative. In each iteration, I build a list of the largest rectangles that could be formed from each of the grid's plottable cells by extending in all 4 directions from the cell. After sorting the list largest first, I begin with the largest rectangle found, mark its underlying cells as "plotted", and record the rectangle in a list. Before plotting each rectangle, its underlying cells are checked to ensure they are not yet plotted (overlapping a previous plot). We then start again, finding the largest remaining rectangles that can be formed and plotting them until all cells have been plotted as part of some rectangle. I consider this approach slightly more optimized than a dumb brute-force search, but I am wasting a lot of cycles (re)calculating cells' largest rectangles and checking underlying cells' states. Currently, this rectangle-discovery routine takes the lion's share of the total runtime of the tool, especially for large blueprints. I have sacrificed some accuracy for the sake of speed by only considering rectangles from cells which appear to form a rectangle's corner (determined using some neighboring-cell heuristics which aren't always correct). As a result of this 'optimization', my current code doesn't actually generate the above solution correctly, but it's close enough. More broadly, I consider the goal of largest-rectangles-first to be a "good enough" approach for this application. However I observe that if the goal is instead to find the minimum set (fewest number) of rectangles to completely cover multiple areas, the solution would look like this instead: . 3 . 5 6 8 1 3 4 5 6 8 . 3 4 5 . 8 2 3 4 5 7 8 . 3 . 5 7 8 This second goal actually represents a more optimal solution to the problem, as fewer rectangles usually means fewer commands sent to Dwarf Fortress. However, this approach strikes me as closer to NP-Hard, based on my limited math knowledge. Watch the video if you'd like to better understand the overall strategy; I have not addressed other aspects of Quickfort's process, such as finding the shortest cursor-path that plots all rectangles. Possibly there is a solution to this problem that coherently combines these multiple strategies. Help of any form would be appreciated.

    Read the article

  • simplify expression k/m%n

    - by aaa
    hello. Simple question, is it possible to simplify (or replace division or modulo by less-expensive operation) (k/m)%n where variables are integers and operators are C style division and modulo operators. what about the case where m and n are constants (both or just one), not based 2? Thank you

    Read the article

  • Given a word, how do I get the list of all words, that differ by one letter?

    - by user187809
    Let's say I have the word "CAT". These words differ from "CAT" by one letter (not the full list) CUT CAP PAT FAT COT etc. Is there an elegant way to generate this? Obviously, one way to do it is through brute force. pseduo code: while (0 to length of word) while (A to Z) replace one letter at a time, and check if the resulting word is a valid word If I had a 10 letter word, the loop would run 26 * 10 = 260 times. Is there a better, elegant way to do this?

    Read the article

  • Finding cities close to one another using longitude and latitude

    - by Jamie
    Each user in my db is associated to a city (with it's longitude and latitude) How would I go about finding out which cities are close to one another? i.e. in England, Cambridge is fairly close to London. So If I have a user who lives in Cambridge. Users close to them would be users living in close surrounding cities, such as London, Hertford etc. Any ideas how I could go about this? And also, how would I define what is close? i.e. in the UK close would be much closer than if it were in the US as the US is far more spread out. Ideas and suggestions. Also, do you know any services that provide this sort of functionality? Thanks

    Read the article

  • Generate encoding String according to creation order.

    - by Tony
    I need to generate encoding String for each item I inserted into the database. for example: x00001 for the first item x00002 for the sencond item x00003 for the third item The way I chose to do this is counting the rows. Before I insert the third item, I count against the database, I know there're already 2 rows, so the next encoding is ended with 3. But there is a problem. If I delete the second item, the forth item will not be the x00004,but x00003. I can add additional columns to table, to store the next encoding, I don't know if there's other better solutions ?

    Read the article

  • Classical task-scheduling assignment

    - by Bruno
    I am working on a flight scheduling app (disclaimer: it's for a college project, so no code answers, please). Please read this question w/ a quantum of attention before answering as it has a lot of peculiarities :( First, some terminology issues: You have planes and flights, and you have to pair them up. For simplicity's sake, we'll assume that a plane is free as soon as the flight using it prior lands. Flights are seen as tasks: They have a duration They have dependencies They have an expected date/time for beginning Planes can be seen as resources to be used by tasks (or flights, in our terminology). Flights have a specific type of plane needed. e.g. flight 200 needs a plane of type B. Planes obviously are of one and only one specific type, e.g., Plane Airforce One is of type C. A "project" is the set of all the flights by an airline in a given time period. The functionality required is: Finding the shortest possible duration for a said project The earliest and latest possible start for a task (flight) The critical tasks, with basis on provided data, complete with identifiers of preceding tasks. Automatically pair up flights and planes, so as to get all flights paired up with a plane. (Note: the duration of flights is fixed) Get a Gantt diagram with the projects scheduling, in which all flights begin as early as possible, showing all previously referred data graphically (dependencies, time info, etc.) So the questions is: How in the world do I achieve this? Particularly: We are required to use a graph. What do the graph's edges and nodes respectively symbolise? Are we required to discard tasks to achieve the critical tasks set? If you could also recommend some algorithms for us to look up, that'd be great.

    Read the article

  • .NET Performance: Deep Recursion vs Queue

    - by JeffN825
    I'm writing a component that needs to walk large object graphs, sometimes 20-30 levels deep. What is the most performant way of walking the graph? A. Enqueueing "steps" so as to avoid deep recursion or B. A DFS (depth first search) which may step many levels deep and have a "deep" stack trace at times. I guess the question I'm asking is: Is there a performance hit in .NET for doing a DFS that causes a "deep" stack trace? If so, what is the hit? And would I better better off with some BFS by means of queueing up steps that would have been handled recursively in a DFS? Sorry if I'm being unclear. Thanks.

    Read the article

  • Result of Long Positive Integers & Search and element in array..

    - by AGeek
    Hi, I have two Questions for which I cannot find answers by googling, but I find these questions very important for preparation.. Kindly explain only the logic, I will be able to code. In Search of Efficient Logic..... in terms of Memory and Time. WAP to add two long positive integers. What Data structure / data type we can use to store the numbers and result. What is the best way to search an element from an array in shortest time. Size of the array could be large enough, and any elements could be stored in the array(i.e. no range). Thanks.

    Read the article

  • Can my tortoise vs. hare race be improved?

    - by FredOverflow
    Here is my code for detecting cycles in a linked list: do { hare = hare.next(); if (hare == back) return; hare = hare.next(); if (hare == back) return; tortoise = tortoise.next(); } while (tortoise != hare); throw new AssertionError("cyclic linkage"); Is there a way to get rid of the code duplication inside the loop? Am I right in assuming that I don't need a check after making the tortoise take a step forward? As I see it, the tortoise can never reach the end of the list before the hare (contrary to the fable). Any other ways to simplify/beautify this code?

    Read the article

  • Is there a website to lookup already common code functions?

    - by pinnacler
    I'm sitting here writing a function that I'm positive has been written before, somewhere on earth. It's just too common to have not been attempted, and I'm wondering why I can't just go to a website and search for a function that I can then copy and paste into my project in 2 seconds, instead of wasting my day reinventing the wheel. Sure there are certain libraries you can use, but where do you find these libraries and when they are absent, is there a site like I'm describing?

    Read the article

  • Using c#,c/c++ or java to improve BBN with GA

    - by madicemickael
    I have a little problem in my little project , I wish that someone here could help me! I am planning to use a bayesian network as a decision factor in my game AI and I want to improve the decision making every step of the way , anyone knows how to do that ? Any tutorials / existing implementations will be very good,I hope some of you could help me. I heard that a programmer in this community did a good implementation of this put together for poker game AI.I am planning to use it like him ,but in another poker(Texas) or maybe Rentz. Looking for C/c++ or c# or java code. Thanks , Mike

    Read the article

  • Space requirements of a merge-sort

    - by Arkaitz Jimenez
    I'm trying to understand the space requirements for a Mergesort, O(n). I see that time requirements are basically, amount of levels(logn) * merge(n) so that makes (n log n). Now, we are still allocating n per level, in 2 different arrays, left and right. I do understand that the key here is that when the recursive functions return the space gets deallocated, but I'm not seeing it too obvious. Besides, all the info I find, just states space required is O(n) but don't explain it. Any hint? function merge_sort(m) if length(m) = 1 return m var list left, right, result var integer middle = length(m) / 2 for each x in m up to middle add x to left for each x in m after middle add x to right left = merge_sort(left) right = merge_sort(right) result = merge(left, right) return result

    Read the article

  • Garbage Collection in Java

    - by simion
    On the slides I am revising from it says the following: Live objects can be identified either by maintaining a count of the number of references to each object, or by tracing chains of references from the roots. Reference counting is expensive – it needs action every time a reference changes and it doesn’t spot cyclical structures, but it can reclaim space incrementally. Tracing involves identifying live objects only when you need to reclaim space – moving the cost from general access to the time at which the GC runs, typically only when you are out of memory. I understand the principles of why reference counting is expensive but do not understand what "doesn’t spot cyclical structures, but it can reclaim space incrementally." means. Could anyone help me out a little bit please? Thanks

    Read the article

  • Fast, Vectorizable method of taking floating point number modulus of special primes?

    - by caffiend
    Is there a fast method for taking the modulus of a floating point number? With integers, there are tricks for Mersenne primes, so that its possible to calculate y = x MOD 2^31 without needing division. Can any similar tricks be applied for floating point numbers? Preferably, in a way that can be converted into vector/SIMD operations, or moved into GPGPU code. The primes I'm interested in would be 2^7 and 2^31, although if there are more efficient ones for floating point numbers, those would be welcome.

    Read the article

  • Picking apples off a tree

    - by John Retallack
    I have the following problem: I am given a tree with N apples, for each apple I am given it's weight and height. I can pick apples up to a given height H, each time I pick an apple the height of every apple is increased with U. I have to find out the maximum weight of apples I can pick. 1 = N = 100000 0 < {H, U, apples' weight and height, maximum weight} < 231 Example: N=4 H=100 U=10 height weight 82 30 91 10 93 5 94 15 The answer is 45: first pick the apple with the weight of 15 then the one with the weight of 30. Could someone help me approach this problem?

    Read the article

  • Generating different randoms valid for a day on different independent devices?

    - by Pentium10
    Let me describe the system. There are several mobile devices, each independent from each other, and they are generating content for the same record id. I want to avoid generating the same content for the same record on different devices, for this I though I would use a random and make it so too cluster the content pool based on these randoms. Suppose you have choices from 1 to 100. Day 1 Device#1 will choose for the record#33 between 1-10 Device#2 will choose for the record#33 between 40-50 Device#3 will choose for the record#33 between 50-60 Device#1 will choose for the record#55 between 40-50 Device#2 will choose for the record#55 between 1-10 Device#3 will choose for the record#55 between 10-20 Device#1 will choose for the record#11 between 1-10 Device#2 will choose for the record#22 between 1-10 Device#3 will choose for the record#99 between 1-10 Day 2 Device#1 will choose for the record#33 between 90-100 Device#2 will choose for the record#33 between 1-10 Device#3 will choose for the record#33 between 50-60 They don't have access to a central server. Data available for each of them: IMEI (unique per mobile) Date of today (same on all devices) Record id (same on all devices) What do you think, how is it possible? ps. tags can be edited

    Read the article

  • Find the centroid of a polygon with weighted vertices

    - by Calle Kabo
    Hi, I know how to find the centroid (center of mass) of a regular polygon. This assumes that every part of the polygon weighs the same. But how do I calculate the centroid of a weightless polygon (made from aerogel perhaps :), where each vertex has a weight? Simplified illustration of what I mean using straight line: 5kg-----------------5kg ^center of gravity 10kg---------------5kg ^center of gravity offset du to weight of vertices Of course, I know how to calculate the center of gravity on a straight line with weighted vertices, but how do I do it on a polygon with weighted vertices? Thanks for your time!

    Read the article

< Previous Page | 94 95 96 97 98 99 100 101 102 103 104 105  | Next Page >