  • PowerChute for VMware ESX4

    - by ITGuy24
    Hi, I am looking for a free way of installing PowerChute for VMWare. The 2.2.3 and 2.2.4 Linux versions do not support VMWare ESX even though I think prior versions did. APC is now charging $100 for the install CD which I think is a joke considering the price of our Symmetra UPS. VMWare support should be free. Edit: I see someone voted this question to be closed, so to be clear i am looking for a free and legal way of getting PowerChute support for VMWare, by either using an older version or a custom script. Also for future reference if you are voting to close a questions please leave a comment explaining why.

    Read the article

  • APC Smart UPS network shutdown issue

    - by Rob Clarke
    Here is a bit about our setup: We have 2x Smart-UPS RT 6000 XL units with network management cards We are running Powerchute from a network server Powerchute is connected to the management cards of both UPSs UPSs are set to do a graceful shutdown via Powerchute when the battery duration is under 20 minutes We also have a command file that runs with Powerchute Although our setup is redundant we do not have an equal load on each server due to APC switches for single power devices The problem is that as we do not have an equal load on each server the batteries drain at different rates. This means that the UPSs both get to the specified low battery duration at completely different times. The problem here is that UPS 1 may have run down to 5 minutes and is in desperate need of initiating a Powerchute shutdown - UPS 2 still has 25 minutes of runtime so no shutdown is initiated. Consequently UPS 1 goes down and takes all the servers with and then shuts down UPS 2 as well! What we need to happen are 1 of either 2 things: Powerchute initiates the shutdown as soon as either UPS reaches the 20 minutes low battery duration setting - and doesnt wait for both The UPS with the heavier load expends its entire battery but does not shutdown both UPSs and lets the load be switched across to the UPS that still has runtime remaining. That way when the UPS that still has runtime reaches its low battery duration it can proceed with the graceful shutdown via Powerchute. Hope that makes sense, any help is greatly appreciated!

    Read the article

  • APC Smart UPS network shutdown issue

    - by Rob Clarke
    Here is a bit about our setup: We have 2x Smart-UPS RT 6000 XL units with network management cards We are running Powerchute from a network server Powerchute is connected to the management cards of both UPSs UPSs are set to do a graceful shutdown via Powerchute when the battery duration is under 20 minutes We also have a command file that runs with Powerchute Although our setup is redundant we do not have an equal load on each server due to APC switches for single power devices The problem is that as we do not have an equal load on each server the batteries drain at different rates. This means that the UPSs both get to the specified low battery duration at completely different times. The problem here is that UPS 1 may have run down to 5 minutes and is in desperate need of initiating a Powerchute shutdown - UPS 2 still has 25 minutes of runtime so no shutdown is initiated. Consequently UPS 1 goes down and takes all the servers with and then shuts down UPS 2 as well! What we need to happen are 1 of either 2 things: Powerchute initiates the shutdown as soon as either UPS reaches the 20 minutes low battery duration setting - and doesnt wait for both The UPS with the heavier load expends its entire battery but does not shutdown both UPSs and lets the load be switched across to the UPS that still has runtime remaining. That way when the UPS that still has runtime reaches its low battery duration it can proceed with the graceful shutdown via Powerchute. Hope that makes sense, any help is greatly appreciated!

    Read the article

  • APC UPS-5000 Power off remote servers

    - by Vishal
    Hi there, I have a UPS connected via the serial port to a server using PowerChute Business Edition. If a power outage occurs I would like this server to start shutting down all other servers within the network. Is there dedicated software to do this? I was thinking of creating a command file which runs a .bat file to run shut down commands to each server (using PSExec). I can set PowerChute to run this command file when a power failure occurs. Is there not anything APC provide which has this functionality and is more efficient than writing a .bat file to do this? Thanks,

    Read the article

  • Assistance in setting up new APC Smart-UPS RT on a new VMware enviroment

    - by user38085
    I'm new to the realm of setting up a APC Smart-UPS RT 8000VA UPS with a management network card (AP9618). The project calls for the upgrade of the firmware for the network card to the newest and greatest. It also calls for the Powerchute Business Software to be installed with notifications setup per email for temperature, shutdown, and battery low. I know I'll have to use the serial cable to flash the firmware and install the software on one server 2003 box. Also on that server I'll have to install the software and setup the GUI (IP address) interface. Whats confusing the most is the whole process, and steps to use without taking down the network, which would be very bad. In flashing the firmware does it take down the UPS? Do i have to run BOOTP commands to setup the network card? Also no agents will be used on any of the VWware OS's and no SNMP trap will be used.

    Read the article

  • APCUPSD and Hyper V R2

    - by Jason Berg
    I'm about to deploy a Windows Server 2008 R2 machine with the Hyper V role. I'd like to get away from having to use a network management card with my APC UPS as I'm only shutting down 1 server (it just seems like an unneeded point of failure). I'd like to look into using apcupsd instead. Will this work properly if I use a serial connection? Have you got it working yourself? How is the SNMP monitoring? I really like being able to easily monitor my UPS with SNMP when powerchute is installed. Will I be sacrificing this completely? Is the network management card really the way to go with this? If so, why? Bonus question: Is there a better UPS out there that I should be recommending in the future?

    Read the article

  • Redundant APC UPS units, single server set up

    - by Sholom
    Hi All We have a very simple set up, looking for a very simple (reliable) solution: Setup: One Dell box with redundant power supplies running Windows 2003, plugged into two separate APC SmartUPS 1500 units (USB, no smart cards) on two separate circuits. Solution required: IF (UPS1 = Low) AND (UPS2 = Low) THEN: Shutdown gracefully ELSE: DO NOTHING!! APCUPSD only allowes for one instance (and therefore one UPS) in a windows environment. PowerChute can't do this without using APC Smart Cards which means utilizing our switch, but the switch does not have redundant power supplies, so it will only live for as long as one of the two UPS units. And no, i don't have the budget to buy two smart cards pluse a switch with redundancy ;) Thanks

    Read the article

  • How can I shut down all my Virtual Machines when my UPS kicks in?

    - by Tim
    I have a Dell T610 running ESXi4, an APC Smart UPS 1000VA and a local "console" machine running Vista and the vSphere 4 Essentials pack. A dedicated management network is in place between the T610 and the Vista machine. We have 4 VMs: SBS 2003, Server 2003 running Terminal Services, and two XP Machines. Ideally, when the UPS is forced to use battery power [for a set number minutes], I would like to gracefully shutdown all the VMs, then the ESXi, then the console machine. The latter two are not strictly a priority, but the VMs within ESXi are. Google provided lots of deprecated scripts that used to work on ESXi 3.x or similar, however I am unable to find what they were deprecated by. What do I need to be able to do this? I have Powerchute Express as supplied with the UPS, but would be willing to pay for software if required.